CN108560417A - The rapid constructing method and positioning moulding bed of guardrail - Google Patents

The rapid constructing method and positioning moulding bed of guardrail Download PDF

Info

Publication number
CN108560417A
CN108560417A CN201810506965.6A CN201810506965A CN108560417A CN 108560417 A CN108560417 A CN 108560417A CN 201810506965 A CN201810506965 A CN 201810506965A CN 108560417 A CN108560417 A CN 108560417A
Authority
CN
China
Prior art keywords
moulding bed
guardrail
embedded bar
bar
positioning moulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810506965.6A
Other languages
Chinese (zh)
Other versions
CN108560417B (en
Inventor
谢马贤
陈传磊
刘怀刚
高世强
肖向荣
彭寄望
赵升辉
陶坡
吴曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201810506965.6A priority Critical patent/CN108560417B/en
Publication of CN108560417A publication Critical patent/CN108560417A/en
Application granted granted Critical
Publication of CN108560417B publication Critical patent/CN108560417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention provides a kind of positioning moulding bed of guardrail embedded bar, includes the pedestal of lengthwise, one or more groups of to be set on the pedestal and along vertical bridge to the Horizontal limiting portion of extension, and the vertical spacing portion that Horizontal limiting portion at least a side described in every group is laid;The longitudinal axis of the pedestal and vertical bridge are to parallel;Wherein, the Horizontal limiting portion includes spacer bar;The vertical spacing portion is fixed on the pedestal, and the side in the vertical spacing portion towards the Horizontal limiting portion opens up several limiting slots.The present invention also provides a kind of construction methods of guardrail, use the positioning moulding bed of above-mentioned guardrail embedded bar.The present invention, which positions moulding bed, improves the linear of embedded bar so that guardrail construction is not easy affected by environment.The guardrail construction method of the present invention makes embedded bar installation and beam reinforced steel bar installation that can be carried out at the same time, and continuous productive process is adjusted to parallel operations, improves construction efficiency.

