CN108517532A - A kind of Hardware fitting processing pre-treatment all-in-one machine - Google Patents

A kind of Hardware fitting processing pre-treatment all-in-one machine Download PDF

Info

Publication number
CN108517532A
CN108517532A CN201810611235.2A CN201810611235A CN108517532A CN 108517532 A CN108517532 A CN 108517532A CN 201810611235 A CN201810611235 A CN 201810611235A CN 108517532 A CN108517532 A CN 108517532A
Authority
CN
China
Prior art keywords
shell
fixedly connected
room
pipe
hardware fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810611235.2A
Other languages
Chinese (zh)
Inventor
李飞杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang Zheng Nan Hardware Co Ltd
Original Assignee
Xinchang Zheng Nan Hardware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang Zheng Nan Hardware Co Ltd filed Critical Xinchang Zheng Nan Hardware Co Ltd
Priority to CN201810611235.2A priority Critical patent/CN108517532A/en
Publication of CN108517532A publication Critical patent/CN108517532A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23GCLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
    • C23G3/00Apparatus for cleaning or pickling metallic material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B21/00Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
    • F26B21/02Circulating air or gases in closed cycles, e.g. wholly within the drying enclosure

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

The present invention provides a kind of Hardware fitting processing pre-treatment all-in-one machine, is related to Hardware fitting processing equipment field.Hardware fitting processing pre-treatment all-in-one machine, including shell, the bottom of shell is fixedly connected with wheel carrier, the bottom of wheel carrier is movably installed with movable pulley by shaft, the left side top of shell is fixedly connected with handle, the inside of shell is from left to right respectively arranged with washing room, hothouse and pickling room successively, and the inner wall surface of shell is fixedly connected with that there are three partition boards, is fixedly connected by partition board between washing room, hothouse and pickling room.Hardware fitting processing pre-treatment all-in-one machine, it is provided with washing room, hothouse and the process chamber of pickling room three, Hardware fitting can be washed simultaneously, be dried and pickling, it is lower compared to independent washing, dry and pickler cost, the area smaller of occupancy, and more convenient to use, the key step that staff is handled before being completed in an equipment.

Description

A kind of Hardware fitting processing pre-treatment all-in-one machine
Technical field
The present invention relates to Hardware fitting processing equipment field, specially a kind of Hardware fitting processing pre-treatment all-in-one machine.
Background technology
Hardware fitting refers to the machine parts being fabricated to hardware or component and some hardware products, it can be independent Purposes can also do assistance apparatus, such as hardware tool, hardware parts, haberdashery and hardware, architectural hardware and security protection articles for use Deng, hardware product mostly not instead of final consumption product, auxiliary products, semi-finished product and production process as industry manufacture Used tool etc., only sub-fraction haberdashery and hardware product are the necessary tool-class consumer goods of people's life.
Polished, sprayed etc. after Hardware fitting production processing programs, washed before processing, pickling and The pre-treatments such as dry, the fouls such as the iron rust on Hardware fitting surface are removed, but traditional Hardware fitting washing, pickling and drying Equipment is mostly independent, and factory generally requires to prepare three kinds of even more pre-processing devices simultaneously, increases cost, and The big quantity space of factory is occupied, it is also inconvenient to use.
Invention content
(1) the technical issues of solving
In view of the deficiencies of the prior art, it the present invention provides a kind of Hardware fitting processing pre-treatment all-in-one machine, solves Traditional Hardware fitting washing, pickling and drying equipment is mostly independent, increases cost, inconvenient problem with use.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of preceding place of Hardware fitting processing All-in-one machine is managed, including shell, the bottom of the shell are fixedly connected with wheel carrier, the bottom of the wheel carrier is installed by shaft activity There are movable pulley, the left side top of the shell to be fixedly connected with handle, the inside of the shell is from left to right respectively set successively There are washing room, hothouse and a pickling room, the inner wall surface of the shell is fixedly connected with that there are three partition board, the washing room, dryings It is fixedly connected by partition board between room and pickling room, the corresponding washing room in front of the shell, the position of hothouse and pickling room Setting is there are three operation panel, and the top of the shell corresponds to the position of washing room, hothouse and pickling room, and to pass through hinge movable Connection is fixedly connected with knob there are three sealing cover at the top of the sealing cover, the washing room, hothouse and pickling room it is interior Portion is both provided with transverse slat, and the surface of the transverse slat is fixedly connected with the side of the inner wall surface of shell and partition board.
The inner wall bottom of the shell and positioned at washing room inside be from left to right respectively fixedly connected with successively water tank, Rose Box and discharge casing, the inner wall side of the shell and the side of partition board and it is fixedly connected with water spray positioned at the inside of washing room The side of pipe, the sparge pipe is mutually connected with multiple fountain heads, the inner wall bottom of the shell and the inside difference for being located at hothouse It is installed with wind turbine and heating motor, the side of the partition board and is fixedly connected with air hose positioned at the inside of hothouse, it is described The side of air hose is mutually connected with multiple jet thrusts, the inner wall bottom of the shell and is fixedly connected with collection positioned at the inside of pickling room Case, the inner wall side of the shell and the inside for being located at pickling room are fixedly connected with sparge pipe, and the side of the sparge pipe communicates There are multiple jet heads, water pump is installed at the top of the water tank, the input terminal and output end of the water pump are homogeneously connected with The front of aqueduct, the water tank is mutually connected with filler pipe, and connection is mutually connected between the water tank, Rose Box and discharge casing The front of pipe, the discharge casing is mutually connected with drainpipe, and the output end of the heating motor is mutually connected with discharge pipe, and the discharge pipe is remote One end from heating motor is communicated with the bottom of air hose, and the top of the collecting box is mutually connected with collector tube, a left side for the collecting box Side and the top of discharge casing are homogeneously connected with collector pipe, and the front of the collecting box is mutually connected with chemical feed pipe and drain pipe respectively, described The right side of sparge pipe is mutually connected with liquid-feeding tube, and the top movable of the washing room is plugged with article placing frame, and the top of the article placing frame is solid Surely it is connected with along side.
Preferably, the input terminal of the water pump is communicated by aqueduct with the inside of water tank, and the water pump output end is logical Aqueduct is crossed to communicate with the bottom of sparge pipe.
Preferably, the input terminal of the wind turbine and output end are homogeneously connected with guide duct, and the output end of the wind turbine is by leading Air hose is communicated with the input terminal of heating motor.
Preferably, the bottom along side is fixedly connected with fixed column, and jack is offered at the top of the shell, described solid The bottom of fixed column runs through jack and extends to the inside of jack.
Preferably, the bottom of the sealing cover opens up fluted, and the top through-going recess along side simultaneously extends to groove Inside, the position that the top of the shell corresponds to washing room, hothouse and pickling room opens up that there are three putting holes.
Preferably, the front of the filler pipe, drainpipe, chemical feed pipe and drain pipe runs through shell and extends to shell Front side, the one end of the liquid-feeding tube far from sparge pipe run through shell and extend to the right side of shell.
Preferably, the top of the liquid-feeding tube, filler pipe, drainpipe and chemical feed pipe is connected with removable cover, described The surface of drainpipe and drain pipe and control valve is installed on front side of the shell, the inner wall surface point of the Rose Box Filter membrane and filter screen are not fixedly connected with it.
(3) advantageous effect
The present invention provides a kind of Hardware fitting processing pre-treatment all-in-one machines.Has following advantageous effect:
1, Hardware fitting processing pre-treatment all-in-one machine, is provided with washing room, hothouse and the process chamber of pickling room three, Hardware fitting can be washed simultaneously, be dried and pickling, it is lower compared to independent washing, dry and pickler cost, The area smaller of occupancy, and more convenient to use, the master that staff is handled before being completed in an equipment Step is wanted, it is mostly independent to solve traditional Hardware fitting washing, pickling and drying equipment, increases cost, and use is not square Just the problem of.
2, the Hardware fitting, which is processed, uses pre-treatment all-in-one machine, and discharge casing is provided in washing room, can be by the dirty water of cleaning Recycling is collected, the dirty water of collection can be filtered by filter chamber, impurity larger in dirty water is removed, is gone Except the water after impurity can again be recycled into water tank, a large amount of water resource is saved, it can be by drying by wind turbine Indoor air extraction, makes to form thermal cycle in hothouse, makes drying efficiency higher, to save electric power resource, pass through collection Case can collect the indoor pickle of pickling, and medicament can be added into collecting box by chemical feed pipe, so as to by pickle into Row neutralizes, and pickle direct emission is avoided to pollute.
3, Hardware fitting processing pre-treatment all-in-one machine, can play sealing function by sealing cover, effectively prevent water Hot gas spilling in water and drying process during washing causes to waste, and avoids the pickle in acid cleaning process from splashing out and is made to human body At injury, fixed column and article placing frame can be fixed by jack, fixed column can jack up article placing frame, be taken convenient for staff Take article placing frame, whole device is simple in structure, by that will wash, dry and pickling put together, can simultaneously to Hardware fitting into Row washing, dry and pickling, it is more convenient to use compared to traditional autonomous device, it is more suitable for midget plant's use.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is structure of the invention sectional view;
Fig. 3 is partial enlarged view at A in Fig. 2 of the present invention;
Fig. 4 is Rose Box structure sectional view of the present invention.
In figure:1 shell, 2 wheel carriers, 3 movable pulleys, 4 handles, 5 washing rooms, 6 hothouses, 7 pickling rooms, 8 partition boards, 9 operating surfaces Plate, 10 sealing covers, 11 knobs, 12 transverse slats, 13 water tanks, 14 Rose Boxes, 15 discharge casings, 16 sparge pipes, 17 fountain heads, 18 wind Machine, 19 heating motors, 20 air hoses, 21 jet thrusts, 22 collecting boxs, 23 sparge pipes, 24 jet heads, 25 water pumps, 26 aqueducts, 27 add Water pipe, 28 connecting tubes, 29 drainpipes, 30 guide ducts, 31 discharge pipes, 32 collector tubes, 33 collector pipes, 34 chemical feed pipes, 35 drain pipes, 36 liquid-feeding tubes, 37 article placing frames, 38 along side, 39 fixed columns, 40 jacks, 41 grooves, 42 putting holes, 43 removable covers, 44 control valves, 45 filter membranes, 46 filter screens.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the present invention provides a kind of Hardware fitting processing pre-treatment all-in-one machine, as shown in Figs 1-4, including shell 1, The bottom of shell 1 is fixedly connected with wheel carrier 2, and the bottom of wheel carrier 2 is movably installed with movable pulley 3, the left side top of shell 1 by shaft Portion is fixedly connected with handle 4, pushes handle 4 whole equipment can be driven to move, the inside of shell 1 is from left to right set respectively successively It is equipped with washing room 5, hothouse 6 and pickling room 7, the inner wall surface of shell 1 is fixedly connected there are three partition board 8, and washing room 5 is dried It is fixedly connected by partition board 8 between room 6 and pickling room 7, Hardware fitting can be washed simultaneously, dried and pickling, compared Independent washing, dry and pickler cost are lower, the area smaller of occupancy, and more convenient to use, and work people The key step that member is handled before being completed in an equipment, the corresponding washing room 5 in front, hothouse 6 and the pickling of shell 1 There are three operation panel 9, the position that the top of shell 1 corresponds to washing room 5, hothouse 6 and pickling room 7 leads to for the position setting of room 7 Hinge flexible connection is crossed there are three sealing cover 10, the top of sealing cover 10 is fixedly connected with knob 11, pulls knob 11 can will Sealing cover 10 is opened, and the inside of washing room 5, hothouse 6 and pickling room 7 is both provided with transverse slat 12, surface and the shell 1 of transverse slat 12 Inner wall surface be fixedly connected with the side of partition board 8, hole is offered on transverse slat 12, so that water and liquid pass through.
The inner wall bottom of shell 1 and positioned at washing room 5 inside be from left to right respectively fixedly connected with successively water tank 13, The inner wall surface of Rose Box 14 and discharge casing 15, Rose Box 14 has been respectively fixedly connected with filter membrane 45 and filter screen 46, passes through The dirty water of collection can be filtered by filter chamber 14, and impurity larger in dirty water is removed, and removing the water after impurity can enter Water tank 13 recycles again, saves a large amount of water resource, the inner wall side of shell 1 and the side of partition board 8 and is located at water The inside of chamber wash 5 is fixedly connected with sparge pipe 16, and the side of sparge pipe 16 is mutually connected with multiple fountain heads 17, the inner wall bottom of shell 1 Portion and positioned at hothouse 6 inside be installed with respectively wind turbine 18 and heating motor 19, the side of partition board 8 and be located at hothouse 6 inside is fixedly connected with air hose 20, and the side of air hose 20 is mutually connected with multiple jet thrusts 21, the inner wall bottom of shell 1 and is located at The inside of pickling room 7 is fixedly connected with collecting box 22, the inner wall side of shell 1 and is fixedly connected with positioned at the inside of pickling room 7 The side of sparge pipe 23, sparge pipe 23 is mutually connected with multiple jet heads 24, and the top of water tank 13 is installed with water pump 25, water pump 25 input terminal and output end is homogeneously connected with aqueduct 26, the inside that the input terminal of water pump 25 passes through aqueduct 26 and water tank 13 It communicates, 25 output end of water pump is communicated by aqueduct 26 with the bottom of sparge pipe 16, and water pump 25 conveys the water in water tank 13 To sparge pipe 16, the Hardware fitting surface in article placing frame 37 is sprayed under the action of fountain head 17, and Hardware fitting surface is carried out The front of cleaning, water tank 13 is mutually connected with filler pipe 27, and connecting tube is mutually connected between water tank 13, Rose Box 14 and discharge casing 15 28, the front of discharge casing 15 is mutually connected with drainpipe 29, and the input terminal and output end of wind turbine 18 are homogeneously connected with guide duct 30, wind turbine 18 Output end communicated with the input terminal of heating motor 19 by guide duct 30, the guide duct 30 of the output of wind turbine 18 is through cross The air in hothouse 6 can be extracted out by wind turbine 18 in plate 12 and the top for extending to transverse slat 12, make to be formed in hothouse 6 Thermal cycle makes drying efficiency higher, and to save electric power resource, the output end of heating motor 19 is mutually connected with discharge pipe 31, outlet air The one end of pipe 31 far from heating motor 19 is communicated with the bottom of air hose 20, and heating motor 19 heats air, and hot wind passes through outlet air Pipe 31 is sprayed under the action of jet thrust 21, the Hardware fitting in article placing frame 37 is dried, collecting box into Gas inlet tube 20 22 top is mutually connected with collector tube 32, and the left side of collecting box 22 and the top of discharge casing 15 are homogeneously connected with collector pipe 33, hothouse 6 Interior extra water can pass through inside hole and the entrance collecting box 22 of collector pipe 33 on transverse slat 12, the front difference phase of collecting box 22 It is connected with chemical feed pipe 34 and drain pipe 35, filler pipe 27, drainpipe 29, chemical feed pipe 34 and the positive of drain pipe 35 run through shell 1 And the front side of shell 1 is extended to, the surface of drainpipe 29 and drain pipe 35 and it is installed with control valve positioned at the front side of shell 1 Door 44, the pickle in pickling room 7 can be collected, can be added into collecting box 22 by chemical feed pipe 34 by collecting box 22 Medicament avoids pickle direct emission from polluting to neutralize pickle, opens control valve 44, can will arrange Liquid discharge in water tank 15 and collecting box 22, the right side of sparge pipe 23 are mutually connected with liquid-feeding tube 36, and liquid-feeding tube 36 is far from sparge pipe 23 one end is through shell 1 and extends to the right side of shell 1, liquid-feeding tube 36, filler pipe 27, drainpipe 29 and chemical feed pipe 34 top Portion is connected with removable cover 43, opens removable cover 43, adds the pickle mixed into sparge pipe 23 from liquid-feeding tube 36, Pickle sprays under the effect of nozzle 24, and pickling, the top movable grafting of washing room 5 are carried out to the Hardware fitting in article placing frame 37 There are article placing frame 37, Hardware fitting to be placed in article placing frame 37, hole is offered on article placing frame 37, the top of article placing frame 37 is fixedly connected with Along side 38, it is fixedly connected with fixed column 39 along the bottom on side 38, the top of shell 1 offers jack 40, the bottom of fixed column 39 Through jack 40 and the inside of jack 40 is extended to, fixed column 39 and article placing frame 37 can be fixed by jack 40, fixed column 39 can jack up article placing frame 37, take article placing frame 37 convenient for staff, the bottom of sealing cover 10 opens up fluted 41, along side 38 top through-going recess 41 and the inside for extending to groove 41 can play sealing function by sealing cover 10, effectively prevent Hot gas spilling in water and drying process in water-washing process causes to waste, and the pickle in acid cleaning process is avoided to splash out to human body It damages, the position that the top of shell 1 corresponds to washing room 5, hothouse 6 and pickling room 7 is opened up there are three putting hole 42, is placed 42 size of hole matches with article placing frame 37.
Operation principle:When washing to Hardware fitting, knob 11 is pulled first, sealing cover 10 is opened, by five Golden accessory is placed in article placing frame 37, shuts sealing cover 10 after putting well, is operated, is passed through on the operation panel 9 of washing room 5 Water in water tank 13 is transported to sparge pipe 16 by the topped up with water into water tank 13 of filler pipe 27, water pump 25, in fountain head 17 The Hardware fitting surface in article placing frame 37 is sprayed under effect, Hardware fitting surface is cleaned, and the dirty water after cleaning passes through collection Water pipe 33 enter discharge casing 15, by connecting tube 28 enter Rose Box 14, under the action of filter membrane 45 and filter screen 46 will in The impurity in face removes, and removes the water after impurity and enters the recycling of water tank 13 by connecting tube 28, finally cleaning is finished and will be opened It closes, opens control valve 44, the water in discharge casing 15 is discharged, article placing frame 37 is removed, the Hardware fitting of the inside is taken Go out;
When Hardware fitting is dried, Hardware fitting is placed in article placing frame 37 first, opens sealing cover 10, it will Article placing frame 37 is put into from putting hole 42 in hothouse 6, so that the fixed column 39 on side 38 of article placing frame 37 is inserted into jack 40, is put Sealing cover 10 is closed after good, is then operated on operation panel 9, heating motor 19 heats air, and hot wind passes through discharge pipe 31, into Gas inlet tube 20, spray under the action of jet thrust 21, the Hardware fitting in article placing frame 37 are dried, and wind turbine 18 will Air in hothouse 6 is endlessly extracted at heating motor 19, makes to form thermal cycle in hothouse 6, and finally drying finishes Switch is closed, sealing cover 10 is opened, article placing frame 37 and the Hardware fitting of the inside are taken out;
When carrying out pickling to Hardware fitting, Hardware fitting is placed in article placing frame 37 first, opens sealing cover 10, it will Article placing frame 37 is put into from putting hole 42 in pickling room 7, closes sealing cover 10 after putting well, is then operated, is beaten on operation panel 9 Removable cover 43 to be opened, adds the pickle mixed into sparge pipe 23 from liquid-feeding tube 36, pickle sprays under the effect of nozzle 24, Pickling is carried out to the Hardware fitting in article placing frame 37, the pickle after pickling passes through collector tube 32 to enter in collecting box 22, finally Pickling finishes, and opens removable cover 43, and medicament is added from chemical feed pipe 34 to collecting box 22, is neutralized to the pickle of the inside, in With rear opening control valve 44, the liquid in collecting box 22 is discharged from drain pipe 35, the Hardware fitting of the inside is taken out.
In conclusion Hardware fitting processing pre-treatment all-in-one machine, is provided with washing room 5, hothouse 6 and pickling room 7 Three process chambers can simultaneously wash Hardware fitting, be dried and pickling, be set compared to independent washing, dry and pickling Standby cost is lower, the area smaller of occupancy, and more convenient to use, and staff can complete in an equipment The key step of pre-treatment, it is mostly independent to solve traditional Hardware fitting washing, pickling and drying equipment, is added to This, inconvenient problem with use.
The Hardware fitting, which is processed, uses pre-treatment all-in-one machine, and discharge casing 15 is provided in washing room 5, can be by the dirty water of cleaning Recycling is collected, the dirty water of collection can be filtered by filter chamber 14, impurity larger in dirty water is removed, Water after removal impurity can again be recycled into water tank 13, save a large amount of water resource, can be with by wind turbine 18 By the air extraction in hothouse 6, makes to form thermal cycle in hothouse 6, make drying efficiency higher, to save electric power resource, The pickle in pickling room 7 can be collected by collecting box 22, medicament can be added into collecting box 22 by chemical feed pipe 34, To neutralize pickle, pickle direct emission is avoided to pollute.
Hardware fitting processing pre-treatment all-in-one machine, can play sealing function by sealing cover 10, effectively prevent water Hot gas spilling in water and drying process during washing causes to waste, and avoids the pickle in acid cleaning process from splashing out and is made to human body At injury, fixed column 39 and article placing frame 37 can be fixed by jack 40, fixed column 39 can jack up article placing frame 37, be convenient for Staff takes article placing frame 37, and whole device is simple in structure, by that will wash, dry and pickling put together, can be simultaneously Hardware fitting is washed, is dried and pickling, it is more convenient to use compared to traditional autonomous device, it is more suitable for midget plant It uses.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of Hardware fitting processing pre-treatment all-in-one machine, including shell (1), it is characterised in that:The bottom of the shell (1) It is fixedly connected with wheel carrier (2), the bottom of the wheel carrier (2) is movably installed with movable pulley (3) by shaft, the shell (1) Left side top is fixedly connected with handle (4), and the inside of the shell (1) is from left to right respectively arranged with washing room (5), does successively Dry room (6) and pickling room (7), the inner wall surface of the shell (1) are fixedly connected there are three partition board (8), the washing room (5), It is fixedly connected by partition board (8) between hothouse (6) and pickling room (7), the corresponding washing room (5) in front of the shell (1) is done The setting of the position of dry room (6) and pickling room (7) there are three operation panel (9), the top of the shell (1) correspond to washing room (5), The position of hothouse (6) and pickling room (7) is connected through hinge activity there are three sealing cover (10), the top of the sealing cover (10) Portion is fixedly connected with knob (11), and the inside of the washing room (5), hothouse (6) and pickling room (7) is both provided with transverse slat (12), the surface of the transverse slat (12) is fixedly connected with the side of the inner wall surface of shell (1) and partition board (8);
The inner wall bottom of the shell (1) and it is from left to right respectively fixedly connected with water storage successively positioned at the inside of washing room (5) Case (13), Rose Box (14) and discharge casing (15), the inner wall side of the shell (1) and the side of partition board (8) and positioned at washing The inside of room (5) is fixedly connected with sparge pipe (16), and the side of the sparge pipe (16) is mutually connected with multiple fountain heads (17), described The inner wall bottom of shell (1) and the inside for being located at hothouse (6) are installed with wind turbine (18) and heat motor (19), institute respectively It states the side of partition board (8) and is fixedly connected with air hose (20) positioned at the inside of hothouse (6), the side of the air hose (20) communicates There are multiple jet thrusts (21), the inner wall bottom of the shell (1) and is fixedly connected with collecting box positioned at the inside of pickling room (7) (22), the inner wall side of the shell (1) and sparge pipe (23), the hydrojet are fixedly connected with positioned at the inside of pickling room (7) The side of pipe (23) is mutually connected with multiple jet heads (24), and water pump (25) is installed at the top of the water tank (13), described The input terminal and output end of water pump (25) are homogeneously connected with aqueduct (26), and the front of the water tank (13) is mutually connected with filler pipe (27), connecting tube (28), the discharge casing (15) are mutually connected between the water tank (13), Rose Box (14) and discharge casing (15) Front be mutually connected with drainpipe (29), the output end for heating motor (19) is mutually connected with discharge pipe (31), the discharge pipe (31) one end far from heating motor (19) is communicated with the bottom of air hose (20), and the top of the collecting box (22) is mutually connected with liquid collecting It manages (32), the left side of the collecting box (22) and the top of discharge casing (15) are homogeneously connected with collector pipe (33), the collecting box (22) front is mutually connected with chemical feed pipe (34) and drain pipe (35) respectively, and the right side of the sparge pipe (23) is mutually connected with liquid-feeding tube (36), the top movable of the washing room (5) is plugged with article placing frame (37), and edge is fixedly connected at the top of the article placing frame (37) Side (38).
2. a kind of Hardware fitting processing pre-treatment all-in-one machine according to claim 1, it is characterised in that:The water pump (25) input terminal is communicated by aqueduct (26) with the inside of water tank (13), and water pump (25) output end passes through aqueduct (26) it is communicated with the bottom of sparge pipe (16).
3. a kind of Hardware fitting processing pre-treatment all-in-one machine according to claim 1, it is characterised in that:The wind turbine (18) input terminal and output end is homogeneously connected with guide duct (30), and the output end of the wind turbine (18) by guide duct (30) and adds The input terminal of thermoelectric perpetual motion machine (19) communicates.
4. a kind of Hardware fitting processing pre-treatment all-in-one machine according to claim 1, it is characterised in that:It is described along side (38) bottom is fixedly connected with fixed column (39), and jack (40), the fixed column (39) are offered at the top of the shell (1) Bottom through jack (40) and extend to the inside of jack (40).
5. a kind of Hardware fitting processing pre-treatment all-in-one machine according to claim 1, it is characterised in that:The sealing cover (10) bottom opens up fluted (41), and the top through-going recess (41) along side (38) simultaneously extends to the interior of groove (41) Portion, the position that the top of the shell (1) corresponds to washing room (5), hothouse (6) and pickling room (7) open up that there are three putting holes (42)。
6. a kind of Hardware fitting processing pre-treatment all-in-one machine according to claim 1, it is characterised in that:The filler pipe (27), before the front of drainpipe (29), chemical feed pipe (34) and drain pipe (35) runs through shell (1) and extends to shell (1) Side, the one end of the liquid-feeding tube (36) far from sparge pipe (23) run through shell (1) and extend to the right side of shell (1).
7. a kind of Hardware fitting processing pre-treatment all-in-one machine according to claim 6, it is characterised in that:The liquid-feeding tube (36), the top of filler pipe (27), drainpipe (29) and chemical feed pipe (34) is connected with removable cover (43), the drainpipe (29) and the surface of drain pipe (35) and control valve (44), the Rose Box are installed on front side of the shell (1) (14) inner wall surface has been respectively fixedly connected with filter membrane (45) and filter screen (46).
CN201810611235.2A 2018-06-14 2018-06-14 A kind of Hardware fitting processing pre-treatment all-in-one machine Withdrawn CN108517532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810611235.2A CN108517532A (en) 2018-06-14 2018-06-14 A kind of Hardware fitting processing pre-treatment all-in-one machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810611235.2A CN108517532A (en) 2018-06-14 2018-06-14 A kind of Hardware fitting processing pre-treatment all-in-one machine

Publications (1)

Publication Number Publication Date
CN108517532A true CN108517532A (en) 2018-09-11

Family

ID=63427316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810611235.2A Withdrawn CN108517532A (en) 2018-06-14 2018-06-14 A kind of Hardware fitting processing pre-treatment all-in-one machine

Country Status (1)

Country Link
CN (1) CN108517532A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109520229A (en) * 2018-12-20 2019-03-26 西藏净源科技有限公司 A kind of forced air drying device for pelletizing
CN111014162A (en) * 2019-12-17 2020-04-17 徐州振丰超声电子有限公司 Permanent magnet cleaning, pickling and activating integrated machine before electroplating
CN114453304A (en) * 2020-11-10 2022-05-10 杉野机械股份有限公司 Processing system
CN114632777A (en) * 2022-04-08 2022-06-17 浙江强力紧固件有限公司 Pickling equipment for bolt machining and machining process thereof
CN115213157A (en) * 2022-07-19 2022-10-21 江苏格林保尔光伏有限公司 Quartz boat sweeps equipment with weather mechanism

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109520229A (en) * 2018-12-20 2019-03-26 西藏净源科技有限公司 A kind of forced air drying device for pelletizing
CN109520229B (en) * 2018-12-20 2023-11-28 西藏净源科技有限公司 A blast drying device for pellet
CN111014162A (en) * 2019-12-17 2020-04-17 徐州振丰超声电子有限公司 Permanent magnet cleaning, pickling and activating integrated machine before electroplating
CN114453304A (en) * 2020-11-10 2022-05-10 杉野机械股份有限公司 Processing system
CN114632777A (en) * 2022-04-08 2022-06-17 浙江强力紧固件有限公司 Pickling equipment for bolt machining and machining process thereof
CN115213157A (en) * 2022-07-19 2022-10-21 江苏格林保尔光伏有限公司 Quartz boat sweeps equipment with weather mechanism

Similar Documents

Publication Publication Date Title
CN108517532A (en) A kind of Hardware fitting processing pre-treatment all-in-one machine
CN205074264U (en) Heat treating rinse drying device with work piece
CN205966601U (en) Water -saving medicinal material washs and drying equipment
CN202943058U (en) Cleaning system of lead-acid storage battery
CN201022334Y (en) Dried fruit high-pressure spraying cleaning machine
CN108262291A (en) A kind of automatically-controlled door door lock cleaning device and its method
CN208346266U (en) A kind of Hardware fitting processing pre-treatment all-in-one machine
CN208853089U (en) A kind of floor film covering device
CN111906107B (en) Automatic cleaning device for glassware
CN205843002U (en) A kind of idle call auto-cleaning filter screen device
CN107338592A (en) A kind of dyeing water washing machine
CN109107986A (en) A kind of environmental protection glass cleaning drier
CN110721950A (en) Efficient cleaning device for shoe surface for shoe production
CN205310593U (en) Plastic film cleaning device
CN206951470U (en) A kind of full-automatic spray oil machine
CN217709688U (en) Automatic cleaning device for metal product processing
CN221066960U (en) Spray cooling device for hydraulic rubber tube production
CN212103296U (en) Cloth belt cleaning device for textile production
CN221387755U (en) Multiple high pressure cleaning photoresist remover
CN215745267U (en) Valve cleaning device with circulation function
CN218049240U (en) Automatic change equipment belt cleaning device
CN108843000A (en) A kind of inner wall of building painting painting device with agitating function
CN221790316U (en) Water circulation utilization type cleaning machine
CN221694576U (en) Hardware fitting cleaning equipment capable of recycling hardware scraps
CN217665015U (en) Novel handicraft wash drying equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180911

WW01 Invention patent application withdrawn after publication