CN108517881A - Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages and construction method - Google Patents
Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages and construction method Download PDFInfo
- Publication number
- CN108517881A CN108517881A CN201810384467.9A CN201810384467A CN108517881A CN 108517881 A CN108517881 A CN 108517881A CN 201810384467 A CN201810384467 A CN 201810384467A CN 108517881 A CN108517881 A CN 108517881A
- Authority
- CN
- China
- Prior art keywords
- water
- slope
- platform
- compages
- seepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 title claims abstract description 37
- 230000002787 reinforcement Effects 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 title claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 48
- 230000004224 protection Effects 0.000 claims abstract description 33
- 239000000945 filler Substances 0.000 claims abstract description 32
- 230000001681 protective effect Effects 0.000 claims abstract description 20
- 239000004575 stone Substances 0.000 claims description 20
- 239000011449 brick Substances 0.000 claims description 14
- 244000025254 Cannabis sativa Species 0.000 claims description 12
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 claims description 12
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 claims description 12
- 235000009120 camo Nutrition 0.000 claims description 12
- 235000005607 chanvre indien Nutrition 0.000 claims description 12
- 239000011487 hemp Substances 0.000 claims description 12
- 230000005641 tunneling Effects 0.000 claims description 11
- 238000009412 basement excavation Methods 0.000 claims description 7
- 239000004744 fabric Substances 0.000 claims description 4
- 239000000428 dust Substances 0.000 claims description 3
- 230000008595 infiltration Effects 0.000 claims description 3
- 238000001764 infiltration Methods 0.000 claims description 3
- 241000196324 Embryophyta Species 0.000 claims description 2
- 239000004567 concrete Substances 0.000 description 6
- 239000000463 material Substances 0.000 description 6
- 239000004568 cement Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000004570 mortar (masonry) Substances 0.000 description 5
- 238000005086 pumping Methods 0.000 description 3
- 238000001727 in vivo Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 240000002066 Amorpha fruticosa Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 235000011194 food seasoning agent Nutrition 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 229910052655 plagioclase feldspar Inorganic materials 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
It changes the present invention relates to Cut Slopes of Expansive Soil reinforcement formula and fills out compages and construction method, be divided into the top part and the bottom part in side slope and point dig to form side slope step, platform is set between two parts side slope step;Seepage of water A group fillers are filled on the outside of side slope step and form protective slope structure, and corresponding two parts side slope step forms two parts slope surface, platform and intercepting ditch is arranged between two parts slope surface.Cut Slopes of Expansive Soil protection is carried out using the present invention, has many advantages, such as small investment, safe and reliable, it is durable, environment protecting is good, short construction period, be railway, highway safe operation provide a strong guarantee.
Description
Technical field
The present invention relates to a kind of side slope protection facilities, and in particular to a kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out comprehensive knot
Structure and construction method.
Background technology
In the construction of the Large Infrastructure Projects such as railway, highway, expensive soil cutting is frequently encountered, dilatancy is from weak, medium
To strong, slope height is also meter to be differed from several meters to tens, is caved in situation from built railway and highway cutting side slope
It sees, the measures such as traditional slow side slope, Wide Worktable, steady slope foot, reliability is not high, is reinforced again using the stakes class such as pile plate wall and friction pile
Highly limited to, and is involved great expense.
To ensure the long-term stability of the engineerings such as railway and highway, it need to take Cut Slopes of Expansive Soil one kind is safer can
It leans on, economic and practical engineering measure.
Invention content
It is changed the object of the present invention is to provide a kind of Cut Slopes of Expansive Soil reinforcement formula and fills out compages and construction method, to each
The expansile Cut Slopes of Expansive Soil of class all has protection effect.
The technical solution adopted in the present invention is:
Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages, it is characterised in that:
It is divided into the top part and the bottom part in side slope and point digs to form side slope step, platform is set between two parts side slope step;
Seepage of water A group fillers are filled on the outside of side slope step and form protective slope structure, and corresponding two parts side slope step forms two parts
Slope surface, setting platform and intercepting ditch between two parts slope surface.
The seepage of water A group filler interior laminate layers setting TGXG filled, and water pouring floral tube is set.
It is provided with gutter at the top of protective slope structure;
Gutter is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut.
Protective slope structure bottom is provided with the spats coplanar with protective slope structure slope surface.