Description

The rapid constructing method and positioning moulding bed of guardrail
【Technical field】
The present invention relates to the rapid constructing methods of the cast-in-place guardrail technical field of construction of bridge more particularly to a kind of guardrail and fixed Position moulding bed.
【Background technology】
In the cast-in-place guardrail work progress of traditional bridge, embedded bar is controlled by bracing wire control methods often in Embedment Construction Bar spacing and linear.
However, bracing wire control methods have the shortcomings that it is following:First, the line drawn is easy, by wind effect, to apply when wind-force is excessive Work is difficult to carry out;Second, roof steel bar is trampled or the touching of other embedded bars also results in drawn line and walks, Jin Erzao At pre-buried linear and spacing, there are relatively large deviations.Thus, which reinforcing bar can not when bracing wire control methods will cause follow-up guardrail to be constructed It is installed in place, influences guardrail protective layer, can also cause cracking phenomena, influence guardrail service life.In addition, traditional embedded bar Construction need to again be installed after in beam reinforced steel bar, installation is complete, substantially prolong construction period.
Therefore, it is necessary to provide a kind of positioning moulding bed that improvement guardrail embedded bar is linear and a kind of raising construction effect The guardrail construction method of rate.
【Invention content】
The purpose of the present invention is to provide a kind of positioning moulding beds that improvement guardrail embedded bar is linear.
To realize that the purpose, the present invention adopt the following technical scheme that:
A kind of positioning moulding bed of guardrail embedded bar, includes the pedestal of lengthwise, it is one or more groups of be set on the pedestal and Along indulging Horizontal limiting portion of the bridge to extension, and the vertical spacing portion that at least a side of the Horizontal limiting portion described in every group is laid; The longitudinal axis of the pedestal and vertical bridge are to parallel;
Wherein, the Horizontal limiting portion includes spacer bar;The vertical spacing portion is fixed on the pedestal, described perpendicular Several limiting slots are opened up to the side in limiting section towards the Horizontal limiting portion.
Preferably, the positioning moulding bed is set to positioned tire equipped with Horizontal limiting portion described in two groups, the vertical spacing portion Direction across bridge both sides of frame and along the parallel laying of the longitudinal axis of pedestal.
Preferably, the Horizontal limiting portion further includes the support pad set on the spacer bar bottom.
Preferably, the positioning moulding bed indulges bridge and is equipped with positioning plate to the both sides of axis, and the both ends in the vertical spacing portion are logical Dismountable connection type is crossed to be fixed on the positioning plate.
Preferably, the vertical spacing portion includes edge-on channel steel, and the opening direction of the channel steel is backwards to the horizontal limit Position portion.
Preferably, the limiting slot is the notch to match with the embedded bar gabarit.
Preferably, it is equipped with handle at the top of the vertical spacing portion.
Preferably, the upper surface of the pedestal is equipped with transporting supports.
Preferably, the bottom of the pedestal is equipped with supporting leg.
Another object of the present invention is to provide a kind of guardrail construction methods improving construction efficiency.
To realize that the purpose, the present invention adopt the following technical scheme that:
A kind of construction method of guardrail, the guardrail include embedded bar and are followed by reinforcing bar, use above-mentioned guardrail pre-buried The positioning moulding bed of reinforcing bar, the construction method of the guardrail include the following steps:
Set up the positioning moulding bed;
The embedded bar is installed according to the preset position in Horizontal limiting portion and vertical spacing portion, and with positioning The spacer bar of moulding bed links into an integrated entity, to form pre-buried skeleton;
The pre-buried skeleton is transported to specified installation site from positioning moulding bed;
It is followed by reinforcing bar described in the installation of position in plugging into for the pre-buried skeleton, to complete the construction of guardrail.
Preferably, the embedded bar includes close vertical first embedded bar of the bridge to axis side, and set on described By first embedded bar and far from vertical second embedded bar of the bridge to axis side.
Preferably, the embedded bar is installed according to the preset position in Horizontal limiting portion and vertical spacing portion, and And link into an integrated entity with the spacer bar of positioning moulding bed, to form pre-buried skeleton the step of specifically includes:
The embedded bar of first embedded bar/second is mounted on by limiting slot in vertical spacing portion, while by institute The bottom for stating the embedded bar of the first embedded bar/second is fixedly connected with the spacer bar of positioning moulding bed.
Preferably, before the pre-buried skeleton being transported to specified installation site from positioning moulding bed, further include:
All vertical spacing portions are removed from positioning moulding bed respectively.
Preferably, before the pre-buried skeleton being transported to specified installation site from positioning moulding bed, further include:
Beam reinforced steel bar is installed in installed position.
Compared with prior art, the present invention has following advantage:
1. vertical limiting section of the present invention positioning moulding bed by the way that Horizontal limiting portion is arranged and equipped with limiting slot, while in level Limiting section be arranged spacer bar, built-in fitting preliminarily formed after being connected as one with spacer bar it is simple in structure, be easily installed and tear open The framework of steel reinforcement unloaded can be fixed temporarily embedded bar, improve the linear of embedded bar so that guardrail construction is not easy by environment It influences.
2. bottom of the spacer bar in present invention positioning moulding bed in addition to embedded bar can be fixed, additionally it is possible to as box beam top The longitudinal reinforcement of plate, embedded bar walks caused by roof steel bar can be effectively prevent to be trampled.
3. the positioning moulding bed of the present invention can set multigroup Horizontal limiting portion and vertical spacing portion, it is multigroup to can be achieved at the same time guardrail The installation of embedded bar.
