CN108487475A - Prefabrication steel concrete compound shear wall in-site installation vertical connection structure - Google Patents

Prefabrication steel concrete compound shear wall in-site installation vertical connection structure Download PDF

Info

Publication number
CN108487475A
CN108487475A CN201810384450.3A CN201810384450A CN108487475A CN 108487475 A CN108487475 A CN 108487475A CN 201810384450 A CN201810384450 A CN 201810384450A CN 108487475 A CN108487475 A CN 108487475A
Authority
CN
China
Prior art keywords
otic placode
steel
iron
rib
steel concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810384450.3A
Other languages
Chinese (zh)
Inventor
杨梦遥
何慧贤
师国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Lyujian Building Technology Co Ltd
Original Assignee
Henan Lyujian Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Lyujian Building Technology Co Ltd filed Critical Henan Lyujian Building Technology Co Ltd
Priority to CN201810384450.3A priority Critical patent/CN108487475A/en
Publication of CN108487475A publication Critical patent/CN108487475A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/642Protecting metallic construction elements against corrosion
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Abstract

The invention discloses a kind of prefabrication steel concrete compound shear wall in-site installation vertical connection structures, including several vertical rear slotting anchor rib, upper welding otic placode, lower welding otic placode and connection otic placodes;The top of connection otic placode is fastenedly connected by upper connection bolt and upper welding otic placode, and the lower part of connection otic placode is fastenedly connected by lower connection bolt and lower welding otic placode, and slotting anchor rib is vertically set in steel concrete compound tube after vertical.The present invention makes the plasticity of overall steel concrete combined shear wall construction and toughness properties be greatly improved, and substantially increases the non-deformability and compression strength of shear wall, and vertical connection structure is wrapped in inside concrete, it is not only beautiful, and bonding strength is high, and stability is strong, it is ensured that is not easy to misplace.

Description

Prefabrication steel concrete compound shear wall in-site installation vertical connection structure
Technical field
The invention belongs to technical field of structural engineering, and in particular to a kind of prefabrication steel concrete compound shear wall in-site installation Vertical connection structure.
Background technology
The component of assembled architecture can realize that the production of industrialization, component are equivalent to the product of standard in factory, and The scene of transporting to can directly be installed, it may be said that and it is not only convenient, but also quick, the building field second tried to meet the deadline for the project more than strive point, Especially unrivaled superiority;Component is standardized production in factory, mass ratio produce at the scene it is more guaranteed, more can be with It is controlled effectively, the mechanization degree of the high standard of component reduces the outfit of Field Force, in recruitment cost and safety It is helpful in terms of production.
There are following technical problems in installation process at the scene for existing assembled architecture:1, fire prevention, Corrosion Protection are poor, The resistance performance of shear wall is poor after assembling;2, two layers neighbouring of steel concrete compound shear wall docking when work progress compared with To be cumbersome, and connect component it is naked be exposed on the external, not only unsightly, but also structural strength is relatively low.
Invention content
The present invention in order to solve shortcoming in the prior art, provide a kind of fire prevention, Corrosion Protection it is good, convenient for applying Work can be cast in inside shear wall, the prefabrication steel concrete compound shear wall in-site installation vertical connection structure that structural strength is high.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:Prefabrication steel concrete compound shear wall scene Vertical connection structure, including several vertical rear slotting anchor rib, upper welding otic placode, lower welding otic placode and connection otic placodes are installed;
What steel concrete compound shear wall was formed after being connected by cross section steel concrete compound tube in rectangular configuration-type, ├ types, ┘ types, ┼ The shear-resisting wall of type or types;Steel concrete compound tube includes rectangular drum like structural steel and iron made of bending, steel concrete in rectangular configuration Two long sides of compound tube are respectively the medial surface and lateral surface of rectangular drum like structural steel and iron, steel concrete compound tube in rectangular configuration Two short sides be respectively rectangular drum like structural steel and iron left side and right side, the medial surface of rectangular drum like structural steel and iron and outer Side corresponds to the circular hole for offering rectangular array arrangement, and tension rib, tension rib and rectangular drum like structural steel are inserted in circular hole It is connected as one between plate;
Upper welding otic placode is welded on the left side of one row's tension rib of steel concrete compound tube lowest part on top, and lower welding otic placode is welded on down The left side of one row's tension rib of steel concrete compound tube topmost in portion, upper welding otic placode and lower welding otic placode are vertically arranged and upper next One corresponds to, and connection otic placode is close to weld the left side of otic placode and lower welding otic placode, and the top of connection otic placode passes through upper connection spiral shell Bolt is fastenedly connected with upper welding otic placode, and the lower part of connection otic placode is fastenedly connected by lower connection bolt and lower welding otic placode, vertically It inserts anchor rib afterwards to be vertically arranged, one row's tension rib of steel concrete compound tube lowest part of the left upper portion and top of slotting anchor rib after vertical Right side welding, the right side of one row's tension rib of steel concrete compound tube topmost of the left lower and lower part of slotting anchor rib is welded after vertical It connects.
Rectangular drum like structural steel and iron is stretched out in the inner end and outer end of tension rib to both sides respectively, in rectangular drum like structural steel and iron External surrounding is provided with cross section reinforced mesh in rectangular configuration, between having between reinforced mesh and rectangular drum like structural steel and iron Gap, the medial surface and lateral surface of reinforced mesh are respectively fixedly connected in the inner end and outer end of tension rib, the left side of reinforced mesh It is fixedly connected respectively with the left side of rectangular drum like structural steel and iron and right side by peg with right side, rectangular drum like structural steel Intralamellar part is poured condenses the inner concrete being integrated by tension rib, vertical rear slotting anchor rib and rectangular drum like structural steel and iron, The external surrounding of rectangular drum like structural steel and iron pour respectively outer concrete by reinforced mesh, upper welding otic placode, lower welding otic placode and Connection otic placode condenses;Outer concrete, inner concrete, reinforced mesh form steel concrete group by tension rib and rectangular drum like structural steel and iron Close pipe.
Rectangular drum like structural steel and iron is welded after using ribbed steel or profiled sheet bending, ribbed steel surface rolling There are a several ribs, it is rib cross section semicircular in shape, ellipse, triangle, trapezoidal;The cross section of profiled sheet die mould is in triangle Shape, trapezoidal, arc, wave or fold-line-shaped.
Using above-mentioned technical proposal, the present invention has the following technical effects:
By concrete in cast in situs rectangular drum like structural steel and iron internal cavities, steel concrete combined shear wall construction is formd.Its Inner concrete, outer concrete and rebar mesh sheet are made up of the steel plate with rib of tension rib, vertical rear slotting anchor rib and inside It is whole, enhance the geometrical stability of steel plate wall using inside and outside concrete effect of contraction, changes the instability modes of the steel plate with rib, keep away Exempt from or delay the steel plate with rib that local buckling occurs, while overall structure utilizes prefabricated rectangle tubular structure steel plate to concrete Effect of contraction so that the intensity of concrete is improved, plasticity, toughness properties are greatly improved, and compression strength and ductility also carry significantly It is high.This steel concrete compound shear wall fabricated construction ensure that giving full play to for all materials for wall performances.
The invention enables the working procedures of shear wall to become simple, and then improves construction speed, steel concrete compound shear wall Lateral wall use the steel plate with rib, passing through tension rib and increasing steel and concrete contact area enhances the entirety of steel concrete compound shear wall Property, be provided on the outside of the surrounding of rectangular drum like structural steel and iron with the discontiguous reinforced mesh of rectangular drum like structural steel and iron lateral wall, So that the combination of the concrete and rectangular drum like structural steel and iron wrapped up on the outside of rectangular drum like structural steel and iron is more secured, and then improve The resistance performance of steel concrete compound shear wall, due to being enclosed with concrete on the outside of steel concrete compound shear wall, so shear wall can be with Fire retardant anticorrosion loses, and durability gets a promotion.
The connection otic placode of in-site installation vertical connection structure passes through lower connection with lower welding otic placode and upper welding otic placode respectively Bolt and upper connection bolt are fastenedly connected, and this connection type easily facilitates assembling.After this mode installs connection, after vertical Slotting anchor rib is welded with the tension rib on top and the tension rib of lower part respectively, is then poured.It thus will be of vertically-adjacent Two pieces of steel concrete compound shear walls are reliably connected as one.
In conclusion the present invention makes the plasticity of overall steel concrete combined shear wall construction and toughness properties be greatly improved, significantly The non-deformability and compression strength of shear wall are improved, vertical connection structure is wrapped in inside concrete, not only beautiful, and And bonding strength is high, stability is strong, it is ensured that is not easy to misplace.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is A-A sectional views in Fig. 1.
Specific implementation mode
As depicted in figs. 1 and 2, prefabrication steel concrete compound shear wall in-site installation vertical connection structure of the invention, packet Include several vertical rear slotting anchor rib 8, upper welding otic placode 9, lower welding otic placode 10 and connection otic placodes 11;
What steel concrete compound shear wall was formed after being connected by cross section steel concrete compound tube in rectangular configuration-type, ├ types, ┘ types, ┼ The shear-resisting wall of type or types;Steel concrete compound tube includes rectangular drum like structural steel and iron 1 made of bending, steel concrete in rectangular configuration Two long sides of compound tube are respectively the medial surface and lateral surface of rectangular drum like structural steel and iron 1, steel concrete in rectangular configuration combination Two short sides of pipe are respectively the left side and right side of rectangular drum like structural steel and iron 1, the medial surface of rectangular drum like structural steel and iron 1 The circular hole for offering rectangular array arrangement corresponding with lateral surface, is inserted with tension rib 2, tension rib 2 and rectangular drum like in circular hole It is connected as one between structural steel and iron 1;
Upper welding otic placode 9 is welded on the left side of one row's tension rib 2 of steel concrete compound tube lowest part on top, and lower welding otic placode 10 welds In the left side of one row's tension rib 2 of steel concrete compound tube topmost of lower part, upper welding otic placode 9 and lower welding otic placode 10 are vertically arranged And up and down correspond, connection otic placode 11 be close to weld otic placode 9 and it is lower welding otic placode 10 left side, connection otic placode 11 it is upper Portion is fastenedly connected by upper connection bolt 12 and upper welding otic placode 9, and the lower part of connection otic placode 11 is by lower connection bolt 13 under Welding otic placode 10 is fastenedly connected, and slotting anchor rib 8 is vertically arranged after vertical, the left upper portion of slotting anchor rib 8 and top after vertical The right side of one row's tension rib 2 of steel concrete compound tube lowest part is welded, the steel concrete group of the left lower and lower part of slotting anchor rib 8 after vertical Close the right side welding of one row's tension rib 2 of pipe topmost.
Rectangular drum like structural steel and iron 1 is stretched out in the inner end and outer end of tension rib 2 to both sides respectively, in rectangular drum like structural steel and iron 1 external surrounding is provided with cross section reinforced mesh 3 in rectangular configuration, between reinforced mesh 3 and rectangular drum like structural steel and iron 1 With gap, the medial surface and lateral surface of reinforced mesh 3 are respectively fixedly connected in the inner end and outer end of tension rib 2, reinforced mesh 3 Left side and right side be fixedly connected respectively with the left side of rectangular drum like structural steel and iron 1 and right side by peg 4, rectangle It has been poured inside tubular structure steel plate 1 and has been integrated tension rib 2, vertical rear slotting anchor rib 8 and the condensation of rectangular drum like structural steel and iron 1 Inner concrete 5, pour outer concrete 6 respectively by reinforced mesh 3, upper welding in the external surrounding of rectangular drum like structural steel and iron 1 Otic placode 9, lower welding otic placode 10 and connection otic placode 11 condense;Outer concrete 6, inner concrete 5, reinforced mesh 3 by tension rib 2 with Rectangular drum like structural steel and iron 1 forms steel concrete compound tube.
Rectangular drum like structural steel and iron 1 using being welded after ribbed steel or profiled sheet bending, press by ribbed steel surface It is formed with several ribs 7, it is 7 cross section semicircular in shape of rib, ellipse, triangle, trapezoidal;The cross section of profiled sheet die mould is in Triangle, trapezoidal, arc, wave or fold-line-shaped.Attached drawing 1 and Fig. 2 have only illustrated rectangular drum like structural steel and iron 1 next and have used band Rib steel plate, profiled sheet are not shown.
By concrete in 1 internal cavities of cast in situs rectangular drum like structural steel and iron, steel concrete compound shear wall knot is formd Structure.Its inner concrete 5, outer concrete 6 and reinforced mesh 3 pass through tension rib 2, the band rib 7 of vertical rear slotting anchor rib 8 and inside Steel plate group it is integral, using inside and outside concrete effect of contraction enhance steel plate wall geometrical stability, change the steel plate with rib 7 Instability modes avoid or delay the steel plate with rib 7 that local buckling occurs, while overall structure utilizes prefabricated rectangle tubular structure Steel plate 1 makes the intensity of concrete be improved the effect of contraction of concrete, and plasticity, toughness properties are greatly improved, compression strength It is also greatly improved with ductility.This steel concrete compound shear wall fabricated construction ensure that the abundant hair of all materials for wall performances It waves.
The invention enables the working procedures of shear wall to become simple, and then improves construction speed, steel concrete compound shear wall Lateral wall use the steel plate with rib 7, the whole of steel and concrete contact area enhancing steel concrete compound shear wall is increased by tension rib 2 The surrounding outside of body, rectangular drum like structural steel and iron 1 is provided with and the discontiguous bar-mat reinforcement of 1 lateral wall of rectangular drum like structural steel and iron Piece 3 so that the combination for the concrete and rectangular drum like structural steel and iron 1 that 1 outside of rectangular drum like structural steel and iron is wrapped up is more secured, into And the resistance performance of steel concrete compound shear wall is improved, due to being enclosed with concrete on the outside of steel concrete compound shear wall, so shearing Wall can be lost with fire retardant anticorrosion, and durability gets a promotion.
Under the connection otic placode 11 of in-site installation vertical connection structure passes through with lower welding otic placode 10 and upper welding otic placode 9 respectively Connection bolt 13 and upper connection bolt 12 are fastenedly connected, and this connection type easily facilitates assembling.After this mode installs connection, Slotting anchor rib 8 is welded with the tension rib on top 2 and the tension rib of lower part 2 respectively after will be vertical, is then poured.Thus will Of vertically-adjacent two blocks of steel concrete compound shear wall is reliably connected as one.
The present embodiment is not to be made any form of restriction to shape, material, the structure etc. of the present invention, every according to this hair Bright technical spirit belongs to the technology of the present invention side to any simple modification, equivalent change and modification made by above example The protection domain of case.

Claims (3)

1. prefabrication steel concrete compound shear wall in-site installation vertical connection structure, it is characterised in that:Including several it is vertical after Insert anchor rib, upper welding otic placode, lower welding otic placode and connection otic placode;
What steel concrete compound shear wall was formed after being connected by cross section steel concrete compound tube in rectangular configuration-type, ├ types, ┘ types, ┼ The shear-resisting wall of type or types;Steel concrete compound tube includes rectangular drum like structural steel and iron made of bending, steel concrete in rectangular configuration Two long sides of compound tube are respectively the medial surface and lateral surface of rectangular drum like structural steel and iron, steel concrete compound tube in rectangular configuration Two short sides be respectively rectangular drum like structural steel and iron left side and right side, the medial surface of rectangular drum like structural steel and iron and outer Side corresponds to the circular hole for offering rectangular array arrangement, and tension rib, tension rib and rectangular drum like structural steel are inserted in circular hole It is connected as one between plate;
Upper welding otic placode is welded on the left side of one row's tension rib of steel concrete compound tube lowest part on top, and lower welding otic placode is welded on down The left side of one row's tension rib of steel concrete compound tube topmost in portion, upper welding otic placode and lower welding otic placode are vertically arranged and upper next One corresponds to, and connection otic placode is close to weld the left side of otic placode and lower welding otic placode, and the top of connection otic placode passes through upper connection spiral shell Bolt is fastenedly connected with upper welding otic placode, and the lower part of connection otic placode is fastenedly connected by lower connection bolt and lower welding otic placode, vertically It inserts anchor rib afterwards to be vertically arranged, one row's tension rib of steel concrete compound tube lowest part of the left upper portion and top of slotting anchor rib after vertical Right side welding, the right side of one row's tension rib of steel concrete compound tube topmost of the left lower and lower part of slotting anchor rib is welded after vertical It connects.
2. prefabrication steel concrete compound shear wall in-site installation vertical connection structure according to claim 1, feature exist In:Rectangular drum like structural steel and iron is stretched out in the inner end and outer end of tension rib to both sides respectively, in the outside of rectangular drum like structural steel and iron Surrounding is provided with cross section reinforced mesh in rectangular configuration, has gap between reinforced mesh and rectangular drum like structural steel and iron, The medial surface and lateral surface of reinforced mesh are respectively fixedly connected in the inner end and outer end of tension rib, the left side and the right side of reinforced mesh Side is fixedly connected by peg with the left side of rectangular drum like structural steel and iron and right side respectively, in rectangular drum like structural steel and iron Portion is poured condenses the inner concrete being integrated by tension rib, vertical rear slotting anchor rib and rectangular drum like structural steel and iron, in rectangle The external surrounding of tubular structure steel plate pours outer concrete by reinforced mesh, upper welding otic placode, lower welding otic placode and connection respectively Otic placode condenses;Outer concrete, inner concrete, reinforced mesh form steel concrete with rectangular drum like structural steel and iron by tension rib and combine Pipe.
3. prefabrication steel concrete compound shear wall in-site installation vertical connection structure according to claim 1, feature exist In:Rectangular drum like structural steel and iron after ribbed steel or profiled sheet bending using being welded, if ribbed steel surface rolling has Dry rib, it is rib cross section semicircular in shape, ellipse, triangle, trapezoidal;The cross section of profiled sheet die mould is triangular in shape, Trapezoidal, arc, wave or fold-line-shaped.
CN201810384450.3A 2018-04-26 2018-04-26 Prefabrication steel concrete compound shear wall in-site installation vertical connection structure Withdrawn CN108487475A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810384450.3A CN108487475A (en) 2018-04-26 2018-04-26 Prefabrication steel concrete compound shear wall in-site installation vertical connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810384450.3A CN108487475A (en) 2018-04-26 2018-04-26 Prefabrication steel concrete compound shear wall in-site installation vertical connection structure

Publications (1)

Publication Number Publication Date
CN108487475A true CN108487475A (en) 2018-09-04

Family

ID=63314263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810384450.3A Withdrawn CN108487475A (en) 2018-04-26 2018-04-26 Prefabrication steel concrete compound shear wall in-site installation vertical connection structure

Country Status (1)

Country Link
CN (1) CN108487475A (en)

Similar Documents

Publication Publication Date Title
CN208294133U (en) Prefabrication steel concrete compound shear wall assembled-type house structure
CN108505749A (en) The vertical attachment device of prefabrication steel concrete overlapped shear wall in-site installation
CN104508220B (en) The axial surrender delayed support member of type elastoplasticity and vibration-damp steel shelf structure thing
CN108487473A (en) Prefabrication steel concrete compound shear wall with connect steel beam joint connection structure
KR101622522B1 (en) Concrete Filled Steel Tube Columns using H-beam and bending iron plate
CN108487476A (en) Prefabrication steel concrete compound tube site operation shear wall T-type horizontal connection structure
CN110056092A (en) Bolt plug-in type precast shear wall and superimposed sheet connecting structure and construction method up and down
CN108487636B (en) Prefabrication steel concrete compound shear wall assembled-type house construction method
CN108487478A (en) Prefabrication steel concrete compound tube site operation L-type shear wall horizontal connection structure
CN107023082B (en) H-shaped steel multi-ribbed steel hoop prefabricated combination beam and steel-concrete prefabricated wall connecting node
CN208518116U (en) Prefabrication steel concrete overlapped shear wall assembled arthitecutral structure
CN208518351U (en) The vertical attachment device of prefabrication steel concrete overlapped shear wall in-site installation
CN208733918U (en) Steel concrete compound tube of the high-strength bolt as tension rib
CN106436926A (en) Square steel tube column-H-shaped steel beam end-plate connecting node
CN206873729U (en) A kind of prefabricated chain type connects full assembled steel bar concrete floor
CN108571169A (en) Prefabrication steel concrete overlapped shear wall assembled architecture construction method
CN208293780U (en) Prefabrication steel concrete compound shear wall in-site installation vertical connection structure
CN108466018B (en) Prefabrication steel concrete compound tube manufacture craft
CN108466016B (en) Prefabrication steel concrete compound tube production method
CN108487475A (en) Prefabrication steel concrete compound shear wall in-site installation vertical connection structure
CN208518085U (en) Prefabrication steel concrete compound tube site operation Linear shear wall horizontal connection structure
CN208518084U (en) Prefabrication steel concrete compound tube site operation L-type shear wall horizontal connection structure
CN108505637A (en) Prefabrication steel concrete overlapped shear wall assembled arthitecutral structure
CN208088500U (en) A kind of prefabricated beam column crimping joint strengthening stirrup construction
CN108487670A (en) Prefabrication steel concrete compound shear wall assembled-type house structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180904