CN108508360A - Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system - Google Patents

Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system Download PDF

Info

Publication number
CN108508360A
CN108508360A CN201810252579.9A CN201810252579A CN108508360A CN 108508360 A CN108508360 A CN 108508360A CN 201810252579 A CN201810252579 A CN 201810252579A CN 108508360 A CN108508360 A CN 108508360A
Authority
CN
China
Prior art keywords
double
wind turbine
master controller
fed wind
turbine master
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810252579.9A
Other languages
Chinese (zh)
Inventor
王晓声
田博
葛俊
宋鹏
刘辉
崔阳
李智
江浩
孙大卫
巩宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
State Grid Jibei Electric Power Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
North China Electric Power Research Institute Co Ltd
State Grid Jibei Electric Power Co Ltd
Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, North China Electric Power Research Institute Co Ltd, State Grid Jibei Electric Power Co Ltd, Electric Power Research Institute of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810252579.9A priority Critical patent/CN108508360A/en
Publication of CN108508360A publication Critical patent/CN108508360A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/34Testing dynamo-electric machines

Abstract

The present invention, which provides, a kind of being based on RT Lab Double-feed wind powers virtual synchronous generator performance test methods and system, wherein system includes:Mathematical model, double-fed wind turbine master controller, inverter controller and the observation device built in RT Lab replicating machines, wherein the mathematical model includes asynchronous machine, transformer, current transformer and power grid.Transformer is arranged between asynchronous machine stator and power grid;Current transformer is arranged between asynchronous machine rotor and asynchronous machine stator;Double-fed wind turbine master controller is equipped with the simulation program of fan body and drive shaft system, connects inverter controller and the RT Lab replicating machines;Inverter controller connects the RT Lab replicating machines;Observation device connects double-fed wind turbine master controller and inverter controller.The present invention can avoid the limitation of on-the-spot test so that test result and Practical Project are more close.Meanwhile, it is capable to be fully assessed to the control strategy of the Double-feed wind power virtual synchronous generator of different manufacturers, guidance is provided for engineer application.