It is provided with lateral sulcus platform and lateral sulcus on the inside of the spats of protective slope structure;
Lateral sulcus platform is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut;
Lateral sulcus is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut.
The slope surface of protective slope structure is provided with the door shape skeleton of array, forms skeleton bank protection, vegetation is provided in skeleton.
Intercepting ditch is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut.
Cut Slopes of Expansive Soil reinforcement formula changes the construction method for filling out compages, it is characterised in that:
It is realized by following steps:
Step 1:In non-rainy season, the top excavation line starting point of side slope is released outside the gutter of cutting top, and self-unloading vapour is matched using excavator
Vehicle stage excavation and transport undisturbed unsaturated expansive soils from top to bottom, are formed simultaneously two parts side slope step up and down, between platform is set;It opens
It is covered in full slope surface with colour bar cloth after the completion of digging, is built at once from lower edge ramp rank by 0.6m thickness placements in layers and fill out seepage of water A groups
Filler, the seepage of water A group fillers of filling out filled reach speed per hour 160km/h railway bed bottom layer of subgrade compacting criterias;
Step 2:While filling seepage of water A group fillers, while layering is laid with TGXG in seepage of water A group fillers, TGXG is taken
In 1.0m in side slope step;It is longitudinally buried simultaneously every 2.0m every 3.6m, vertical direction in changing to fill out body and fill out in seepage of water A group fillers
Equipped with water pouring floral tube, water pouring floral tube exports on the main rib of skeleton bank protection;
Step 3:After the completion of whole seepage of water A group fillers fill, two parts protective slope structure up and down is formed, clears up, brush flat two parts
Slope surface excavates the groove of skeleton bank protection, spats and platform and intercepting ditch then at the design position of slope surface;Build by laying bricks or stones or pour spats,
Skeleton bank protection and platform and intercepting ditch;
Step 4:It builds or pours lateral sulcus platform by laying bricks or stones, it is made to be linked together with lateral sulcus and spats;
Step 5:Base is dug by design size in lateral sulcus position, builds or pours lateral sulcus by laying bricks or stones, lateral sulcus is made to be linked as with lateral sulcus platform and spats
One;
Step 6:Base is dug by design size in gutter position, builds or pour gutter by laying bricks or stones;
Step 7:It is protected in transplanting shrub greening in skeleton bank protection, shrub spacing 0.3m, after the completion of transplanting shrub, water seasoning.
Dust of the seepage of water A group fillers for fine grained soil content less than 10%, infiltration coefficient more than 10-3cm/s is native, circle gravel is native,
Gravelly soil, land pebble.
The present invention has the following advantages:
Cut Slopes of Expansive Soil protection is carried out using the present invention, there is small investment, safe and reliable, it is durable, environment protecting is good,
The advantages that short construction period, the safe operation for railway, highway provide a strong guarantee.
Description of the drawings
Fig. 1 is inventive structure schematic diagram.
Fig. 2 is lateral sulcus, lateral sulcus platform and spats schematic diagram.
Fig. 3 is platform, platform intercepting ditch and spats schematic diagram.
Fig. 4 is gutter schematic diagram.
Fig. 5 is arch form skeleton bank protection schematic diagram.
In figure, 1- seepage of water A group fillers, 2- TGXG, 3- water pouring floral tubes, 4- skeleton bank protections, 5- platforms and intercepting ditch,
The slopes 6- are high, 7- side slope steps, 8- spats, 9- lateral sulcus platforms, 10- lateral sulcus, 11- gutters.
Specific implementation mode
The present invention will be described in detail With reference to embodiment.
It changes the present invention relates to Cut Slopes of Expansive Soil reinforcement formula and fills out compages, be divided into the top part and the bottom part point to dig in side slope to be formed
Platform is arranged between two parts side slope step 7 in side slope step 7;Seepage of water A groups filler 1, which is filled, in 7 outside of side slope step forms shield
Slope structure, corresponding two parts side slope step 7 form two parts slope surface, platform and intercepting ditch 5 are arranged between two parts slope surface.It intercepts water
Ditch 5 is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut.
1 interior laminate layer of the seepage of water A groups filler setting TGXG 2 filled, and water pouring floral tube 3 is set.
It is provided with gutter 11 at the top of protective slope structure;Gutter 11 is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior complete disconnected
Clog pitch hemp cut in face.
Protective slope structure bottom is provided with the spats 8 coplanar with protective slope structure slope surface.8 inside of spats of protective slope structure is provided with
Lateral sulcus platform 9 and lateral sulcus 10;Lateral sulcus platform 9 is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut;
Lateral sulcus 10 is vertically arranged with the expansion joint of multiple tracks transverse direction, stitches interior tunneling boring and clogs pitch hemp cut.
The slope surface of protective slope structure is provided with the door shape skeleton of array, forms skeleton bank protection 4, vegetation is provided in skeleton.
Structure of the present invention digs to land drainage to dig to change successively including side slope from side slope and fills out facility, changes and fill out in vivo
Reinforcement and pumping equipment, cutting slope protection facility and land drainage facility.It digs to change and fills out facility including excavating undisturbed unsaturated expansive soils
A-B-C-D-E-F-G-H, step 7, seepage of water A groups filler 1;It changes and fills out internal reinforcement and pumping equipment includes TGXG 2 and rushes down
Spray pipe 3;Cutting slope protection facility includes skeleton bank protection 4, lateral sulcus platform 9, plain stage of slope reinforcing 5 and spats 8;Land drainage
Facility includes lateral sulcus 10, platform intercepting ditch 5 and gutter 11.
Changing the requirement of seepage of water A groups filler 1 filled out is:Fine grained soil content is less than 10%, infiltration coefficient and is more than 10-3cm/s, grade
With good dust soil, circle gravel soil, gravelly soil, land pebble.It excavates along the faces A-B-C-D-E of slope excavating line and scrapes out width and be
It after the step of 1.0m, is filled by embankment standard layers, thickness should be not more than 60cm, and compacting requirement should reach speed per hour 160km/h's
Railway bed bottom layer of subgrade standard.
It changes and fills out in internal reinforcement and pumping equipment, it is desirable that 2 tensile strength of TGXG is 25KN/m, and vertical direction is per 0.6m
It is laid with one layer, and is deep into 1.0m in step, the binding force of the seepage of water A groups filler 1 and undisturbed formation filled out is changed with enhancing;It is required that
It is 10cm that water pouring floral tube 3, which uses interior diameter, pipe thickness is not less than 3mm, the PE pipes of pipe shaft nose circle shape slot hole, or using by preventing
Corruption processing same size, with hole body steel pipe.Tubing is buried in vivo every 2.0m changing to fill out along line direction every 3.6m, vertical direction
If pipe outlet is just in the shuting of slope surface skeleton bank protection 4.
The skeleton bank protection 4 of cutting slope protection facility, skeleton clear distance use 3.0m, and main rib width and thickness is 0.6m,
Arch ring width 0.5m, thickness 0.6m, the arch form structure with shuting.M10 water can be used according to the difference of construction criteria in skeleton body
Other undershrubs of silt particle mortar flag stone or C25 concrete materials, the interior plant false indigo of skeleton or suitable local growth are to slope surface
Carry out greening protection.
The lateral sulcus platform 10 of cutting slope protection facility can grout piece according to the difference of construction criteria using M10 cement bonded sands
Stone or C25 concrete materials, size are that 2.0m wide, 0.3m are thick, are connect with lateral sulcus and spats and build by laying bricks or stones or pour.
The plain stage of slope of cutting slope protection facility reinforces 5, also can use M10 water according to the difference of construction criteria, platform
Silt particle mortar flag stone or C25 concrete materials, size are that 2.5m wide, 0.4m are thick, connect with platform intercepting ditch and spats 8 build by laying bricks or stones or
It pours.
The spats 8 of cutting slope protection facility, according to the difference of construction criteria, using M10 cement bonded sands mortar flag stone or C25
Concrete material, size are 0.4m thickness, plagioclase 1.0m, are connect with lateral sulcus platform 9 or plain stage of slope 5 and build by laying bricks or stones or pour.
The lateral sulcus 10 of land drainage facility, size is 0.4m bottom width, 0.8m is deep, 0.3m is thick.According to different construction criterias
Using M10 cement bonded sands mortar flag stone or C25 concrete materials.
The gutter 11 of land drainage facility, size is 0.4m bottom width, 0.6m is deep, 0.3m is thick.According to different construction criterias
Using M10 cement bonded sands mortar flag stone or C25 concrete materials.
Cut Slopes of Expansive Soil reinforcement formula changes the construction method for filling out compages, is realized by following steps:
The construction line-putting should be carried out first, performs ground temporary drainage system, prepare excavator, dump truck, road roller;According to setting
Count the complete TGXG of standard purchase price, water pouring floral tube, slabstone, sand, cement, colour bar cloth;The production of seepage of water A group fillers is investigated
Ground.
Step 1:In non-rainy season, the top excavation line A points of side slope A-B-C-D-E are released outside cutting top gutter 11, are used
Excavator matches dump truck stage excavation and transport undisturbed unsaturated expansive soils A-B-C-D-E-F-G-H from top to bottom, is formed simultaneously side slope
Step 7 is covered with colour bar cloth in full slope surface A-B-C-D after the completion of excavating;After the completion of excavation, pressed at once from the faces DE of bottom
0.6m thickness placements in layers, which are built, fills out seepage of water A groups filler 1, and that fills fills out seepage of water A groups filler 1 and should reach speed per hour 160km/h railways
Roadbed bottom compacting criteria;
Step 2:While fill seepage of water A groups filler 1, while in the seepage of water A groups filler 1 layering be laid with TGXG 2, Tu Gongge
Grid 2 should be taken in 1.0m in side slope step 7;It fills out body simultaneously and fills out in seepage of water A groups filler 1 longitudinally every 3.6m, vertical direction in changing
It is embedded with water pouring floral tube 3 every 2.0m, the outlet of water pouring floral tube 3 should be on the main rib of skeleton bank protection 4;
Step 3:After the completion of whole seepage of water A groups fillers 1 fill, clears up, brushes flat slope surface EF and GH, then at the design position of slope surface
Set the groove for excavating skeleton bank protection 4, spats 8 and platform and intercepting ditch 5;Build by laying bricks or stones or pour spats 8, skeleton bank protection 4 and platform and
Intercepting ditch 5;
Step 4:It builds or pours lateral sulcus platform 9 by laying bricks or stones, it is made to be linked together with lateral sulcus 10 and spats 8;
Step 5:Base is dug by design size in lateral sulcus position, builds or pours lateral sulcus 10 by laying bricks or stones, make lateral sulcus 10 and lateral sulcus platform 9 and shield
Foot 8 is linked together;
Step 6:Base is dug by design size in gutter position, builds or pour gutter 11 by laying bricks or stones;
Step 7:In plant shrub greening protection in skeleton bank protection 4, shrub spacing 0.3m, after the completion of transplanting shrub, watering is supported
Shield.
Finally, temporary drainage facility is removed.
Present disclosure is not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention
And to any equivalent transformation that technical solution of the present invention is taken, it is that claim of the invention is covered.
Claims (9)
1. Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages, it is characterised in that:
It is divided into the top part and the bottom part in side slope and point digs to form side slope step(7), two parts side slope step(7)Between platform is set;
In side slope step(7)Fill seepage of water A group fillers in outside(1)Form protective slope structure, corresponding two parts side slope step(7)Shape
At two parts slope surface, platform and intercepting ditch are set between two parts slope surface(5).
2. Cut Slopes of Expansive Soil reinforcement formula according to claim 1, which is changed, fills out compages, it is characterised in that:
The seepage of water A group fillers filled(1)TGXG is arranged in interior laminate layer(2), and water pouring floral tube is set(3).
3. Cut Slopes of Expansive Soil reinforcement formula according to claim 1, which is changed, fills out compages, it is characterised in that:
It is provided with gutter at the top of protective slope structure(11);
Gutter(11)It is vertically arranged with the expansion joint of multiple tracks transverse direction, interior tunneling boring is stitched and clogs pitch hemp cut.
4. Cut Slopes of Expansive Soil reinforcement formula according to claim 1, which is changed, fills out compages, it is characterised in that:
Protective slope structure bottom is provided with the spats coplanar with protective slope structure slope surface(8).
5. Cut Slopes of Expansive Soil reinforcement formula according to claim 4, which is changed, fills out compages, it is characterised in that:
The spats of protective slope structure(8)Inside is provided with lateral sulcus platform(9)And lateral sulcus(10);
Lateral sulcus platform(9)It is vertically arranged with the expansion joint of multiple tracks transverse direction, interior tunneling boring is stitched and clogs pitch hemp cut;
Lateral sulcus(10)It is vertically arranged with the expansion joint of multiple tracks transverse direction, interior tunneling boring is stitched and clogs pitch hemp cut.
6. Cut Slopes of Expansive Soil reinforcement formula according to claim 1, which is changed, fills out compages, it is characterised in that:
The slope surface of protective slope structure is provided with the door shape skeleton of array, forms skeleton bank protection(4), vegetation is provided in skeleton.
7. Cut Slopes of Expansive Soil reinforcement formula according to claim 1, which is changed, fills out compages, it is characterised in that:
Intercepting ditch(5)It is vertically arranged with the expansion joint of multiple tracks transverse direction, interior tunneling boring is stitched and clogs pitch hemp cut.
8. Cut Slopes of Expansive Soil reinforcement formula changes the construction method for filling out compages, it is characterised in that:
It is realized by following steps:
Step 1:In non-rainy season, in cutting top gutter(11)The outer top excavation line starting point for releasing side slope, is matched certainly using excavator
Automobile stage excavation and transport undisturbed unsaturated expansive soils from top to bottom are unloaded, two parts side slope step up and down is formed simultaneously(7), between be arranged
Platform;It is covered in full slope surface, at once from lower edge ramp rank with colour bar cloth after the completion of excavating(7)It builds and fills out by 0.6m thickness placements in layers
Seepage of water A group fillers(1), that fills fills out seepage of water A group fillers(1)Reach the compacting of speed per hour 160km/h railway bed bottom layer of subgrade
Standard;
Step 2:While filling seepage of water A group fillers(1), while in seepage of water A group fillers(1)Interior layering is laid with TGXG(2),
TGXG(2)It takes in side slope step(7)Interior 1.0m;It fills out body simultaneously and fills out seepage of water A group fillers in changing(1)Interior longitudinal direction every
3.6m, vertical direction are embedded with water pouring floral tube every 2.0m(3), water pouring floral tube(3)Outlet is in skeleton bank protection(4)Main rib on;
Step 3:Whole seepage of water A group fillers(1)After the completion of filling, two parts protective slope structure up and down is formed, clears up, brush flat two
Part slope surface, the design position then at slope surface excavate skeleton bank protection(4), spats(8)With platform and intercepting ditch(5)Groove;It builds
Build or pour spats(8), skeleton bank protection(4)With platform and intercepting ditch(5);
Step 4:Build or pour lateral sulcus platform by laying bricks or stones(9), make itself and lateral sulcus(10)And spats(8)It is linked together;
Step 5:Base is dug by design size in lateral sulcus position, builds or pour lateral sulcus by laying bricks or stones(10), make lateral sulcus(10)With lateral sulcus platform
(9)And spats(8)It is linked together;
Step 6:Base is dug by design size in gutter position, builds or pour gutter by laying bricks or stones(11);
Step 7:In skeleton bank protection(4)Interior plant shrub greening protection, shrub spacing 0.3m, after the completion of transplanting shrub, watering is supported
Shield.
9. Cut Slopes of Expansive Soil reinforcement formula according to claim 8 changes the construction method for filling out compages, feature exists
In:
Seepage of water A group fillers(1)For fine grained soil content be less than 10%, infiltration coefficient more than 10-3cm/s dust soil, circle gravel soil,
Gravelly soil, land pebble.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810384467.9A CN108517881A (en) | 2018-04-26 | 2018-04-26 | Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810384467.9A CN108517881A (en) | 2018-04-26 | 2018-04-26 | Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108517881A true CN108517881A (en) | 2018-09-11 |
Family
ID=63429141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810384467.9A Pending CN108517881A (en) | 2018-04-26 | 2018-04-26 | Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108517881A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424424A (en) * | 2019-08-27 | 2019-11-08 | 中铁第一勘察设计院集团有限公司 | Debris Flow on Slope Surface control structure |
CN111893827A (en) * | 2020-08-05 | 2020-11-06 | 中交上海航道局有限公司 | Construction process of urban trunk road |
CN112262679A (en) * | 2020-10-14 | 2021-01-26 | 云南大学 | Method for greening and ecological restoration of extreme habitat side slope |
CN112726638A (en) * | 2020-12-16 | 2021-04-30 | 中国水利水电第四工程局有限公司 | Expansive soil cutting slope protection structure and construction method |
CN113403904A (en) * | 2021-07-21 | 2021-09-17 | 中信国安建工集团有限公司 | Highway filling and digging boundary roadbed structure and construction operation method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234005A (en) * | 2014-08-27 | 2014-12-24 | 中铁第一勘察设计院集团有限公司 | Railway river-following embankment anti-flushing protection structure and construction method of railway river-following embankment anti-flushing protection structure |
CN208293588U (en) * | 2018-04-26 | 2018-12-28 | 中铁第一勘察设计院集团有限公司 | A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages |
-
2018
- 2018-04-26 CN CN201810384467.9A patent/CN108517881A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234005A (en) * | 2014-08-27 | 2014-12-24 | 中铁第一勘察设计院集团有限公司 | Railway river-following embankment anti-flushing protection structure and construction method of railway river-following embankment anti-flushing protection structure |
CN208293588U (en) * | 2018-04-26 | 2018-12-28 | 中铁第一勘察设计院集团有限公司 | A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages |
Non-Patent Citations (1)
Title |
---|
张利军: ""安康枢纽膨胀土路堑边坡失稳机理及治理措施研究"", 《路基工程》, pages 203 - 206 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424424A (en) * | 2019-08-27 | 2019-11-08 | 中铁第一勘察设计院集团有限公司 | Debris Flow on Slope Surface control structure |
CN111893827A (en) * | 2020-08-05 | 2020-11-06 | 中交上海航道局有限公司 | Construction process of urban trunk road |
CN112262679A (en) * | 2020-10-14 | 2021-01-26 | 云南大学 | Method for greening and ecological restoration of extreme habitat side slope |
CN112726638A (en) * | 2020-12-16 | 2021-04-30 | 中国水利水电第四工程局有限公司 | Expansive soil cutting slope protection structure and construction method |
CN113403904A (en) * | 2021-07-21 | 2021-09-17 | 中信国安建工集团有限公司 | Highway filling and digging boundary roadbed structure and construction operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108517881A (en) | Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages and construction method | |
CN106759473B (en) | The constructing structure and its construction method of underground pipe gallery and road | |
CN106703050A (en) | Expansive soil road cutting side slope reinforced soil back-pressure seepage-preventive supporting structure and construction method thereof | |
CN103882884B (en) | A kind of anchor cable geo-grid retaining structure and construction method thereof | |
CN105569058A (en) | Expansive soil cutting structure and construction method thereof | |
CN105696427A (en) | Construction method for reinforcing newly-built railway karst foundation and roadbed structure thereof | |
CN108625879A (en) | Mountain Tunnels half-open and half-hidden structure and its construction method | |
CN108978385A (en) | A kind of roadbed construction method on the road Tong Cun | |
CN106049195A (en) | Method for strengthening subgrade basement of existing high speed railway line | |
CN110397079A (en) | Marine facies rich water karst strata open-cut station construction technology | |
CN107740434A (en) | It is a kind of to be used for sandy gravel, the construction method of dolomite crushed zone dam foundation ditch water protecting curtain | |
CN208293588U (en) | A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages | |
CN102235007B (en) | Method for supporting deep foundation with upper nail-lower pile combination | |
CN208416561U (en) | A kind of Mountain Tunnels half-open and half-hidden structure | |
CN205399440U (en) | Inflation dirt road moat structure | |
CN110080232A (en) | A kind of deep basal pit earth-filling method of underground high water level | |
CN104328797B (en) | High slope large curvy wall building construction engineering method | |
CN108824460A (en) | A kind of construction technology of cut subgrade banket | |
CN112854254A (en) | Construction method for existing railway field level subgrade support in deep artificial waste slag area | |
CN107269930B (en) | Bellows substitutes the construction of sealing-tape machine concrete corridor in sandstone system | |
CN105821902A (en) | Construction method for vertical lattice type light reinforced concrete ecological retaining wall | |
CN102535485B (en) | Concentric-circle-shaped reinforced rib geotechnological supporting structure for soft soil cutting excavation slope and top-down method of concentric-circle-shaped reinforced rib geotechnological supporting structure | |
CN206220108U (en) | Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction | |
CN107975378A (en) | The U-shaped wall base with architecture separates bearing type liner structure with bottom plate sound | |
CN208073500U (en) | Both sides setting has both the liner structure of the L-shaped pedestal of draining, carrying and supporting and retaining system function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180911 |