4. the guardrail construction method of the present invention is used embedded bar being made after pre-buried skeleton and be installed again, without waiting for beam slab Embedded bar construction is carried out again after the completion of reinforcement installation so that embedded bar is installed and beam reinforced steel bar installation can be carried out at the same time, will Continuous productive process is adjusted to parallel operations, substantially increases construction efficiency.
【Description of the drawings】
Fig. 1 is a kind of structural schematic diagram of an exemplary embodiments of the positioning moulding bed of guardrail embedded bar of the present invention;
Fig. 2 is a kind of structural schematic diagram of another embodiment of the positioning moulding bed of guardrail embedded bar of the present invention;
Fig. 3 is a kind of structural schematic diagram of another embodiment of the positioning moulding bed of guardrail embedded bar of the present invention;
Fig. 4 is a kind of structural schematic diagram of another embodiment of the positioning moulding bed of guardrail embedded bar of the present invention;
Fig. 5 is the composed structure schematic diagram of guardrail in a kind of construction method of guardrail of the present invention.
【Specific implementation mode】
The present invention is further described with exemplary embodiment below in conjunction with the accompanying drawings, identical label wherein in attached drawing All refer to identical component.In addition, if the detailed description of known technology is for showing the invention is characterized in that unnecessary , then it omits it.
Embodiment 1
Referring to Fig. 1, a kind of positioning moulding bed 1 of guardrail embedded bar includes the pedestal 10 of lengthwise, and two are mounted on the pedestal To the Horizontal limiting portion 11 of extension on 10 and along vertical bridge, and 11 side of Horizontal limiting portion described in every group corresponds to two groups laid Vertical spacing portion 12.Wherein, after positioning moulding bed 1 is installed, the longitudinal axis of pedestal 10 and vertical bridge are to parallel.Specifically, described Vertical spacing portion 12 is set to the direction across bridge both sides of institute's positioning moulding bed 1 and along the parallel laying of the longitudinal axis of pedestal 10, the pedestal The pre-buried backbone length that 10 length and the length in vertical spacing portion 12 can be installed as needed is adjusted.The vertical spacing Portion 12 is set to the both sides of positioning 1 direction across bridge of moulding bed, so as to the dismounting and carrying of pre-buried skeleton.
The Horizontal limiting portion 11 includes two spaced spacer bars 111, and the both ends of the spacer bar 111 are taken On the pedestal 10.The vertical spacing portion 12 includes the edge-on channel steel 121 being fixed on the pedestal 10, the channel steel 121 opening direction is backwards to the Horizontal limiting portion 11, side of the vertical spacing portion 12 towards the Horizontal limiting portion 11 Open up several limiting slots (not shown).Preferably, the limiting slot is the notch to match with 2 gabarit of the embedded bar, institute It states and is equipped with limiting slot to spacing according to certain vertical bridge on channel steel 121, the limit separation in two groups of vertical spacing portions 12 is equal, with Just the correspondence between two groups of embedded bars 2 is controlled, basis is provided for the accurate installation of follow-up embedded bar 2.In addition, passing through Limiting slot is arranged on channel steel 121 to limit embedded bar 2 so that the positioning of embedded bar 2 is more stablized, and is not easy by day Gas influences.
The pedestal 10 includes several short channel-section steels (not shown) along direction across bridge setting, and several short channel-section steels pass through fixation In 11 bottom of Horizontal limiting portion, fixed frame is collectively formed with Horizontal limiting portion 11.The upper surface of the pedestal 10, which is additionally provided with, removes Holder 14 is transported, which is that several round steel erect and be laterally arranged set up the frame bracket to be formed.It is carried Holder 14 is set to the middle part of positioning moulding bed 1, and impetus is provided for whole carry of positioning moulding bed 1.The bottom of the pedestal 10 is set There is supporting leg 101, to adjust the height for positioning moulding bed 1 to the height of suitable construction, improves construction efficiency.
Between the Horizontal limiting portion 11 and pedestal 10, using the side of welding between the vertical spacing portion 12 and pedestal 10 Formula connects.It can also be by bolting or hinged mode connects between the vertical spacing portion 12 and pedestal 10, both the above connects The mode of connecing is easily installed and dismantles, and need not cut weldering after the use of positioning moulding bed 1, not damaged to positioning moulding bed 1, also allows for Position 1 subsequent recycling of moulding bed.After the installation for completing embedded bar 2, successively to the vertical spacing portion 12 and pedestal It carries out cutting weldering or dismounting between 10, carry out between the Horizontal limiting portion 11 and pedestal 10 cutting weldering, by the vertical spacing portion After 12 remove from positioning moulding bed 1, the pre-buried skeleton that embedded bar 2 and spacer bar 111 form is transported to specified installation Position.Bottom of the spacer bar 111 in addition to that can fix embedded bar 2 can also be used as box beam top plate after installing to guard rail position Longitudinal reinforcement, embedded bar 2 walks caused by roof steel bar can be effectively prevent to be trampled.
The present invention position moulding bed 1 step of setting up be:Using several isometric short channel-section steels formation is placed to alignment along bridge is indulged Open Side Down for pedestal 10, wherein short channel-section steel;Two groups of spacer bars 111 are erected in short channel-section steel successively, are welded after adjusting position Fixation is connect, the interim moulding bed that Horizontal limiting portion 11 is formed with pedestal 10 is formed;Interim moulding bed is inverted, and is welded in 10 bottom of pedestal Connect supporting leg 101 more than two;It is set up to direction along vertical bridge in 10 end face of pedestal using several settings and the round steel being laterally arranged Transporting supports 14;Finally, the installation site in adjustment vertical spacing portion 12 after connecting in vertical spacing portion 12 with pedestal 10, is formed Position moulding bed 1.
The composition material that the present invention positions moulding bed 1 utilizes building site current material, rigidity to meet construction requirement, additionally may be used Multigroup Horizontal limiting portion 11 and vertical spacing portion 12 are set simultaneously according to actual conditions, can be achieved at the same time the multigroup pre-buried steel of guardrail The installation of muscle 2.
