CN108502508A - A kind of construction material conveying equipment - Google Patents
A kind of construction material conveying equipment Download PDFInfo
- Publication number
- CN108502508A CN108502508A CN201810184417.6A CN201810184417A CN108502508A CN 108502508 A CN108502508 A CN 108502508A CN 201810184417 A CN201810184417 A CN 201810184417A CN 108502508 A CN108502508 A CN 108502508A
- Authority
- CN
- China
- Prior art keywords
- shaft
- mounting plate
- framework
- bevel gear
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G47/00—Article or material-handling devices associated with conveyors; Methods employing such devices
- B65G47/74—Feeding, transfer, or discharging devices of particular kinds or types
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G15/00—Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
Abstract
The present invention relates to a kind of conveying equipment more particularly to a kind of construction material conveying equipments.The technical problem to be solved in the present invention is to provide one kind can quickly conveying material, conveys the construction material conveying equipment of material safety.The present invention provides such a construction material conveying equipments, include bottom plate, holder, the first sliding rail, the first sliding block, the first mounting plate, the first nut, first motor, screw rod etc.;Bottom plate top right side is equipped with holder, and the first sliding rail is embedded on the left of holder, and slidingtype is connected with the first sliding block on the first sliding rail, and the first mounting plate is connected on the left of the first sliding block, and the first mounting plate right part is equipped with the first nut, and bottom plate top right side is equipped with first motor.Invention achieves can quickly convey material, the effect of material safety is conveyed, the construction material in the first framework is transported to eminence by the present invention by first motor, not only accelerates the mode of construction material conveying, simultaneously as people is not required to oneself conveying material, it is therefore prevented that the generation of safety accident.
Description
Technical field
The present invention relates to a kind of conveying equipment more particularly to a kind of construction material conveying equipments.
Background technology
Building is all utilizable materials such as people's soil, stone, wood, steel, glass, reed, plastics, ice cube, is built
Structures.Building is not purpose, and the purpose of building is to obtain building to be formed by " space ".It is people to meet
Social life needs, and utilizes grasped material technology means, and with certain scientific law, geomantic omen theory and aesthetic principle
The artificial environment of creation.It when building is repaiied, is required for carrying out the conveying of material, the mode for conveying material at present is all to rely on
Material is transported to the side of construction personnel by artificial mode, and the mode of this total material conveying is not only slow but also dangerous.
To sum up, it needs research and development one kind that can quickly convey material at present, conveys the construction material conveying equipment of material safety,
Come overcome in the prior art conveying material it is slow, convey the unsafe disadvantage of material.
Invention content
(1)Technical problems to be solved
The present invention in order to overcome in the prior art conveying material it is slow, convey the unsafe disadvantage of material, the invention solves skill
Art problem, which is to provide one kind, can quickly convey material, convey the construction material conveying equipment of material safety.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a construction material conveying equipments, include bottom plate, branch
Frame, the first sliding block, the first mounting plate, the first nut, first motor, screw rod, oval sliding rail, the second sliding block, connects the first sliding rail
Extension bar, the first framework, the second motor, first rotating shaft and the first snap-gauge, bottom plate top right side are equipped with holder, embedded with the on the left of holder
One sliding rail, slidingtype is connected with the first sliding block on the first sliding rail, and the first mounting plate, the first mounting plate are connected on the left of the first sliding block
Right part is equipped with the first nut, and bottom plate top right side is equipped with first motor, screw rod, spiral shell are connected on the output shaft at the top of first motor
Bar passes through the first nut, the first mounting plate bottom left to be equipped with oval sliding rail, and there are two oval sliding rail inner sliding type connections
Second sliding block, the second slider bottom are respectively connected with connecting rod, and connecting rod bottom end is respectively connected with the first framework, the first mounting plate top
Left side is equipped with the second motor, and first rotating shaft is connected on the output shaft of the second motor bottom, and first rotating shaft passes through the first mounting plate
With the center of oval sliding rail, first rotating shaft bottom end is connected with the first snap-gauge, and a word hole is provided on the first snap-gauge, and connecting rod passes through
One word hole.
Preferably, further include having left and right conveying device, bottom plate top left side is equipped with left and right conveying device, left and right conveying device
Include the second mounting plate, first bearing seat, the second shaft, roller, conveyer belt, second framework and rocking handle, bottom plate top left side
It is equipped with the second mounting plate with right side, the second mounting plate top is equipped with first bearing seat, second is equipped in first bearing seat
Shaft, the second shaft rear portion are equipped with roller, and conveyer belt is wound on the roller of the left and right sides, and conveyer belt top right side is equipped with second
Second shaft front end of framework, right side is connected with rocking handle.
Preferably, further include having placement plate and handle, conveyer belt top right side is equipped with placement plate, and second framework, which is placed on, puts
It sets in plate, two wall outer upper of second framework or so is equipped with handle.
Preferably, further include having first bevel gear, second bevel gear, strut, second bearing seat, third shaft, third cone
The second shaft front end of gear and the 4th bevel gear, right side is connected with first bevel gear, and bottom plate top right side is equipped with strut, strut
Between first motor and the second mounting plate, strut top is connected with second bearing seat, and third shaft is equipped in second bearing seat,
Third shaft left end is connected with third hand tap gear, and third hand tap gear is engaged with first bevel gear, and third shaft right end is connected with
Four bevel gears, screw rod lower part are equipped with second bevel gear, and second bevel gear is engaged with the 4th bevel gear.
Preferably, further include having the second snap-gauge, the first bolt, connecting plate, the second bolt and the second nut, screw rod is from lower part
Two sections are cut into, top is equipped with the second snap-gauge, the screw rod lower part on the second snap-gauge top and top at left and right sides of the screw rod of lower part
It is provided with threaded hole, the first bolt is rotary in threaded hole, strut is cut into two sections from middle part, and the strut left upper portion of lower part is set
There are connecting plate, connecting plate top to be provided with pilot hole, the strut left lower on top is equipped with the second bolt, and the second bolt, which passes through, to be oriented to
Hole, the second bolt left part are rotary with the second nut, and the strut of the strut on top and lower part is fixed together by the second nut.
Operation principle:When needing to carry out the conveying of construction material using the equipment, user will need Building wood to be used
Material is placed in the first framework, and then user's control first motor rotates counterclockwise, and screw rod is driven to rotate counterclockwise, and then is driven
First nut moves up, and to the first mounting plate of drive and device moves up thereon so that the first framework and thereon device
It moves up, when the first framework is moved upwards up to the position of needs, user's control first motor is stopped, and then work people
Member take left side the first framework in construction material, when needing the construction material on the right side of use in the first framework, user's control
It makes the second motor and rotates 180 °, drive first rotating shaft to rotate 180 °, and then the first snap-gauge is driven to rotate 180 ° so that the left and right sides
The first frame body position be interchangeable, then staff can take right side the first framework in construction material.When the first frame
After internal materials'use, user's control first motor rotates clockwise, and screw rod is driven to rotate clockwise, and then drives the
One nut moves down so that the first mounting plate and device moves down thereon drives the first framework to move down, when the first frame
After body moves down reset, user's control first motor is stopped.If at this point, also needing to carry out material using the equipment
Conveying, user repeat above step.In this way, the construction material in the first framework is transported to eminence by first motor, no
The mode of construction material conveying is only accelerated, simultaneously as people is not required to oneself conveying material, it is therefore prevented that the generation of safety accident.
Because further including having left and right conveying device, bottom plate top left side is equipped with left and right conveying device, left and right conveying device packet
Included the second mounting plate, first bearing seat, the second shaft, roller, conveyer belt, second framework and rocking handle, bottom plate top left side and
Right side is equipped with the second mounting plate, and the second mounting plate top is equipped with first bearing seat, second turn is equipped in first bearing seat
Axis, the second shaft rear portion are equipped with roller, and conveyer belt is wound on the roller of the left and right sides, and conveyer belt top right side is equipped with the second frame
Second shaft front end of body, right side is connected with rocking handle.So when needing to convey construction material to the left, user is by construction material
It is placed in second framework, then user rotates counterclockwise rocking handle, and second shaft on right side is driven to rotate counterclockwise, and then drives
Roller rotates counterclockwise, to drive conveyer belt to rotate counterclockwise so that second framework is moved to the left, when second framework is to moving to left
When moving the position of needs, user stops operating rocking handle, need by second framework to the right it is mobile reset when, user is clockwise
Rotation crank drives second shaft on right side to rotate clockwise, and then roller is driven to rotate clockwise, to drive conveyer belt inverse
Hour hands rotate so that second framework moves right, and after second framework moves right reset, user stops operating rocking handle.So
Material can be transported to left side, facilitate user job.
Because further including having placement plate and handle, conveyer belt top right side is equipped with placement plate, and second framework is placed on placement
In plate, two wall outer upper of second framework or so is equipped with handle.So second framework can be removed, placement Building wood is facilitated
Expect and construction material of taking, handle can conveniently pick and place second framework.
Because further including having first bevel gear, second bevel gear, strut, second bearing seat, third shaft, third hand tap gear
With the 4th bevel gear, the second shaft front end on right side is connected with first bevel gear, and bottom plate top right side is equipped with strut, and strut is the
Between one motor and the second mounting plate, strut top is connected with second bearing seat, and third shaft, third are equipped in second bearing seat
Shaft left end is connected with third hand tap gear, and third hand tap gear is engaged with first bevel gear, and third shaft right end is connected with the 4th cone
Gear, screw rod lower part are equipped with second bevel gear, and second bevel gear is engaged with the 4th bevel gear.So needing to the left and top
When transmitting construction material simultaneously, user's control first motor rotates counterclockwise, and drives screw rod to rotate counterclockwise so that the first framework
It moves up, while screw rod rotates counterclockwise and second bevel gear is driven to rotate counterclockwise, and then drives the 4th bevel gear clockwise
Rotation, to drive third shaft to rotate clockwise so that third hand tap gear rotates clockwise, and drives first bevel gear counterclockwise
Rotation, and then second shaft on right side is driven to rotate counterclockwise, can so second framework be driven to be moved to the left, needed the
When two frameworks and the first framework reset, user's control first motor rotates clockwise, and drives screw rod to rotate clockwise so that first
Framework moves down, while screw rod rotates clockwise and second bevel gear is driven to rotate clockwise, and then drives the 4th bevel gear inverse
Hour hands rotate, to drive third shaft to rotate counterclockwise so that third hand tap gear rotates counterclockwise, and drives first bevel gear suitable
Hour hands rotate, and then second shaft on right side is driven to rotate clockwise so that second framework moves right, when second framework and the
After one framework resets, user's control motor is stopped, and can so not need user oneself rotation crank, alleviate user's
Burden.
Because further including having the second snap-gauge, the first bolt, connecting plate, the second bolt and the second nut, screw rod is from lower part quilt
It cuts in two, top is equipped with the second snap-gauge at left and right sides of the screw rod of lower part, and the screw rod lower part on the second snap-gauge top and top is equal
It is provided with threaded hole, the first bolt is rotary in threaded hole, strut is cut into two sections from middle part, and the strut left upper portion of lower part is equipped with
Connecting plate, connecting plate top are provided with pilot hole, and the strut left lower on top is equipped with the second bolt, and the second bolt, which passes through, to be oriented to
Hole, the second bolt left part are rotary with the second nut, and the strut of the strut on top and lower part is fixed together by the second nut.Institute
With when need to only be delivered up construction material, user backs out the second nut, then the strut on top is moved down so that the
Then one bevel gear, second bevel gear, third hand tap gear and the separation of the 4th bevel gear can drive the first frame by first motor
Body moves up and down the conveying for carrying out construction material, and after material conveys, user resets the strut on top, then by the second spiral shell
Mother tightens, and when only needing to convey material to the left, user back-outs the first bolt, then can drive the by first motor
Two frameworks move left and right the conveying for carrying out material, and after material exports, user screws back the first bolt in threaded hole.
(3)Advantageous effect
Invention achieves can quickly convey material, the effect of material safety is conveyed, the present invention is by first motor by first
Construction material in framework is transported to eminence, not only accelerates the mode of construction material conveying, simultaneously as to be not required to oneself defeated by people
Send material, it is therefore prevented that material can be transported to left side, facilitate user job by the generation of safety accident, left and right conveying device.
Description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the present invention looks up structural representation of the oval sliding rail of the present invention.
Fig. 3 is the first part main structure diagram of the present invention.
Fig. 4 is second of part main structure diagram of the present invention.
Fig. 5 is the third part main structure diagram of the present invention.
Fig. 6 is the 4th kind of part main structure diagram of the present invention.
Label in attached drawing be:1- bottom plates, 2- holders, the first sliding rails of 3-, the first sliding blocks of 4-, the first mounting plates of 5-, 6-
One nut, 7- first motors, 8- screw rods, 9- ellipse sliding rails, the second sliding blocks of 10-, 11- connecting rods, the first frameworks of 12-, 13-
Two motors, 14- first rotating shafts, the first snap-gauges of 15-, the mono- word holes 16-, 17- or so conveying devices, the second mounting plates of 171-, 172-
First bearing seat, the second shafts of 173-, 174- rollers, 175- conveyer belts, 176- second frameworks, 177- rocking handles, 18- placement plates,
19- handles, 20- first bevel gears, 21- second bevel gears, 22- struts, 23- second bearing seats, 24- third shafts, 25- thirds
Bevel gear, the 4th bevel gears of 26-, the second snap-gauges of 27-, 28- threaded holes, the first bolts of 29-, 30- connecting plates, 31- pilot holes,
The second bolts of 32-, the second nuts of 33-.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction material conveying equipment includes as shown in figures 1 to 6 bottom plate 1, holder 2, the first sliding rail 3, the first sliding block 4,
One mounting plate 5, the first nut 6, first motor 7, screw rod 8, oval sliding rail 9, the second sliding block 10, connecting rod 11, the first framework
12, the second motor 13, first rotating shaft 14 and the first snap-gauge 15,1 top right side of bottom plate are equipped with holder 2, and 2 left side of holder is embedded with first
Sliding rail 3, slidingtype is connected with the first sliding block 4 on the first sliding rail 3, and 4 left side of the first sliding block is connected with the first mounting plate 5, the first peace
5 right part of loading board is equipped with the first nut 6, and 1 top right side of bottom plate is equipped with first motor 7, is connected on the output shaft at 7 top of first motor
There are screw rod 8, screw rod 8 that the first nut 6,5 bottom left of the first mounting plate is passed through to be equipped with oval sliding rail 9, slided in oval sliding rail 9
Dynamic formula connection is there are two the second sliding block 10, and 10 bottom of the second sliding block is respectively connected with connecting rod 11, and 11 bottom end of connecting rod is respectively connected with
First framework 12,5 top left side of the first mounting plate are equipped with the second motor 13, and the is connected on the output shaft of 13 bottom of the second motor
One shaft 14, first rotating shaft 14 pass through the center of the first mounting plate 5 and oval sliding rail 9, and 14 bottom end of first rotating shaft is connected with the
One snap-gauge 15, a word hole 16 is provided on the first snap-gauge 15, and connecting rod 11 passes through a word hole 16.
Embodiment 2
A kind of construction material conveying equipment includes as shown in figures 1 to 6 bottom plate 1, holder 2, the first sliding rail 3, the first sliding block 4,
One mounting plate 5, the first nut 6, first motor 7, screw rod 8, oval sliding rail 9, the second sliding block 10, connecting rod 11, the first framework
12, the second motor 13, first rotating shaft 14 and the first snap-gauge 15,1 top right side of bottom plate are equipped with holder 2, and 2 left side of holder is embedded with first
Sliding rail 3, slidingtype is connected with the first sliding block 4 on the first sliding rail 3, and 4 left side of the first sliding block is connected with the first mounting plate 5, the first peace
5 right part of loading board is equipped with the first nut 6, and 1 top right side of bottom plate is equipped with first motor 7, is connected on the output shaft at 7 top of first motor
There are screw rod 8, screw rod 8 that the first nut 6,5 bottom left of the first mounting plate is passed through to be equipped with oval sliding rail 9, slided in oval sliding rail 9
Dynamic formula connection is there are two the second sliding block 10, and 10 bottom of the second sliding block is respectively connected with connecting rod 11, and 11 bottom end of connecting rod is respectively connected with
First framework 12,5 top left side of the first mounting plate are equipped with the second motor 13, and the is connected on the output shaft of 13 bottom of the second motor
One shaft 14, first rotating shaft 14 pass through the center of the first mounting plate 5 and oval sliding rail 9, and 14 bottom end of first rotating shaft is connected with the
One snap-gauge 15, a word hole 16 is provided on the first snap-gauge 15, and connecting rod 11 passes through a word hole 16.
Further include having left and right conveying device 17,1 top left side of bottom plate is equipped with left and right conveying device 17, left and right conveying device 17
Include the second mounting plate 171, first bearing seat 172, the second shaft 173, roller 174, conveyer belt 175,176 and of second framework
Rocking handle 177,1 top left side of bottom plate and right side are equipped with the second mounting plate 171, and 171 top of the second mounting plate is equipped with first axle
Bearing 172, the second shaft 173 is equipped in first bearing seat 172, and 173 rear portion of the second shaft is equipped with roller 174, left and right two
Conveyer belt 175 is wound on the roller 174 of side, 175 top right side of conveyer belt is equipped with second framework 176, second shaft 173 on right side
Front end is connected with rocking handle 177.
Embodiment 3
A kind of construction material conveying equipment includes as shown in figures 1 to 6 bottom plate 1, holder 2, the first sliding rail 3, the first sliding block 4,
One mounting plate 5, the first nut 6, first motor 7, screw rod 8, oval sliding rail 9, the second sliding block 10, connecting rod 11, the first framework
12, the second motor 13, first rotating shaft 14 and the first snap-gauge 15,1 top right side of bottom plate are equipped with holder 2, and 2 left side of holder is embedded with first
Sliding rail 3, slidingtype is connected with the first sliding block 4 on the first sliding rail 3, and 4 left side of the first sliding block is connected with the first mounting plate 5, the first peace
5 right part of loading board is equipped with the first nut 6, and 1 top right side of bottom plate is equipped with first motor 7, is connected on the output shaft at 7 top of first motor
There are screw rod 8, screw rod 8 that the first nut 6,5 bottom left of the first mounting plate is passed through to be equipped with oval sliding rail 9, slided in oval sliding rail 9
Dynamic formula connection is there are two the second sliding block 10, and 10 bottom of the second sliding block is respectively connected with connecting rod 11, and 11 bottom end of connecting rod is respectively connected with
First framework 12,5 top left side of the first mounting plate are equipped with the second motor 13, and the is connected on the output shaft of 13 bottom of the second motor
One shaft 14, first rotating shaft 14 pass through the center of the first mounting plate 5 and oval sliding rail 9, and 14 bottom end of first rotating shaft is connected with the
One snap-gauge 15, a word hole 16 is provided on the first snap-gauge 15, and connecting rod 11 passes through a word hole 16.
Further include having left and right conveying device 17,1 top left side of bottom plate is equipped with left and right conveying device 17, left and right conveying device 17
Include the second mounting plate 171, first bearing seat 172, the second shaft 173, roller 174, conveyer belt 175,176 and of second framework
Rocking handle 177,1 top left side of bottom plate and right side are equipped with the second mounting plate 171, and 171 top of the second mounting plate is equipped with first axle
Bearing 172, the second shaft 173 is equipped in first bearing seat 172, and 173 rear portion of the second shaft is equipped with roller 174, left and right two
Conveyer belt 175 is wound on the roller 174 of side, 175 top right side of conveyer belt is equipped with second framework 176, second shaft 173 on right side
Front end is connected with rocking handle 177.
Further include having placement plate 18 and handle 19,175 top right side of conveyer belt is equipped with placement plate 18, and second framework 176 is put
It sets in placement plate 18,176 or so two wall outer upper of second framework is equipped with handle 19.
Embodiment 4
A kind of construction material conveying equipment includes as shown in figures 1 to 6 bottom plate 1, holder 2, the first sliding rail 3, the first sliding block 4,
One mounting plate 5, the first nut 6, first motor 7, screw rod 8, oval sliding rail 9, the second sliding block 10, connecting rod 11, the first framework
12, the second motor 13, first rotating shaft 14 and the first snap-gauge 15,1 top right side of bottom plate are equipped with holder 2, and 2 left side of holder is embedded with first
Sliding rail 3, slidingtype is connected with the first sliding block 4 on the first sliding rail 3, and 4 left side of the first sliding block is connected with the first mounting plate 5, the first peace
5 right part of loading board is equipped with the first nut 6, and 1 top right side of bottom plate is equipped with first motor 7, is connected on the output shaft at 7 top of first motor
There are screw rod 8, screw rod 8 that the first nut 6,5 bottom left of the first mounting plate is passed through to be equipped with oval sliding rail 9, slided in oval sliding rail 9
Dynamic formula connection is there are two the second sliding block 10, and 10 bottom of the second sliding block is respectively connected with connecting rod 11, and 11 bottom end of connecting rod is respectively connected with
First framework 12,5 top left side of the first mounting plate are equipped with the second motor 13, and the is connected on the output shaft of 13 bottom of the second motor
One shaft 14, first rotating shaft 14 pass through the center of the first mounting plate 5 and oval sliding rail 9, and 14 bottom end of first rotating shaft is connected with the
One snap-gauge 15, a word hole 16 is provided on the first snap-gauge 15, and connecting rod 11 passes through a word hole 16.
Further include having left and right conveying device 17,1 top left side of bottom plate is equipped with left and right conveying device 17, left and right conveying device 17
Include the second mounting plate 171, first bearing seat 172, the second shaft 173, roller 174, conveyer belt 175,176 and of second framework
Rocking handle 177,1 top left side of bottom plate and right side are equipped with the second mounting plate 171, and 171 top of the second mounting plate is equipped with first axle
Bearing 172, the second shaft 173 is equipped in first bearing seat 172, and 173 rear portion of the second shaft is equipped with roller 174, left and right two
Conveyer belt 175 is wound on the roller 174 of side, 175 top right side of conveyer belt is equipped with second framework 176, second shaft 173 on right side
Front end is connected with rocking handle 177.
Further include having placement plate 18 and handle 19,175 top right side of conveyer belt is equipped with placement plate 18, and second framework 176 is put
It sets in placement plate 18,176 or so two wall outer upper of second framework is equipped with handle 19.
Further include having first bevel gear 20, second bevel gear 21, strut 22, second bearing seat 23, third shaft 24, third
173 front end of the second shaft of bevel gear 25 and the 4th bevel gear 26, right side is connected with first bevel gear 20,1 top right side of bottom plate
Equipped with strut 22, for strut 22 between first motor 7 and the second mounting plate 171,22 top of strut is connected with second bearing seat 23,
Be equipped with third shaft 24 in second bearing seat 23,24 left end of third shaft is connected with third hand tap gear 25, third hand tap gear 25 with
First bevel gear 20 engages, and 24 right end of third shaft is connected with the 4th bevel gear 26, and 8 lower part of screw rod is equipped with second bevel gear 21,
Second bevel gear 21 is engaged with the 4th bevel gear 26.
Further include having the second snap-gauge 27, the first bolt 29, connecting plate 30, the second bolt 32 and the second nut 33, screw rod 8 from
Lower part is cut into two sections, and 8 left and right sides top of screw rod of lower part is equipped with the second snap-gauge 27,27 top of the second snap-gauge and top
8 lower part of screw rod is provided with threaded hole 28, and the first bolt 29 is rotary in threaded hole 28, and strut 22 is cut into two sections from middle part, under
22 left upper portion of strut in portion is equipped with connecting plate 30, and 30 top of connecting plate is provided with pilot hole 31,22 left lower of strut on top
Equipped with the second bolt 32, the second bolt 32 passes through pilot hole 31,32 left part of the second bolt to be rotary with the second nut 33, the second nut 33
The strut 22 of the strut 22 on top and lower part is fixed together.
Operation principle:When needing to carry out the conveying of construction material using the equipment, user will need Building wood to be used
Material is placed in the first framework 12, and then user's control first motor 7 rotates counterclockwise, and drives screw rod 8 to rotate counterclockwise, in turn
Drive the first nut 6 to move up, to drive the first mounting plate 5 and device moves up thereon so that the first framework 12 and
Device moves up thereon, and when the first framework 12 is moved upwards up to the position of needs, user's control first motor 7 stops work
Make, then staff take left side the first framework 12 in construction material, when needing on the right side of use in the first framework 12
When construction material, the second motor of user's control 13 rotates 180 °, drives first rotating shaft 14 to rotate 180 °, and then drive the first snap-gauge
15 rotation 180 ° so that 12 position of the first framework of the left and right sides is interchangeable, then staff can take right side first
Construction material in framework 12.After the materials'use in the first framework 12, user's control first motor 7 turns clockwise
It is dynamic, drive screw rod 8 to rotate clockwise, and then the first nut 6 is driven to move down so that the first mounting plate 5 and thereon device to
Lower movement drives the first framework 12 to move down, and after the first framework 12 moves down reset, user's control first motor 7 is stopped
Only work.If at this point, also needing to carry out the conveying of material using the equipment, user repeats above step.In this way, passing through
Construction material in first framework 12 is transported to eminence by one motor 7, not only accelerate construction material conveying mode, while because
Behaviour is not required to oneself conveying material, it is therefore prevented that the generation of safety accident.
Because further including having left and right conveying device 17,1 top left side of bottom plate is equipped with left and right conveying device 17, left and right conveying dress
It includes the second mounting plate 171, first bearing seat 172, the second shaft 173, roller 174, conveyer belt 175, second framework to set 17
176 and rocking handle 177,1 top left side of bottom plate and right side be equipped with the second mounting plate 171,171 top of the second mounting plate is equipped with
One bearing block 172 is equipped with the second shaft 173 in first bearing seat 172, and 173 rear portion of the second shaft is equipped with roller 174, left
It is wound with conveyer belt 175 on the roller 174 of right both sides, 175 top right side of conveyer belt is equipped with second framework 176, second turn of right side
173 front end of axis is connected with rocking handle 177.So when needing to convey construction material to the left, construction material is placed on the by user
In two frameworks 176, then user rotates counterclockwise rocking handle 177, drives second shaft 173 on right side to rotate counterclockwise, and then band
Dynamic roller 174 rotates counterclockwise, to drive conveyer belt 175 to rotate counterclockwise so that second framework 176 is moved to the left, when the
When two frameworks 176 are moved to the left to the position of needs, user stops operating rocking handle 177, is needing second framework 176 to the right
When mobile reset, user rotates clockwise rocking handle 177, and second shaft 173 on right side is driven to rotate clockwise, and then drives roller
174 rotate clockwise, to drive conveyer belt 175 to rotate counterclockwise so that second framework 176 moves right, and works as second framework
176 move right after reset, and user stops operating rocking handle 177.Material can be so transported to left side, facilitate user's work
Make.
Because further including having placement plate 18 and handle 19,175 top right side of conveyer belt is equipped with placement plate 18, second framework
176 are placed in placement plate 18, and 176 or so two wall outer upper of second framework is equipped with handle 19.So second framework 176 can
It to remove, facilitates and places construction material and construction material of taking, handle 19 can conveniently pick and place second framework 176.
Because further include have first bevel gear 20, second bevel gear 21, strut 22, second bearing seat 23, third shaft 24,
173 front end of the second shaft of third hand tap gear 25 and the 4th bevel gear 26, right side is connected with first bevel gear 20,1 top of bottom plate
Right side is equipped with strut 22, and for strut 22 between first motor 7 and the second mounting plate 171,22 top of strut is connected with second bearing
Seat 23, second bearing seat 23 is interior to be equipped with third shaft 24, and 24 left end of third shaft is connected with third hand tap gear 25, third hand tap gear
25 engage with first bevel gear 20, and 24 right end of third shaft is connected with the 4th bevel gear 26, and 8 lower part of screw rod is equipped with second bevel gear
21, second bevel gear 21 is engaged with the 4th bevel gear 26.So when needing to transmit construction material simultaneously with top to the left, use
Family control first motor 7 rotates counterclockwise, and drives screw rod 8 to rotate counterclockwise so that the first framework 12 moves up, while screw rod
8, which rotate counterclockwise drive second bevel gear 21, rotates counterclockwise, and then the 4th bevel gear 26 is driven to rotate clockwise, to drive
Third shaft 24 rotates clockwise so that and third hand tap gear 25 rotates clockwise, and first bevel gear 20 is driven to rotate counterclockwise, into
And second shaft 173 on right side is driven to rotate counterclockwise, it can so drive second framework 176 to be moved to the left, need the
When two frameworks 176 and the first framework 12 reset, user's control first motor 7 rotates clockwise, and screw rod 8 is driven to rotate clockwise,
So that the first framework 12 moves down, while screw rod 8 rotates clockwise and second bevel gear 21 is driven to rotate clockwise, and then drives
4th bevel gear 26 rotates counterclockwise, to drive third shaft 24 to rotate counterclockwise so that third hand tap gear 25 turns counterclockwise
It is dynamic, drive first bevel gear 20 to rotate clockwise, and then second shaft 173 on right side is driven to rotate clockwise so that the second frame
Body 176 moves right, and after second framework 176 and the reset of the first framework 12, user's control motor is stopped, and so may not be used
User oneself rotation crank 177 is needed, the burden of user is alleviated.
Because further including having the second snap-gauge 27, the first bolt 29, connecting plate 30, the second bolt 32 and the second nut 33, spiral shell
Bar 8 is cut into two sections from lower part, and 8 left and right sides top of screw rod of lower part is equipped with the second snap-gauge 27,27 top of the second snap-gauge with
8 lower part of screw rod on top is provided with threaded hole 28, and the first bolt 29 is rotary in threaded hole 28, and strut 22 is cut into two from middle part
22 left upper portion of strut of section, lower part is equipped with connecting plate 30, and 30 top of connecting plate is provided with pilot hole 31,22 left side of strut on top
Lower part is equipped with the second bolt 32, and the second bolt 32 passes through pilot hole 31,32 left part of the second bolt to be rotary with the second nut 33, the second spiral shell
The strut 22 of the strut 22 on top and lower part is fixed together by mother 33.So when need to only be delivered up construction material,
User backs out the second nut 33, then moves down the strut on top 22 so that first bevel gear 20, second bevel gear
21, then third hand tap gear 25 and the separation of the 4th bevel gear 26 can drive the first framework 12 to move up and down by first motor 7
The conveying of construction material is carried out, after material conveys, user resets the strut 22 on top, then twists the second nut 33
Tightly, when only needing to convey material to the left, user back-outs the first bolt 29, then can drive the by first motor 7
Two frameworks 176 move left and right the conveying for carrying out material, and after material exports, the first bolt 29 is screwed back threaded hole 28 by user
It is interior.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (5)
1. a kind of construction material conveying equipment, which is characterized in that include bottom plate(1), holder(2), the first sliding rail(3), first
Sliding block(4), the first mounting plate(5), the first nut(6), first motor(7), screw rod(8), oval sliding rail(9), the second sliding block
(10), connecting rod(11), the first framework(12), the second motor(13), first rotating shaft(14)With the first snap-gauge(15), bottom plate(1)
Top right side is equipped with holder(2), holder(2)Left side is embedded with the first sliding rail(3), the first sliding rail(3)Upper slidingtype is connected with first
Sliding block(4), the first sliding block(4)Left side is connected with the first mounting plate(5), the first mounting plate(5)Right part is equipped with the first nut(6),
Bottom plate(1)Top right side is equipped with first motor(7), first motor(7)It is connected with screw rod on the output shaft at top(8), screw rod(8)
Across the first nut(6), the first mounting plate(5)Bottom left is equipped with oval sliding rail(9), oval sliding rail(9)Inner sliding type
There are two the second sliding blocks for connection(10), the second sliding block(10)Bottom is respectively connected with connecting rod(11), connecting rod(11)Bottom end connects
It is connected to the first framework(12), the first mounting plate(5)Top left side is equipped with the second motor(13), the second motor(13)The output of bottom
First rotating shaft is connected on axis(14), first rotating shaft(14)Across the first mounting plate(5)With oval sliding rail(9)Center,
One shaft(14)Bottom end is connected with the first snap-gauge(15), the first snap-gauge(15)On be provided with a word hole(16), connecting rod(11)It passes through
One word hole(16).
2. a kind of construction material conveying equipment according to claim 1, which is characterized in that further include having left and right conveying device
(17), bottom plate(1)Top left side is equipped with left and right conveying device(17), left and right conveying device(17)It include the second mounting plate
(171), first bearing seat(172), the second shaft(173), roller(174), conveyer belt(175), second framework(176)And rocking handle
(177), bottom plate(1)Top left side and right side are equipped with the second mounting plate(171), the second mounting plate(171)Top is equipped with
One bearing block(172), first bearing seat(172)Inside it is equipped with the second shaft(173), the second shaft(173)Rear portion is equipped with rolling
Cylinder(174), the roller of the left and right sides(174)On be wound with conveyer belt(175), conveyer belt(175)Top right side is equipped with second framework
(176), second shaft on right side(173)Front end is connected with rocking handle(177).
3. a kind of construction material conveying equipment according to claim 2, which is characterized in that further include having placement plate(18)With
Handle(19), conveyer belt(175)Top right side is equipped with placement plate(18), second framework(176)It is placed on placement plate(18)It is interior, the
Two frameworks(176)Two wall outer uppers of left and right are equipped with handle(19).
4. a kind of construction material conveying equipment according to claim 3, which is characterized in that further include having first bevel gear
(20), second bevel gear(21), strut(22), second bearing seat(23), third shaft(24), third hand tap gear(25)With the 4th
Bevel gear(26), second shaft on right side(173)Front end is connected with first bevel gear(20), bottom plate(1)Top right side is equipped with branch
Bar(22), strut(22)In first motor(7)With the second mounting plate(171)Between, strut(22)Top is connected with second bearing
Seat(23), second bearing seat(23)It is interior to be equipped with third shaft(24), third shaft(24)Left end is connected with third hand tap gear(25),
Third hand tap gear(25)With first bevel gear(20)Engagement, third shaft(24)Right end is connected with the 4th bevel gear(26), screw rod
(8)Lower part is equipped with second bevel gear(21), second bevel gear(21)With the 4th bevel gear(26)Engagement.
5. a kind of construction material conveying equipment according to claim 4, which is characterized in that further include having the second snap-gauge
(27), the first bolt(29), connecting plate(30), the second bolt(32)With the second nut(33), screw rod(8)It is cut into two from lower part
Section, the screw rod of lower part(8)Left and right sides top is equipped with the second snap-gauge(27), the second snap-gauge(27)The screw rod on top and top
(8)Lower part is provided with threaded hole(28), threaded hole(28)Inside it is rotary with the first bolt(29), strut(22)It is cut into two from middle part
Section, the strut of lower part(22)Left upper portion is equipped with connecting plate(30), connecting plate(30)Top is provided with pilot hole(31), the branch on top
Bar(22)Left lower is equipped with the second bolt(32), the second bolt(32)Across pilot hole(31), the second bolt(32)Left part revolves
There is the second nut(33), the second nut(33)By the strut on top(22)With the strut of lower part(22)It is fixed together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810184417.6A CN108502508A (en) | 2018-03-07 | 2018-03-07 | A kind of construction material conveying equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810184417.6A CN108502508A (en) | 2018-03-07 | 2018-03-07 | A kind of construction material conveying equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108502508A true CN108502508A (en) | 2018-09-07 |
Family
ID=63377255
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810184417.6A Withdrawn CN108502508A (en) | 2018-03-07 | 2018-03-07 | A kind of construction material conveying equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108502508A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6241155A (en) * | 1985-08-19 | 1987-02-23 | Fuji Seiki Seizosho:Kk | Transshipping and transferring device for sheet workpiece |
CN104649042A (en) * | 2013-11-22 | 2015-05-27 | 西安嘉乐世纪机电科技有限公司 | On-line full-automatic PCB feeding machine structure |
CN106241211A (en) * | 2016-08-30 | 2016-12-21 | 安丘博阳机械制造有限公司 | Intelligence induction system |
CN205946658U (en) * | 2016-08-17 | 2017-02-15 | 蒋中平 | Tree pruning device for horticulture |
CN106576979A (en) * | 2016-11-28 | 2017-04-26 | 严仁海 | New energy source flower stand for municipal administration |
CN106648119A (en) * | 2017-02-12 | 2017-05-10 | 吴哲铭 | Virtual-reality user experiencing device |
CN106884177A (en) * | 2017-03-03 | 2017-06-23 | 南昌浩牛科技有限公司 | A kind of Industrial Steels pipe surface sprays degreasing agent equipment |
CN107442495A (en) * | 2017-09-14 | 2017-12-08 | 邵林芳 | A kind of detection device slide measure high-efficiency cleaning equipment |
CN107497529A (en) * | 2017-08-30 | 2017-12-22 | 钟光远 | A kind of discarded intelligent watch efficiency crushing device |
CN206882361U (en) * | 2017-05-28 | 2018-01-16 | 王靓雅 | A kind of internal medicine inspection test tube cleaning device |
-
2018
- 2018-03-07 CN CN201810184417.6A patent/CN108502508A/en not_active Withdrawn
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6241155A (en) * | 1985-08-19 | 1987-02-23 | Fuji Seiki Seizosho:Kk | Transshipping and transferring device for sheet workpiece |
CN104649042A (en) * | 2013-11-22 | 2015-05-27 | 西安嘉乐世纪机电科技有限公司 | On-line full-automatic PCB feeding machine structure |
CN205946658U (en) * | 2016-08-17 | 2017-02-15 | 蒋中平 | Tree pruning device for horticulture |
CN106241211A (en) * | 2016-08-30 | 2016-12-21 | 安丘博阳机械制造有限公司 | Intelligence induction system |
CN106576979A (en) * | 2016-11-28 | 2017-04-26 | 严仁海 | New energy source flower stand for municipal administration |
CN106648119A (en) * | 2017-02-12 | 2017-05-10 | 吴哲铭 | Virtual-reality user experiencing device |
CN106884177A (en) * | 2017-03-03 | 2017-06-23 | 南昌浩牛科技有限公司 | A kind of Industrial Steels pipe surface sprays degreasing agent equipment |
CN206882361U (en) * | 2017-05-28 | 2018-01-16 | 王靓雅 | A kind of internal medicine inspection test tube cleaning device |
CN107497529A (en) * | 2017-08-30 | 2017-12-22 | 钟光远 | A kind of discarded intelligent watch efficiency crushing device |
CN107442495A (en) * | 2017-09-14 | 2017-12-08 | 邵林芳 | A kind of detection device slide measure high-efficiency cleaning equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207103699U (en) | A kind of construction bar cropper | |
AU2020103994A4 (en) | Crushing device of livestock and poultry bones and crushing method thereof | |
CN207327960U (en) | A kind of construction and decoration heavy duty detergent wallpaper sticker | |
CN207525655U (en) | A kind of engineering warning sign for building convenient for adjusting | |
CN109940766A (en) | A kind of safe protection engineering construction metope drilling equipment | |
CN108502508A (en) | A kind of construction material conveying equipment | |
CN203790993U (en) | Mussel shell breaking device | |
WO2009007867A3 (en) | Machine for laminating soft doughs for pasta | |
CN204682194U (en) | Solar rail formula feeds fish device | |
CN209852384U (en) | Material conveyer for building engineering | |
CN110126071A (en) | A kind of manual refining sculpture mud equipment of low cost for sculpture creation | |
CN108212365A (en) | A kind of smart home is with quickly chopping sunken equipment | |
CN203921866U (en) | A kind of convenient driving band that American leather is installed | |
CN108820021A (en) | A kind of construction material handling device that can mitigate work load | |
CN205524554U (en) | Simple and easy cat ladder mechanism | |
CN206720392U (en) | A kind of Novel leatheroid-conveying device | |
CN112718810A (en) | Knee joint brace extrusion recovery unit | |
CN216582801U (en) | Unloader is used in sauce processing | |
CN210818543U (en) | Punching structure of steel structure | |
CN205761476U (en) | A kind of productive manpower Calculus Bovis ball mill | |
CN103751965A (en) | Energy-saving treadmill | |
CN108412170A (en) | Apparatus for drying after a kind of wall plaster | |
CN109926138A (en) | A kind of construction material rubbish quick crashing device | |
CN204453862U (en) | A kind of walking grain shines receipts machine | |
CN207375450U (en) | Film discharging roller cutting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180907 |
|
WW01 | Invention patent application withdrawn after publication |