CN108487237A - A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred - Google Patents

A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred Download PDF

Info

Publication number
CN108487237A
CN108487237A CN201810281262.8A CN201810281262A CN108487237A CN 108487237 A CN108487237 A CN 108487237A CN 201810281262 A CN201810281262 A CN 201810281262A CN 108487237 A CN108487237 A CN 108487237A
Authority
CN
China
Prior art keywords
steel
crossbeam
pedestal
support plate
auxiliary tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810281262.8A
Other languages
Chinese (zh)
Inventor
喻坤
冯林波
邱宏雨
田作福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201810281262.8A priority Critical patent/CN108487237A/en
Publication of CN108487237A publication Critical patent/CN108487237A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses the auxiliary tools of a kind of no lifting machinery appointed condition descending reinforcing cage processing and decentralization, it include the crossbeam (1) positioned at top, the both ends of the crossbeam (1) are respectively provided with a supporting leg, which is the support plate (2) arranged by two inverted V-shapeds and the A font structures that a pull rod (4) being connected between the waist of two support plates (2) is constituted;The bottom of every support plate (2) and the pedestal (5) of one piece of thin-slab structure are connected as one, and pedestal (5) is connect by bolt with ground;There is the hanging ring (6) as lifting point in the middle part underhung of crossbeam (1).It, can banding steel cage personnel be difficult up and down effectively in conventional holes stake, insufficient space in hole, binding speed is slow, security risk is big (welding toxic and harmful gas, falls at junk), construction cost is high, the various disadvantages such as long in time limit by the auxiliary tool.

Description

A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred
Technical field
The present invention relates to the auxiliary tools of a kind of no lifting machinery appointed condition descending reinforcing cage processing and decentralization, belong to building Technical field of construction.
Background technology
At steep slope position, the steel reinforcement cage made can not be transported to construction point, need to carry out hole stake in construction point position Steel reinforcement cage bind, the equipment such as crane can not admission, steel reinforcement cage cannot be lifted by crane.Traditional construction technology is that steel reinforcement cage is carried out in hole Spreading and stirrup binding, there are, without operating space, speed of application is slow, security risk is big, construction cost is high in hole, long in time limit etc. Various disadvantages.
Invention content
The purpose of the present invention is to solve the series of technical mentioned in background technology, and a kind of nothing proposed rises Loop wheel machine tool appointed condition descending reinforcing cage is processed and the auxiliary tool of decentralization.
To achieve the goals above, present invention employs following technical solutions:
A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred, includes the cross positioned at top The both ends of beam, the crossbeam are respectively provided with a supporting leg, which is the support plate arranged by two inverted V-shapeds and is connected to two support plates Waist between a pull rod constitute A font structures;The bottom of every support plate and the pedestal of one piece of thin-slab structure are connected as One, pedestal are connect by bolt with ground;There is the hanging ring as lifting point in the middle part underhung of crossbeam.
Wherein, every support plate passes through a brace and the oblique connection of crossbeam.
Further, the crossbeam is made of the rod iron of Q235 materials, and diameter is not less than 50mm;The support plate, brace It is that shaped steel is made with pull rod;The pedestal is 1cm steel plates, size 25cm*25cm;The hanging ring is 10t and with mo(u)ld top half Number chain block or electric block.
Further, the support plate is made of H profile steel, channel steel, square steel or rod iron;Brace is channel steel, square steel, angle steel or steel Stick is made;Pull rod is made of H profile steel, channel steel, square steel or rod iron;There are four the pedestal is set at four corner edge 5cm of distanceScrew hole, the mating 4 10mm bolts of each pedestal, gasket and nut.
Device using the present invention can ensure no lifting machinery appointed condition descending reinforcing cage processing and decentralization work progress It is safe, inexpensive, efficient, in traditional hole banding steel cage exist:Personnel are difficult up and down, insufficient space in hole, tie up Prick that speed is slow, security risk big (welding toxic and harmful gas), construction cost are high, the various disadvantages such as long in time limit;It is this easy Auxiliary tool carries out fabrication of reinforcing cage processing outside hole in ground grading, it is possible to prevente effectively from disadvantage mentioned above, and can also be more A work point is used in turn, economical quick.
Description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the vertical view of the present invention.
Label in attached drawing be:1- crossbeams, 2- supporting legs, 3- braces, 4- scuffings of cylinder bore, 5- pedestals, 6- hanging rings.
Specific implementation mode
The invention will be further described with reference to the accompanying drawings and examples, but not as any limitation of the invention.
As shown in Figure 1-Figure 3:The invention mainly comprises crossbeam 1, the supporting leg that support plate 2 is constituted, brace 3, pull rod 4, pedestal 5, Hanging ring 6 etc. is process, and crossbeam 1 is connected as entirety by welding at the top of the supporting leg constituted with support plate 2, and crossbeam 1 leads to and support plate 2 The supporting leg of composition is all made of by brace 3 is welded as whole enhancing longitudinal stability, and passing through pull rod 4 between two legs of supporting leg welds company It connects, 2 bottom end of support plate uses with pedestal 5 and is welded to connect;Specific procedure of processing is as follows:
Step 1: crossbeam 1 is standard rod iron, it is formed by welding a supporting leg with two equal length support plates 2, two support plates 2 press from both sides Angle is in 60 ° of inverted v-shaped;
Step 2: being welded to connect with pull rod 4 between two support plates 2, A-shaped shape, enhance supporting leg stability;
Step 3: 2 bottom of support plate and 5 steel plate center weld of pedestal;
Step 4: crossbeam 1 and support plate 2 carry out welding by brace 3 and be again coupled to, enhance its overall stability.
The rod iron diameter selected in step 1 has to be larger than 50mm, and leg length must be identical and be shaped steel, prevents from hanging Bearing capacity is insufficient when steel reinforcement cage, deforms, and welding quality must be full closely knit.
Pull rod 4 must weld full closely knit with supporting leg in step 2.
Supporting leg must be welded with 5 steel plate centre of pedestal in step 3, and dislocation is avoided to cause to tie up bolt hole position, be welded Seam must be full closely knit.
The necessary firm welding of welding of brace 4 and crossbeam 1 and supporting leg, weld seam are full closely knit in step 4.
Specific implementation is such:
1. by making 3-4m long first segment steel reinforcement cages by drawing in the foundation ground of the smooth hardening of aperture periphery, weight Measure about 0.5t.It is laid with channel steel bearing beam in aperture, first segment steel reinforcement cage weight is supported, using the excavator with suspension hook by first segment steel Muscle cage, which is hung, to be placed on channel steel bearing beam, and the tool of the present invention is hung using excavator welded suspending hook and is moved to right over aperture, is put Set reliable, pedestal 5 is anchored on the basis of ground concrete using expansion bolt, using steel wire penetrating hanging ring 6, hangs reinforcing bar Cage.
2. the steel reinforcement cage for carrying out next segment lengthens, main reinforcement is connected using screw shell, and stirrup is bound according to design drawing, Steel reinforcement cage decentralization is proceeded by after binding is good.
3. hanging ring 6 is caught on steel wire rope, steel wire rope both sides hang steel reinforcement cage both sides suspension centre, and hanging ring 6 is pulled to promote 10cm, take out Go out channel steel cross beam, hanging ring 6 transfers steel reinforcement cage about 2m, penetrates channel steel bearing beam under the second stirrup of the top, spacer bar cage into The operations such as the next section steel reinforcement cage spreading of row and stirrup binding, hoop welding of putting more energy into, positioning bar welding, after the completion, 2m is one successively Repetend, construction is until complete the processing and placement of pile foundation steel bar cage.
The specific application example of the above only present invention, the present invention also has other embodiments, all to use equivalent replacement Or the technical solution that equivalent transformation is formed, it all falls within protection domain of the presently claimed invention.

Claims (4)

1. the auxiliary tool of a kind of no lifting machinery appointed condition descending reinforcing cage processing and decentralization, it is characterised in that:Including being located at The both ends of the crossbeam (1) at top, the crossbeam (1) are respectively provided with a supporting leg, which is the support plate (2) arranged by two inverted V-shapeds And the A font structures that a pull rod (4) being connected between the waist of two support plates (2) is constituted;The bottom of every support plate (2) It is connected as one with the pedestal (5) of one piece of thin-slab structure, pedestal (5) is connect by bolt with ground;Under the middle part of crossbeam (1) Side is hung with the hanging ring (6) as lifting point.
2. the auxiliary tool of no lifting machinery appointed condition descending reinforcing cage processing according to claim 1 and decentralization, special Sign is:Every support plate (2) passes through a brace (3) and crossbeam (1) oblique connection.
3. the auxiliary tool of no lifting machinery appointed condition descending reinforcing cage processing according to claim 1 and decentralization, special Sign is:The crossbeam (1) is made of the rod iron of Q235 materials, and diameter is not less than 50mm;The support plate (2), brace (3) and Pull rod (4) is that shaped steel is made;The pedestal (5) is 1cm steel plates, size 25cm*25cm;The hanging ring (6) be 10t and The chain block or electric block of the above model.
4. the auxiliary tool of no lifting machinery appointed condition descending reinforcing cage processing according to claim 1 and decentralization, special Sign is:The support plate (2) is made of H profile steel, channel steel, square steel or rod iron;Brace (3) is channel steel, square steel, angle steel or rod iron system At;Pull rod (4) is made of H profile steel, channel steel, square steel or rod iron;There are four the pedestal (5) sets at four corner edge 5cm of distanceScrew hole, the mating 4 10mm bolts of each pedestal (5), gasket and nut.
CN201810281262.8A 2018-04-02 2018-04-02 A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred Pending CN108487237A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810281262.8A CN108487237A (en) 2018-04-02 2018-04-02 A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810281262.8A CN108487237A (en) 2018-04-02 2018-04-02 A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred

Publications (1)

Publication Number Publication Date
CN108487237A true CN108487237A (en) 2018-09-04

Family

ID=63317928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810281262.8A Pending CN108487237A (en) 2018-04-02 2018-04-02 A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred

Country Status (1)

Country Link
CN (1) CN108487237A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253184A (en) * 2020-10-20 2021-01-22 四川港航建设工程有限公司 Water delivery tunnel inverted arch lining rapid sealing system and construction method
CN114233006A (en) * 2021-12-01 2022-03-25 中冶天工集团有限公司 Auxiliary device for external binding forming of large-section cast-in-place beam steel bar mold and using method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000103589A (en) * 1998-09-29 2000-04-11 Mitsubishi Electric Building Techno Service Co Ltd Gate type weight lifting device
CN202298606U (en) * 2011-09-26 2012-07-04 中交第二航务工程局有限公司 Descending frame for mounting reinforcement cage of pile foundation
CN202963332U (en) * 2012-11-23 2013-06-05 中交一公局第六工程有限公司 Device for manufacturing pile foundation reinforcement cage by using simple portal frame
CN103552913A (en) * 2013-11-14 2014-02-05 中国海洋石油总公司 Multifunctional underwater structure connecting frame
CN204626411U (en) * 2015-05-18 2015-09-09 葛洲坝集团第五工程有限公司 A kind of pile foundation steel bar cage erecting device
CN106522207A (en) * 2016-11-22 2017-03-22 中交公局海威工程建设有限公司 Reinforcement cage bracket and reinforcement cage mounting device
CN208088284U (en) * 2018-04-02 2018-11-13 中建四局第五建筑工程有限公司 A kind of artificial digging pile fabrication of reinforcing cage auxiliary tool

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000103589A (en) * 1998-09-29 2000-04-11 Mitsubishi Electric Building Techno Service Co Ltd Gate type weight lifting device
CN202298606U (en) * 2011-09-26 2012-07-04 中交第二航务工程局有限公司 Descending frame for mounting reinforcement cage of pile foundation
CN202963332U (en) * 2012-11-23 2013-06-05 中交一公局第六工程有限公司 Device for manufacturing pile foundation reinforcement cage by using simple portal frame
CN103552913A (en) * 2013-11-14 2014-02-05 中国海洋石油总公司 Multifunctional underwater structure connecting frame
CN204626411U (en) * 2015-05-18 2015-09-09 葛洲坝集团第五工程有限公司 A kind of pile foundation steel bar cage erecting device
CN106522207A (en) * 2016-11-22 2017-03-22 中交公局海威工程建设有限公司 Reinforcement cage bracket and reinforcement cage mounting device
CN208088284U (en) * 2018-04-02 2018-11-13 中建四局第五建筑工程有限公司 A kind of artificial digging pile fabrication of reinforcing cage auxiliary tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112253184A (en) * 2020-10-20 2021-01-22 四川港航建设工程有限公司 Water delivery tunnel inverted arch lining rapid sealing system and construction method
CN114233006A (en) * 2021-12-01 2022-03-25 中冶天工集团有限公司 Auxiliary device for external binding forming of large-section cast-in-place beam steel bar mold and using method

Similar Documents

Publication Publication Date Title
CN108487237A (en) A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN209702242U (en) Small-size portable hoisting machine for building
CN208088284U (en) A kind of artificial digging pile fabrication of reinforcing cage auxiliary tool
CN207390826U (en) EPR nuclear power station chimney mounting suspensions
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN213297372U (en) Simple turnover telegraph pole anti-toppling protection device
CN216516954U (en) Self-climbing concrete distributing device in super high-rise well way
CN112193984B (en) Steel reinforcement cage lifting and fixing device and steel reinforcement cage lifting method
CN212984892U (en) Can have enough to meet need and enclose fender foundation structure
CN210853369U (en) Protection device for vertical transportation building blocks of tower crane
CN211078151U (en) Small-size prefabricated section stone tongs
CN209779627U (en) Steel-pipe pile construction positioner
CN207633773U (en) A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system
CN207158618U (en) Pipeline welding lift hanger
CN201305993Y (en) Concrete pouring platform for cylinders
CN206476686U (en) A kind of gate-type hoisting bracket
CN211735395U (en) Pile stabilizing device for pile cutting construction
CN216613922U (en) Auxiliary transportation device for steel bar rolls
CN211521358U (en) Hoist for prefabricated hollow slab
CN208949874U (en) A kind of steel reinforcement cage hanging steel bar device
CN211368715U (en) Pile pulling device for large-area backfill high-program control pile manufacturing
CN218025076U (en) Frame is transferred in hoisting of friction pile owner muscle
CN216512435U (en) Shaft hoist and mount truss device
CN214527616U (en) Box culvert lifting appliance for on-site overturning and mounting of prefabricated box culvert

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180904

RJ01 Rejection of invention patent application after publication