CN108487508A - A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab - Google Patents

A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab Download PDF

Info

Publication number
CN108487508A
CN108487508A CN201810348229.2A CN201810348229A CN108487508A CN 108487508 A CN108487508 A CN 108487508A CN 201810348229 A CN201810348229 A CN 201810348229A CN 108487508 A CN108487508 A CN 108487508A
Authority
CN
China
Prior art keywords
concrete slab
lightweight concrete
groove
tongue
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810348229.2A
Other languages
Chinese (zh)
Inventor
王建河
张枫
张建设
沈兵
张迦翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jin Xin Green Construction Co Ltd
Original Assignee
Shenzhen Jin Xin Green Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jin Xin Green Construction Co Ltd filed Critical Shenzhen Jin Xin Green Construction Co Ltd
Priority to CN201810348229.2A priority Critical patent/CN108487508A/en
Publication of CN108487508A publication Critical patent/CN108487508A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building

Abstract

The invention discloses a kind of construction methods of two-way tongue and groove autoclave at high temperature lightweight concrete slab, including the embedded iron parts in floor construction layer, the side of floor construction layer is spliced between the two-way tongue and groove of lightweight concrete slab, the both ends of lightweight concrete slab are fixed using the angle cleat of wallboard connection bolt and floor construction layer, lightweight concrete slab lower end is completely spread levelling with cement mortar, on, sealing material is filled in the lightweight concrete slab horizontal clearance of lower layer, and elastic water-proof fluid sealant is filled at sealing, realize the waterproof requirement of plate mouth seam, meet force request of the embedded Side fascia under wind load and deformation operating mode, floor construction layer bonds closely knit with lightweight concrete slab, avoid the occurrence of the horizontal clearance of cladding panel;Secondly, the floor construction layer of upper and lower layer is directly connected by lightweight concrete slab, and seam crossing fills sealing material and waterproof gasket cement, avoids the cracking being connect with floor and leakage hidden trouble.

Description

A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab
Technical field
The present invention relates to building board construction technical field, specially a kind of two-way tongue and groove autoclave at high temperature lightweight concrete slab Construction method.
Background technology
Autoclave at high temperature light concrete plate (Autoclaved Lightweight Concrete) is that high-performance steam pressure adds One kind of gas concrete is with flyash (or silica sand), cement, lime etc. for main material, made of autoclave curing More aerocrete sheet formings (including treated reinforcing bar enhancing), are a kind of building materials of superior performance.
The existing embedded mounting process of autoclave at high temperature light concrete plate be only applicable to the interior wall of both ends flat mouth type every Plate construct, cannot meet matchboard exterior wall installation requirement.
Invention content
The purpose of the present invention is to provide a kind of construction methods of two-way tongue and groove autoclave at high temperature lightweight concrete slab, using interior Embedded mounting structure, construction technology is simple, and water resistance is good, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides the following technical solutions:A kind of two-way tongue and groove autoclave at high temperature lightweight concrete The construction method of plate, includes the following steps:
S1:The embedded iron parts in floor construction layer splice the side of floor construction layer in upper and lower two blocks of lightweight concretes Between the areas unidirectional tongue and groove A and the areas unidirectional tongue and groove B of plate;
S2:The vertical surface side contacted with lightweight concrete slab in floor construction layer is fixedly connected with angle steel, lightweight concrete slab Horizontal load reach agent structure layer by angle cleat and embedded iron parts;
S3:The both ends of lightweight concrete slab are fixed using the angle cleat of wallboard connection bolt and floor construction layer, are realized The horizontal load of lightweight concrete slab reaches the angle cleat fixing piece of floor construction layer;
S4:Lightweight concrete slab lower end completely spread with cement mortar it is levelling, realize lightweight concrete slab vertical load pass through sand Pulp layer effectively reaches floor construction layer, and bonding and the leveling of lightweight concrete slab and floor construction layer are realized by mortar;
S5:Sealing material is filled in the lightweight concrete slab horizontal clearance of upper and lower layer, and elastic water-proof is filled at sealing Fluid sealant realizes the waterproof requirement of plate mouth seam.
Preferably, the angle cleat is fixedly connected with embedded iron parts.
Preferably, the areas unidirectional tongue and groove A and the areas unidirectional tongue and groove B are to make a thickness at the both ends of lightweight concrete slab Thin type tongue and groove face not less than 40mm, thin type tongue and groove height are fixed according to the slab thickness of place floor.
Preferably, the lightweight concrete slab is mounted on using embedded on floor construction layer, the areas unidirectional tongue and groove A and list The outside of floor structure plate side elevation is wrapped in the tongue and groove side in the areas tongue and groove B, unilateral tongue and groove height can be in floor structure plate thickness Value in range.
Preferably, the angle cleat is mounted on vertical with floor structure plate on the outside of the areas unidirectional tongue and groove A and the areas unidirectional tongue and groove B Wallboard connection bolt is fastened between facing directly, and on angle cleat, the other end perforation of wallboard connection bolt is connected to lightweight and mixes In concrete board.
Compared with prior art, the beneficial effects of the invention are as follows:
1, the construction method of this two-way tongue and groove autoclave at high temperature lightweight concrete slab, meets embedded Side fascia in wind load and change Force request under shape operating mode, by the processing of screed, lightweight concrete slab can be effectively embedded on floor construction layer, building Harden structure layer and lightweight concrete slab bonding are closely knit, avoid the occurrence of the horizontal clearance of cladding panel.
2, the construction method of this two-way tongue and groove autoclave at high temperature lightweight concrete slab is bolted, lightweight by wallboard connection Power transmission between concrete slab and floor construction layer is clear, and the floor construction layer of upper and lower layer is directly held in the mouth by lightweight concrete slab It connects, seam crossing fills sealing material and waterproof gasket cement, avoids the cracking being connect with floor and leakage hidden trouble.
Description of the drawings
Fig. 1 is the overall structure figure of the present invention;
Fig. 2 is the portions the A enlarged drawing of Fig. 1 of the present invention;
Fig. 3 is the lightweight concrete slab structure chart of the present invention.
In figure:1 floor construction floor, 2 embedded iron parts, 3 lightweight concrete slabs, 4 areas unidirectional tongue and groove A, 5 areas unidirectional tongue and groove B, 6 Angle cleat, 7 wallboards connection bolt, 8 cement mortar, 9 sealing materials, 10 waterproof gasket cements.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, in the embodiment of the present invention:A kind of construction of two-way tongue and groove autoclave at high temperature lightweight concrete slab is provided Method includes the following steps:
The first step:The embedded iron parts 2 in floor construction layer 1 splice the side of floor construction layer 1 in upper and lower two pieces of lightweights Between the areas unidirectional tongue and groove A 4 of concrete slab 3 and the unidirectional areas tongue and groove B 5;
Second step:It is fixedly connected with angle steel 6 in the vertical surface side that floor construction layer 1 is contacted with lightweight concrete slab 3, lightweight is mixed The horizontal load of concrete board 3 reaches agent structure layer by angle cleat 6 and embedded iron parts 2;
Third walks:The both ends of lightweight concrete slab 3 are solid using wallboard connection bolt 7 and the angle cleat 6 of floor construction layer 1 It is fixed, realize that the horizontal load of lightweight concrete slab 3 reaches 6 fixing piece of angle cleat of floor construction layer 1;
4th step:3 lower end of lightweight concrete slab completely spreads levelling, realization 3 vertical load of lightweight concrete slab with cement mortar 8 Floor construction layer 1 is effectively reached by screed, and the bonding of lightweight concrete slab 3 and floor construction layer 1 is realized by mortar And leveling;
5th step:Sealing material 9 is filled in 3 horizontal clearance of lightweight concrete slab of upper and lower layer, and bullet is filled at sealing Property waterproof gasket cement 10, realize plate mouth seam waterproof requirement.
Wherein, angle cleat 6 is fixedly connected with embedded iron parts 2;The unidirectional areas tongue and groove A 4 and the areas unidirectional tongue and groove B 5 are in lightweight The both ends of concrete slab 3 make the thin type tongue and groove face that a thickness is not less than 40mm, and thin type tongue and groove height is according to place floor Slab thickness is fixed;The inside of entire floor construction layer 1 is embedded on lightweight concrete slab 3, and the unidirectional enterprise of lightweight concrete slab 3 Mouth bread wraps up in 1 side of floor construction layer, meets force request of the embedded Side fascia under wind load and deformation operating mode, no longer needs to increase Add floor side plastering etc., saves material and artificial.
In summary:A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab provided by the invention meets Force request of the embedded Side fascia under wind load and deformation operating mode, by the processing of screed, lightweight concrete slab 3 can be effective Ground is embedded on floor construction layer 1, and floor construction layer 1 bonds closely knit with lightweight concrete slab 3, avoids the occurrence of the level of cladding panel Gap;Secondly, bolt 7 being connected by wallboard to connect, the power transmission between lightweight concrete slab 3 and floor construction layer 1 is clear, upper, The floor construction layer 1 of lower layer is directly connected by lightweight concrete slab 3, and seam crossing fills sealing material 9 and waterproof gasket cement 10, Avoid the cracking being connect with floor and leakage hidden trouble.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab, which is characterized in that include the following steps:
S1:It is in floor construction layer (1) interior embedded iron parts (2), the side splicing of floor construction layer (1) is mixed in upper and lower two pieces of lightweights Between the areas unidirectional tongue and groove A (4) and the areas unidirectional tongue and groove B (5) of concrete board (3);
S2:It is fixedly connected with angle steel (6), lightweight coagulation in the vertical surface side that floor construction layer (1) is contacted with lightweight concrete slab (3) The horizontal load of native plate (3) reaches agent structure layer by angle cleat (6) and embedded iron parts (2);
S3:The both ends of lightweight concrete slab (3) are solid using wallboard connection bolt (7) and the angle cleat (6) of floor construction layer (1) It is fixed, realize that the horizontal load of lightweight concrete slab (3) reaches angle cleat (6) fixing piece of floor construction layer (1);
S4:Lightweight concrete slab (3) lower end is completely spread levelling with cement mortar (8), realizes that lightweight concrete slab (3) vertical load is logical It crosses screed and effectively reaches floor construction layer (1), and lightweight concrete slab (3) and floor construction layer (1) are realized by mortar Bonding and leveling;
S5:The filling sealing material (9) in lightweight concrete slab (3) horizontal clearance of upper and lower layer, and it is anti-that elasticity is filled at sealing The waterproof requirement of plate mouth seam is realized in watertight sealing (10).
2. a kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab as described in claim 1, which is characterized in that The angle cleat (6) is fixedly connected with embedded iron parts (2).
3. a kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab as described in claim 1, which is characterized in that The areas unidirectional tongue and groove A (4) and the areas unidirectional tongue and groove B (5) are to make a thickness at the both ends of lightweight concrete slab (3) to be not less than The thin type tongue and groove face of 40mm, thin type tongue and groove height are fixed according to the slab thickness of place floor.
4. a kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab as described in claim 1, which is characterized in that The lightweight concrete slab (3) is mounted on using embedded on floor construction layer (1), the areas unidirectional tongue and groove A (4) and unidirectional tongue and groove The tongue and groove side in the areas B (5) is wrapped in the outside of floor structure plate side elevation, and unilateral tongue and groove height can be in floor structure plate thickness range Interior value.
5. a kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab as described in claim 1, which is characterized in that The angle cleat (6) be mounted on the outside of the areas unidirectional tongue and groove A (4) and the areas unidirectional tongue and groove B (5) and the vertical plane of floor structure plate it Between, and wallboard connection bolt (7) is fastened on angle cleat (6), the other end perforation of wallboard connection bolt (7) is connected to lightweight In concrete slab (3).
CN201810348229.2A 2018-04-18 2018-04-18 A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab Pending CN108487508A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810348229.2A CN108487508A (en) 2018-04-18 2018-04-18 A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810348229.2A CN108487508A (en) 2018-04-18 2018-04-18 A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab

Publications (1)

Publication Number Publication Date
CN108487508A true CN108487508A (en) 2018-09-04

Family

ID=63313732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810348229.2A Pending CN108487508A (en) 2018-04-18 2018-04-18 A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab

Country Status (1)

Country Link
CN (1) CN108487508A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374230A (en) * 2019-06-26 2019-10-25 中建四局第六建筑工程有限公司 A kind of exterior wall light cellular partition board installation node and its construction method
CN111779141A (en) * 2020-08-13 2020-10-16 哈尔滨工业大学(深圳) Light external wallboard connected node
CN114687600A (en) * 2022-03-19 2022-07-01 北京工业大学 Self-tapping nail cluster connecting structure and method for assembled composite wallboard and cantilever composite roof
CN110374230B (en) * 2019-06-26 2024-05-03 中建四局第六建筑工程有限公司 Mounting node of light partition board of outer wall and construction method of mounting node

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273993A (en) * 1999-03-24 2000-10-03 Matsushita Electric Works Ltd Partition wall structure
CN201614665U (en) * 2010-03-12 2010-10-27 南通建筑工程总承包有限公司 Air conditioner mounting plate connecting joint
CN204475529U (en) * 2015-02-05 2015-07-15 中国建筑第七工程局有限公司 The syndeton of a kind of assembling type outer wall and beam
CN204590317U (en) * 2015-02-26 2015-08-26 河南亚鹰钢结构幕墙工程有限公司 A kind of steel work exterior wall insulated structure and use the house of this structure
CN204590269U (en) * 2015-02-26 2015-08-26 河南亚鹰钢结构幕墙工程有限公司 A kind of house and exterior wall insulated structure thereof
CN106499091A (en) * 2016-11-22 2017-03-15 中国建筑第七工程局有限公司 A kind of assembling type partition wall construction method based on ALC plates

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273993A (en) * 1999-03-24 2000-10-03 Matsushita Electric Works Ltd Partition wall structure
CN201614665U (en) * 2010-03-12 2010-10-27 南通建筑工程总承包有限公司 Air conditioner mounting plate connecting joint
CN204475529U (en) * 2015-02-05 2015-07-15 中国建筑第七工程局有限公司 The syndeton of a kind of assembling type outer wall and beam
CN204590317U (en) * 2015-02-26 2015-08-26 河南亚鹰钢结构幕墙工程有限公司 A kind of steel work exterior wall insulated structure and use the house of this structure
CN204590269U (en) * 2015-02-26 2015-08-26 河南亚鹰钢结构幕墙工程有限公司 A kind of house and exterior wall insulated structure thereof
CN106499091A (en) * 2016-11-22 2017-03-15 中国建筑第七工程局有限公司 A kind of assembling type partition wall construction method based on ALC plates

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374230A (en) * 2019-06-26 2019-10-25 中建四局第六建筑工程有限公司 A kind of exterior wall light cellular partition board installation node and its construction method
CN110374230B (en) * 2019-06-26 2024-05-03 中建四局第六建筑工程有限公司 Mounting node of light partition board of outer wall and construction method of mounting node
CN111779141A (en) * 2020-08-13 2020-10-16 哈尔滨工业大学(深圳) Light external wallboard connected node
CN114687600A (en) * 2022-03-19 2022-07-01 北京工业大学 Self-tapping nail cluster connecting structure and method for assembled composite wallboard and cantilever composite roof

Similar Documents

Publication Publication Date Title
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN100513717C (en) Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN215253698U (en) Ceramsite foam concrete exterior wall hanging plate in assembly type building
CN2871681Y (en) External-wall thermal insulating structure
CN202787603U (en) Light-weight heat preservation house roof plate or floor plate
CN112324017A (en) Light concrete reinforcing steel bar net frame composite heat-insulation wall plate and mounting method thereof
CN108081699A (en) Assembled CF steam pressure porcelain powder aerated concrete outer wall hanging plates and production method
CN111075107A (en) Assembled combined concrete external wall board and preparation and installation method thereof
CN108487508A (en) A kind of construction method of two-way tongue and groove autoclave at high temperature lightweight concrete slab
CN215166634U (en) Assembly type building wallboard connecting structure
CN110107001A (en) Modified foaming concrete lightweight partition wall construction method
CN107575033A (en) Assembling type steel structure prefabricated outer wall panel is prefabricated and construction method
CN211523508U (en) Be used for house heat preservation intergral template external wall insulation node
CN108374559A (en) A kind of construction method of unidirectional tongue and groove autoclave at high temperature lightweight concrete slab
CN102535847B (en) Method for constructing gypsum self-insulation outer wall block masonry
CN210658785U (en) Embedded light wallboard steel construction building structure
CN205669284U (en) The cast-in-place Integral Steel frame wall filled with masonry system that a kind of spring connects
CN108951887B (en) Construction method of assembled type autoclaved lightweight concrete parapet joint
CN210263531U (en) Waterproof ALC panel
CN102493595A (en) Cast-in-place concrete core column ring beam house manufactured by light composite board and assembling method
CN207419749U (en) A kind of waterproof exterior wall of new high shock resistance
CN214995208U (en) Assembled wallboard connection structure
CN218541038U (en) Flexible connection assembling autoclaved aerated concrete outer wall large plate system for integrated construction
CN217175285U (en) FC composite external wall panel connecting node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180904