Description

Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system
Technical field
The invention belongs to wind-powered electricity generation fields, more particularly to one kind being based on RT-Lab Double-feed wind power virtual synchronous generator performances Test method and system.
Background technology
With the increasingly depleted of traditional energy and increasingly sharpening for environmental problem, using photovoltaic, wind-powered electricity generation as the new energy of representative Generation technology development is swift and violent, and double-fed wind turbine has accounted for sizable ratio wherein.Since double-fed wind turbine uses asynchronous generating Machine, output power there's almost no with mains frequency and voltage and couple, therefore is difficult for power grid and provides necessary frequency and voltage Support.With the continuous improvement of double-fed wind turbine permeability in power grid, an urgent demand double-fed wind turbine has to generate electricity with conventional synchronization The similar frequency modulation and voltage modulation ability of machine, virtual synchronous generator (Virtual Synchronous Generator, VSG) technology carry A solution is supplied.
VSG technologies by simulating the characteristics such as active frequency modulation and idle pressure regulation in the controls so that double-fed wind turbine is grid-connected System is similar with synchronous generator in external characteristics, to provide frequency and voltage support for power grid.The research of VSG technologies is current It is still in the starting stage, still has certain distance apart from large-scale engineering applications.In order to which Double-feed wind power virtual synchronous generator exists Following large-scale promotion and application, there is an urgent need to which its performance is tested and assessed, and still lacks effective double-fed at present Type wind-powered electricity generation virtual synchronous generator performance test method and system.
The performance test of Double-feed wind power virtual synchronous generator is mainly realized by the method for Digital Simulation at present.Number Word emulation mode is only capable of providing qualitative verification to control strategy, with real system in control structure, signal transmission, parameter tuning Etc. have very big difference, it is limited to the directive significance of engineer application.Therefore, also lack at present it is a kind of it is practical close to engineering, cut It is real it is feasible, it can be considered that the Double-feed wind power virtual synchronous generator performance test method of different manufacturers product differentiation and being System.
Invention content
The present invention is used to solve to use the method verification Double-feed wind power virtual synchronous power generation of Digital Simulation in the prior art On the one hand the performance of machine has greater difference with Practical Project consistency, on the other hand can not be to the otherness of different manufacturers product It is considered.
A technical solution of the invention is to provide one kind to test based on RT-Lab Double-feed wind power virtual synchronous generator performances System, including:Mathematical model, double-fed wind turbine master controller, inverter controller and the observation built in RT-Lab replicating machines Equipment, wherein the mathematical model includes asynchronous machine, transformer, current transformer and power grid;
The transformer is arranged between asynchronous machine stator and the power grid, for boosting;
The current transformer is arranged between asynchronous machine rotor and asynchronous machine stator, for according to second control signal tune The electromagnetic torque and rotating speed of the whole asynchronous machine;
The double-fed wind turbine master controller is equipped with the simulation program of fan body and drive shaft system, connects the current transformer Controller and the RT-Lab replicating machines send rotation speed of fan for sending out first control signal to the inverter controller To the asynchronous machine rotor;
The inverter controller connects the RT-Lab replicating machines, for sending out the second control according to first control signal Signal is to the current transformer;
The observation device connects the double-fed wind turbine master controller and the inverter controller, for observing and recording Electrical quantity in the double-fed wind turbine master controller and the inverter controller.
Another technical solution of the present invention is to provide one kind to survey based on RT-Lab Double-feed wind power virtual synchronous generator performances Method for testing, including:
Build the Double-feed wind power virtual synchronous test system for generator described in previous embodiment;
Setting emulation duty parameter, double-fed wind turbine master controller parameter and inverter controller parameter, utilize observation device It observes and records the electrical quantity in the double-fed wind turbine master controller and the inverter controller;
The performance indicator of Double-feed wind power virtual synchronous generator is analyzed according to the electrical quantity of observation device record;
The performance indicator that analysis obtains is compared with standard index, determines whether performance indicator meets the requirements.
The present invention will propose the test of Double-feed wind power virtual synchronous generator performance using the tool of half hardware in loop in kind Method and system can avoid the limitation of on-the-spot test so that test result and Practical Project are more close.Meanwhile, it is capable to To control strategy (double-fed wind turbine master controller and the Frequency Converter Control of the Double-feed wind power virtual synchronous generator of different manufacturers Device) it is fully assessed, provide guidance for engineer application.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, required use in being described below to embodiment Attached drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this For the those of ordinary skill of field, without creative efforts, others are can also be obtained according to these attached drawings Attached drawing.
Fig. 1 is the knot that system is tested based on RT-Lab Double-feed wind power virtual synchronous generator performances of the embodiment of the present invention Composition;
Fig. 2 is the embodiment of the present invention based on the practical connection figure of RT-Lab Double-feed wind power virtual synchronous generators;
Fig. 3 is the stream based on RT-Lab Double-feed wind power virtual synchronous generator performance test methods of the embodiment of the present invention Cheng Tu;
Mains frequency when Fig. 4 a and Fig. 4 b are the Double-feed wind power virtual synchronous generator inertia test of the embodiment of the present invention And the waveform variation diagram of active power;
Power grid when Fig. 5 a and Fig. 5 b are the Double-feed wind power virtual synchronous generator primary frequency modulation test of the embodiment of the present invention The waveform variation diagram of frequency and active power.
Specific implementation mode
