CN108505492A - One kind, which is built a dam, prevents washing away sand hill - Google Patents

One kind, which is built a dam, prevents washing away sand hill Download PDF

Info

Publication number
CN108505492A
CN108505492A CN201810368020.2A CN201810368020A CN108505492A CN 108505492 A CN108505492 A CN 108505492A CN 201810368020 A CN201810368020 A CN 201810368020A CN 108505492 A CN108505492 A CN 108505492A
Authority
CN
China
Prior art keywords
sand hill
anchor
hook
lantern ring
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810368020.2A
Other languages
Chinese (zh)
Inventor
周金和
征茂德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou King All-Match Logistics Technology Co Ltd
Original Assignee
Suzhou King All-Match Logistics Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou King All-Match Logistics Technology Co Ltd filed Critical Suzhou King All-Match Logistics Technology Co Ltd
Priority to CN201810368020.2A priority Critical patent/CN108505492A/en
Publication of CN108505492A publication Critical patent/CN108505492A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • E02B3/108Temporary dykes with a filling, e.g. filled by water or sand

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention, which discloses one kind and builds a dam, to be prevented washing away sand hill, including sand hill ontology and Quick Connect Kit, the Quick Connect Kit is set on sand hill ontology, the Quick Connect Kit includes anchor and/or hook and/or lantern ring, the anchor, lantern ring and hook can be two two interconnected, and the sand hill ontology includes the rope of the bag body and fast packing sack that can fill sandstone or soil.It the sand hill built a dam and is linked together by Quick Connect Kit between sand hill, so as to prevent part sand hill from being washed away by flood well, also strengthens the intensity of dykes and dams, prevent dykes and dams from being broken up.

Description

One kind, which is built a dam, prevents washing away sand hill
Technical field
It builds a dam the present invention relates to a kind of sand hill, especially one kind and anti-washes away sand hill.
Background technology
In various natural calamities, flood is most common and endangers maximum one kind again.The flood frequency of occurrences is high, involves model It encloses extensively, breaks with tremendous force, it is destructive very big.Flood not only floods house and population, causes a tremendous loss of lives, but also sweeps away people The all goods of the place of residence, including grain are produced, and flood farmland, crop is damaged, leads to the grain significantly underproduction, to cause famine It is waste.Flood can also destroy industrial building, communication and means of transportation, to cause the destruction to national economy.Since this century, generation Nearly 40 catastrophic flood damages occurred once for various countries of boundary, resulted in the death of people up to ten thousand and the mistake of wandering about as a refugee of " millions of people every time Institute.In recent decades, the frequency occurs for flood and casualty loss is all increasing year by year.China is exactly that flood is serious from ancient times Country.In order to the disaster that pre- flood-protection is brought to us, we can take the measure built a dam to prevent flood, and build a dam Usually used is exactly sand hill, however, present sand hill is all independent, can not be linked together.
Invention content
It is an object of the invention to overcome problem above of the existing technology, one kind is provided and is built a dam and prevents washing away sand hill, it should It is linked together by Quick Connect Kit between the sand hill and sand hill built a dam, so as to prevent part sand hill well It is washed away by flood, also strengthens the intensity of dykes and dams, prevent dykes and dams from being broken up.
One kind, which is built a dam, prevents washing away sand hill, including sand hill ontology and Quick Connect Kit, and the Quick Connect Kit is set to On sand hill ontology, the Quick Connect Kit includes anchor and/or hook and/or lantern ring, and the anchor, lantern ring and hook can be two-by-two It is connected with each other, the sand hill ontology includes the rope of the bag body and fast packing sack that can fill sandstone or soil.
Further, the anchor includes the first anchor and the second anchor.
Further, first anchor is connect with the first annulus, and first anchor is by the first annulus and ties up at first Rope connection on sand hill, the lantern ring are connect with the rope tied up on second sand hill, and first sand hill passes through first Anchor hook is lived lantern ring and is connect with second sand hill.
Further, first anchor is connect by rotation axis with the iron plate in first sand hill, and the lantern ring is by turning Moving axis is connect with the iron plate in second sand hill, and first sand hill lives lantern ring by the first anchor hook and second sand hill connects It connects.
Further, second anchor is connect with the second annulus, and second anchor is by the second annulus and ties up at first Rope connection on sand hill, the hook are connect with third lantern ring, and the hook is by third lantern ring and ties up in second sand hill On rope connection, first sand hill live hook by the second anchor hook and connect with second sand hill.
Further, second anchor is connect by rotation axis with the iron plate in first sand hill, and the hook is by turning Moving axis is connect with the iron plate in second sand hill, and first sand hill lives hook by the second anchor hook and second sand hill connects It connects.
Further, one layer of antirust coat coating, the antirust coat are coated on first anchor, the second anchor, hook and lantern ring Material be vegetable oil and/or mineral oil and/or electrogalvanizing and/or plating Cr and/or electrophoretic paint.
Further, first anchor and the second anchor can be replaced with iron hook, and the rope can use chain and/or rubber band And/or iron wire is replaced.
Further, the end of first anchor, the second anchor and hook is all obtuse angle, the anchor and/or hook and/or set Ring and sand hill ontology.
The beneficial effects of the invention are as follows:
It the sand hill built a dam and is linked together by Quick Connect Kit between sand hill, so as to good preventing portion Divide sand hill to be washed away by flood, also strengthens the intensity of dykes and dams, prevent dykes and dams from being broken up.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram of the embodiment of the present invention 1;
Fig. 2 is the structural schematic diagram of the embodiment of the present invention 2.
In figure:First sand hill, 1, second sand hill 1, the first anchor 3, the first annulus 4, lantern ring 5, the second anchor 6, the second annulus 7, hook 8, third annulus 9.
Specific implementation mode
Below in conjunction with the accompanying drawings to further description of the present invention
As shown in Figure 1 to Figure 2, one kind, which is built a dam, prevents washing away sand hill, including sand hill ontology and Quick Connect Kit, the quick connection Device is set on sand hill ontology, and the Quick Connect Kit includes anchor and/or hook 8 and/or lantern ring 5, the anchor, lantern ring 5 Can be two two interconnected with hook 8, the sand hill ontology includes the bag body and fast packing bag that can fill sandstone or soil The rope of mouth.
Further, the anchor includes the first anchor 3 and the second anchor 6.
Further, first anchor 3 is connect with the first annulus 4, first anchor 3 by the first annulus 4 with tie up the Rope connection on one sand hill 1, the lantern ring 5 are connect with the rope tied up on second sand hill 1, first sand hill 1 Lantern ring 5 is caught on by the first anchor 3 to connect with second sand hill 1.
Further, first anchor 3 is connect by rotation axis with the iron plate in first sand hill 1, and the lantern ring 5 passes through Rotation axis is connect with the iron plate in second sand hill 1, and first sand hill 1 catches on lantern ring 5 and second sand by the first anchor 3 1 connection of packet.
Further, second anchor 6 is connect with the second annulus 7, second anchor 6 by the second annulus 7 with tie up the Rope connection on one sand hill 1, the hook 8 connect with third lantern ring 9, the hook 8 by third lantern ring 9 with tie up the Rope connection on two sand hills 1, first sand hill 1 catch on hook 8 by the second anchor 6 and are connect with second sand hill 1.
Further, second anchor 6 is connect by rotation axis with the iron plate in first sand hill 1, and the hook 8 passes through Rotation axis is connect with the iron plate in second sand hill 1, and first sand hill 1 catches on hook 8 and second sand by the second anchor 6 1 connection of packet.
Further, one layer of antirust coat coating is coated on first anchor 3, the second anchor 6, hook 8 and lantern ring 5, it is described anti- The material of rusty scale is vegetable oil and/or mineral oil and/or electrogalvanizing and/or plating Cr and/or electrophoretic paint.
Further, first anchor, 3 and second anchor 6 can be replaced with iron hook, and the rope can use chain and/or skin Muscle and/or iron wire are replaced.
Further, the end of first anchor 3, the second anchor 6 and hook 8 is all obtuse angle, the anchor and/or hook 8 and/ Or lantern ring 5 and sand hill ontology.
Specific embodiment:
It when user needs to build a dam, needs to fill sand in sack, then recycles rope that the mouth system of sack gets up, Then user recycles the Quick Connect Kit on sand hill that each independent sand hill links together, when user utilizes the first anchor When connection with lantern ring, it is necessary first to the first anchor on first sand hill are directed at the lantern ring on second sand hill, and by the One anchor hook in lantern ring, can thus make first sand hill and second sand hill link together, remaining sand hill Connecting by means of which can;When user wants to connect with hook using the second anchor, it is necessary first to will The second anchor on first sand hill is directed at the hook on second sand hill, and the second anchor hook hook, can thus make First sand hill and second sand hill link together, remaining sand hill also connects by means of which can; And the first, second anchor and hook are sleeved on rope using annulus, to ensure that the spirit of the first, second anchor and hook Activity.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention is subject to the protection scope in claims.

Claims (9)

  1. Prevent washing away sand hill, including sand hill ontology and Quick Connect Kit 1. one kind is built a dam, it is characterised in that:The quick connection dress It installs and is placed on sand hill ontology, the Quick Connect Kit includes anchor and/or hook(8)And/or lantern ring(5), the anchor, lantern ring (5)And hook(8)Can be two two interconnected, the sand hill ontology includes the bag body and quick envelope that can fill sandstone or soil The rope of bagging-off spout.
  2. Prevent washing away sand hill 2. one kind is built a dam according to claim 1, it is characterised in that:The anchor includes the first anchor(3)With Two anchors(6).
  3. Prevent washing away sand hill 3. one kind is built a dam according to claim 2, it is characterised in that:First anchor(3)With the first annulus (4)Connection, first anchor(3)Pass through the first annulus(4)With tie up in first sand hill(1)On rope connection, the lantern ring (5)With tie up in second sand hill(1)On rope connection, first sand hill(1)Pass through the first anchor(3)Catch on lantern ring(5) With second sand hill(1)Connection.
  4. Prevent washing away sand hill 4. one kind is built a dam according to claim 2, it is characterised in that:First anchor(3)Pass through rotation axis With first sand hill(1)Interior iron plate connection, the lantern ring(5)Pass through rotation axis and second sand hill(1)Interior iron plate connection, First sand hill(1)Pass through the first anchor(3)Catch on lantern ring(5)With second sand hill(1)Connection.
  5. Prevent washing away sand hill 5. one kind is built a dam according to claim 2, it is characterised in that:Second anchor(6)With the second annulus (7)Connection, second anchor(6)Pass through the second annulus(7)With tie up in first sand hill(1)On rope connection, the hook (8)With third lantern ring(9)Connection, the hook(8)Pass through third lantern ring(9)With tie up in second sand hill(1)On rope connect It connects, first sand hill(1)Pass through the second anchor(6)Catch on hook(8)With second sand hill(1)Connection.
  6. Prevent washing away sand hill 6. being built a dam according to the described one kind of claim 2 or 5, it is characterised in that:Second anchor(6)Pass through rotation Axis and first sand hill(1)Interior iron plate connection, the hook(8)Pass through rotation axis and second sand hill(1)Interior iron plate connects It connects, first sand hill(1)Pass through the second anchor(6)Catch on hook(8)With second sand hill(1)Connection.
  7. Prevent washing away sand hill 7. one kind is built a dam according to claim 1, it is characterised in that:First anchor(3), the second anchor(6)、 Hook(8)And lantern ring(5)On be coated with one layer of antirust coat coating, the material of the antirust coat be vegetable oil and/or mineral oil and/or Electrogalvanizing and/or plating Cr and/or electrophoretic paint.
  8. Prevent washing away sand hill 8. one kind is built a dam according to claim 2, it is characterised in that:First anchor(3)With the second anchor(6) It can be replaced with iron hook, the rope can use chain and/or rubber band and/or iron wire to replace.
  9. Prevent washing away sand hill 9. one kind is built a dam according to claim 1, it is characterised in that:First anchor(3), the second anchor(6) And hook(8)End be all obtuse angle, the anchor and/or hook(8)And/or lantern ring(5)With sand hill ontology.
CN201810368020.2A 2018-04-23 2018-04-23 One kind, which is built a dam, prevents washing away sand hill Withdrawn CN108505492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810368020.2A CN108505492A (en) 2018-04-23 2018-04-23 One kind, which is built a dam, prevents washing away sand hill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810368020.2A CN108505492A (en) 2018-04-23 2018-04-23 One kind, which is built a dam, prevents washing away sand hill

Publications (1)

Publication Number Publication Date
CN108505492A true CN108505492A (en) 2018-09-07

Family

ID=63383035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810368020.2A Withdrawn CN108505492A (en) 2018-04-23 2018-04-23 One kind, which is built a dam, prevents washing away sand hill

Country Status (1)

Country Link
CN (1) CN108505492A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487184A (en) * 2018-04-23 2018-09-04 苏州千层茧农业科技有限公司 One kind, which is built a dam, prevents washing away sand hill

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200310136Y1 (en) * 2002-12-24 2003-04-18 김동규 Sack- accumulating type water stopping wall for preventing a dam or river from overflowing
CN102535394A (en) * 2012-03-09 2012-07-04 陈中阳 Emergent rescue sub-embankment
CN205636641U (en) * 2016-05-27 2016-10-12 申作强 Sand bag is filled in emergency flood fighting
CN107034850A (en) * 2017-06-12 2017-08-11 方松科 A kind of plugging device suitable for the small-sized breach of dykes and dams
CN107130562A (en) * 2017-06-12 2017-09-05 方松科 A kind of plugging device for throwing hanging dike breach
CN107178064A (en) * 2017-06-08 2017-09-19 防城港市海河堤管理站 A kind of flood control sandbag
CN206635719U (en) * 2017-03-07 2017-11-14 陈之勇 A kind of T-shaped flood control sand hill
CN108487184A (en) * 2018-04-23 2018-09-04 苏州千层茧农业科技有限公司 One kind, which is built a dam, prevents washing away sand hill

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200310136Y1 (en) * 2002-12-24 2003-04-18 김동규 Sack- accumulating type water stopping wall for preventing a dam or river from overflowing
CN102535394A (en) * 2012-03-09 2012-07-04 陈中阳 Emergent rescue sub-embankment
CN205636641U (en) * 2016-05-27 2016-10-12 申作强 Sand bag is filled in emergency flood fighting
CN206635719U (en) * 2017-03-07 2017-11-14 陈之勇 A kind of T-shaped flood control sand hill
CN107178064A (en) * 2017-06-08 2017-09-19 防城港市海河堤管理站 A kind of flood control sandbag
CN107034850A (en) * 2017-06-12 2017-08-11 方松科 A kind of plugging device suitable for the small-sized breach of dykes and dams
CN107130562A (en) * 2017-06-12 2017-09-05 方松科 A kind of plugging device for throwing hanging dike breach
CN108487184A (en) * 2018-04-23 2018-09-04 苏州千层茧农业科技有限公司 One kind, which is built a dam, prevents washing away sand hill

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487184A (en) * 2018-04-23 2018-09-04 苏州千层茧农业科技有限公司 One kind, which is built a dam, prevents washing away sand hill

Similar Documents

Publication Publication Date Title
CN107130562B (en) A kind of plugging device for throwing hanging dike breach
CN106245584B (en) It is a kind of for building dykes and dams or the double jaw rack blocked up that shuts off
CN107190706B (en) A kind of dike breach plugging device convenient for quickly transporting
CN108487184A (en) One kind, which is built a dam, prevents washing away sand hill
CN108505492A (en) One kind, which is built a dam, prevents washing away sand hill
CN107178064B (en) A kind of flood control sandbag
CN206256425U (en) A kind of Water flood protection device
CN107034850B (en) A kind of plugging device suitable for the small-sized breach of dykes and dams
CN205857125U (en) Emergent dash removable splicing water-retention dam combined equipment
CN206052759U (en) A kind of steel-pipe pile attachment means under water
CN107034851B (en) A kind of dike breach pouch-shaped plugging device
CN108487185A (en) A kind of speed is heavy anchor sand hill
CN206941508U (en) Native stone basket bag
CN211033577U (en) Woven bag
CN206359957U (en) Speedily carry out rescue work steel reinforcement cage
CN103588086B (en) Four rope eight lobe nickel minerals grab buckets
CN108505495A (en) A kind of build a dam in advance prevents washing away sand hill
CN207243231U (en) Lifting corner protector
CN206826874U (en) A kind of artificial anchor
CN109969581A (en) A kind of convenient woven bag of sealing
CN2559681Y (en) Flood prevention bag
CN108487183A (en) A kind of water conservancy diversion sand hill
GB1278938A (en) A boom for containing and removing non-soluble pollutions from open waters
CN204919473U (en) Flood prevention bag
CN108505496A (en) A kind of free hook flood control sand hill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180907