CN108487772A - A kind of Construction of Civil Engineering waterproof enclosure device - Google Patents
A kind of Construction of Civil Engineering waterproof enclosure device Download PDFInfo
- Publication number
- CN108487772A CN108487772A CN201810189156.7A CN201810189156A CN108487772A CN 108487772 A CN108487772 A CN 108487772A CN 201810189156 A CN201810189156 A CN 201810189156A CN 108487772 A CN108487772 A CN 108487772A
- Authority
- CN
- China
- Prior art keywords
- enclosure device
- main body
- device main
- construction
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F9/00—Arrangement of road signs or traffic signals; Arrangements for enforcing caution
- E01F9/60—Upright bodies, e.g. marker posts or bollards; Supports for road signs
- E01F9/604—Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
- E01F9/615—Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings illuminated
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F9/00—Arrangement of road signs or traffic signals; Arrangements for enforcing caution
- E01F9/60—Upright bodies, e.g. marker posts or bollards; Supports for road signs
- E01F9/658—Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing
- E01F9/669—Upright bodies, e.g. marker posts or bollards; Supports for road signs characterised by means for fixing for fastening to safety barriers or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/16—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The present invention relates to a kind of Construction of Civil Engineering waterproof enclosure devices, including the first shock structure and bumper bracket, the outer wall of first shock structure is provided with the first protective plate, and first the right end of shock structure enclosure device main body is installed, the bottom side both ends of the enclosure device main body offer water conservancy diversion through-hole, the bumper bracket is fixed on the positive bottom end of enclosure device main body, and the positive Middle face of enclosure device main body is provided with fixed plate, the right end of the enclosure device main body is inlaid with the second shock structure, and second the outer wall of shock structure be fixed with the second protective plate, the top both sides of the enclosure device main body are equipped with add-in card, and the top middle portion of enclosure device main body is provided with supporting rod, the top of the supporting rod is connected with adjusting rod.The beneficial effects of the invention are as follows:The Construction of Civil Engineering waterproof enclosure device, can protect the space on the outside of enclosure device main body by the first protective plate and the second protective plate, avoids unexpectedly colliding in enclosing and is damaged to it.
Description
Technical field
The present invention relates to engineering construction technology field, specially a kind of Construction of Civil Engineering waterproof enclosure device.
Background technology
Civil engineering is very special and with systematicness.Because of almost all of structure civil engineer design and built
It is unique to build object all, two identical buildings must not occurs.Although some buildings seem identical, but
It is that the site condition (ground, wind load, earthquake load etc.) built all is different.It is big as dam, bridge or tunnel
Type building is each entirely different.Therefore, civil engineer will prepare to deal with new complex situations at any time.
With the expansion of civil engineering scale and resulting construction tool, equipment, machinery to multi items, automation,
Mechanization and automation are increasingly moved towards in enlargement development, construction.The theory for starting application system and side are organized simultaneously
Method is increasingly moved towards scientific;The construction of some job facilities continues to tend to structure and component standardization and production industrializes.This
Sample can not only reduce cost, shorten the construction period, raise labour productivity, but also can solve the construction operation under specific condition
Problem, to build the engineering for being difficult to construct in the past.Civil engineering is one with mathematics, physics, chemistry, computerized information
The basic scientific knowledges such as science, the technological sciences such as mechanics, material knowledge and corresponding knowledge of engineering technology studying, design and
Build the subject of the job facilities such as industry and civil buildings, tunnel and hypogee, highways and urban roads and bridge.
It usually requires to carry out enclosing, stability when existing enclosure device uses to its specified position in Construction of Civil Engineering
It is bad, and enclosing range is smaller, enclosing range can not be adjusted according to actual conditions, while overall structure fastness
It is bad.
Invention content
The purpose of the present invention is to provide a kind of Construction of Civil Engineering waterproof enclosure devices, to solve in above-mentioned background technology
Stability is bad when the existing enclosure device proposed uses, and enclosing range is smaller, can not be according to actual conditions to enclosing
Range is adjusted, while the problem that overall structure fastness is bad.
To achieve the above object, the present invention provides the following technical solutions:A kind of Construction of Civil Engineering waterproof enclosure device, packet
The first shock structure and bumper bracket are included, the outer wall of first shock structure is provided with the first protective plate, and the right end of the first shock structure
Enclosure device main body is installed, the bottom side both ends of the enclosure device main body offer water conservancy diversion through-hole, and the bumper bracket is fixed on
The positive bottom end of enclosure device main body, and the positive Middle face of enclosure device main body is provided with fixed plate, the enclosure device main body
Right end be inlaid with the second shock structure, and the outer wall of the second shock structure is fixed with the second protective plate, the enclosure device main body
Top both sides are equipped with add-in card, and the top middle portion of enclosure device main body is provided with supporting rod, the top of the supporting rod and
Adjusting rod is connected, and the back side of the enclosure device main body is fixed with data board, and phosphor strip is equipped with below data board, institute
The end for stating bumper bracket is connected with fixing axle, and balancing pole is provided on the outside of fixing axle, and the innermost insert of the supporting rod has
Reinforcing rib, and the top of supporting rod is connected by fixed pin with adjusting rod, the side upper and lower ends of first protective plate are opened
It equipped with connection through-hole, and connects and isolating pad is installed on the inside of through-hole, the outer wall of the isolating pad is fixed with adsorption layer.
Preferably, the length of first protective plate is more than the height of enclosure device main body, and the area of the first protective plate
With the area equation of the second protective plate.
Preferably, it is that integration is set between water conservancy diversion through-hole and enclosure device main body there are two the water conservancy diversion through-hole settings
Meter, and water conservancy diversion through-hole is symmetrical about enclosure device main body central axes.
Preferably, the bumper bracket is in rugosity structure, and is flexible connection between bumper bracket and enclosure device main body.
Preferably, the fixed plate is connected by nut with enclosure device main body, and the outer wall of fixed plate is in frosted shape
Structure.
Preferably, there are two the add-in card settings, and add-in card is symmetrical about enclosure device main body central axes.
Preferably, it is flexible connection between the supporting rod and adjusting rod, and the length of adjusting rod is support pole length
1/5th.
Preferably, it is bonding between the phosphor strip and enclosure device main body, and phosphor strip length is less than enclosure device master
The width of body.
Preferably, retainer plate shape structure in a ring, and there are two retainer plate settings, retainer plate is about in supporting rack
Axisymmetrical.
Compared with prior art, the beneficial effects of the invention are as follows:The Construction of Civil Engineering waterproof enclosure device, passes through first
Protective plate and the second protective plate can protect the space on the outside of enclosure device main body, avoid unexpectedly colliding in enclosing
It is damaged, the length of the first protective plate is more than the height of enclosure device main body, and the area of the first protective plate and the
The area equation of two protective plates so that the area of protection reaches optimization, reduces the presence at protection dead angle, and water conservancy diversion through-hole is set
It there are two setting, is the integrated design between water conservancy diversion through-hole and enclosure device main body, and water conservancy diversion through-hole is about enclosure device main body
Central axes are symmetrical, can carry out water conservancy diversion to extra ponding, reduce delay of the sewage in bottom, and bumper bracket is in rugosity knot
Structure, and be flexible connection between bumper bracket and enclosure device main body, the pressure generated when enclosing can be carried out by bumper bracket
Dispersion in real time, it is ensured that the stabilization of enclosing process is bonding between phosphor strip and enclosure device main body, and phosphor strip length is small
In the width of enclosure device main body so that be able to indicate that the position of enclosure device at night, avoid causing unexpectedly colliding, together
When fixed plate be connected with enclosure device main body by nut, and the outer wall of fixed plate be in frosted shape structure, can increase structure jail
Solidity substantially increases the practicability of Construction of Civil Engineering waterproof enclosure device.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of Construction of Civil Engineering waterproof enclosure device of the present invention;
Fig. 2 is a kind of structure schematic diagram of Construction of Civil Engineering waterproof enclosure device of the present invention;
Fig. 3 is a kind of balance bar structure schematic diagram of Construction of Civil Engineering waterproof enclosure device of the present invention;
Fig. 4 is a kind of reinforcing rib structure schematic diagram of Construction of Civil Engineering waterproof enclosure device of the present invention;
Fig. 5 is a kind of first protection plate structure schematic diagram of Construction of Civil Engineering waterproof enclosure device of the present invention.
In figure:1, the first shock structure, the 2, first protective plate, 3, enclosure device main body, 4, water conservancy diversion through-hole, 5, bumper bracket, 6,
Fixed plate, the 7, second protective plate, the 8, second shock structure, 9, add-in card, 10, supporting rod, 11, adjusting rod, 12, data board, 13, glimmering
Striation, 14, fixing axle, 15, balancing pole, 16, reinforcing rib, 17, fixed pin, 18, connection through-hole, 19, isolating pad, 20, adsorption layer.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of Construction of Civil Engineering waterproof enclosure device, including
First shock structure 1, the first protective plate 2, enclosure device main body 3, water conservancy diversion through-hole 4, bumper bracket 5, fixed plate 6, the second protective plate 7,
Second shock structure 8, supporting rod 10, adjusting rod 11, data board 12, phosphor strip 13, fixing axle 14, balancing pole 15, adds add-in card 9
Strengthening tendons 16, fixed pin 17, connection through-hole 18, isolating pad 19 and adsorption layer 20, the outer wall of the first shock structure 1 are provided with the first protection
Plate 2, and the right end of the first shock structure 1 is equipped with enclosure device main body 3, the length of the first protective plate 2 is more than enclosure device main body 3
Height, and the area equation of the area of the first protective plate 2 and the second protective plate 7, the bottom side both ends of enclosure device main body 3 open up
There is water conservancy diversion through-hole 4, there are two the settings of water conservancy diversion through-hole 4, is the integrated design between water conservancy diversion through-hole 4 and enclosure device main body 3, and
Water conservancy diversion through-hole 4 is symmetrical about 3 central axes of enclosure device main body, and bumper bracket 5 is fixed on the positive bottom end of enclosure device main body 3, and
The positive Middle face of enclosure device main body 3 is provided with fixed plate 6, and fixed plate 6 is connected by nut with enclosure device main body 3, and
The outer wall of fixed plate 6 is in frosted shape structure, and bumper bracket 5 is in rugosity structure, and is between bumper bracket 5 and enclosure device main body 3
The right end of flexible connection, enclosure device main body 3 is inlaid with the second shock structure 8, and the outer wall of the second shock structure 8 is fixed with second and prevents
The top both sides of backplate 7, enclosure device main body 3 are equipped with add-in card 9, and the top middle portion of enclosure device main body 3 is provided with branch
Strut 10 is flexible connection between supporting rod 10 and adjusting rod 11, and five points that the length of adjusting rod 11 is 10 length of supporting rod
One of, there are two the settings of add-in card 9, and add-in card 9 is symmetrical about 3 central axes of enclosure device main body, the top of supporting rod 10 and
Adjusting rod 11 is connected, and the back side of enclosure device main body 3 is fixed with data board 12, and the lower section of data board 12 is equipped with phosphor strip
13, it is bonding between phosphor strip 13 and enclosure device main body 3, and 13 length of phosphor strip is less than the width of enclosure device main body 3,
The end of bumper bracket 5 is connected with fixing axle 14, and the outside of fixing axle 14 is provided with balancing pole 15, the innermost insert of supporting rod 10
There is reinforcing rib 16, and the top of supporting rod 10 is connected by fixed pin 17 with adjusting rod 11, above and below the side of the first protective plate 2
Both ends offer connection through-hole 18, and the inside for connecting through-hole 18 is equipped with isolating pad 19, connect through-hole 18 and the first protective plate 2
Between be the integrated design, and the inside for connecting through-hole 18 is in thread-like structure, and the outer wall of isolating pad 19 is fixed with adsorption layer
20。
The operation principle of the present embodiment:The Construction of Civil Engineering waterproof enclosure device, first passes through the first protection when in use
Plate 2 and the second protective plate 7 can protect the space in 3 outside of enclosure device main body, avoid unexpectedly colliding in enclosing
It is damaged, the length of the first protective plate 2 is more than the height of enclosure device main body 3, and the area of the first protective plate 2 and
The area equation of second protective plate 7 so that the area of protection reaches optimization, reduces the presence at protection dead angle, and water conservancy diversion is logical
There are two the settings of hole 4, is the integrated design between water conservancy diversion through-hole 4 and enclosure device main body 3, and water conservancy diversion through-hole 4 is about enclosing
3 central axes of apparatus main body are symmetrical, can carry out water conservancy diversion to extra ponding, reduce delay of the sewage in bottom, bumper bracket 5 is in
Rugosity structure, and be flexible connection between bumper bracket 5 and enclosure device main body 3, it can be to being generated when enclosing by bumper bracket 5
Pressure disperseed in real time, it is ensured that the stabilization of enclosing process, between phosphor strip 13 and enclosure device main body 3 for bonding,
And 13 length of phosphor strip is less than the width of enclosure device main body 3 so that is able to indicate that the position of enclosure device at night, avoids
It causes unexpectedly to collide, while fixed plate 6 is connected by nut with enclosure device main body 3, and the outer wall of fixed plate 6 is in mill
Sand shape structure, can increase structural integrity, substantially increase the practicability of Construction of Civil Engineering waterproof enclosure device.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art,
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
With replacing, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection domain of invention.
Claims (9)
1. a kind of Construction of Civil Engineering waterproof enclosure device, including the first shock structure (1) and bumper bracket (5), it is characterised in that:Institute
The outer wall for stating the first shock structure (1) is provided with the first protective plate (2), and the right end of the first shock structure (1) is equipped with enclosure device
The bottom side both ends of main body (3), the enclosure device main body (3) offer water conservancy diversion through-hole (4), and the bumper bracket (5), which is fixed on, encloses
The positive bottom end of blocking means main body (3), and the positive Middle face of enclosure device main body (3) is provided with fixed plate (6), the enclosing dress
The right end for setting main body (3) is inlaid with the second shock structure (8), and the outer wall of the second shock structure (8) is fixed with the second protective plate (7),
The top both sides of the enclosure device main body (3) are equipped with add-in card (9), and the top middle portion setting of enclosure device main body (3)
There are supporting rod (10), the top of the supporting rod (10) to be connected with adjusting rod (11), the back side of the enclosure device main body (3)
It is fixed with data board (12), and phosphor strip (13) is installed below data board (12), the end of the bumper bracket (5) is connected with
Fixing axle (14), and balancing pole (15) is provided on the outside of fixing axle (14), the innermost insert of the supporting rod (10) has reinforcement
Muscle (16), and the top of supporting rod (10) is connected by fixed pin (17) with adjusting rod (11), first protective plate (2)
Side upper and lower ends offer connection through-hole (18), and connect and be equipped with isolating pad (19), the isolation on the inside of through-hole (18)
The outer wall of pad (19) is fixed with adsorption layer (20).
2. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:First protection
The length of plate (2) is more than the height of enclosure device main body (3), and the face of the area of the first protective plate (2) and the second protective plate (7)
Product is equal.
3. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The water conservancy diversion through-hole
(4) it there are two setting, is the integrated design between water conservancy diversion through-hole (4) and enclosure device main body (3), and water conservancy diversion through-hole (4) closes
It is symmetrical in enclosure device main body (3) central axes.
4. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The bumper bracket
(5) it is in rugosity structure, and is flexible connection between bumper bracket (5) and enclosure device main body (3).
5. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The fixed plate
(6) it is connected with enclosure device main body (3) by nut, and the outer wall of fixed plate (6) is in frosted shape structure.
6. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The add-in card
(9) there are two setting, and add-in card (9) is symmetrical about enclosure device main body (3) central axes.
7. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The supporting rod
(10) it is flexible connection between adjusting rod (11), and 1/5th that the length of adjusting rod (11) is supporting rod (10) length.
8. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The phosphor strip
(13) it is bonding between enclosure device main body (3), and phosphor strip (13) length is less than the width of enclosure device main body (3).
9. a kind of Construction of Civil Engineering waterproof enclosure device according to claim 1, it is characterised in that:The connection through-hole
(18) inside for being the integrated design between the first protective plate (2), and connecting through-hole (18) is in thread-like structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810189156.7A CN108487772A (en) | 2018-03-08 | 2018-03-08 | A kind of Construction of Civil Engineering waterproof enclosure device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810189156.7A CN108487772A (en) | 2018-03-08 | 2018-03-08 | A kind of Construction of Civil Engineering waterproof enclosure device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108487772A true CN108487772A (en) | 2018-09-04 |
Family
ID=63337912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810189156.7A Pending CN108487772A (en) | 2018-03-08 | 2018-03-08 | A kind of Construction of Civil Engineering waterproof enclosure device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487772A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759084A (en) * | 2016-12-23 | 2017-05-31 | 成都佳美嘉科技有限公司 | Hydraulic engineering protector |
CN107119983A (en) * | 2017-06-29 | 2017-09-01 | 海宁市引领知识产权咨询服务有限公司 | A kind of construction guard rail |
CN107366428A (en) * | 2017-06-23 | 2017-11-21 | 安徽新兴翼凌机电发展有限公司 | A kind of construction protective baffle plate |
CN206707402U (en) * | 2017-05-05 | 2017-12-05 | 杭州轩至唐科技有限公司 | A kind of isolating and protecting device of plant equipment |
KR20180012589A (en) * | 2016-07-27 | 2018-02-06 | (주)우진건설 | Fence, wall structure using fence and construction method thereof |
CN107762260A (en) * | 2017-11-22 | 2018-03-06 | 韩玲 | A kind of water conservancy construction enclosure device |
-
2018
- 2018-03-08 CN CN201810189156.7A patent/CN108487772A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180012589A (en) * | 2016-07-27 | 2018-02-06 | (주)우진건설 | Fence, wall structure using fence and construction method thereof |
CN106759084A (en) * | 2016-12-23 | 2017-05-31 | 成都佳美嘉科技有限公司 | Hydraulic engineering protector |
CN206707402U (en) * | 2017-05-05 | 2017-12-05 | 杭州轩至唐科技有限公司 | A kind of isolating and protecting device of plant equipment |
CN107366428A (en) * | 2017-06-23 | 2017-11-21 | 安徽新兴翼凌机电发展有限公司 | A kind of construction protective baffle plate |
CN107119983A (en) * | 2017-06-29 | 2017-09-01 | 海宁市引领知识产权咨询服务有限公司 | A kind of construction guard rail |
CN107762260A (en) * | 2017-11-22 | 2018-03-06 | 韩玲 | A kind of water conservancy construction enclosure device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Static and seismic experiment for bolted-welded joint in modularized prefabricated steel structure | |
Yu et al. | Effect of concrete masonry infill walls on progressive collapse performance of reinforced concrete infilled frames | |
Silva et al. | Seismic structural assessment of the Christchurch catholic basilica, New Zealand | |
Wang et al. | Experimental investigation on H-section buckling-restrained braces with partially restrained flange | |
CN201245896Y (en) | Frame type box body structure combination assembled movable building | |
Lu et al. | Recent progress of seismic research on tall buildings in China Mainland | |
Li et al. | Experimental and analytical study of eccentrically braced frames combined with high-strength steel | |
CN108487772A (en) | A kind of Construction of Civil Engineering waterproof enclosure device | |
CN204475179U (en) | Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support | |
CN206554265U (en) | A kind of suspension type modular architectural structural | |
Zeng et al. | Seismic performance of suspended‐floor structures with viscous dampers considering acceptable interstory drift | |
Motwani et al. | Simulation of brick infill and effect of openings on RC frames using ANSYS | |
Zhang et al. | Construction process simulation and in situ monitoring of dendritic structure on nanjing Niushou mountain | |
Sococol et al. | Negative influences (effects) of masonry infilled RC frames to seismic response of RC frame systems and practical methods (solutions) for these problems (state of the art) | |
Pavani et al. | Analytical and experimental study on composite deep beams with rolled section reinforcement | |
Ortega et al. | Seismic behaviour assessment of vernacular isolated buildings | |
CN207718654U (en) | Precast shear wall Side fascia teaching training apparatus | |
CN206438424U (en) | A kind of bridge strengthening device with shock insulation function | |
Kuang et al. | Shake table tests of infilled RC frames with different column-to-infill connections | |
CN207405790U (en) | Prefabricated beam-column node structure in contrary sequence method foundation pit | |
Zhou et al. | Seismic performance of composite steel plate reinforced concrete shear wall | |
Abrams | NEES research on hybrid masonry structural systems | |
Dubey et al. | An experimental investigation on the ultimate strength of epoxy-repaired braced partial infilled RC frames | |
Balasubramanian et al. | Reverse Cyclic Loading Effect on RCC Wall‐Floor Slab‐Deep Beam Connection | |
Singh et al. | Effect of URM infills on seismic performance of RC frame buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180904 |
|
WD01 | Invention patent application deemed withdrawn after publication |