In order to which the technical characterstic and effect that make the present invention are more obvious, technical scheme of the present invention is done below in conjunction with the accompanying drawings It further illustrates, the specific example that the present invention also can have other different is illustrated or implements, any those skilled in the art The equivalents done within the scope of the claims belong to the protection category of the present invention.
In the description of this specification, reference term " embodiment ", " specific embodiment ", " such as ", etc. description Mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained in at least one of the present invention In embodiment or example.In the present specification, schematic expression of the above terms be not necessarily referring to identical embodiment or Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more embodiments or example In can be combined in any suitable manner.Implementation of the step of involved in each embodiment sequentially for schematically illustrating the present invention, it is therein Sequence of steps is not construed as limiting, and can be appropriately adjusted as needed.
As shown in FIG. 1, FIG. 1 is the embodiment of the present invention to be surveyed based on RT-Lab Double-feed wind power virtual synchronous generator performances The structure chart of test system, the present embodiment can avoid the limitation of on-the-spot test so that test result more connects with Practical Project Closely.Meanwhile, it is capable to Double-feed wind power virtual synchronous generator to different manufacturers control strategy (double-fed wind turbine master controller and Frequency converter controller) it is fully assessed, provide guidance for engineer application.
Specifically, including based on RT-Lab Double-feed wind power virtual synchronous generator performances test system:It is imitative in RT-Lab Mathematical model 100, double-fed wind turbine master controller 200, inverter controller 300 and the observation device 400 built in prototype, In, mathematical model 100, double-fed wind turbine master controller 200, inverter controller 300 constitute the power generation of Double-feed wind power virtual synchronous Machine, mathematical model 100 include asynchronous machine 110, transformer 120, current transformer 130 and power grid 140.
Transformer 120 is arranged between asynchronous machine 110 and power grid 140, for boosting, as shown in Figure 1, transformer passes through Transmission line connects asynchronous machine 110 and power grid 140.When it is implemented, mathematical model includes two-stage transformer, 35kV/690V Transformer and 220kV/35Kv transformers.
Current transformer 130 is arranged between asynchronous machine rotor and asynchronous machine stator (as shown in Figure 2), for according to second The electromagnetic torque and rotating speed for controlling signal adjustment asynchronous machine adjust grid-connected total current to realize.
Double-fed wind turbine master controller 200 is equipped with the simulation program 210 of fan body and drive shaft system, connects current transformer control Device 300 and RT-Lab replicating machines processed send rotation speed of fan to different for sending out first control signal to inverter controller 300 Walk rotor.Specifically, first control signal is, for example, wind turbine electromagnetic torque command value and propeller pitch angle command value.
Inverter controller 300 connects RT-Lab replicating machines, for sending out second control signal according to first control signal To current transformer 130.Specifically, second control signal is, for example, net side current transformer IGBT pulse signals, generator-side converter wear IGBT Pulse signal, net side contactor switching signal, excitation contactor switching signal etc. control signal.
Observation device 400 connects double-fed wind turbine master controller 200 and inverter controller 300, double for observing and recording Present the electrical quantity in wind turbine master controller 200 and inverter controller 300.
In the present embodiment, it is compiled into C code after mathematical model real time implementation, is downloaded in RT-Lab replicating machines.Double-fed wind turbine Master controller and inverter controller are entity hardware, can be that the market-oriented product of arbitrary manufacturer (is run with scene Double-fed wind turbine master controller is consistent) or the product developed, the present invention is to double-fed wind turbine master controller and inverter controller Production firm, model etc. be not construed as limiting.Pass through fieldbus between double-fed wind turbine master controller and inverter controller (Rrobus) it is connected, double-fed wind turbine master controller and inverter controller are connected by I/O interface with RT-Lab replicating machines, are passed through Software set is connected to realize with the specific device in mathematical model.
In one embodiment of the invention, mathematical model also may include main circuit of converter, protection circuit, filter branch etc..
In one embodiment of the invention, observation device is host computer oscillograph, host computer recording software or oscillograph.Observation is set It is standby to go back Observable other than observing and recording electrical quantity and record the mechanical quantities such as rotation speed of fan, propeller pitch angle, mechanical output, so as to Judge whether fan body and drive shaft system are normal according to these mechanical quantities.
Further, observation device be additionally operable to observe and record network voltage, power network current, stator voltage, stator current, The analog quantitys such as voltage on line side, current on line side, pusher side voltage, side currents, DC bus-bar voltage, Crowbar voltages, net side contact The digital quantity signals such as device switching signal, excitation contactor switching signal.
In one embodiment of the invention, the situation of change of each parameters of operating part in mathematical model is understood for the ease of tester, Further include multiple oscillographs in mathematical model, is connect respectively with asynchronous electronics, transformer, current transformer and power grid.
In one embodiment of the invention, the electrical quantity of observation device record includes:Electromagnetic power, grid entry point voltage and grid-connected total Electric current.Wherein, electromagnetic power is obtained from double-fed wind turbine main controller, and grid entry point voltage and grid-connected total current are obtained from inverter controller It takes.
As shown in figure 3, Fig. 3 is being surveyed based on RT-Lab Double-feed wind power virtual synchronous generator performances for the embodiment of the present invention The flow chart of method for testing.It is first built before being implemented based on RT-Lab Double-feed wind power virtual synchronous generator performance test methods aforementioned Double-feed wind power virtual synchronous test system for generator described in embodiment, as shown in Figure 1.It is virtually same Double-feed wind power has been built Follow-up test process can be carried out after step test system for generator.
Specifically, the method includes:
Step 301, setting emulation duty parameter, and/or double-fed wind turbine master controller parameter, and/or inverter controller Parameter is observed using observation device and records the electrical quantity in the double-fed wind turbine master controller and the inverter controller.
