CN108487179A - A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging - Google Patents

A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging Download PDF

Info

Publication number
CN108487179A
CN108487179A CN201810490550.4A CN201810490550A CN108487179A CN 108487179 A CN108487179 A CN 108487179A CN 201810490550 A CN201810490550 A CN 201810490550A CN 108487179 A CN108487179 A CN 108487179A
Authority
CN
China
Prior art keywords
ship
hull
positioning
jettisoninged
jettisoninging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810490550.4A
Other languages
Chinese (zh)
Inventor
薛爽
张国栋
刘俊杰
卢鹏
彭力
方涛
夏贺峰
王元骏
何义丰
伊青
朱聪睿
常坤
薛昌军
张华�
孙涛
汪金豹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yichang Changjiang River Waterway Engineering Office
Original Assignee
Yichang Changjiang River Waterway Engineering Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yichang Changjiang River Waterway Engineering Office filed Critical Yichang Changjiang River Waterway Engineering Office
Priority to CN201810490550.4A priority Critical patent/CN108487179A/en
Publication of CN108487179A publication Critical patent/CN108487179A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/38Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
    • G01S19/39Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/42Determining position
    • G01S19/421Determining position by combining or switching between position solutions or signals derived from different satellite radio beacon positioning systems; by combining or switching between position solutions or signals derived from different modes of operation in a single system
    • G01S19/423Determining position by combining or switching between position solutions or signals derived from different satellite radio beacon positioning systems; by combining or switching between position solutions or signals derived from different modes of operation in a single system by combining or switching between position solutions derived from different satellite radio beacon positioning systems

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Traffic Control Systems (AREA)

Abstract

A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging, and is mainly jettisoninged integrated ship, including hull, position portion, part of jettisoninging including a kind of positioning waterborne;The hull positions hull;The position portion includes two GPS instruments, five electric windlass, two dolphins, two anchor points;The part of jettisoninging includes director's arm digging machine, a track.A kind of positioning waterborne provided by the invention is jettisoninged integrated ship, and by being arranged hull, position portion, part of jettisoninging, realization is jettisoninged from point to surface, uniformly jettisoninged by being scattered to piece, is improved construction quality, is effectively reduced construction cost and security risk.

Description

A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging
Technical field
It jettisonings block stone the present invention relates to positioning waterborne, specifically a kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging.
Background technology
It is a kind of management measure common in waterway regulation works that block stone, which is jettisoninged, mainly prevents riverbank or structure by flow It washes away.At present block stone jettisoning it is artificial carry jettisoning, excavator is gone on board 2 kinds of modes of jettisoninging such as jettisoning, all have certain limitation, It is embodied in:
1), it is artificial carry that jettisoning be that block stone is carried to cargo ship ship side by manpower, then lift in water.This method is more former Begin to fall behind, takes time and effort, inefficiency, exist simultaneously the security risks such as man overboard.
2), excavator goes on board and jettisonings is cargo ship on digging machine, and block stone is thrown into water by scraper bowl, this method is jettisoninged distribution , there is the disadvantage of leakage throwing or product heap in unevenness, construction quality is not easy to ensure.Excavator is moved forward and backward in cargo ship and constructs, and ship is steady It is qualitative poor, and excavator has thrown after a ship that there are larger security risks during traveling to another ship.
Invention content
Technical problem to be solved by the invention is to provide a kind of positioning waterborne jettisoning integrated ship and jettisoning method, it can be achieved that Block stone is jettisoninged from point to surface, uniformly jettisoninged by being scattered to piece, is improved construction quality, is effectively reduced construction cost and security risk. In addition, it is simple in structure, easy to operate, there is good promotional value.
In order to solve the above technical problems, the technical solution adopted in the present invention is:
A kind of positioning waterborne is jettisoninged integrated ship, including hull, position portion, part of jettisoninging.
The hull is positioning hull, is the carrier of position portion and part of jettisoninging as construction operation platform.
The position portion includes GPS instruments, electric windlass, dolphin, anchor point.
Wherein, GPS instruments at least two, and connect with central station of floating dock computer, it is shown on computer screen by conversion parameter Show two anchor point plan-positions, is compared with planning grid plan line position, central station of floating dock commander's operation electric windlass folding and unfolding Wirerope, running fix ship to two anchor points are overlapped with planning grid plan line endpoints, complete positioning ship positionning.
Dolphin at least two, it is front and back to be vertically arranged side on the quarter and stretch out hull certain length, when completion positions Afterwards, cargo ship is close to dolphin, passes through hawser and station keeping ship tying-up.Dolphin forms a cuboid with station keeping ship and cargo ship Space, as region of jettisoninging.
The anchor point at least two, and be distributed before and after hull.
The part of jettisoninging includes long-armed digging machine, and long-armed digging machine setting is in orbit, and track is in positioning hull upper edge hull Longitudinal axis is distributed.
The electric windlass totally 5, including 5 anchors and 5 wireropes, positioning hull both ends are respectively with 2,3 points Cloth.5 windlass folding and unfolding wireropes are controlled by coordination, are achieved in station keeping ship displacement and positioning
It is 2 m that the ship pier, which stretches out hull partial-length, and thickness is 1 m, and two dolphin spacing are 30m.It in this way can be with positioning Ship, cargo ship form the rectangular parallelepiped space that a cross section is 30 meters × 2 meters.
The brachium of the long-armed digging machine is 18m, and scraper bowl sets 0.4 m3~0.6m3.
The track width is 2 m, and length is 40 m.As long-armed digging machine transitional zone, long-armed digging machine edge in orbit Hull longitudinal axis translates, by the vertical interior throwing of the block stone of cargo ship corresponding position to region of jettisoninging.
The anchor point is arranged in front and back ship pier and ship side junction.Region of jettisoninging be can be used as along ship side direction endpoint.
A method of integrated ship being jettisoninged to jettisoning using positioning waterborne, is included the following steps:
Step 1:Positioning hull is driven into the navigation channel for needing to jettisoning building stones, two GPS instruments, two anchor points of progress are passed through Positioning, the position of two anchor points shown by conversion parameter on central station of floating dock computer screen, and with planning grid plan Line compares, and control electric windlass folding and unfolding wirerope realizes station keeping ship displacement, when two anchor points and planning grid plan line endpoints weight It closes, positioning ship positionning is completed;
Step 2:By fully loaded cargo ship be close to dolphin stop, by hawser by fully loaded cargo ship together with station keeping ship tying-up, It is positioned such that ship, fully loaded cargo ship and two dolphins constitute rectangular parallelepiped space, which is region of jettisoninging.
Step 3:Long-armed digging machine is translated along track, by the block stone of fully loaded cargo ship corresponding position perpendicular to ship side direction Interior throw to what dolphin and two hull ship sides were formed is jettisoninged in region.
Step 4:Behind a region of having jettisoninged, step 1 is repeated, two anchor points are moved into next planning grid meter Scribing line endpoint repeats step 3 and continues to jettisoning.Sequential analysis is until cargo ship block stone has been thrown according to this.
A kind of positioning waterborne of the present invention is jettisoninged integrated ship and method of jettisoninging, by double GPS connections central station of floating dock computers, in screen Two positioning point coordinates of upper display, by the way that compared with planning grid plan line, command and control electric windlass folding and unfolding wirerope is mobile fixed Position ship is overlapped to two anchor points with planning grid plan line endpoints, completes positioning.Cargo ship is close to dolphin and passes through hawser system In station keeping ship, long-armed digging machine translates in orbit, and 30 meters × 2 meters areas of jettisoninging formed to dolphin and ship side will be thrown in block stone Domain.It often jettisonings and completes one 30 meters × 2 meters of small grid, station keeping ship is displaced to next small grid to be thrown according to appeal operation order Continue to construct.The application of entire work progress, double GPS positionings improves positioning accuracy;Digging machine is in two dolphins and ship side shape At 30 meters × 2 meters regions jettisoning, improve precision of jettisoninging;Using from point to surface, improved by the mode of jettisoninging for being scattered to piece It jettisonings the uniformity;The digging machine track designed by stability of ship is tested ensures the stability of ship in digging machine translation motion, Significantly improve working security.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the vertical view of the present invention.
Fig. 2 is the left view of the present invention.
Fig. 3 is the working state figure of the present invention.
Fig. 4 is schematic diagram of the anchor point on grid plan line in the present invention(Hatching is corresponding in grid plan line It jettisonings region after positioning every time).
In figure:The hull 1 positions hull 1-1, position portion 2, GPS instrument 2-1, electric windlass 2-2, dolphin 2- 3, anchor point 2-4, part 3 of jettisoninging, long-armed digging machine 3-1, track 3-2 are fully loaded with cargo ship 4, region 5 of jettisoninging.
Specific implementation mode
As shown in Figs 1-4, a kind of positioning waterborne is jettisoninged integrated ship, including hull 1, position portion 2, part 3 of jettisoninging.
The hull 1 positions hull 1-1;Apparatus carriers of the positioning hull as position portion and part of jettisoninging.
The position portion 2 includes GPS instrument 2-1, electric windlass 2-2, dolphin 2-3, anchor point 2-4;The GPS instrument Device 2-1 totally two, is connected to central station of floating dock computer, shows two plan-positions anchor point 2-4 on the screen by conversion parameter, with Planning grid plan line position compares, central station of floating dock commander's 5 electric windlass 2-2 folding and unfolding wireropes of operation, running fix ship 1-1 to two A anchor point 2-4 is overlapped with planning grid plan line endpoints, completes station keeping ship 1-1 positioning.The dolphin 2-3 totally two, fortune Defeated ship is close to dolphin 2-3 and is formed in station keeping ship 1-1, two dolphin 2-3 and station keeping ship 1-1 and cargo ship by hawser tying-up The rectangular parallelepiped space that one cross section is 2 meters × 30 meters, as region of jettisoninging.
The part 3 of jettisoninging includes long-armed digging machine 3-1, track 3-2;The long-armed digging machine 3-1 is in track 3-2 upper edge hulls Longitudinal axis translates, by the vertical interior throwing of the block stone of cargo ship corresponding position to region of jettisoninging;The track 3-2 length sets 40 Rice, width sets 2 meters, as the transitional zones long-armed digging machine 3-1.
A method of integrated ship being jettisoninged to jettisoning using positioning waterborne, is included the following steps:
Step 1: positioning:Positioning hull 1-1 is driven into the navigation channel for needing to jettisoning building stones, is carried out by two GPS instruments 2-1 The position of the positioning of two anchor point 2-4, two anchor point 2-4 is shown by conversion parameter on central station of floating dock computer screen Come, and compared with planning grid plan line, control electric windlass folding and unfolding wirerope realizes station keeping ship displacement, when two anchor points with set It counts grid plan line endpoints to overlap, positioning ship positionning is completed;
Step 2: performing:Fully loaded cargo ship 4 is close to dolphin 2-3 to stop, by hawser by fully loaded cargo ship 4 and station keeping ship 1-1 tying-ups together, are positioned such that ship 1-1, fully loaded cargo ship 4 and two dolphin 2-3 constitute rectangular parallelepiped space, which is For region 5 of jettisoninging.
Step 3: jettisoninging:Long-armed digging machine 3-1 is translated along track 3-2, and the block stone of 5 corresponding position of fully loaded cargo ship is hung down Directly jettisoning in region 5 in being thrown in ship side direction to 2 meters × 30 meters of dolphin 2-3 and the formation of two hull ship sides.
Step 4: displacement:Behind one 2 meters × 30 meters of the region of having jettisoninged, step 1 is repeated, by two anchor point 2-4 Next planning grid plan line endpoints are moved to, step 3 is repeated and continues to jettisoning.Sequential analysis is until cargo ship block stone is thrown according to this It is complete.

Claims (7)

  1. The integrated ship 1. a kind of positioning waterborne is jettisoninged, it is characterised in that:Including hull(1), position portion (2), part of jettisoninging(3); The hull(1)To position hull(1-1);The position portion(2)Including GPS instruments(2-1), electric windlass(2-2), lean on ship Pier(2-3), anchor point(2-4);Wherein, GPS instruments(2-1)Number and anchor point(2-4)It is adapted, and connects with central station of floating dock computer It connects, anchor point is accurately shown on the diagram by the way that conversion parameter is arranged(2-4)Position;Dolphin(2-3)At least two, it is front and back It is vertically arranged side on the quarter and stretches out hull certain length;The anchor point(2-4)At least two and before and after hull point Cloth;
    The part of jettisoninging(3)Including long-armed digging machine(3-1), long-armed digging machine(3-1)It is arranged in track(3-2)On, track(3-2) In positioning hull(1-1)Upper edge hull longitudinal axis is distributed.
  2. The integrated ship 2. a kind of positioning waterborne according to claim 1 is jettisoninged, it is characterised in that:The electric windlass(2-2) Totally 5, including 5 anchors and 5 wireropes, 5 electric windlass(2-2)In positioning hull(1-1)Both ends are distributed.
  3. The integrated ship 3. a kind of positioning waterborne according to claim 1 is jettisoninged, it is characterised in that:The ship pier(2-3)It stretches out Hull partial-length is 2 m, and thickness is 1 m, and two dolphin spacing are 30m.
  4. The integrated ship 4. a kind of positioning waterborne according to claim 1 is jettisoninged, it is characterised in that:The long-armed digging machine(3-1) Brachium be 18m, scraper bowl sets 0.4 m3~0.6m3.
  5. The integrated ship 5. a kind of positioning waterborne according to claim 1 is jettisoninged, it is characterised in that:The track(3-2)Width For 2 m, length is 40 m.
  6. The integrated ship 6. a kind of positioning waterborne according to claim 1 is jettisoninged, it is characterised in that:The anchor point(2-4)If It sets in front and back ship pier and ship side junction.
  7. 7. the method that a kind of positioning waterborne according to any one of claim 1~6 jettisonings integrated ship to jettisoning, It is characterized in that:Include the following steps:
    Step 1:Hull will be positioned(1-1)It drives into the navigation channel for needing to jettisoning building stones, passes through two GPS instruments(2-1)Carry out two A anchor point(2-4)Positioning, two anchor points(2-4)Position shown on central station of floating dock computer screen by conversion parameter Come, and compared with planning grid plan line, control electric windlass folding and unfolding wirerope realizes station keeping ship displacement, when two anchor points with set It counts grid plan line endpoints to overlap, positioning ship positionning is completed;
    Step 2:By fully loaded cargo ship(4)It is close to dolphin(2-3)It stops, by hawser by fully loaded cargo ship(4)With station keeping ship (1-1)Tying-up together, is positioned such that ship(1-1), fully loaded cargo ship(4)And two dolphins(2-3)Rectangular parallelepiped space is constituted, The space is region of jettisoninging(5);
    Step 3:Long-armed digging machine(3-1)Along track(3-2)Translation, by fully loaded cargo ship(5)The block stone of corresponding position perpendicular to It is thrown to dolphin in ship side direction(2-3)The region of jettisoninging formed with two hull ship sides(5)It is interior;
    Step 4:Behind a region of having jettisoninged, step 1 is repeated, by two anchor points(2-4)Move to next planning grid Plan line endpoints, repeats step 3 and continue to jettisoning;
    Sequential analysis is until cargo ship block stone has been thrown according to this.
CN201810490550.4A 2018-05-21 2018-05-21 A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging Pending CN108487179A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810490550.4A CN108487179A (en) 2018-05-21 2018-05-21 A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810490550.4A CN108487179A (en) 2018-05-21 2018-05-21 A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging

Publications (1)

Publication Number Publication Date
CN108487179A true CN108487179A (en) 2018-09-04

Family

ID=63353477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810490550.4A Pending CN108487179A (en) 2018-05-21 2018-05-21 A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging

Country Status (1)

Country Link
CN (1) CN108487179A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322283A (en) * 2018-11-28 2019-02-12 江苏省水利建设工程有限公司 A kind of Sai Kegebin construction technology

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144739A (en) * 1998-11-12 2000-05-26 Ohbayashi Corp Covering sand method
CN102888846A (en) * 2012-09-29 2013-01-23 宁波科宁爆炸技术工程有限公司 Construction method of compact underwater rubble bed
CN203080529U (en) * 2013-02-04 2013-07-24 上海交通建设总承包有限公司 Underwater riprapping construction GPS satellite positioning device
CN104018508A (en) * 2014-07-01 2014-09-03 长江重庆航道工程局 Stone dumper of high-front shovel and stone-dumping construction method thereof
CN105015717A (en) * 2015-07-24 2015-11-04 上海勘测设计研究院有限公司 Box-type deepwater positioning throwing boat and usage method thereof
CN205857193U (en) * 2016-06-22 2017-01-04 兴化市三盛水利工程有限公司 A kind of deep water stone dumper combination and stone dumper thereof
JP2017066642A (en) * 2015-09-29 2017-04-06 株式会社本間組 Height management device of water bottom construction area

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144739A (en) * 1998-11-12 2000-05-26 Ohbayashi Corp Covering sand method
CN102888846A (en) * 2012-09-29 2013-01-23 宁波科宁爆炸技术工程有限公司 Construction method of compact underwater rubble bed
CN203080529U (en) * 2013-02-04 2013-07-24 上海交通建设总承包有限公司 Underwater riprapping construction GPS satellite positioning device
CN104018508A (en) * 2014-07-01 2014-09-03 长江重庆航道工程局 Stone dumper of high-front shovel and stone-dumping construction method thereof
CN105015717A (en) * 2015-07-24 2015-11-04 上海勘测设计研究院有限公司 Box-type deepwater positioning throwing boat and usage method thereof
JP2017066642A (en) * 2015-09-29 2017-04-06 株式会社本間組 Height management device of water bottom construction area
CN205857193U (en) * 2016-06-22 2017-01-04 兴化市三盛水利工程有限公司 A kind of deep water stone dumper combination and stone dumper thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
山东省公路水运工程安全生产管理人员继续教育培训教材编审委员会组织: "《公路水运工程施工安全技术》", 中国矿业大学出版社, pages: 375 - 376 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322283A (en) * 2018-11-28 2019-02-12 江苏省水利建设工程有限公司 A kind of Sai Kegebin construction technology

Similar Documents

Publication Publication Date Title
CN104652348B (en) Deep-water foundation bed rock throwing system
CN107916607B (en) Automatic paver system with measurement and positioning structure
CN206205391U (en) A kind of metope scrapes slurry plastered work device and metope is scraped slurry and plastered robot
CN104652394A (en) Novel multifunctional work platform at shallow sea
CN112144535A (en) Working method of riprap leveling ship
CN108487179A (en) A kind of positioning waterborne is jettisoninged integrated ship and method of jettisoninging
CN102477733A (en) Installation method for integrally dragging cantilever beam onto platform
CN206785388U (en) Anchor cable removes system in a kind of tunnel
CN107130965A (en) Anchor cable sweep-out method and removing system in a kind of tunnel
CN208346744U (en) A kind of positioning waterborne is jettisoninged integrated ship
CN203684042U (en) Synchronous macadam spreader
JP2015530331A (en) Dock building apparatus and construction method using the building apparatus
CN107938594B (en) Deep water mixing dike construction method
CN204662343U (en) Deep water bedding jackstone system
US20160222628A1 (en) Method for maneuvering a vessel
CN104790401B (en) A kind of building dredging mud foundation ditch embankment material spray stirs constructing device
CN203255941U (en) Rapid construction special vehicle for large-span overhead working
CN208135764U (en) A kind of pipeline hanging device without spin
CN108104108B (en) Construction equipment and method for shallow in-situ solidification of waste sludge
CN107142957B (en) A kind of city integrated piping lane walking circulation construction system and its method
JP2017066642A (en) Height management device of water bottom construction area
CN206941567U (en) The Macadam Pile Construction barge waterborne
CN107724398A (en) Automatic paver system with scraper-type material-falling hopper
CN103241691B (en) Long-span working-at-height rapid construction special cage
CN204530815U (en) Rubble bedding desilting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination