A kind of construction drilling equipment Download PDFInfo
- Publication number
- CN108505937A CN108505937A CN201810413064.2A CN201810413064A CN108505937A CN 108505937 A CN108505937 A CN 108505937A CN 201810413064 A CN201810413064 A CN 201810413064A CN 108505937 A CN108505937 A CN 108505937A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- movable plate
- inner cavity
- drill bit
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 46
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 238000013016 damping Methods 0.000 claims abstract description 25
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 36
- 239000007921 spray Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 6
- 230000002035 prolonged effect Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 239000000428 dust Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 241001074085 Scophthalmus aquosus Species 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- FGRBYDKOBBBPOI-UHFFFAOYSA-N 10,10-dioxo-2-[4-(N-phenylanilino)phenyl]thioxanthen-9-one Chemical compound O=C1c2ccccc2S(=O)(=O)c2ccc(cc12)-c1ccc(cc1)N(c1ccccc1)c1ccccc1 FGRBYDKOBBBPOI-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004630 mental health Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
- E21B15/006—Means for anchoring the drilling machine to the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/07—Arrangements for treating drilling fluids outside the borehole for treating dust-laden gaseous fluids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16F—SPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
- F16F15/00—Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
- F16F15/02—Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
- F16F15/04—Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- General Engineering & Computer Science (AREA)
- Acoustics & Sound (AREA)
- Aviation & Aerospace Engineering (AREA)
- Earth Drilling (AREA)
Abstract
The invention discloses a kind of construction drilling equipments, including body, body is fixedly connected with hydraulic telescopic rod at the top of inner cavity, the output end of hydraulic telescopic rod is fixedly connected with movable plate, the bottom of movable plate is fixedly connected with motor, the output shaft of motor is fixedly connected with drill bit, and the bottom of drill bit runs through body and extends to the outside of body.The present invention passes through hydraulic telescopic rod, movable plate, motor, drill bit, first damping spring, fixed frame, second damping spring, the setting of gag lever post and placement plate, bore operation can be carried out automatically, the vibrations that drilling generates can be effectively reduced in boring procedure simultaneously, construction personnel is facilitated to use, it is time saving and energy saving, solving traditional drilling equipment is all performed manually by drilling simultaneously, drilling efficiency is low, and wasting manpower and material resources, it will produce vibrations in bore operation simultaneously, prolonged operation can damage drill bit, the problem of causing damages to the personal safety of user when serious.
Description
Technical field
The present invention relates to Architectural Equipment technical field, specially a kind of construction drilling equipment.
Background technology
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, in construction
It is required for drilling to ground using drilling machine, drilling machine refers to passing through using the tool harder, sharper keen than object
The mode of rotary cutting or rotary squeezing, the machinery and equipment that cylindrical hole or hole are left on object are referred to as, with society
Development, in mechanical processing, building etc. using more and more extensive, the type of drilling machine has very much, according to difference drilling machine
Use occasion, large-scale drilling machine and Small Drill Press can be divided into, traditional drilling equipment is all performed manually by drilling, drilling effect
Rate is low, and wasting manpower and material resources, while will produce vibrations in bore operation, and prolonged operation can damage drill bit, when serious
It can cause damages to the personal safety of user.
Invention content
The purpose of the present invention is to provide a kind of construction drilling equipments, have drilling efficiency height, and bore operation
In the advantages of drill bit being protected, solve traditional drilling equipment and be all performed manually by drilling, drilling efficiency is low, and wave
Take manpower and materials, while will produce vibrations in bore operation, prolonged operation can damage drill bit, can be to user when serious
Personal safety the problem of causing damages.
To achieve the above object, the present invention provides the following technical solutions:A kind of construction drilling equipment, including machine
Body is fixedly connected with hydraulic telescopic rod at the top of the body inner cavity, and the output end of the hydraulic telescopic rod is fixedly connected with shifting
The bottom of movable plate, the movable plate is fixedly connected with motor, and the output shaft of the motor is fixedly connected with drill bit, the drill bit
Bottom runs through body and extends to the outside of body, and the both sides of the movable plate bottom have been fixedly connected with the first damping spring,
The bottom of first damping spring is fixedly connected with the bottom of body inner cavity, and the both sides of the body have been fixedly connected with fixation
Frame is fixedly connected with the second damping spring at the top of the fixed frame inner cavity, and the bottom of second damping spring is fixedly connected
There is a gag lever post, the bottom of the gag lever post is through fixed frame and extends to the external stability of fixed frame and is connected with placement plate, described
The bottom of placement plate is in fluted body, and the positive left side of body is fixedly connected with water tank, the right side and position of the water tank
It is fixedly connected with water pump in the front of body, the front of the body and underside positioned at water pump is connected with roller bearing is described
The surface of roller bearing is arranged with casing, and the positive both sides of described sleeve pipe are connected with adjusting rod, the adjusting rod by axis pin
Bottom be fixedly connected with communicating pipe, the bottom of the communicating pipe is communicated with sprinkler head, the water inlet pipe of first water pump and storage
The right side of water tank is connected to, and the outlet pipe of first water pump is connected to the top of communicating pipe.
Preferably, it is fixedly connected with handle at the top of the body, the surface of described handle one end is fixedly connected with anti-skidding
Set, the both sides of the organism bottom have been fixedly connected with stock, and the stock is internally provided with supporting leg, the bottom of the supporting leg
It extends to the outside of stock and is connected with idler wheel, be fixedly connected by active pin shaft between the supporting leg and stock.
Preferably, the both sides of the body inner cavity have been fixedly connected with the first link block, the inside of first link block
The first sliding groove is offered, the both sides of the movable plate have been fixedly connected with the first slide bar, and first slide bar is far from movable plate
One end is connected with pulley, and the pulley is located at the inside of the first sliding groove and is slidably connected with the inner wall of the first sliding groove.
Preferably, the both sides of the fixed frame inner cavity have been fixedly connected with the second link block, second link block it is interior
Side offers second sliding slot, and the internal slide of the second sliding slot is connected with slide bar, and the slide bar is far from second sliding slot inner cavity
One end is fixedly connected with the surface of gag lever post one end, and the bottom of the second sliding slot inner cavity is fixedly connected with buffer spring, described
The top of buffer spring is fixedly connected with the bottom of slide bar one end.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention by hydraulic telescopic rod, movable plate, motor, drill bit, the first damping spring, fixed frame, the second damping spring,
The setting of gag lever post and placement plate can carry out bore operation automatically, while drilling production can be effectively reduced in boring procedure
Raw vibrations, facilitate construction personnel to use, time saving and energy saving, while solving traditional drilling equipment and being all performed manually by brill
Hole, drilling efficiency is low, and wasting manpower and material resources, while will produce vibrations in bore operation, and prolonged operation can damage brill
Head, the problem of causing damages to the personal safety of user when serious.
2, the present invention passes through the setting of water tank, water pump, roller bearing, casing, adjusting rod, communicating pipe and sprinkler head, Ke Yitong
It crosses and adjusting rod is adjusted, sprinkler head is moved to bore position carries out sprinkling processing to dust, while can be with by axis pin
Adjusting rod is fixed on sleeve surface, casing is adjusted spray angle in roller surface rotation manually, it is convenient to drilling
The dust of generation is cleared up, by the setting of handle, stock and supporting leg, facilitate construction personnel manually to body carry out it is mobile and
Pressing carries out bore operation to construction ground, while supporting leg can be accommodated in inside stock by active pin shaft makes placement plate
It is contacted with ground, facilitates carry out bore operation, by the first link block, the setting of the first sliding groove, the first slide bar and pulley, incited somebody to action
Increase mobile stability when movable plate moves down, prevent drill bit from generating offset, influence drilling efficiency, passes through the second connection
The setting of block, second sliding slot, slide bar and buffer spring, can increase when being drilled gag lever post moved in fixed frame it is steady
It is qualitative, while the vibrations that drilling generates can be effectively reduced, it is used convenient for construction personnel.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is housing construction front view of the present invention.
In figure:1 body, 2 hydraulic telescopic rods, 3 movable plates, 4 motors, 5 drill bits, 6 first damping springs, 7 fixed frames, 8
Two damping springs, 9 gag lever posts, 10 placement plates, 11 water tanks, 12 water pumps, 13 roller bearings, 14 casings, 15 adjusting rods, 16 communicating pipes,
17 sprinkler heads, 18 handles, 19 stocks, 20 supporting legs, 21 first link blocks, 22 the first sliding grooves, 23 first slide bars, 24 pulleys, 25
Two link blocks, 26 second sliding slots, 27 slide bars, 28 buffer springs.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, a kind of construction drilling equipment, including body 1, the top of body 1 are fixedly connected with handle
The surface of hand 18,18 one end of handle is fixedly connected with Anti-slip cover, and the both sides of 1 bottom of body have been fixedly connected with stock 19, stock
19 are internally provided with supporting leg 20, and the bottom of supporting leg 20 extends to the outside of stock 19 and be connected with idler wheel, supporting leg 20 with
It is fixedly connected by active pin shaft between stock 19, by the setting of handle 18, stock 19 and supporting leg 20, facilitates construction personnel's hand
It is dynamic that body 1 is moved and pressed, bore operation is carried out to construction ground, while supporting leg 20 can be received by active pin shaft
Being contained in inside stock 19 makes placement plate 10 be contacted with ground, and carry out bore operation, body is facilitated to be fixedly connected at the top of 1 inner cavity
The output end of hydraulic telescopic rod 2, hydraulic telescopic rod 2 is fixedly connected with movable plate 3, and the both sides of 1 inner cavity of body have been fixedly connected with
The inside of first link block 21, the first link block 21 offers the first sliding groove 22, and the both sides of movable plate 3 have been fixedly connected with first
Slide bar 23, first one end of slide bar 23 far from movable plate 3 are connected with pulley 24, and pulley 24 is located at the inside of the first sliding groove 22
And be slidably connected with the inner wall of the first sliding groove 22, pass through the first link block 21, the first sliding groove 22, the first slide bar 23 and pulley 24
Setting increases mobile stability when moving down movable plate 3, prevents drill bit 5 from generating offset, influences drilling efficiency, moves
The bottom of movable plate 3 is fixedly connected with motor 4, and the output shaft of motor 4 is fixedly connected with drill bit 5, and body 1 is run through in the bottom of drill bit 5
And the outside of body 1 is extended to, the both sides of 3 bottom of movable plate have been fixedly connected with the first damping spring 6, the first damping spring 6
Bottom be fixedly connected with the bottom of 1 inner cavity of body, the both sides of body 1 have been fixedly connected with fixed frame 7,7 inner cavity of fixed frame
Both sides have been fixedly connected with the second link block 25, and the inside of the second link block 25 offers second sliding slot 26, second sliding slot 26
Internal slide is connected with slide bar 27, and company is fixed on the one end of slide bar 27 far from 26 inner cavity of second sliding slot and the surface of 9 one end of gag lever post
It connects, the bottom of 26 inner cavity of second sliding slot is fixedly connected with buffer spring 28, the bottom at the top and 27 one end of slide bar of buffer spring 28
Portion is fixedly connected, by the setting of the second link block 25, second sliding slot 26, slide bar 27 and buffer spring 28, when being drilled
The stability that gag lever post 9 moves in fixed frame 7 can be increased, while can effectively reduce the vibrations that drilling generates, convenient for applying
Worker person is used, and the second damping spring 8 is fixedly connected at the top of 7 inner cavity of fixed frame, and the bottom of the second damping spring 8 is solid
Surely it is connected with gag lever post 9, the bottom of gag lever post 9 is through fixed frame 7 and extends to the external stability of fixed frame 7 and is connected with placement plate
10, the bottom of placement plate 10 is in fluted body, and 1 positive left side of body is fixedly connected with water tank 11, the right side of water tank 11 and
It is fixedly connected with water pump 12 positioned at the front of body 1, the front of the body 1 and underside positioned at water pump 12 is connected with roller bearing
13, the surface of roller bearing 13 is arranged with casing 14, and 14 positive both sides of casing are connected with adjusting rod 15 by axis pin, adjusts
The bottom of bar 15 is fixedly connected with communicating pipe 16, and the bottom of communicating pipe 16 is communicated with sprinkler head 17, passes through water tank 11, water pump
12, roller bearing 13, casing 14, adjusting rod 15, the setting of communicating pipe 16 and sprinkler head 17, can be by adjusting adjusting rod 15
Section, is moved to bore position by sprinkler head 17 and carries out sprinkling processing to dust, while can be fixed adjusting rod 15 by axis pin
On 14 surface of casing, casing 14 is adjusted spray angle in 13 surface pivots of roller bearing manually, it is convenient to the generation that drills
Dust is cleared up, and the water inlet pipe of the first water pump 12 is connected to the right side of water tank 11, the outlet pipe of the first water pump 12 be connected to
The top of pipe 16 is connected to, and passes through hydraulic telescopic rod 2, movable plate 3, motor 4, drill bit 5, the first damping spring 6, fixed frame 7, second
The setting of damping spring 8, gag lever post 9 and placement plate 10 can carry out bore operation, while can have in boring procedure automatically
Effect reduces the vibrations that drilling generates, and construction personnel is facilitated to use, time saving and energy saving, while solving traditional drilling equipment all
It is performed manually by drilling, drilling efficiency is low, and wasting manpower and material resources, while will produce vibrations in bore operation, for a long time
Operation can damage drill bit, the problem of causing damages to the personal safety of user when serious.
In use, body 1 is moved to the position for needing to punch by construction personnel by handle 18 by idler wheel, then pass through
Active pin shaft takes in the supporting leg 20 at the top of idler wheel inside stock 19, and placement plate 10 is made to be contacted with ground, then by outer
If controller starts hydraulic telescopic rod 2, motor 4 and water pump 12 work, hydraulic telescopic rod 2, which extends, will push movable plate 3 to moving down
Dynamic, pair first damping spring 6 compresses while movable plate 3 moves, at the same drive motor 4 and drill bit 5 move to ground into
Row bore operation, while the vibrations that the work of drill bit 5 generates can be reduced by the first damping spring 6, it is worked in drill bit 5
Placement plate 10 is steadily contacted with ground in journey, and when construction personnel, which presses body 1, carries out bore operation, gag lever post 9 subtracts to second
Shake spring 8 is squeezed, while the sliding in the second sliding slot 26 with moving slide-bar 27 of gag lever post 9, buffer spring 28 to slide bar 27 into
Row buffering limits, and reaches good damping effect, while the flow inside water tank 11 can be delivered to communicating pipe by water pump 12
16 spray through sprinkler head 17, and the angle of communicating pipe 16 is adjusted by axis pin revoling tube 14, and stretching adjusting rod 15 makes company
Siphunculus 16 is moved to bore position and is sprayed to the dust generated in boring procedure, prevents a large amount of dusts when drilling from influencing construction
The physical and mental health of personnel improves the drilling efficiency of construction.
In summary:The construction drilling equipment passes through hydraulic telescopic rod 2, movable plate 3, motor 4, drill bit 5,
One damping spring 6, fixed frame 7, the second damping spring 8, gag lever post 9, placement plate 10, water tank 11, water pump 12, roller bearing 13, set
Pipe 14, adjusting rod 15, the cooperation of communicating pipe 16 and sprinkler head 17 solve traditional drilling equipment and are all performed manually by drilling,
Drilling efficiency is low, and wasting manpower and material resources, while will produce vibrations in bore operation, and prolonged operation can damage drill bit,
The problem of causing damages to the personal safety of user when serious.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (4)
1. a kind of construction drilling equipment, including body(1), it is characterised in that:The body(1)The top of inner cavity is fixed
It is connected with hydraulic telescopic rod(2), the hydraulic telescopic rod(2)Output end be fixedly connected with movable plate(3), the movable plate
(3)Bottom be fixedly connected with motor(4), the motor(4)Output shaft be fixedly connected with drill bit(5), the drill bit(5)'s
Body is run through in bottom(1)And extend to body(1)Outside, the movable plate(3)The both sides of bottom have been fixedly connected with first
Damping spring(6), first damping spring(6)Bottom and body(1)The bottom of inner cavity is fixedly connected, the body(1)
Both sides be fixedly connected with fixed frame(7), the fixed frame(7)The second damping spring is fixedly connected at the top of inner cavity(8),
Second damping spring(8)Bottom be fixedly connected with gag lever post(9), the gag lever post(9)Bottom run through fixed frame(7)
And extend to fixed frame(7)External stability be connected with placement plate(10), the placement plate(10)Bottom be in fluted body, it is described
Body(1)Positive left side is fixedly connected with water tank(11), the water tank(11)Right side and be located at body(1)Front
It is fixedly connected with water pump(12), the body(1)Front and be located at water pump(12)Underside be connected with roller bearing(13), institute
State roller bearing(13)Surface be arranged with casing(14), described sleeve pipe(14)Positive both sides are connected with adjusting by axis pin
Bar(15), the adjusting rod(15)Bottom be fixedly connected with communicating pipe(16), the communicating pipe(16)Bottom be communicated with spray
Spill head(17), first water pump(12)Water inlet pipe and water tank(11)Right side connection, first water pump(12)Go out
Water pipe and communicating pipe(16)Top connection.
2. a kind of construction drilling equipment according to claim 1, it is characterised in that:The body(1)Top
It is fixedly connected with handle(18), the handle(18)The surface of one end is fixedly connected with Anti-slip cover, the body(1)The two of bottom
Side has been fixedly connected with stock(19), the stock(19)Be internally provided with supporting leg(20), the supporting leg(20)Bottom prolong
Extend to stock(19)Outside and be connected with idler wheel, the supporting leg(20)With stock(19)Between fixed by active pin shaft
Connection.
3. a kind of construction drilling equipment according to claim 1, it is characterised in that:The body(1)Inner cavity
Both sides have been fixedly connected with the first link block(21), first link block(21)Inside offer the first sliding groove(22), institute
State movable plate(3)Both sides be fixedly connected with the first slide bar(23), first slide bar(23)Far from movable plate(3)One end
It is connected with pulley(24), the pulley(24)Positioned at the first sliding groove(22)Inside and and the first sliding groove(22)Inner wall slide
Dynamic connection.
4. a kind of construction drilling equipment according to claim 1, it is characterised in that:The fixed frame(7)Inner cavity
Both sides be fixedly connected with the second link block(25), second link block(25)Inside offer second sliding slot(26),
The second sliding slot(26)Internal slide be connected with slide bar(27), the slide bar(27)Far from second sliding slot(26)The one of inner cavity
End and gag lever post(9)The surface of one end is fixedly connected, the second sliding slot(26)The bottom of inner cavity is fixedly connected with buffer spring
(28), the buffer spring(28)Top and slide bar(27)The bottom of one end is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810413064.2A CN108505937B (en) | 2018-05-03 | 2018-05-03 | Drilling equipment for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810413064.2A CN108505937B (en) | 2018-05-03 | 2018-05-03 | Drilling equipment for construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108505937A true CN108505937A (en) | 2018-09-07 |
CN108505937B CN108505937B (en) | 2020-05-01 |
Family
ID=63399608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810413064.2A Active CN108505937B (en) | 2018-05-03 | 2018-05-03 | Drilling equipment for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108505937B (en) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108819759A (en) * | 2018-06-26 | 2018-11-16 | 东莞唯度电子科技服务有限公司 | A kind of new-energy automobile Portable charging equipment |
CN109027540A (en) * | 2018-09-26 | 2018-12-18 | 吴磊 | A kind of land-based area gas hydrate exploitation device |
CN109184553A (en) * | 2018-11-13 | 2019-01-11 | 惠安县晶鹰建材有限责任公司 | A kind of construction site drilling machine |
CN109252812A (en) * | 2018-10-30 | 2019-01-22 | 栾勇 | A kind of self-propelled surface drilling device of pumping fixed |
CN109297751A (en) * | 2018-11-29 | 2019-02-01 | 王星伟 | A kind of field investigation multifunctional soil boring device |
CN109501455A (en) * | 2018-11-07 | 2019-03-22 | 许春雷 | A kind of telescopic device of draw-bar box type spray head in spray-painting device pedestal |
CN109584703A (en) * | 2019-01-04 | 2019-04-05 | 浙江工业职业技术学院 | A kind of teaching engineering mechanical electric equipment |
CN109630009A (en) * | 2019-01-28 | 2019-04-16 | 刘晓东 | A kind of oil exploitation lift drilling equipment |
CN110230472A (en) * | 2019-06-03 | 2019-09-13 | 吴璇儿 | A kind of drilling platforms pedestal reinforcement structure |
CN110318665A (en) * | 2019-07-30 | 2019-10-11 | 李金� | A kind of construction ground drilling equipment |
CN110725647A (en) * | 2019-10-23 | 2020-01-24 | 徐州市盖力工程机械有限公司 | Portable screw rod drilling machine |
CN110790073A (en) * | 2019-10-05 | 2020-02-14 | 张艳新 | Effectual weaving equipment pay-off of shock attenuation |
CN111923254A (en) * | 2020-07-29 | 2020-11-13 | 程诗栋 | Construction machinery slotting device |
CN112177537A (en) * | 2020-09-11 | 2021-01-05 | 祁东县锋速钻探工具有限公司 | Diamond geology drill bit with drill bit is prevented skidding |
CN112440383A (en) * | 2019-08-27 | 2021-03-05 | 友焜建工集团有限公司 | Punching support with auxiliary power assisting function and convenient to position for building |
CN112502150A (en) * | 2019-09-15 | 2021-03-16 | 浙江令大夫生物科技有限公司 | Gardens building construction is with small-size stake device of irritating that punches |
CN113802982A (en) * | 2021-09-27 | 2021-12-17 | 青岛康太源建设集团有限公司 | Building construction drilling equipment |
CN114541969A (en) * | 2022-04-26 | 2022-05-27 | 中建八局西南建设工程有限公司 | Percussion bit for rock stratum drilling |
CN115365878A (en) * | 2022-10-24 | 2022-11-22 | 江苏龙旺达磁性材料有限公司 | Magnetic material drilling buffering equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004039865A1 (en) * | 2004-08-17 | 2006-02-23 | Klemm Bohrtechnik Zweigniederlassung Der Bauer Maschinen Gmbh | Drilling machine, especially for drilling earth or rock, has at least one spring device arranged between drill drive and holder via which drill drive is held on holder |
CN106522836A (en) * | 2016-12-20 | 2017-03-22 | 嘉善弘欣化工厂(普通合伙) | High-stability drilling device for building foundation construction |
CN206500286U (en) * | 2017-02-21 | 2017-09-19 | 石家庄丰环环保设备有限公司 | A kind of dregs transportation car dust suppressant spraying device |
CN107414122A (en) * | 2017-09-20 | 2017-12-01 | 任宝亮 | A kind of construction perforating device |
CN107535322A (en) * | 2017-09-30 | 2018-01-05 | 梁水明 | A kind of urban afforestation Automated condtrol sprinkling irrigation equipment |
-
2018
- 2018-05-03 CN CN201810413064.2A patent/CN108505937B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004039865A1 (en) * | 2004-08-17 | 2006-02-23 | Klemm Bohrtechnik Zweigniederlassung Der Bauer Maschinen Gmbh | Drilling machine, especially for drilling earth or rock, has at least one spring device arranged between drill drive and holder via which drill drive is held on holder |
CN106522836A (en) * | 2016-12-20 | 2017-03-22 | 嘉善弘欣化工厂(普通合伙) | High-stability drilling device for building foundation construction |
CN206500286U (en) * | 2017-02-21 | 2017-09-19 | 石家庄丰环环保设备有限公司 | A kind of dregs transportation car dust suppressant spraying device |
CN107414122A (en) * | 2017-09-20 | 2017-12-01 | 任宝亮 | A kind of construction perforating device |
CN107535322A (en) * | 2017-09-30 | 2018-01-05 | 梁水明 | A kind of urban afforestation Automated condtrol sprinkling irrigation equipment |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108819759B (en) * | 2018-06-26 | 2022-01-14 | 浙江万马海立斯新能源有限公司 | Portable charging equipment of new energy automobile |
CN108819759A (en) * | 2018-06-26 | 2018-11-16 | 东莞唯度电子科技服务有限公司 | A kind of new-energy automobile Portable charging equipment |
CN109027540A (en) * | 2018-09-26 | 2018-12-18 | 吴磊 | A kind of land-based area gas hydrate exploitation device |
CN109252812A (en) * | 2018-10-30 | 2019-01-22 | 栾勇 | A kind of self-propelled surface drilling device of pumping fixed |
CN109501455A (en) * | 2018-11-07 | 2019-03-22 | 许春雷 | A kind of telescopic device of draw-bar box type spray head in spray-painting device pedestal |
CN109184553A (en) * | 2018-11-13 | 2019-01-11 | 惠安县晶鹰建材有限责任公司 | A kind of construction site drilling machine |
CN109297751B (en) * | 2018-11-29 | 2020-11-17 | 盐池县荣桂昌食品科技有限公司 | Multifunctional earth drill device for field investigation |
CN109297751A (en) * | 2018-11-29 | 2019-02-01 | 王星伟 | A kind of field investigation multifunctional soil boring device |
CN109584703A (en) * | 2019-01-04 | 2019-04-05 | 浙江工业职业技术学院 | A kind of teaching engineering mechanical electric equipment |
CN109630009A (en) * | 2019-01-28 | 2019-04-16 | 刘晓东 | A kind of oil exploitation lift drilling equipment |
CN110230472A (en) * | 2019-06-03 | 2019-09-13 | 吴璇儿 | A kind of drilling platforms pedestal reinforcement structure |
CN110318665A (en) * | 2019-07-30 | 2019-10-11 | 李金� | A kind of construction ground drilling equipment |
CN112440383A (en) * | 2019-08-27 | 2021-03-05 | 友焜建工集团有限公司 | Punching support with auxiliary power assisting function and convenient to position for building |
CN112502150A (en) * | 2019-09-15 | 2021-03-16 | 浙江令大夫生物科技有限公司 | Gardens building construction is with small-size stake device of irritating that punches |
CN110790073A (en) * | 2019-10-05 | 2020-02-14 | 张艳新 | Effectual weaving equipment pay-off of shock attenuation |
CN110725647A (en) * | 2019-10-23 | 2020-01-24 | 徐州市盖力工程机械有限公司 | Portable screw rod drilling machine |
CN111923254A (en) * | 2020-07-29 | 2020-11-13 | 程诗栋 | Construction machinery slotting device |
CN111923254B (en) * | 2020-07-29 | 2021-05-04 | 江苏信众知识产权运营管理有限公司 | Construction machinery slotting device |
CN112177537A (en) * | 2020-09-11 | 2021-01-05 | 祁东县锋速钻探工具有限公司 | Diamond geology drill bit with drill bit is prevented skidding |
CN113802982A (en) * | 2021-09-27 | 2021-12-17 | 青岛康太源建设集团有限公司 | Building construction drilling equipment |
CN114541969A (en) * | 2022-04-26 | 2022-05-27 | 中建八局西南建设工程有限公司 | Percussion bit for rock stratum drilling |
CN115365878A (en) * | 2022-10-24 | 2022-11-22 | 江苏龙旺达磁性材料有限公司 | Magnetic material drilling buffering equipment |
Also Published As
Publication number | Publication date |
---|---|
CN108505937B (en) | 2020-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108505937A (en) | A kind of construction drilling equipment | |
CN208451187U (en) | It is a kind of for producing the drilling equipment of reducer shell | |
CN207534344U (en) | A kind of processing unit (plant) of new steel structure | |
CN107489374A (en) | A kind of building lot construction adjustable drilling aperture apparatus | |
CN204819990U (en) | Portable low noise saw of dust control formula | |
CN206605059U (en) | Packaged type drilling machine is used in a kind of auto parts and components processing | |
CN210863210U (en) | Sampling device for concrete quality detection | |
CN109940766A (en) | A kind of safe protection engineering construction metope drilling equipment | |
CN209681747U (en) | A kind of bench drill of novel environment friendly | |
CN208357841U (en) | A kind of drilling machine being conveniently replaceable drill bit | |
CN208645699U (en) | A kind of stone material trimming device of good dedusting effect | |
CN210435421U (en) | Drilling machine for hardware processing with noise reduction function | |
CN212169590U (en) | Plate drilling device for hydraulic engineering | |
CN112355338A (en) | Batch drilling equipment for machining | |
CN208179812U (en) | Hydraulic forming device is used in a kind of production of furniture wood-based planet | |
CN205572621U (en) | Horizontal band saw blanking machine of padauk | |
CN211138217U (en) | Oil pressing device for processing capsicum seed oil | |
CN210308467U (en) | Dustless drilling equipment is used to worker's civil engineering fitment | |
CN210025839U (en) | Automobile glass perforating device | |
CN207593299U (en) | A kind of plank multi-panel drilling equipment | |
CN208759736U (en) | A kind of circuit board processing unit (plant) | |
CN209551898U (en) | A kind of construction material perforating device | |
CN209335794U (en) | Plank puncher | |
CN208556979U (en) | A kind of burr processing unit in Furniture manufacturing | |
CN213718594U (en) | Soil leveling and loosening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200409 Address after: 10 / F, building B, Xinniu building, No.7, Jiuhuan Road, Jianggan District, Hangzhou, Zhejiang Province Applicant after: Zhejiang Zhongan Construction Group Co.,Ltd. Address before: 314299 No. 42 Xinhua Middle Road, Danghu Street, Pinghu City, Jiaxing City, Zhejiang Province Applicant before: Liu Haifeng |
|
GR01 | Patent grant | ||
GR01 | Patent grant |