Specifically, the emulation duty parameter includes:Mains frequency, network voltage and wind speed.Wind speed can be certain Value is arranged by the simulation program of fan body and drive shaft system.Mains frequency and network voltage can be according to step or oblique waves Form changes, and is arranged by the power grid in mathematical model, and specific version with test event (survey by inertia test, primary frequency modulation Examination) it is related, this is not limited by the present invention.The double-fed wind turbine master controller parameter includes:Inertia coefficient of frequency modulation, primary frequency modulation Coefficient and supporting time etc..The parameter of the inverter controller includes:Frequency filtering coefficient and ratio/integral coefficient etc..
Step 302, the performance that Double-feed wind power virtual synchronous generator is analyzed according to the electrical quantity of observation device record refers to Mark.Specifically, the performance indicator of the Double-feed wind power virtual synchronous generator includes active power, response time, adjusting One or more of time, support amplitude, supporting time, power error and power swing, performance indicator specific formula for calculation Referring to the prior art, this is not limited by the present invention.
Step 303:The performance indicator that analysis obtains is compared with respective standard index, determines whether performance indicator accords with It closes and requires.If analyzing obtained performance indicator in respective standard indication range, it is determined that performance indicator meets the requirements, conversely, It is then undesirable.
In some embodiments, in the case of undesirable, can return to step 301 adjustment emulation duty parameter and/ Or double-fed wind turbine master controller parameter, and/or inverter controller parameter, repetition step 302~step 303 further determine that Whether performance indicator meets the requirements, if repeatedly test is undesirable, feeds back to double-fed wind turbine master controller, current transformer control Zhi Qi manufacturers, to be adjusted to double-fed wind turbine master controller and inverter controller algorithm.
In other embodiment, in the case of undesirable, current transformer control parameter can be only adjusted, repeats above-mentioned step Rapid 302 and step 303, determine whether performance indicator can tune to normal range (NR).
In one embodiment of the invention, the setting emulation of above-mentioned steps 301 duty parameter, double-fed wind turbine master controller parameter and change Device controller parameter is flowed, is observed and is recorded in the double-fed wind turbine master controller and the inverter controller using observation device The process of the electrical quantity in portion includes:
1) setting is initial first emulates duty parameter, and it is rated value that mains frequency and voltage, which is arranged, and certain wind is arranged Machine rotating speed starts Double-feed wind power virtual synchronous generator and enters stable state.
2) adjustment emulation duty parameter, such as changes mains frequency or network voltage, is observed and recorded by observation device double The response parameter of feedback type wind-powered electricity generation virtual synchronous generator.Mains frequency or network voltage can become according to step or oblique wave form Change.
3) controller parameter, including double-fed wind turbine master controller parameter and inverter controller parameter are adjusted, observation is passed through Equipment observes and records the response parameter of Double-feed wind power virtual synchronous generator.
In one embodiment of the invention, the observation device is also observed and records the machinery in the double-fed wind turbine master controller Amount, such as rotation speed of fan, propeller pitch angle, mechanical output etc..Before above-mentioned steps 303, among or further include later:Step 303 ', According to mechanical quantity judge fan body and drive shaft system whether failure.If when it is implemented, step 303 ' it executes in above-mentioned steps Before 303, when judging that fan body and drive shaft system there are when failure, then need not execute step 303 again;If step 303 ' It executes among above-mentioned steps 303 or later, when judging fan body and drive shaft system there are when failure, even if above-mentioned steps 303 determination performance indicators meet the requirements, also insincere.
In one embodiment of the invention, in order to fully assess the performance of Double-feed wind power virtual synchronous generator, above-mentioned steps Further include after 304:Repeatedly change emulation duty parameter and/or double-fed wind turbine master controller and/or current transformer control The parameter of device, repeatedly to be tested.
In a specific embodiment of the invention, using test system proposed above, domestic certain mainstream current transformer control is accessed The 2MW double-fed wind turbine master controllers and inverter controller of device producer, the waveform obtained under specific operation such as Fig. 4 a, Fig. 4 b, Shown in Fig. 5 a and Fig. 5 b.Fig. 4 a and Fig. 4 b give mains frequency when Double-feed wind power virtual synchronous generator inertia is tested and have The waveform of work(power changes, power grid frequency when Fig. 5 a and Fig. 5 b give the test of Double-feed wind power virtual synchronous generator primary frequency modulation The waveform of rate and active power changes.
When implementation, observation device can also be acquired and be analyzed as needed including rotation speed of fan, wind speed, propeller pitch angle, grid-connected total Many electrical quantity including electric current etc. and mechanical quantity.
Double-feed wind power virtual synchronous generator performance proposed by the invention tests system and method, can will be actual Double-fed wind turbine master controller and inverter controller are linked into RT-Lab replicating machines (test system), realize that double-fed wind turbine is virtual Whole integral links of synchronous generator being built and simulating.Keep test result practical with engineering more closely, in turn avoiding existing The limitation of field test.For the test method proposed by the way that different emulation duty parameter or controller parameter is arranged, verification is double The frequency modulation performance of feedback type wind-powered electricity generation virtual synchronous generator, can also to different manufacturers Double-feed wind power virtual synchronous generator solution into Row fully assesses, and guidance is provided for engineer application.
It should be understood by those skilled in the art that, the embodiment of the present invention can be provided as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, the present invention can be used in one or more wherein include computer usable program code computer The computer program production implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The present invention be with reference to according to the method for the embodiment of the present invention, the flow of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
The above is only used to illustrate the technical scheme of the present invention, any those of ordinary skill in the art can without prejudice to Under the spirit and scope of the present invention, modifications and changes are made to the above embodiments.Therefore, the scope of the present invention should regard Subject to right.

Claims (12)

1. one kind testing system based on RT-Lab Double-feed wind power virtual synchronous generator performances, which is characterized in that including: Mathematical model, double-fed wind turbine master controller, inverter controller and the observation device built in RT-Lab replicating machines, wherein institute It includes asynchronous machine, transformer, current transformer and power grid to state mathematical model;
The transformer is arranged between asynchronous machine stator and the power grid, for boosting;
The current transformer is arranged between asynchronous machine rotor and asynchronous machine stator, for adjusting institute according to second control signal State the electromagnetic torque and rotating speed of asynchronous machine;
The double-fed wind turbine master controller is equipped with the simulation program of fan body and drive shaft system, connects the current transformer control Device and the RT-Lab replicating machines send rotation speed of fan to institute for sending out first control signal to the inverter controller State asynchronous machine rotor;
The inverter controller connects the RT-Lab replicating machines, for sending out second control signal according to first control signal To the current transformer;
The observation device connects the double-fed wind turbine master controller and the inverter controller, described for observing and recording Electrical quantity in double-fed wind turbine master controller and the inverter controller.
2. the system as claimed in claim 1, which is characterized in that the electrical quantity includes:Electromagnetic power, grid entry point voltage and simultaneously Net total current.
3. the system as claimed in claim 1, which is characterized in that the observation device is oscillograph or oscillograph.
4. the system as claimed in claim 1, which is characterized in that the observation device is additionally operable to observe and record the double-fed wind Mechanical quantity in owner's controller.
5. system as claimed in claim 4, which is characterized in that the mechanical quantity includes:Rotation speed of fan, propeller pitch angle and mechanical work Rate.
6. a kind of testing system based on Double-feed wind power virtual synchronous generator performance described in any one of claim 1 to 5 Test method, which is characterized in that including:
Setting emulation duty parameter, and/or double-fed wind turbine master controller parameter, and/or and inverter controller parameter, utilize sight Measurement equipment is observed and records the electrical quantity in the double-fed wind turbine master controller and the inverter controller;
The performance indicator of Double-feed wind power virtual synchronous generator is analyzed according to the electrical quantity of observation device record;
The performance indicator that analysis obtains is compared with standard index, determines whether performance indicator meets the requirements.
7. method as claimed in claim 6, which is characterized in that the emulation duty parameter includes:Mains frequency, network voltage And wind speed.
8. method as claimed in claim 6, which is characterized in that the double-fed wind turbine master controller parameter includes:Inertia frequency modulation Coefficient, primary frequency modulation coefficient and supporting time.
9. method as claimed in claim 6, which is characterized in that the inverter controller parameter includes:Frequency filtering coefficient And ratio/integral coefficient.
10. method as claimed in claim 6, which is characterized in that the performance of the Double-feed wind power virtual synchronous generator refers to Mark includes:One in active power, response time, regulating time, support amplitude, supporting time, power error and power swing It is a or multiple.
11. method as claimed in claim 6, which is characterized in that further include:According to the mechanical quantity in double-fed wind turbine master controller Judge fan body and drive shaft system whether failure, the mechanical quantity in the double-fed wind turbine master controller is recorded in the observation and sets In standby.
12. method as claimed in claim 6, which is characterized in that further include:Change emulation duty parameter and/or double-fed wind turbine Master controller parameter and/or inverter controller parameter carry out repeatedly test to fully assess Double-feed wind power virtual synchronous hair The performance of motor.
CN201810252579.9A 2018-03-26 2018-03-26 Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system Pending CN108508360A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810252579.9A CN108508360A (en) 2018-03-26 2018-03-26 Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810252579.9A CN108508360A (en) 2018-03-26 2018-03-26 Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system

Publications (1)

Publication Number Publication Date
CN108508360A true CN108508360A (en) 2018-09-07

Family

ID=63378436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810252579.9A Pending CN108508360A (en) 2018-03-26 2018-03-26 Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system

Country Status (1)

Country Link
CN (1) CN108508360A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109239600A (en) * 2018-11-12 2019-01-18 射阳远景能源科技有限公司 A kind of intelligence yaw simulative debugging system
CN109490773A (en) * 2018-10-29 2019-03-19 全球能源互联网研究院有限公司 A kind of virtual synchronous machine low voltage crossing characteristic test method, apparatus and system
CN109782626A (en) * 2019-01-17 2019-05-21 中国东方电气集团有限公司 A kind of wind power master control real-time simulation test macro based on RT-LAB
CN110334385A (en) * 2019-05-09 2019-10-15 南方电网科学研究院有限责任公司 Test method, device and the equipment of integrated energy system central controller
CN114153155A (en) * 2021-11-30 2022-03-08 上海电机学院 Wind power generation converter semi-physical simulation platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203102283U (en) * 2013-02-01 2013-07-31 华北电力科学研究院有限责任公司 Wind power plant modeling simulation system based on real time digital simulator (RTDS)
CN104597765A (en) * 2014-12-26 2015-05-06 重庆文理学院 Semi-physical real-time simulation platform of wind generating set
CN105549420A (en) * 2015-12-22 2016-05-04 南京南瑞集团公司 Real-time simulation test method of direct-driving draught-fan variable flow control system
CN205750525U (en) * 2016-06-30 2016-11-30 华北电力科学研究院有限责任公司 Double-fed blower fan subsynchronous resonance hardware-in-the-loop test system
CN106199193A (en) * 2016-06-30 2016-12-07 华北电力科学研究院有限责任公司 Double-fed blower fan impedance hardware-in-the-loop test system and method
CN207924103U (en) * 2018-03-26 2018-09-28 华北电力科学研究院有限责任公司 System is tested based on RT-Lab Double-feed wind power virtual synchronous generator performances

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203102283U (en) * 2013-02-01 2013-07-31 华北电力科学研究院有限责任公司 Wind power plant modeling simulation system based on real time digital simulator (RTDS)
CN104597765A (en) * 2014-12-26 2015-05-06 重庆文理学院 Semi-physical real-time simulation platform of wind generating set
CN105549420A (en) * 2015-12-22 2016-05-04 南京南瑞集团公司 Real-time simulation test method of direct-driving draught-fan variable flow control system
CN205750525U (en) * 2016-06-30 2016-11-30 华北电力科学研究院有限责任公司 Double-fed blower fan subsynchronous resonance hardware-in-the-loop test system
CN106199193A (en) * 2016-06-30 2016-12-07 华北电力科学研究院有限责任公司 Double-fed blower fan impedance hardware-in-the-loop test system and method
CN207924103U (en) * 2018-03-26 2018-09-28 华北电力科学研究院有限责任公司 System is tested based on RT-Lab Double-feed wind power virtual synchronous generator performances

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109490773A (en) * 2018-10-29 2019-03-19 全球能源互联网研究院有限公司 A kind of virtual synchronous machine low voltage crossing characteristic test method, apparatus and system
CN109239600A (en) * 2018-11-12 2019-01-18 射阳远景能源科技有限公司 A kind of intelligence yaw simulative debugging system
CN109782626A (en) * 2019-01-17 2019-05-21 中国东方电气集团有限公司 A kind of wind power master control real-time simulation test macro based on RT-LAB
CN110334385A (en) * 2019-05-09 2019-10-15 南方电网科学研究院有限责任公司 Test method, device and the equipment of integrated energy system central controller
CN114153155A (en) * 2021-11-30 2022-03-08 上海电机学院 Wind power generation converter semi-physical simulation platform

Similar Documents

Publication Publication Date Title
CN108508360A (en) Based on RT-Lab Double-feed wind powers virtual synchronous generator performance test method and system
Munteanu et al. Hardware-in-the-loop-based simulator for a class of variable-speed wind energy conversion systems: Design and performance assessment
CN104641529B (en) Method for determining the individual set point in generating equipment controller and generating equipment controller
US9300142B2 (en) Method for emulation of synchronous machine
CN106020168B (en) Double-fed wind turbine subsynchronous resonance hardware-in―the-loop test system and method
CN108196187B (en) Method for diagnosing three-phase asymmetric load fault of rotor winding of doubly-fed wind generator
Kana et al. System management of a wind-energy converter
Muntean et al. Hardware in the loop wind turbine emulator
CN112542855B (en) Modeling and simulation method for phasor model of double-fed wind power generation system
CN109800455A (en) A kind of idle characteristic Simulation method and apparatus of double-fed fan motor unit transient state
CN103713622A (en) Running test system and method of master control system of wind-driven generator
Xiaolin et al. Test method for inertia and damping of photovoltaic virtual synchronous generator based on power angle transfer function
WO2011150941A1 (en) Device and method for testing a wind power plant component
Neshati et al. Hardware-in-the-loop testing of wind turbine nacelles for electrical certification on a dynamometer test rig
CN109062077B (en) Pumped storage variable speed unit power generation and electric test system and control method thereof
Weijie et al. Investigating instability of the wind turbine simulator with the conventional inertia emulation scheme
CN207924103U (en) System is tested based on RT-Lab Double-feed wind power virtual synchronous generator performances
CN109755962A (en) The unit allocation method, apparatus and Wind turbines that no-voltage is passed through
Ferrari et al. Open-Code, Real-Time Emulation Testbed Of Grid-Connected Type-3 Wind Turbine System With Hardware Validation
CN110286605B (en) Wind power plant real-time testing and evaluating system and method thereof
Li et al. DFIG-based wind farm electromagnetic dynamic model and impact on protection relay of transmission network
CN107167733B (en) A kind of acquisition methods of the basal evaluation data of synchronous generator excited system performance
Sheeba et al. Optimizing electrical generators of wind energy conversion system for efficient power extraction
Alam et al. Power Hardware-In-the-Loop Hydropower and Ultracapacitor Hybrid Testbed
Gevorgian et al. Wgrid-49 GMLC project report: Understanding the role of short-term energy storage and large motor loads for active power controls by wind power

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination