CN108493799A - A kind of spliced ring main unit precast construction - Google Patents

A kind of spliced ring main unit precast construction Download PDF

Info

Publication number
CN108493799A
CN108493799A CN201810528961.8A CN201810528961A CN108493799A CN 108493799 A CN108493799 A CN 108493799A CN 201810528961 A CN201810528961 A CN 201810528961A CN 108493799 A CN108493799 A CN 108493799A
Authority
CN
China
Prior art keywords
collar tie
tie beam
side plate
main unit
ring main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810528961.8A
Other languages
Chinese (zh)
Inventor
蒋安为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Small Wisdom Mdt Infotech Ltd
Original Assignee
Shandong Small Wisdom Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Small Wisdom Mdt Infotech Ltd filed Critical Shandong Small Wisdom Mdt Infotech Ltd
Priority to CN201810528961.8A priority Critical patent/CN108493799A/en
Publication of CN108493799A publication Critical patent/CN108493799A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/20Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
    • H02B1/202Cable lay-outs
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • H02B1/305Cable entries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G15/00Cable fittings
    • H02G15/08Cable junctions

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Cable Accessories (AREA)

Abstract

The present invention relates to a kind of spliced ring main unit precast constructions, side plate is mounted on bottom plate, the top left side of side plate is equipped with the first collar tie beam, its top right side is equipped with the second collar tie beam, cover board is embedded in the top of the second collar tie beam, the left-hand end of second collar tie beam and the right-hand end of the first collar tie beam are tightly connected, side plate includes two long side plates being oppositely arranged and two end side plates being oppositely arranged, side plate is provided with multiple cable sealed joints on the short side plate close to second collar tie beam one end, second collar tie beam one end is being provided with maintenance ladder on one long side plate of side plate, air grid is offered on the front and back side plate of first collar tie beam, it is internally provided with closure interlayer, it blocks and is provided with multiple cable sealed joints on interlayer.The present invention solves the problems such as condensation of prefabricated foundation, percolating water, has ensured the safe operation of ring main unit.

Description

A kind of spliced ring main unit precast construction
Technical field
The present invention relates to technical field of electric power construction more particularly to a kind of spliced ring main unit precast constructions.
Background technology
As Urbanization Process In China quickly propels, many security risks existing for original city power distribution facility, not Adapt to the requirement under existing situation, while maintenance cost increases year by year, it is also desirable to which electric power facility considers that the maintenance in later stage is wanted It reduces to the greatest extent, realizes sustainable development.At present ring main unit prefabricated foundation the problems such as there are condensation, percolating waters, easily cause component Etching insulative performance declines, and biogas is easily formed in basis, there are the security risks such as explosion.
Invention content
The purpose of the present invention is to provide a kind of spliced ring main unit precast constructions, to solve the above technical problems.
The present invention uses following technical scheme to achieve the above object:
A kind of spliced ring main unit precast construction, including bottom plate, side plate, the first collar tie beam, cover board, the second collar tie beam, the side plate peace On bottom plate, the top left side of the side plate is equipped with the first collar tie beam, and top right side is equipped with the second collar tie beam, described Cover board is embedded in the top of the second collar tie beam, and the left-hand end of second collar tie beam is tightly connected with the right-hand end of the first collar tie beam, described Side plate includes two long side plates being oppositely arranged and two short side plates being oppositely arranged, and the side plate is close to second collar tie beam one end Short side plate on be provided with multiple cable sealed joints, be provided with close to second collar tie beam one end on a long side plate of the side plate Maintenance ladder offers air grid on the front and back side plate of first collar tie beam, is internally provided with closure interlayer, the closure interlayer On be provided with multiple cable sealed joints.
On the basis of above-mentioned technical proposal, the cover board is made of light composite material, and is sealed with the second collar tie beam Connection.
On the basis of above-mentioned technical proposal, the bottom plate, side plate, the first collar tie beam, the second collar tie beam are all made of armored concrete Connection structure that is prefabricated, and being connected and fixed using card slot positioning bolt between each component.
On the basis of above-mentioned technical proposal, the cable sealed joint use can knock out formula embedded sleeve barrel structure.
Compared with prior art, the present invention has the following advantages:Condensation, the percolating water that the present invention solves prefabricated foundation are asked Topic, has ensured the safe operation of ring main unit;And using the cable sealed joint that can knock out formula embedded sleeve barrel structure, it is convenient for the later stage Maintenance and dilatation;The site operation period is short, alleviates the workload of O&M department.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is a member connection structure schematic diagram of the present invention.
Fig. 3 is the first lap girder construction schematic diagram of the present invention.
Fig. 4 is the short side plate attachment structure schematic diagram of the present invention.
Fig. 5 is the cover board and the second collar tie beam attachment structure schematic diagram of the present invention.
Fig. 6 is the long lateral plate structure schematic diagram of the present invention.
In figure:1, bottom plate, 2, side plate, the 3, first collar tie beam, 4, cover board, the 5, second collar tie beam, 6, block interlayer, 7, air grid, 8, cable sealed joint, 9, long side plate, 10, short side plate, 11, maintenance ladder.
Specific implementation mode
The present invention is further elaborated in the following with reference to the drawings and specific embodiments.
As shown in Fig. 1 ~ 6, a kind of spliced ring main unit precast construction, including bottom plate 1, side plate 2, the first collar tie beam 3, cover board 4, Second collar tie beam 5, it is characterised in that:The side plate 2 is mounted on bottom plate 1, and the top left side of the side plate 2 is equipped with first lap Beam 3, top right side are equipped with the second collar tie beam 5, and the cover board 4 is embedded in the top of the second collar tie beam 5, second collar tie beam 5 The right-hand end of left-hand end and the first collar tie beam 3 be tightly connected, the side plate 2 includes two long side plates 9 being oppositely arranged and two The short side plate 10 being oppositely arranged, the side plate 2 are provided with multiple cable seals on the short side plate 10 close to 5 one end of the second collar tie beam Connector 8 is being provided with maintenance ladder 11 on a long side plate 9 of the side plate 2 close to 5 one end of the second collar tie beam, first collar tie beam 3 Air grid 7 is offered on front and back side plate, is internally provided with and blocks interlayer 6, and it is close to be provided with multiple cables on the closure interlayer 6 Sealing joint 8, the cover board 4 are made of light composite material, and are tightly connected with the second collar tie beam 5, the bottom plate 1, side plate 2, it is prefabricated to be all made of armored concrete for the first collar tie beam 3, the second collar tie beam 5, and are connected using card slot positioning bolt between each component Fixed connection structure, the cable sealed joint 8 is using can knock out formula embedded sleeve barrel structure.
The operation principle of the present invention:For the present invention when specifically used, bottom plate 1 and side plate 2 are embedded in underground, the first collar tie beam 3 It is located at earth's surface or more with the second collar tie beam 5, ring main unit is mounted on the first collar tie beam 3, and cable is through the cable seal on short side plate 10 Connector 8 and the cable sealed joint 8 blocked on interlayer 6 connect ring main unit, and cable disengaging prepackage basis is to be tightly connected, It effectively prevent seeping water in basis;Ventilation is offered on first collar tie beam 3 and deletes 7, can prevent the solidifying frost of ring main unit;It is overhauled or is expanded When holding upkeep operation, top blind flange 3 is opened, is entered in basis from maintenance ladder 11.
The above is present pre-ferred embodiments, for the ordinary skill in the art, according to the present invention Introduction, in the case where not departing from the principle of the present invention with spirit, changes, modifications, replacement and change that embodiment is carried out Type is still fallen within protection scope of the present invention.

Claims (4)

1. a kind of spliced ring main unit precast construction, including bottom plate(1), side plate(2), the first collar tie beam(3), cover board(4), second circle Beam(5), it is characterised in that:The side plate(2)Mounted on bottom plate(1)On, the side plate(2)Top left side be equipped with first Collar tie beam(3), top right side is equipped with the second collar tie beam(5), the cover board(4)It is embedded in the second collar tie beam(5)Top, it is described Second collar tie beam(5)Left-hand end and the first collar tie beam(3)Right-hand end be tightly connected, the side plate(2)It is oppositely arranged including two Long side plate(9)The short side plate being oppositely arranged with two(10), the side plate(2)Close to the second collar tie beam(5)The short side of one end Plate(10)On be provided with multiple cable sealed joints(8), the side plate(2)A long side plate(9)On close to the second collar tie beam(5) One end is provided with maintenance ladder(11), first collar tie beam(3)Front and back side plate on offer air grid(7), it is internally provided with Block interlayer(6), the closure interlayer(6)On be provided with multiple cable sealed joints(8).
2. a kind of spliced ring main unit precast construction according to claim 1, it is characterised in that:The cover board(4)Using Light composite material is made, and with the second collar tie beam(5)It is tightly connected.
3. a kind of spliced ring main unit precast construction according to claim 1, it is characterised in that:The bottom plate(1), side plate (2), the first collar tie beam(3), the second collar tie beam(5)It is prefabricated to be all made of armored concrete, and spiral shell is positioned using card slot between each component It tethers and connects fixed connection structure.
4. a kind of spliced ring main unit precast construction according to claim 1, it is characterised in that:The cable sealed joint (8)Using formula embedded sleeve barrel structure can be knocked out.
CN201810528961.8A 2018-05-29 2018-05-29 A kind of spliced ring main unit precast construction Withdrawn CN108493799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810528961.8A CN108493799A (en) 2018-05-29 2018-05-29 A kind of spliced ring main unit precast construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810528961.8A CN108493799A (en) 2018-05-29 2018-05-29 A kind of spliced ring main unit precast construction

Publications (1)

Publication Number Publication Date
CN108493799A true CN108493799A (en) 2018-09-04

Family

ID=63350880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810528961.8A Withdrawn CN108493799A (en) 2018-05-29 2018-05-29 A kind of spliced ring main unit precast construction

Country Status (1)

Country Link
CN (1) CN108493799A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067258A (en) * 2019-05-17 2019-07-30 山东鲁泰建材科技集团有限公司 A kind of modularized combination type ring network cabinet basis and construction method
CN113202134A (en) * 2021-05-07 2021-08-03 江苏上元正信水电设备工程有限公司 Prefabricated assembled looped netowrk cabinet basis

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067258A (en) * 2019-05-17 2019-07-30 山东鲁泰建材科技集团有限公司 A kind of modularized combination type ring network cabinet basis and construction method
CN113202134A (en) * 2021-05-07 2021-08-03 江苏上元正信水电设备工程有限公司 Prefabricated assembled looped netowrk cabinet basis

Similar Documents

Publication Publication Date Title
CN204258238U (en) A kind of prefabricated assembled irrigation canals and ditches device
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN108832563A (en) A kind of pre-fabricated electric cables comb and its construction method
CN208272403U (en) A kind of spliced ring network cabinet precast construction
CN108493799A (en) A kind of spliced ring main unit precast construction
CN204098215U (en) A kind of novel prefabricated concrete building structures
CN104158130A (en) Suspension type fireproof bridge stand
CN206408538U (en) A kind of highway bridge concrete steel form
CN205477664U (en) Twin side heading method undercut tunnel utility tunnel
CN206267314U (en) It is embedded with the house that the modularization wall of distributed pipeline builds
CN205935184U (en) Take single -side supporting formwork basement outer wall of flexible waterproof layer external mold
CN205400736U (en) CRD undercut tunnel utility tunnel
CN106049667B (en) A kind of single side formwork outer wall of basement with flexible waterproof layer external mold
CN106972444A (en) A kind of cable protecting device suitable for karst area
CN207018014U (en) A kind of corrugated steel tunnel structure using natural lighting
CN207553360U (en) A kind of lightweight aerated concrete integrated wall plate with window
CN208073552U (en) tunnel drainage structure
CN202360109U (en) Composite-lining fully-closed waterproof construction
CN208690872U (en) A kind of pre-fabricated electric cables comb
CN204457797U (en) A kind of top longitudinal beam structure of subway station
CN208415994U (en) A kind of concrete slab hole is without damaged plugging structure
CN208782449U (en) A kind of cable duct bank
CN207453312U (en) A kind of fixed railing built-in fitting of bilayer
CN104895194A (en) Fast-constructed beam and slab connecting structure and construction method thereof
CN204419198U (en) A kind of concrete inverted arch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180904

WW01 Invention patent application withdrawn after publication