The present invention positions moulding bed 1 by setting Horizontal limiting portion 11 and the vertical limiting section 12 equipped with limiting slot, while Spacer bar 111 is arranged in Horizontal limiting portion 11, and embedded bar 2 preliminarily forms structure letter after being connected as one with spacer bar 111 Framework of steel reinforcement that is single, being easily installed and dismantle, can be fixed temporarily embedded bar 2, improve the linear of embedded bar 2 so that Guardrail construction is not easy to be influenced by weather.Learnt according to the field conduct effect of positioning moulding bed 1, embedded bar is linear obtained it is excellent Change, and often can save duration half a day across the box beam of 50m.
Embodiment 2
Referring to Fig. 2, compared with Example 1, difference lies in described for the positioning moulding bed 1 of guardrail embedded bar in embodiment 2 Horizontal limiting portion 11 includes spacer bar 111, and the support pad 112 set on 111 bottom of spacer bar.The support pad 112 is slot Steel, the channel steel it is opening down.A part of the channel steel as Horizontal limiting portion 11 increases embedded bar 2 and level Contact area between limiting section 11, embedded bar 2 can also be welded on support pad 112 other than being fixed with spacer bar 111 On, it so, it is possible to reinforce the connection between embedded bar 2 and Horizontal limiting portion 11 significantly, realize strong fix.
In addition, 12 top of the vertical spacing portion is additionally provided with handle 122, the handle 122 is that several round steel set up shape At frame.By helping the handle 122, convenient for cut postwelding quickly by the vertical spacing portion 12 from positioning moulding bed 1 on remove Under, without etc. the heat that vertical spacing portion 12 generates during weldering to be cut disperse after can carry.
Embodiment 3
Referring to Fig. 3, compared with Example 2, difference lies in described for the positioning moulding bed 1 of guardrail embedded bar in embodiment 3 Positioning moulding bed 1 indulges bridge and positioning plate 13 is fixedly installed to the both sides of axis, and the both ends in the vertical spacing portion 12 pass through dismountable Connection type is fixed on the positioning plate 13.Specifically, positioning plate 13 is rectangular steel plates, and the both ends in vertical spacing portion 12 pass through Be fixedly welded on the positioning plate 13, to be fixed on the positioning moulding bed 1, positioning plate 13 as vertical spacing portion 12 with The contact site for positioning moulding bed 1, compared with directly vertical spacing portion 12 is welded on pedestal 10, welding is more convenient, more Material-saving has been also convenient for cutting weldering by being welded between vertical spacing portion 12 and positioning plate 13.
Embodiment 4
Referring to Fig. 4, positioning moulding bed 1 can flexibly be adjusted according to the embedded bar quantity of guardrail, with 1 phase of embodiment Than difference lies in including one be mounted on the pedestal 10 and along vertical the positioning moulding bed 1 of guardrail embedded bar in embodiment 4 Bridge to the Horizontal limiting portion 11 of extension, and 11 side of Horizontal limiting portion lay vertical spacing portion 12.
Embodiment 5
A kind of construction method of guardrail, referring to Fig. 1-5, which includes embedded bar 2 and is followed by reinforcing bar 3, is used The positioning moulding bed 1 for the guardrail embedded bar stated, the construction method of the guardrail include the following steps:
Set up the positioning moulding bed 1;
The embedded bar 2 is installed according to Horizontal limiting portion 11 and 12 preset position of vertical spacing portion, and It links into an integrated entity with the spacer bar 111 of positioning moulding bed 1, to form pre-buried skeleton;
The pre-buried skeleton is transported to specified installation site from positioning moulding bed 1;
It is followed by reinforcing bar 3 described in the installation of position in plugging into for the pre-buried skeleton, to complete the construction of guardrail.
Wherein, the embedded bar 2 includes close vertical first embedded bar 21 of the bridge to axis side, and set on described First embedded bar, 21 side and separate vertical second embedded bar 22 of the bridge to axis side.
The embedded bar 2 is installed according to Horizontal limiting portion 11 and 12 preset position of vertical spacing portion, and It links into an integrated entity with the spacer bar 111 of positioning moulding bed 1, to form pre-buried skeleton the step of specifically includes:Successively by described One embedded bar 21, the second embedded bar 22 are mounted on by limiting slot in vertical spacing portion 12, while pre-buried by described first Reinforcing bar 21, the second embedded bar 22 bottom be welded on positioning moulding bed 1 spacer bar 111 on.
Preferably, before the pre-buried skeleton being transported to specified installation site from positioning moulding bed 1, further include:To perpendicular To carrying out cutting weldering between limiting section 12 and pedestal 10, and vertical spacing portion 12 is removed from positioning moulding bed 1.Again to the level It carries out cutting weldering between limiting section 11 and pedestal 10, pre-buried skeleton is moved away from from positioning moulding bed 1 and is put into storage area.
Preferably, before the pre-buried skeleton being transported to specified installation site from positioning moulding bed 1, further include:Pacifying Beam reinforced steel bar 4 is installed at holding position.
The beam reinforced steel bar 4 is for being fixed on two reinforcing bars that direction across bridge is in same level, specifically, beam reinforced steel bar 4 be used as reference, can make the first embedded bar 21 for belonging to same level and the second embedded bar 22 by respectively with beam slab Reinforcing bar 4 is attached to realize the accurate positionin of embedded bar 2.
The guardrail construction method of the present invention is used embedded bar 2 being made after pre-buried skeleton and be installed again, without waiting for beam slab Reinforcing bar 4 carries out the construction of embedded bar 2 after installation is complete again so that embedded bar 2 install and the installation of beam reinforced steel bar 4 can simultaneously into Row, is adjusted to parallel operations by continuous productive process, substantially increases construction efficiency.
Although having been illustrated with some exemplary embodiments of the present invention above, those skilled in the art will manage Solution, in the case where not departing from the principle of the present invention or spirit, can make a change these exemplary embodiments, of the invention Range is limited by claim and its equivalent.

Claims (14)

1. a kind of positioning moulding bed of guardrail embedded bar, which is characterized in that the pedestal including lengthwise, it is one or more groups of set on described To the Horizontal limiting portion of extension on pedestal and along vertical bridge, and at least a side of the Horizontal limiting portion described in every group lay it is vertical Limiting section;The longitudinal axis of the pedestal and vertical bridge are to parallel;
Wherein, the Horizontal limiting portion further includes spacer bar;The vertical spacing portion is fixed on the pedestal, described vertical The side in limiting section towards the Horizontal limiting portion opens up several limiting slots.
2. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the positioning moulding bed is equipped with two The group Horizontal limiting portion, the vertical spacing portion are set to the direction across bridge both sides of institute's positioning moulding bed and are put down along the longitudinal axis of pedestal Row is laid.
3. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the Horizontal limiting portion is also wrapped Include the support pad set on the spacer bar bottom.
4. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the positioning moulding bed indulge bridge to The both sides of axis are equipped with positioning plate, and the positioning plate is fixed in the both ends in the vertical spacing portion by dismountable connection type On.
5. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the vertical spacing portion includes Edge-on channel steel, the opening direction of the channel steel is backwards to the Horizontal limiting portion.
6. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the limiting slot be with it is described The notch that embedded bar gabarit matches.
7. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that at the top of the vertical spacing portion Equipped with handle.
8. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the upper surface of the pedestal is set There are transporting supports.
9. the positioning moulding bed of guardrail embedded bar according to claim 1, which is characterized in that the bottom of the pedestal is equipped with Supporting leg.
10. a kind of construction method of guardrail, which includes embedded bar and is followed by reinforcing bar, which is characterized in that it is used such as power Profit requires the positioning moulding bed of 1-9 any one of them guardrail embedded bars, the construction method of the guardrail to include the following steps:
Set up the positioning moulding bed;
The embedded bar is installed according to the preset position in Horizontal limiting portion and vertical spacing portion, and with positioning moulding bed Spacer bar link into an integrated entity, to form pre-buried skeleton;
The pre-buried skeleton is transported to specified installation site from positioning moulding bed;
It is followed by reinforcing bar described in the installation of position in plugging into for the pre-buried skeleton, to complete the construction of guardrail.
11. the construction method of guardrail according to claim 10, which is characterized in that the embedded bar includes close to vertical bridge To the first embedded bar of axis side, and to the second of axis side by first embedded bar and far from vertical bridge Embedded bar.
12. the construction method of guardrail according to claim 11, which is characterized in that limit the embedded bar according to level Position portion and vertical spacing portion are installed preset position, and are linked into an integrated entity with the spacer bar of positioning moulding bed, to be formed The step of pre-buried skeleton, specifically includes:
The embedded bar of first embedded bar/second is mounted on by limiting slot in vertical spacing portion, while by described the The bottom of the embedded bar of one embedded bar/second is fixedly connected with the spacer bar of positioning moulding bed.
13. the construction method of guardrail according to claim 10, which is characterized in that by the pre-buried skeleton from positioning moulding bed It is transported to before specified installation site, further includes:
All vertical spacing portions are removed from positioning moulding bed respectively.
14. the construction method of guardrail according to claim 10, which is characterized in that by the pre-buried skeleton from positioning moulding bed It is transported to before specified installation site, further includes:
Beam reinforced steel bar is installed in installed position.
CN201810506965.6A 2018-05-24 2018-05-24 Quick construction method and positioning jig frame for guardrail Active CN108560417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810506965.6A CN108560417B (en) 2018-05-24 2018-05-24 Quick construction method and positioning jig frame for guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810506965.6A CN108560417B (en) 2018-05-24 2018-05-24 Quick construction method and positioning jig frame for guardrail

Publications (2)

Publication Number Publication Date
CN108560417A true CN108560417A (en) 2018-09-21
CN108560417B CN108560417B (en) 2024-02-06

Family

ID=63539632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810506965.6A Active CN108560417B (en) 2018-05-24 2018-05-24 Quick construction method and positioning jig frame for guardrail

Country Status (1)

Country Link
CN (1) CN108560417B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110539099A (en) * 2019-09-27 2019-12-06 中交第一航务工程局有限公司 adjustable jig frame for positioning precast beam guardrail reinforcing steel bars and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038419A (en) * 2000-07-21 2002-02-06 Sanken Steel:Kk Steel-made wall handrail and installing method of steel- made wall handrail
KR20060128805A (en) * 2006-11-24 2006-12-14 전영총 Pc structure for a falling of a bridge and manufacturing method thereof
CN204001776U (en) * 2014-07-25 2014-12-10 中国建筑第六工程局有限公司 Cast-in-place anticollision barrier reinforcing bar location moulding bed
CN204076497U (en) * 2014-07-28 2015-01-07 中国建筑第六工程局有限公司 A kind of prefabricated case beam reinforcing bar binding location moulding bed
JP2015071907A (en) * 2013-10-03 2015-04-16 株式会社奥村組 Mounting structure of concrete wall railing
CN204955097U (en) * 2015-09-28 2016-01-13 中铁上海工程局集团有限公司 Prefabricated T web reinforcing bar bed -jig
CN105603917A (en) * 2015-12-23 2016-05-25 广东冠粤路桥有限公司 Jig frame for making guardrail rebars and construction method of guardrail
CN205501835U (en) * 2016-03-17 2016-08-24 中国建筑第六工程局有限公司 A positioner for anticollision barrier embedded bar
CN206396633U (en) * 2016-12-23 2017-08-11 中国水利水电第五工程局有限公司 A kind of bridge assembled steel anticollision barrier
CN107386119A (en) * 2017-07-26 2017-11-24 中交公局第二工程有限公司 A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device
CN206986719U (en) * 2017-05-10 2018-02-09 中国水利水电第五工程局有限公司 A kind of bridge floor anti-collision wall reinforcing bar positioning installation apparatus
CN208379436U (en) * 2018-05-24 2019-01-15 中交路桥华南工程有限公司 The positioning moulding bed of guardrail embedded bar

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038419A (en) * 2000-07-21 2002-02-06 Sanken Steel:Kk Steel-made wall handrail and installing method of steel- made wall handrail
KR20060128805A (en) * 2006-11-24 2006-12-14 전영총 Pc structure for a falling of a bridge and manufacturing method thereof
JP2015071907A (en) * 2013-10-03 2015-04-16 株式会社奥村組 Mounting structure of concrete wall railing
CN204001776U (en) * 2014-07-25 2014-12-10 中国建筑第六工程局有限公司 Cast-in-place anticollision barrier reinforcing bar location moulding bed
CN204076497U (en) * 2014-07-28 2015-01-07 中国建筑第六工程局有限公司 A kind of prefabricated case beam reinforcing bar binding location moulding bed
CN204955097U (en) * 2015-09-28 2016-01-13 中铁上海工程局集团有限公司 Prefabricated T web reinforcing bar bed -jig
CN105603917A (en) * 2015-12-23 2016-05-25 广东冠粤路桥有限公司 Jig frame for making guardrail rebars and construction method of guardrail
CN205501835U (en) * 2016-03-17 2016-08-24 中国建筑第六工程局有限公司 A positioner for anticollision barrier embedded bar
CN206396633U (en) * 2016-12-23 2017-08-11 中国水利水电第五工程局有限公司 A kind of bridge assembled steel anticollision barrier
CN206986719U (en) * 2017-05-10 2018-02-09 中国水利水电第五工程局有限公司 A kind of bridge floor anti-collision wall reinforcing bar positioning installation apparatus
CN107386119A (en) * 2017-07-26 2017-11-24 中交公局第二工程有限公司 A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device
CN208379436U (en) * 2018-05-24 2019-01-15 中交路桥华南工程有限公司 The positioning moulding bed of guardrail embedded bar

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李斐;: "预制箱梁胎架(定位)施工工法", 四川水泥, no. 06, pages 232 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110539099A (en) * 2019-09-27 2019-12-06 中交第一航务工程局有限公司 adjustable jig frame for positioning precast beam guardrail reinforcing steel bars and construction method thereof
CN110539099B (en) * 2019-09-27 2024-03-12 中交第一航务工程局有限公司 Adjustable jig frame for positioning reinforcement bars of precast beam guardrails and construction method of adjustable jig frame

Also Published As

Publication number Publication date
CN108560417B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
JP5047680B2 (en) Construction method of continuous viaduct
CN104806011B (en) Raft board post poured band formwork for placing
CN110306788A (en) Roof board post poured band bottom formwork erecting structure and its construction method
CN108149577B (en) A kind of steel bracket system and its installation method
CN201400996Y (en) Construction frame of post-pouring flange plate
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN108560417A (en) The rapid constructing method and positioning moulding bed of guardrail
US3689019A (en) Apparatus for shuttering poured concrete structures
CN208379436U (en) The positioning moulding bed of guardrail embedded bar
CN108343252A (en) Dismantled and assembled adjustable multipurpose wall moulding bed
CN102936958A (en) Construction method for positioning upper reinforcements of concrete floor slab by using tool type supports
CN108708292A (en) A kind of I-shaped steel reinforced concrete combination beam concrete folding constructing device and construction method
CN208039865U (en) A kind of dismantled and assembled adjustable multipurpose wall moulding bed
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN211571419U (en) Supporting and reinforcing device for side beam overhanging bridge deck template
CN110539099B (en) Adjustable jig frame for positioning reinforcement bars of precast beam guardrails and construction method of adjustable jig frame
CN208615041U (en) A kind of prefabricated case beam door rebar positioning bogie
CN208167715U (en) A kind of navigation channel bored concrete pile operation platform
CN214168757U (en) Road and bridge rail guard
CN219490689U (en) Main arch ring adjustable arch frame
CN110331647A (en) Urban track traffic bondbeam and its construction method
CN215848856U (en) Binding jig frame for prefabricated box girder steel reinforcement framework
CN205134912U (en) A bed -jig for making open string roof beam
CN220685792U (en) Adjustable temporary supporting device
CN214424046U (en) Prefabricated T beam web reinforcing bar positioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant