CN108489745A - 一种变截面土压平衡式盾构模拟试验系统 - Google Patents

一种变截面土压平衡式盾构模拟试验系统 Download PDF

Info

Publication number
CN108489745A
CN108489745A CN201810197380.0A CN201810197380A CN108489745A CN 108489745 A CN108489745 A CN 108489745A CN 201810197380 A CN201810197380 A CN 201810197380A CN 108489745 A CN108489745 A CN 108489745A
Authority
CN
China
Prior art keywords
soil
section
shield machine
shield
cutterhead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810197380.0A
Other languages
English (en)
Inventor
路德春
林庆涛
李鹏飞
龚秋明
杜修力
雷春明
孔凡超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201810197380.0A priority Critical patent/CN108489745A/zh
Publication of CN108489745A publication Critical patent/CN108489745A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Abstract

本发明公布了一种变截面土压平衡式盾构模拟试验系统,该系统由模型箱、监测系统、掘削系统和顶进系统四部分组成。在模型箱内填筑配置好的土体,用以模拟不同的围岩条件。由液压系统提供动力,实现模型盾构机的掘进过程。随着掘进过程的推进,盾构机的等截面段A、B、C、D逐渐进入土箱,四种截面分别对应四种地层损失。预先安置在模型箱的千分表、位移计、土压力盒,实时采集围岩的应力和变形数据,通过对围岩横向和纵向应力和变形数据的分析,进而得到盾构开挖过程中地层损失对地层应力和变形的影响规律。该系统主要用于盾构机的掘进过程中,地层损失对地层应力和变形的影响问题的研究。

Description

一种变截面土压平衡式盾构模拟试验系统
技术领域
本发明涉及一种变截面土压平衡式盾构模拟试验系统,属于盾构施工技术领域。。
背景技术
盾构法施工过程中,由于盾构机壳本身存在一定厚度、以及纠偏或掘进方向的调整引起的超挖等原因,不可避免的引起地层损失。地层损失的大小对隧道上方地层的位移有着很大的影响,LEE YJ(2009)设计了一种可精确改变直径大小的机械装置,通过改变该装置直径的大小模拟盾构隧道开挖过程中不同地层损失对地层变形的影响;潘志刚(2015)研制了一套水囊系统,通过精确控制排水量模拟盾构隧道开挖过程中不同地层损对地层变形的影响。这两种装置只能用于小规模的二维试验,而且不能反映盾构机的掘进过程。为了真实反映盾构机的掘进过程,国内外很多学者对模型盾构试验机进行了研究,如Nomoto(1999)等人研制的可进行离心试验的小型盾构机、Champan(2006)等人建立的适用于黏土的小模型盾构机、以及国内上海隧道股份有限公司(1996)研制的小盾构模拟试验台、上海隧道股份有限公司联合浙江大学、同济大学等(2004)研制的大直径模型盾构机、同济大学(2006)研制的双壳单螺旋模型盾构、北京交通大学(2007)研制的土压平衡盾构设备、何川(2013)研制的小直径泥水平衡盾构机等。这些模型盾构机可较为真实的反映盾构机的掘进过程,但盾构机都为等直径圆截面,不能用于研究地层损失变化对地层变形的影响。因而设计一种既能反映盾构机掘进过程,同时又能反映不同地层损失影响的模型盾构试验系统十分必要。
发明内容
本发明的目的在于提供一种变截面的土压平衡盾构试验系统,既可以真实的模拟盾构机的掘进过程,同时能研究地层损失对地层变形的影响。
为了达到上述目的,本发明采用了以下技术方案:
一种变截面土压平衡式盾构模拟试验系统,包括模型箱、监测系统、切削系统、出土系统和顶进系统:
装有试验土体的模型箱固定于底座上,监测系统主要包括千分表、位移计、土压力盒,及相应的数据采集及控制装置,千分表固定在填土表面上方,位移计、土压力盒预埋在模型箱内部的土体中;
切削系统包括刀盘和刀盘驱动装置,刀盘通过主轴与刀盘驱动装置相连,刀盘驱动装置由液压马达驱动;盾构机前部经过模型箱侧面上预留的开挖孔进入模型箱,刀盘驱动装置通过主轴带动刀盘旋转,实现对前方土体的掘削;
顶进系统包括一对千斤顶和液压油箱,千斤顶位于盾构机左右两侧,连接于模型箱和刀盘驱动装置之间,通过千斤顶的回缩使盾构机底座沿轨道向前移动,从而实现盾构向前掘进的过程;
出土系统包括螺旋出土器、螺旋出土器驱动装置、排土口、渣土箱,刀盘和后方设置的隔板之间的空间构成土压舱,螺旋出土器的进口伸入土压舱,出口与盾构机后部的排土口相连,渣土从排土口排出后直接落入渣土箱。
液压马达和千斤顶共用一个液压油箱,螺旋出土器的螺旋轴与小型电机相连。
所述盾构机分为A、B、C、D四个等截面段,截面均为圆形,直径RA>RB>RC>RD,盾构机各截面下端点在同一水平线上,盾构机的主轴在刀盘的中心位置,RA为等截面段A的半径,RB为等截面段B的半径,RC为等截面段C的半径,RD为等截面段D的半径。
本发明的工作过程和工作原理是:
在模型箱内填筑配置好的土体,用以模拟不同的围岩条件。盾构机前部经过模型箱侧面上预留的开挖孔进入模型箱。刀盘驱动装置通过主轴带动刀盘旋转,实现对前方土体的掘削。千斤顶位于盾构机左右两侧,连接于模型箱和刀盘驱动装置之间,通过千斤顶的回油带动盾构机底座沿轨道向前移动,从而实现盾构向前掘进;掘进过程中切削下来的土体进入刀盘和隔板之间的土压舱,螺旋出土器的进口伸入土压舱,出口与盾构机后部的排土口相连,渣土从排土口排出后直接落入渣土箱。随着掘进过程的推进,盾构机的等截面段A、B、C、D逐渐进入土箱,等截面段A、B、C、D分别对应四种地层损失。预先安置在模型箱的千分表、位移计、土压力盒实时记录围岩的应力和变形,通过对围岩横向和纵向应力和变形数据的分析,进而得到盾构开挖过程中地层损失对地层应力和变形的影响规律。
本发明的有益效果在于:
关于地层损失对盾构隧道地层变形的模型试验研究,前人设计的试验装置只适用于小规模二维试验模型,而且不能反映盾构机的掘进过程。而目前模型试验盾构机都是等直径的,不能用来研究地层损失对地层应力和变形的影响。本发明中盾构机由四段不同直径的等圆截面组成,能够同时用来模拟盾构机的掘进过程,同时可以用来研究地层损失对地层应力和变形的影响的问题。
附图说明:
图1是本发明所述模型盾构机正视结构示意图;
图2是本发明所述模型盾构机截面示意图;
图3是本发明所述盾构机主体俯视图。
具体实施方式:
下面结合附图对本发明作进一步具体描述:
如图1-图3所示,本发明所述的变截面土压平衡盾构模拟试验系统,其组成包括模型箱(1)、监测系统、切削系统、出土系统和顶进系统:
装有试验土体的模型箱(1)固定于底座(2)上;监测系统包括千分表(21)、位移计(22)、土压力盒(23)及相应的数据采集及控制装置,千分表(21)固定在填土表面上方,位移计(22)、土压力盒(23)预埋在模型箱内部的土体中;切削系统包括刀盘(5)和刀盘驱动装置(7),刀盘(5)通过主轴(6)与刀盘驱动装置(7)相连,刀盘驱动装置(7)由液压马达驱动;盾构机(3)前部经过模型箱侧面上预留的开挖孔(4)进入模型箱(1),刀盘驱动装置(7)通过主轴(6)带动刀盘(5)旋转,实现对前方土体的掘削;
顶进系统包括一对千斤顶(8)和液压油箱,千斤顶(8)位于盾构机(3)左右两侧,连接于模型箱(1)和刀盘驱动装置(7)之间,通过千斤顶(8)的回缩使盾构机底座(2)沿轨道(16)向前移动,从而实现盾构向前掘进;
出土系统包括螺旋出土器(12)、螺旋出土器驱动装置(13)、排土口(25)、渣土箱(24),刀盘(5)和后方设置的隔板(11)之间的空间构成土压舱,螺旋出土器(12)的进口伸入土压舱,螺旋出土器(12)的出口与盾构机(3)后部的排土口(25)相连,渣土从排土口(25)排出后直接落入渣土箱(24)。
随着掘进过程的推进,盾构机(3)的等截面段A(17)、B(18)、C(19)、D(20)逐渐进入模型箱(1),等截面段A(17)、B(18)、C(19)、D(20)分别对应四种地层损失。预埋于模型箱中的千分表(21)、位移计(22)、土压力盒(23)及相应的数据采集装置,实时记录围岩的应力和变形。通过对围岩横向和纵向应力和变形数据的分析,进而得到盾构开挖过程中地层损失对地层应力和变形的影响规律,RA为等截面段A的半径,RB为等截面段B的半径,RC为等截面段C的半径,RD为等截面段D的半径。

Claims (3)

1.一种变截面土压平衡式盾构模拟试验系统,包括模型箱、监测系统、切削系统、出土系统和顶进系统,其特征在于:
装有试验土体的模型箱(1)固定于底座(2)上,监测系统主要包括千分表(21)、位移计(22)、土压力盒(23),及相应的数据采集及控制装置,千分表(21)固定在填土表面上方,位移计(22)、土压力盒(23)预埋在模型箱内部的土体中;切削系统包括刀盘(5)和刀盘驱动装置(7),刀盘(5)通过主轴(6)与刀盘驱动装置(7)相连,刀盘驱动装置(7)由液压马达驱动;盾构机(3)前部经过模型箱侧面上预留的开挖孔(4)进入模型箱(1),刀盘驱动装置(7)通过主轴(6)带动刀盘(5)旋转,实现对前方土体的掘削;顶进系统包括一对千斤顶(8)和液压油箱(14),千斤顶(8)位于盾构机(3)左右两侧,连接于模型箱(1)和刀盘驱动装置(7)之间,通过千斤顶(8)的回油带动盾构机底座(2)沿轨道(16)向前移动,从而实现盾构向前掘进;出土系统包括螺旋出土器(12)、螺旋出土器驱动装置(13)、排土口(25)、渣土箱(24),刀盘(5)和后方设置的隔板(11)之间的空间构成土压舱,螺旋出土器(12)的进口伸入土压舱,螺旋出土器(12)的出口与盾构机(3)后部的排土口(25)相连,渣土从排土口(25)排出后直接落入渣土箱(24)。
2.如权利1所述的一种土压平衡盾构模拟试验系统,其特征在于:液压马达(9)和千斤顶(8)共用一个液压油箱(14),螺旋出土器(12)的螺旋轴与小型电机(13)相连。
3.如权利1所述的一种土压平衡盾构模拟试验系统,其特征在于:所述盾构机(3)分为A(17)、B(18)、C(19)、D(20)四个等截面段,截面均为圆形,直径RA>RB>RC>RD,盾构机各截面下端点在同一水平线上,盾构机的主轴(6)在刀盘(5)的中心位置,RA为等截面段A的半径,RB为等截面段B的半径,RC为等截面段C的半径,RD为等截面段D的半径。
CN201810197380.0A 2018-03-11 2018-03-11 一种变截面土压平衡式盾构模拟试验系统 Pending CN108489745A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810197380.0A CN108489745A (zh) 2018-03-11 2018-03-11 一种变截面土压平衡式盾构模拟试验系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810197380.0A CN108489745A (zh) 2018-03-11 2018-03-11 一种变截面土压平衡式盾构模拟试验系统

Publications (1)

Publication Number Publication Date
CN108489745A true CN108489745A (zh) 2018-09-04

Family

ID=63338197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810197380.0A Pending CN108489745A (zh) 2018-03-11 2018-03-11 一种变截面土压平衡式盾构模拟试验系统

Country Status (1)

Country Link
CN (1) CN108489745A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613212A (zh) * 2019-01-03 2019-04-12 同济大学 模拟地埋管线受隧道开挖影响的试验装置
CN110261151A (zh) * 2019-06-10 2019-09-20 石家庄铁道大学 一种顶管隧道施工模拟方法及模型装置
CN111189760A (zh) * 2020-03-13 2020-05-22 浙江大学城市学院 一种模拟盾构始发时渗流对前方地层影响的试验装置及方法
CN112365785A (zh) * 2020-10-20 2021-02-12 山东大学 一种伺服式复合土压平衡微型盾构装置及工作方法
CN113188995A (zh) * 2021-04-27 2021-07-30 同济大学 盾构刀盘转动及地表振动作用下开挖面稳定性模型试验装置
CN113281179A (zh) * 2021-05-21 2021-08-20 中铁第一勘察设计院集团有限公司 一种盾构隧道开挖模型试验箱
CN113310714A (zh) * 2021-03-19 2021-08-27 无锡地铁集团有限公司 一种模拟矩形顶管施工可视化试验系统
CN114136970A (zh) * 2021-12-02 2022-03-04 内蒙古科技大学 一种研究矩形顶管隧道掘进引起背土效应的实验方法
CN114184401A (zh) * 2021-11-09 2022-03-15 中铁第一勘察设计院集团有限公司 土压平衡式盾构下穿复合地基的相似模型试验系统
US11733128B1 (en) * 2022-03-08 2023-08-22 Hangzhou City University Test device and method for studying influence of external load on soil arching effect of shield tunnel
CN111189760B (zh) * 2020-03-13 2024-05-14 浙江大学城市学院 一种模拟盾构始发时渗流对前方地层影响的试验装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11294092A (ja) * 1998-04-10 1999-10-26 Kumagai Gumi Co Ltd 可変断面シールドの覆工構造
JP2000145360A (ja) * 1998-11-13 2000-05-26 Taisei Corp 拡大シールド掘削機
CN102221474A (zh) * 2011-02-28 2011-10-19 西南交通大学 一种泥水平衡式盾构模拟试验系统
CN102305844A (zh) * 2011-05-24 2012-01-04 北京工业大学 一种土压平衡盾构施工土体改良试验的土压舱模型装置
CN104948197A (zh) * 2015-06-17 2015-09-30 蚌埠市行星工程机械有限公司 一种可伸缩移动的盾构机刮刀机构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11294092A (ja) * 1998-04-10 1999-10-26 Kumagai Gumi Co Ltd 可変断面シールドの覆工構造
JP2000145360A (ja) * 1998-11-13 2000-05-26 Taisei Corp 拡大シールド掘削機
CN102221474A (zh) * 2011-02-28 2011-10-19 西南交通大学 一种泥水平衡式盾构模拟试验系统
CN102305844A (zh) * 2011-05-24 2012-01-04 北京工业大学 一种土压平衡盾构施工土体改良试验的土压舱模型装置
CN104948197A (zh) * 2015-06-17 2015-09-30 蚌埠市行星工程机械有限公司 一种可伸缩移动的盾构机刮刀机构

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109613212A (zh) * 2019-01-03 2019-04-12 同济大学 模拟地埋管线受隧道开挖影响的试验装置
CN109613212B (zh) * 2019-01-03 2021-09-14 同济大学 模拟地埋管线受隧道开挖影响的试验装置
CN110261151A (zh) * 2019-06-10 2019-09-20 石家庄铁道大学 一种顶管隧道施工模拟方法及模型装置
CN111189760A (zh) * 2020-03-13 2020-05-22 浙江大学城市学院 一种模拟盾构始发时渗流对前方地层影响的试验装置及方法
CN111189760B (zh) * 2020-03-13 2024-05-14 浙江大学城市学院 一种模拟盾构始发时渗流对前方地层影响的试验装置及方法
CN112365785A (zh) * 2020-10-20 2021-02-12 山东大学 一种伺服式复合土压平衡微型盾构装置及工作方法
CN113310714A (zh) * 2021-03-19 2021-08-27 无锡地铁集团有限公司 一种模拟矩形顶管施工可视化试验系统
CN113188995A (zh) * 2021-04-27 2021-07-30 同济大学 盾构刀盘转动及地表振动作用下开挖面稳定性模型试验装置
CN113281179A (zh) * 2021-05-21 2021-08-20 中铁第一勘察设计院集团有限公司 一种盾构隧道开挖模型试验箱
CN114184401A (zh) * 2021-11-09 2022-03-15 中铁第一勘察设计院集团有限公司 土压平衡式盾构下穿复合地基的相似模型试验系统
CN114136970A (zh) * 2021-12-02 2022-03-04 内蒙古科技大学 一种研究矩形顶管隧道掘进引起背土效应的实验方法
CN114136970B (zh) * 2021-12-02 2024-01-26 内蒙古科技大学 一种研究矩形顶管隧道掘进引起背土效应的实验方法
US11733128B1 (en) * 2022-03-08 2023-08-22 Hangzhou City University Test device and method for studying influence of external load on soil arching effect of shield tunnel
US20230288294A1 (en) * 2022-03-08 2023-09-14 Hangzhou City University Test device and method for studying influence of external load on soil arching effect of shield tunnel

Similar Documents

Publication Publication Date Title
CN108489745A (zh) 一种变截面土压平衡式盾构模拟试验系统
CN201297175Y (zh) 一种土压平衡式盾构施工过程模拟试验装置
CN101403306B (zh) 一种土压平衡式盾构模拟试验设备
US11048002B1 (en) Visualization system for simulating excavation of fluid-structure interaction tunnel
CN108414259B (zh) 一种可实现刀盘和衬砌压力监测功能的土压平衡盾构模型试验系统
CN102221474B (zh) 一种泥水平衡式盾构模拟试验系统
CN108506005B (zh) 一种可实现刀盘压力监测功能的土压平衡模型盾构试验机
CN106442941B (zh) 盾构穿越上部可液化下部坚硬土层的试验装置及试验方法
CN108266199A (zh) 一种用于土压平衡盾构刀盘结泥饼模拟的试验装置及方法
CN103437771A (zh) 可模拟泥水平衡盾构施工的室内模型试验装置及使用方法
CN109060395A (zh) 一种盾构下穿切除复合地基桩体的试验系统平台
CN108107186A (zh) 煤层开采模拟实验装置及其制作方法和操作方法
CN102226729B (zh) 土压平衡盾构渣土压力控制模型试验装置
CN102840990A (zh) 一种土压平衡式盾构模拟试验系统
CN103061774A (zh) 一种盾构隧道施工环境模拟装置
CN105527404A (zh) 模拟盾构隧道纵断面内地层损失扩展的试验系统及方法
CN108868801A (zh) 一种能够模拟注浆的模型盾构机
CN203595613U (zh) 模拟土压平衡盾构施工过程的试验装置
CN112269015A (zh) 承压含水层倾角可调的倾斜煤层开采三维相似试验装置与测试方法
CN108444740B (zh) 一种可实现衬砌支护功能的土压平衡模型盾构试验机
CN104849429B (zh) 带土舱模拟的盾构地层适应性测试方法
CN107091721A (zh) 一种掘支锚联合机组实验装置及方法
CN107123359A (zh) 一种实验型盾构机推进实验平台
CN104949851A (zh) 类矩形盾构切削推进模拟试验系统
CN208950587U (zh) 能够模拟注浆的模型盾构机

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180904

RJ01 Rejection of invention patent application after publication