CN108540378A - A kind of method of industry things-internet gateway ladder power saving - Google Patents
A kind of method of industry things-internet gateway ladder power saving Download PDFInfo
- Publication number
- CN108540378A CN108540378A CN201810371932.5A CN201810371932A CN108540378A CN 108540378 A CN108540378 A CN 108540378A CN 201810371932 A CN201810371932 A CN 201810371932A CN 108540378 A CN108540378 A CN 108540378A
- Authority
- CN
- China
- Prior art keywords
- data
- gateway
- battery
- electricity
- power saving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/66—Arrangements for connecting between networks having differing types of switching systems, e.g. gateways
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/4207—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells for several batteries or cells simultaneously or sequentially
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/48—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
- H01M10/482—Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Selective Calling Equipment (AREA)
Abstract
The invention belongs to industrial gateway control fields, and it discloses a kind of methods of industrial things-internet gateway ladder power saving, include the following steps:Step 1:Battery is set in electricity as the time interval Tx of the data collection in the cycle of operation of the Wx~Wx 1 and required time Ta of data of collection;Wherein, the power in gateway when collecting data is P, and power when interval of the gateway between data collection twice is Ps;Step 2:In the case that the gateway is using battery powered, the electricity data Wm of present battery is obtained;Step 3:The time interval Tm of current data collection is set according to Wm, then calculating electricity according to Tm, Ps, Ta, P, Wm, Wm 1 is reduced to the number Xm run during Wm 1 from Wm;Wm Wm 1=(Tm*Ps+Ta*P) * Xm;Step 4:Constantly current battery charge data are obtained until battery capacity data are Wm 1;Step 5:Repeat step 24.The purpose of the present invention is to provide a kind of methods for the industrial things-internet gateway ladder power saving effectively improving gateway cruising ability.
Description
Technical field
The present invention relates to industrial gateway control field, specially a kind of method of industrial things-internet gateway ladder power saving.
Background technology
CN 201711307575.8 discloses a kind of gateway device of effectively pre- anti-power failure, including gateway device ontology, net
It closes and is coated with shell outside apparatus body, the gateway device ontology is connected with plug by conducting wire, electricity is additionally provided on conducting wire
The upper surface of source adapter, the shell is connected with one layer of optical energy power layer, and the optical energy power layer is connected with solar energy power accumulating
Pond, solar storage battery are connected with controller, and the controller is connected with power supply adaptor.The gateway device is long cruise duration,
It can work under power failure, promote the convenience that gateway device uses.
It is not to be suitable for being equipped with solar power generation unit it should be noted that in many application environments.This
In the case of, the cruising ability of gateway how is improved, the collecting method of a set of rational gateway is needed.
Invention content
The purpose of the present invention is to provide a kind of industrial things-internet gateway ladder power savings effectively improving gateway cruising ability
Method.
To achieve the above object, the present invention provides the following technical solutions:A kind of side of industry things-internet gateway ladder power saving
Method includes the following steps:
Step 1:Set data collection of the battery within the cycle of operation of the electricity as Wx~Wx-1 time interval Tx and
Collect the required time Ta of a data;Wherein, the power in gateway when collecting data is P, and gateway is received in data twice
Power when interval between integrating is Ps;
Step 2:In the case that the gateway is using battery powered, the electricity data Wm of present battery is obtained;
Step 3:The time interval Tm that current data collection is set according to Wm, then according to Tm, Ps, Ta, P, Wm, Wm-1
It calculates electricity and is reduced to the number Xm run during Wm-1 from Wm;Wm-Wm-1=(Tm*Ps+Ta*P) * Xm;
Step 4:Constantly current battery charge data are obtained until battery capacity data are Wm-1;
Step 5:Step 2-4 is repeated, until dead battery capability or external power restore electricity.
In the method for above-mentioned industrial things-internet gateway ladder power saving, in the step 1, the section of Wx~Wx-1 is long
Degree is voluntarily arranged by user.
In the method for above-mentioned industrial things-internet gateway ladder power saving, in step 1, Wx > Wx-1, Ta < Ta-1.
Further include step 6 in the method for above-mentioned industrial things-internet gateway ladder power saving:Calculating battery according to Wm can also
The time Tlive that enough runs and the server that Tlive is sent to peripheral hardware;
Tlive=(Tm+Ta) * Xm+ (Tm-1+Ta) * Xm-1 ... (T0+Ta) * X0;X0 is a fortune before electricity exhausts
The data times of collection in row period.
Compared with prior art, the beneficial effects of the invention are as follows:
The present invention is the lifting means continuity operating time to power-saving working mode further purposefully on demand, and can
It to send the different of interval to data according to client requires that multiple ladders are arranged, industrial environment is utmostly adapted to realize
And meet the purpose of the requirement of client.
Description of the drawings
Fig. 1 is the flow diagram of the embodiment of the present invention 1
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
Referring to Fig. 1, a kind of method of industry things-internet gateway ladder power saving, includes the following steps:
Step 1:Set data collection of the battery within the cycle of operation of the electricity as Wx~Wx-1 time interval Tx and
Collect the required time Ta of a data;Wherein, the power in gateway when collecting data is P, and gateway is received in data twice
Power when interval between integrating is Ps;
It is illustrated with a simply example:
When setting electricity as 100-90%, it is divided into 3min between acquisition time, which is known as battery saving mode;Collect one
It is that 0.5min (does not change, which is known as normal work when different electricity of the time below the time required to secondary data
Operation mode);
When setting electricity as 90-80%, 5min is divided between acquisition time;
When setting electricity as 80-70%, 8min is divided between acquisition time;
When setting electricity as 70-60%, 10min is divided between acquisition time;
When setting electricity as 60-50%, 12min is divided between acquisition time;
When setting electricity as 50-40%, 15min is divided between acquisition time;
When setting electricity as 40-30%, 18min is divided between acquisition time;
When setting electricity as 30-20%, 21min is divided between acquisition time;
When setting electricity as 20-10%, 25min is divided between acquisition time;
When setting electricity as 10-0%, 30min is divided between acquisition time;
Power when P is normal mode of operation, Ps are the power under battery saving mode.
Above-mentioned data are only to enumerate, the specific demand designed, designed needed according to client.In general, the cycle of operation is about
Short, power saving is more accurate.
Step 2:In the case that the gateway is using battery powered, the electricity data Wm of present battery is obtained;
Step 3:The time interval Tm that current data collection is set according to Wm, then according to Tm, Ps, Ta, P, Wm, Wm-1
It calculates electricity and is reduced to the number Xm run during Wm-1 from Wm;Wm-Wm-1=(Tm*Ps+Ta*P) * Xm;
Tm, Ps, Ta, P of the cycle of operation of Wm~Wm-1 can be compareed according to the preset parameter of step 1 and be obtained.
Step 4:Constantly current battery charge data are obtained until battery capacity data are Wm-1;
Step 5:Step 2-4 is repeated, until dead battery capability or external power restore electricity.
Step 6:The time Tlive that can also run of battery is calculated according to Wm and Tlive is sent to the server of peripheral hardware;
Tlive=(Tm+Ta) * Xm+ (Tm-1+Ta) * Xm-1 ... (T0+Ta) * X0;X0 is a fortune before electricity exhausts
The data times of collection in row period.
In the present embodiment, Xm=(Wm-Wm-1)/(Tm*Ps+Ta*P) can be calculated.
And Xm-1 ... X0 carry out computational theory value according to the pre-set parameter in step 1.
By above-mentioned design, gateway can be made according to actual electric quantity consumption situation, it is flexible to carry out single operation week
The adjustment of number of run in phase and the adjustment of interval realize the purpose of high-precision electricity control, prolong as far as possible
The cruise duration of long battery.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
Claims (4)
1. a kind of method of industry things-internet gateway ladder power saving, which is characterized in that include the following steps:
Step 1:Set time interval Tx and the collection of data collection of the battery within the cycle of operation of the electricity as Wx~Wx-1
The required time Ta of data;Wherein, the power in gateway when collecting data be P, gateway data collection twice it
Between interval when power be Ps;
Step 2:In the case that the gateway is using battery powered, the electricity data Wm of present battery is obtained;
Step 3:The time interval Tm of current data collection is set according to Wm, is then calculated according to Tm, Ps, Ta, P, Wm, Wm-1
Electricity is reduced to the number Xm run during Wm-1 from Wm;Wm-Wm-1=(Tm*Ps+Ta*P) * Xm;
Step 4:Constantly current battery charge data are obtained until battery capacity data are Wm-1;
Step 5:Step 2-4 is repeated, until dead battery capability or external power restore electricity.
2. the method for industry things-internet gateway ladder power saving according to claim 1, which is characterized in that the step 1
In, the siding-to-siding block length of Wx~Wx-1 is voluntarily arranged by user.
3. the method for industry things-internet gateway ladder power saving according to claim 1, which is characterized in that in step 1, Wx
> Wx-1, Ta < Ta-1.
4. the method for industry things-internet gateway ladder power saving according to claim 1, which is characterized in that further include step 6:
The time Tlive that can also run of battery is calculated according to Wm and Tlive is sent to the server of peripheral hardware;
Tlive=(Tm+Ta) * Xm+ (Tm-1+Ta) * Xm-1 ... (T0+Ta) * X0;X0 is an operation week before electricity exhausts
The data times of collection of phase.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810371932.5A CN108540378A (en) | 2018-04-24 | 2018-04-24 | A kind of method of industry things-internet gateway ladder power saving |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810371932.5A CN108540378A (en) | 2018-04-24 | 2018-04-24 | A kind of method of industry things-internet gateway ladder power saving |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108540378A true CN108540378A (en) | 2018-09-14 |
Family
ID=63478364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810371932.5A Pending CN108540378A (en) | 2018-04-24 | 2018-04-24 | A kind of method of industry things-internet gateway ladder power saving |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108540378A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110278147A (en) * | 2019-06-20 | 2019-09-24 | 深圳市中创工业互联网有限公司 | A kind of power-saving method of gateway, device and economize on electricity gateway |
CN112995941A (en) * | 2021-03-08 | 2021-06-18 | 莫毓昌 | Industrial Internet of things data transmission system and method for dormancy awakening mechanism |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1917677A (en) * | 2005-08-19 | 2007-02-21 | 鸿富锦精密工业(深圳)有限公司 | Handset with function of saving electricity, and method of saving electricity |
CN101853166A (en) * | 2010-06-07 | 2010-10-06 | 北京大学 | Application-oriented method and system for indicating use time of intelligent mobile phone battery |
CN202663561U (en) * | 2012-03-11 | 2013-01-09 | 上海宜云物联科技有限公司 | Internet of Things gateway capable of long-term operation without electricity |
CN104216501A (en) * | 2014-08-21 | 2014-12-17 | 刘勇 | Electricity saving method for mobile terminal, electricity saving system for mobile terminal and mobile terminal |
CN105978971A (en) * | 2016-05-11 | 2016-09-28 | 北京奇虎科技有限公司 | Message pushing method and device, and message pushing server |
KR20170039471A (en) * | 2015-10-01 | 2017-04-11 | 엘지전자 주식회사 | Mobile termianl and method for controlling the same |
CN107404533A (en) * | 2017-07-29 | 2017-11-28 | 深圳市盛路物联通讯技术有限公司 | A kind of method for monitoring biological activity, and monitoring device |
-
2018
- 2018-04-24 CN CN201810371932.5A patent/CN108540378A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1917677A (en) * | 2005-08-19 | 2007-02-21 | 鸿富锦精密工业(深圳)有限公司 | Handset with function of saving electricity, and method of saving electricity |
CN101853166A (en) * | 2010-06-07 | 2010-10-06 | 北京大学 | Application-oriented method and system for indicating use time of intelligent mobile phone battery |
CN202663561U (en) * | 2012-03-11 | 2013-01-09 | 上海宜云物联科技有限公司 | Internet of Things gateway capable of long-term operation without electricity |
CN104216501A (en) * | 2014-08-21 | 2014-12-17 | 刘勇 | Electricity saving method for mobile terminal, electricity saving system for mobile terminal and mobile terminal |
KR20170039471A (en) * | 2015-10-01 | 2017-04-11 | 엘지전자 주식회사 | Mobile termianl and method for controlling the same |
CN105978971A (en) * | 2016-05-11 | 2016-09-28 | 北京奇虎科技有限公司 | Message pushing method and device, and message pushing server |
CN107404533A (en) * | 2017-07-29 | 2017-11-28 | 深圳市盛路物联通讯技术有限公司 | A kind of method for monitoring biological activity, and monitoring device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110278147A (en) * | 2019-06-20 | 2019-09-24 | 深圳市中创工业互联网有限公司 | A kind of power-saving method of gateway, device and economize on electricity gateway |
CN110278147B (en) * | 2019-06-20 | 2023-10-20 | 深圳市中创工业互联网有限公司 | Power saving method and device for gateway and power saving gateway |
CN112995941A (en) * | 2021-03-08 | 2021-06-18 | 莫毓昌 | Industrial Internet of things data transmission system and method for dormancy awakening mechanism |
CN112995941B (en) * | 2021-03-08 | 2022-07-15 | 莫毓昌 | Industrial Internet of things data transmission system and method for dormancy awakening mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016037303A1 (en) | Evaluation method for online accommodating capacity of new energy power generation | |
EP3182581B1 (en) | Power distribution priority controller and control method for photovoltaic power generation system | |
JP6168060B2 (en) | Power management method, power management apparatus and program | |
CN203455714U (en) | ZigBee wireless monitoring system of power line towers | |
CN105510779A (en) | Arrester on-line monitoring system and application method thereof | |
CN103956887A (en) | Wind power converter IGBT module junction temperature online computing method | |
CN103187735A (en) | Bidirectional intelligent gateway device for distributed new energy grid connection | |
CN105162113A (en) | Sensitivity analysis based interaction cost calculation method for microgrid and power distribution grid | |
CN105375477A (en) | Rural power distribution network line loss calculation method and system | |
CN108540378A (en) | A kind of method of industry things-internet gateway ladder power saving | |
CN103455716A (en) | Ultra-short-term wind power prediction-based voltage stability margin calculation method for power system | |
CN201955410U (en) | Remote online arrester monitoring device | |
CN107257130A (en) | The low-voltage network loss computing method of decoupling is measured based on region | |
CN103942429A (en) | Satellite on-orbit transient temperature simulation and prediction system | |
CN201945641U (en) | Distributed electric energy metering device of power transformation and distribution station | |
CN108551205A (en) | A kind of electricity saving method, gateway and the gateway system of super low-power consumption industry things-internet gateway | |
CN201503468U (en) | Electric energy meter for voltage quality | |
CN103245850B (en) | The feeder line peak load predictor method of substation transformer | |
CN106972498B (en) | Power demand response control system and load control method thereof | |
CN205375815U (en) | Wisdom energy modularization monitoring system based on smart electric meter | |
CN206226013U (en) | A kind of Distributed Multi sampling Short-Term Power Load Forecasting System | |
CN211905518U (en) | Anti-electricity-theft online monitoring device | |
CN204790388U (en) | A on --spot monitor control device for long -range monitor platform of water treatment | |
CN207427180U (en) | A kind of internet device restarts system automatically | |
CN206523996U (en) | A kind of wireless collector-shoe gears of ZigBee |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180914 |