CN108487037A - Wavelike steel webplate pc combined box beam prefabricated construction engineering methods - Google Patents

Wavelike steel webplate pc combined box beam prefabricated construction engineering methods Download PDF

Info

Publication number
CN108487037A
CN108487037A CN201810106645.1A CN201810106645A CN108487037A CN 108487037 A CN108487037 A CN 108487037A CN 201810106645 A CN201810106645 A CN 201810106645A CN 108487037 A CN108487037 A CN 108487037A
Authority
CN
China
Prior art keywords
web
steel
wavelike steel
steel webplate
webplate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810106645.1A
Other languages
Chinese (zh)
Inventor
邓坤
郑大金
王陈君
吴泽强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Xinyu Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201810106645.1A priority Critical patent/CN108487037A/en
Publication of CN108487037A publication Critical patent/CN108487037A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Abstract

The invention discloses Wavelike steel webplate pc combined box beam prefabricated construction engineering methods, box beam caisson platform precasting, staff is familiar with drawing dimensional structure, it is constructed according to the precast pedestal planned, Wavelike steel webplate is processed, the structure provided according to design drawing, size, it is processed per a piece of box beam and component by professional production producer, precast pedestal center line positions, center line and corresponding segment position are made in the position of every a piece of beam, splice at Wavelike steel webplate scene, Wavelike steel webplate is checked the number into installation in place by each piece of position using gantry crane, each piece of box girder with corrugated steel webs after adjustment, and it is fixed using temporary steel support.Have when the Wavelike steel webplate splicing in the present invention each stage and accurately positions, ensure the firmness of temporary support, firm foundations have been beaten for box beam spelling, technology before and after each spelling is detected at scene, compound control of checking on, the line style and total quality that ensure that box girder with corrugated steel webs, have saved cost.

Description

Wavelike steel webplate pc combined box beam prefabricated construction engineering methods
Technical field
The present invention relates to Wavelike steel webplate pc combined box beam prefabricated construction technical fields more particularly to Wavelike steel webplate pc groups The beam prefabricated construction of mould assembling.
Background technology
Wavelike steel webplate inherent stress concrete box-beam bridge is also known as Wavelike steel webplate PC bridges, refers to pre- with corrugated sheet steel substitution The concrete web of prestressed concrete box beam makees the box-girder of web, and distinguishing feature is to replace thickness with the steel plate of 10~20mm thickness The concrete web of 30~80cm thickness, in the eighties, France designs and built first replaces common mix with Wavelike steel webplate New composite structure bridge-Cognac the bridges of solidifying soil box girder web, have built thereafter and in succession Maupre overpass, Asterix The several Wavelike steel webplate bridges such as bridge and Dole, Wavelike steel webplate prestressed concrete combined box beam there is no real bridge at home, with this Meanwhile France/Germany, especially Japan have built the bridge of several this types in succession, technique of design and construction is increasingly mature, wave Shape steel web prestressed concrete combined box beam, particularly suitable in, the continuous box girder of Long span, as the country is to this structure Analysis and research development and deeply, and the reference to external engineering experience, Wavelike steel webplate prestressed concrete Native combined box beam will be applied in the bridge construction in China, currently, Wavelike steel webplate pc combined box beam prefabricated construction precision Poor, whole quality safety is not high enough.
Invention content
Technical problems based on background technology, the present invention propose Wavelike steel webplate pc combined box beam prefabricated construction works Method.
Wavelike steel webplate pc combined box beams prefabricated construction engineering method proposed by the present invention, includes the following steps:
S1:Box beam caisson platform precasting, staff are familiar with drawing dimensional structure, are applied according to the precast pedestal planned Work;
S2:Wavelike steel webplate is processed, and according to the structure and size that design drawing provides, is processed by professional production producer each Piece box beam and component;
S3:Precast pedestal center line positions, and center line and corresponding segment position are made in the position of every a piece of beam;
S4:Wavelike steel webplate scene is spliced, and Wavelike steel webplate is checked the number installation just by each piece of position using gantry crane Position, each piece of box girder with corrugated steel webs after adjustment, and fixed using temporary steel support;
S5:Welding, the Wavelike steel webplate to adjusting post-reinforcing are welded using penetration;
S6:Roof and floor concrete construction, using the sequence construction roof and floor structure of top plate after first bottom plate;
S7:Prestressed stretch-draw is answered according to work progress tune rope to adjust structure using rope, single, Cyclic Symmetry tensioning is divided Power keeps bridge completion state more reasonable by construction monitoring, it is ensured that structure construction is safe and stablizes;
S8:Wavelike steel webplate linear monitoring, Wavelike steel webplate is instead of concrete web, the line of box girder with corrugated steel webs after installation Type quality and welding quality influence the stress of whole bridge, and the steel wire concrete for becoming monitoring in the pre-buried stress of box beam roof and floor strains biography Sensor, mating high-precision frequency collection instrument carry out in-situ stresses sampling, at the construction field (site) by the linear of box beam block and its Displacement monitoring and stress monitoring are distributed to obtain box beam block practical distortion with internal force, it is ensured that the linear and quality of Cheng Qiao.
The method of the Wavelike steel webplate scene splicing of Wavelike steel webplate pc combined box beam prefabricated construction engineering methods, including following step Suddenly:
S1:Wavelike steel webplate coarse positioning, when installing web, flange plate dropping place is on nose girder top pushing platform, and then crane is light It puts, the longitudinal direction of Wavelike steel webplate and lateral and vertical mark is finely tuned using jack and crowbar according to live absolute altitude and design position Height, in lifting, the mode that steel wire rope and bottle gouard moved by hands can be used adjusts the angle carry out coarse positioning, and elevation location is according to measurement class Absolute altitude that group is given and rule of thumb sinking is adjusted;
S2:Steel web is accurately positioned, and after web is thick in place, is fixed with interim diagonal brace, and whether measure elevation high with design Cheng Fuhe, cushioning steel plate, which is soldered to, when not meeting meets design altitude, then carries out dropping place processing, and skew web plate is closed in Bottom Altitude Interim diagonal brace top is adjusted after lattice, and to adjust steel web angle to design requirement is met, after dropping place, it is solid to carry out steel web It is fixed, and reinforcing bar is set and is welded with bottom plate connector, prevent disturbance from steel web being caused to conjugate, lifting web is accurately in place, in web Between setting temporary support to ensure the accurate positioning of steel web;
S3:Vertically and horizontally position adjusts, and adjusts absolute altitude using bottle gouard moved by hands in steel web, steel abdomen is finely tuned with upper and lower adjustable cross-brace Then horizontal drawings reinforcing bar and the reinforcement lumps of wood is arranged on web top every 5m, accurately each block of steel web in Board position and linear It is adjusted to layout design position, fixes dropping place after steel web;
S4:Installation is checked and accepted, and after steel web positions self-test qualification, precision requires to control according to following, and management is submitted a report asking for after qualified Engineer checks and accepts as required, and next procedure construction can be carried out after acceptance(check).
Preferably, the construction system includes lifting module, detection module, adjustment module and welding module, and detects mould Block includes Leica total station, ordinary level, supersonic detector and welding detection ruler.
Preferably, the welding module includes dioxo gas protection welding machine, DC welder, gouge and oxygen cutting gun, and is lifted Module includes gantry crane, steel wire rope, autocrane.
Preferably, the adjustment system includes hydraulic jack and chain block, and hydraulic jack is connected with switch, opens Connection is connected to computer.
Having the beneficial effect that in the present invention:
1, have and accurately position when the Wavelike steel webplate splicing in this engineering method each stage, it is ensured that temporary support it is secured Degree has beaten firm foundations for box beam spelling;
2, the technology before and after each spelling is detected at this engineering method scene, and compound control of checking on ensure that Wavelike steel webplate case The line style and total quality of beam, have saved cost.
Description of the drawings
Fig. 1 is the flow diagram of Wavelike steel webplate pc combined box beams prefabricated construction engineering method proposed by the present invention;
Fig. 2 is the construction system schematic diagram of Wavelike steel webplate pc combined box beams prefabricated construction engineering method proposed by the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Figures 1 and 2, Wavelike steel webplate pc combined box beams prefabricated construction engineering method, includes the following steps:
S1:Box beam caisson platform precasting, staff are familiar with drawing dimensional structure, are applied according to the precast pedestal planned Work;
S2:Wavelike steel webplate is processed, and according to the structure and size that design drawing provides, is processed by professional production producer each Piece box beam and component;
S3:Precast pedestal center line positions, and center line and corresponding segment position are made in the position of every a piece of beam;
S4:Wavelike steel webplate scene is spliced, and Wavelike steel webplate is checked the number installation just by each piece of position using gantry crane Position, each piece of box girder with corrugated steel webs after adjustment, and fixed using temporary steel support;
S5:Welding, the Wavelike steel webplate to adjusting post-reinforcing are welded using penetration;
S6:Roof and floor concrete construction, using the sequence construction roof and floor structure of top plate after first bottom plate;
S7:Prestressed stretch-draw is answered according to work progress tune rope to adjust structure using rope, single, Cyclic Symmetry tensioning is divided Power keeps bridge completion state more reasonable by construction monitoring, it is ensured that structure construction is safe and stablizes;
S8:Wavelike steel webplate linear monitoring, Wavelike steel webplate is instead of concrete web, the line of box girder with corrugated steel webs after installation Type quality and welding quality influence the stress of whole bridge, and the steel wire concrete for becoming monitoring in the pre-buried stress of box beam roof and floor strains biography Sensor, mating high-precision frequency collection instrument carry out in-situ stresses sampling, at the construction field (site) by the linear of box beam block and its Displacement monitoring and stress monitoring are distributed to obtain box beam block practical distortion with internal force, it is ensured that the linear and quality of Cheng Qiao.
The method of the Wavelike steel webplate scene splicing of Wavelike steel webplate pc combined box beam prefabricated construction engineering methods, including following step Suddenly:
S1:Wavelike steel webplate coarse positioning, when installing web, flange plate dropping place is on nose girder top pushing platform, and then crane is light It puts, the longitudinal direction of Wavelike steel webplate and lateral and vertical mark is finely tuned using jack and crowbar according to live absolute altitude and design position Height, in lifting, the mode that steel wire rope and bottle gouard moved by hands can be used adjusts the angle carry out coarse positioning, and elevation location is according to measurement class Absolute altitude that group is given and rule of thumb sinking is adjusted;
S2:Steel web is accurately positioned, and after web is thick in place, is fixed with interim diagonal brace, and whether measure elevation high with design Cheng Fuhe, cushioning steel plate, which is soldered to, when not meeting meets design altitude, then carries out dropping place processing, and skew web plate is closed in Bottom Altitude Interim diagonal brace top is adjusted after lattice, and to adjust steel web angle to design requirement is met, after dropping place, it is solid to carry out steel web It is fixed, and reinforcing bar is set and is welded with bottom plate connector, prevent disturbance from steel web being caused to conjugate, lifting web is accurately in place, in web Between setting temporary support to ensure the accurate positioning of steel web;
S3:Vertically and horizontally position adjusts, and adjusts absolute altitude using bottle gouard moved by hands in steel web, steel abdomen is finely tuned with upper and lower adjustable cross-brace Then horizontal drawings reinforcing bar and the reinforcement lumps of wood is arranged on web top every 5m, accurately each block of steel web in Board position and linear It is adjusted to layout design position, fixes dropping place after steel web;
S4:Installation is checked and accepted, and after steel web positions self-test qualification, precision requires to control according to following, and management is submitted a report asking for after qualified Engineer checks and accepts as required, and next procedure construction can be carried out after acceptance(check).
In the present invention, construction system includes lifting module, detection module, adjusts module and welding module, and detection module Including Leica total station, ordinary level, supersonic detector and welding detection ruler, welding module includes dioxo gas protection weldering Machine, DC welder, gouge and oxygen cutting gun, and it includes gantry crane, steel wire rope, autocrane to lift module, adjustment system includes Hydraulic jack and chain block, and hydraulic jack is connected with switch, switch is connected with computer.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. Wavelike steel webplate pc combined box beam prefabricated construction engineering methods, include the following steps:
S1:Box beam caisson platform precasting, staff are familiar with drawing dimensional structure, are constructed according to the precast pedestal planned;
S2:Wavelike steel webplate is processed, and according to the structure and size that design drawing provides, is processed per a piece of case by professional production producer Beam and component;
S3:Precast pedestal center line positions, and center line and corresponding segment position are made in the position of every a piece of beam;
S4:Wavelike steel webplate scene is spliced, and Wavelike steel webplate is checked the number installation in place by each piece of position using gantry crane, is adjusted Each piece of box girder with corrugated steel webs after whole, and fixed using temporary steel support;
S5:Welding, the Wavelike steel webplate to adjusting post-reinforcing are welded using penetration;
S6:Roof and floor concrete construction, using the sequence construction roof and floor structure of top plate after first bottom plate;
S7:Prestressed stretch-draw adjusts structural stress using rope, single, Cyclic Symmetry tensioning is divided according to work progress tune rope, By construction monitoring, keep bridge completion state more reasonable, it is ensured that structure construction is safe and stablizes;
S8:Wavelike steel webplate linear monitoring, Wavelike steel webplate is instead of concrete web, the line style matter of box girder with corrugated steel webs after installation Amount and welding quality influence the stress of whole bridge, become the steel wire concrete strain sensing of monitoring in the pre-buried stress of box beam roof and floor Device, mating high-precision frequency collection instrument carry out in-situ stresses sampling, pass through the linear and its position to box beam block at the construction field (site) Monitoring and stress monitoring are moved, is distributed with internal force to obtain box beam block practical distortion, it is ensured that the linear and quality of Cheng Qiao.
2. Wavelike steel webplate pc combined box beams prefabricated construction engineering method according to claim 1, is implemented by construction system, It is characterized in that, the construction system includes lifting module, detection module, adjustment module and welding module, and detection module includes Leica total station, ordinary level, supersonic detector and welding detection ruler.
3. the construction system of Wavelike steel webplate pc combined box beams prefabricated construction engineering method according to claim 2, feature exist In the welding module includes dioxo gas protection welding machine, DC welder, gouge and oxygen cutting gun, and it includes gantry to lift module It hangs, steel wire rope, autocrane.
4. the construction system of Wavelike steel webplate pc combined box beams prefabricated construction engineering method according to claim 2, feature exist In the adjustment system includes hydraulic jack and chain block, and hydraulic jack is connected with switch, and switch is connected with electricity Brain.
5. the Wavelike steel webplate scene of Wavelike steel webplate pc combined box beams prefabricated construction engineering method according to claim 1 is spliced Method, include the following steps:
S1:Wavelike steel webplate coarse positioning, when installing web, flange plate dropping place is on nose girder top pushing platform, and then crane is put down gently, root Longitudinal direction and transverse direction and the vertical elevation for finely tuning Wavelike steel webplate using jack and crowbar according to live absolute altitude and design position, When lifting, the mode that steel wire rope and bottle gouard moved by hands can be used adjusts the angle carry out coarse positioning, and elevation location is given according to teams and groups are measured Absolute altitude and rule of thumb sinking is adjusted;
S2:Steel web is accurately positioned, and after web is thick in place, is fixed with interim diagonal brace, and measures whether elevation accords with design altitude It closes, cushioning steel plate, which is soldered to, when not meeting meets design altitude, then carries out dropping place processing, skew web plate is after Bottom Altitude qualification Interim diagonal brace top is adjusted, to adjust steel web angle to design requirement is met, after dropping place, steel web is carried out and fixes, And reinforcing bar is set and is welded with bottom plate connector, prevent disturbance from steel web being caused to conjugate, lifting web is accurately in place, between web Temporary support is set to ensure the accurate positioning of steel web;
S3:Vertically and horizontally position adjusts, and absolute altitude is adjusted using bottle gouard moved by hands in steel web, with upper and lower adjustable cross-brace fine tuning steel web position Set with it is linear, horizontal drawings reinforcing bar and the reinforcement lumps of wood then are set on web top every 5m, each block of steel web is accurately adjusted To layout design position, dropping place after steel web is fixed;
S4:Installation is checked and accepted, and after steel web positions self-test qualification, precision requires to control according to following, and Supervision engineering is submitted a report asking for after qualified Teacher checks and accepts as required, and next procedure construction can be carried out after acceptance(check).
CN201810106645.1A 2018-02-02 2018-02-02 Wavelike steel webplate pc combined box beam prefabricated construction engineering methods Pending CN108487037A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810106645.1A CN108487037A (en) 2018-02-02 2018-02-02 Wavelike steel webplate pc combined box beam prefabricated construction engineering methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810106645.1A CN108487037A (en) 2018-02-02 2018-02-02 Wavelike steel webplate pc combined box beam prefabricated construction engineering methods

Publications (1)

Publication Number Publication Date
CN108487037A true CN108487037A (en) 2018-09-04

Family

ID=63344500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810106645.1A Pending CN108487037A (en) 2018-02-02 2018-02-02 Wavelike steel webplate pc combined box beam prefabricated construction engineering methods

Country Status (1)

Country Link
CN (1) CN108487037A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110653918A (en) * 2019-09-26 2020-01-07 中交一公局第六工程有限公司 Construction method for synchronously pouring large-span corrugated steel inclined web precast beam with toothed block on top and bottom plates by post-tensioning method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201202084Y (en) * 2008-06-03 2009-03-04 万水 Corrugated steel web-prestressed concrete combined box grinder subsection
JP2010163790A (en) * 2009-01-15 2010-07-29 Ps Mitsubishi Construction Co Ltd Prestressed concrete box girder with struts
KR20130088246A (en) * 2012-01-31 2013-08-08 권희재 Connecting structure of corrugated steel plate web-psc composite girder
CN107237252A (en) * 2017-06-21 2017-10-10 东南大学 A kind of combined box beam and its construction method
CN107245934A (en) * 2017-07-31 2017-10-13 哈尔滨工业大学 A kind of assembled steel profiled sheet concrete combined board small box girder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201202084Y (en) * 2008-06-03 2009-03-04 万水 Corrugated steel web-prestressed concrete combined box grinder subsection
JP2010163790A (en) * 2009-01-15 2010-07-29 Ps Mitsubishi Construction Co Ltd Prestressed concrete box girder with struts
KR20130088246A (en) * 2012-01-31 2013-08-08 권희재 Connecting structure of corrugated steel plate web-psc composite girder
CN107237252A (en) * 2017-06-21 2017-10-10 东南大学 A kind of combined box beam and its construction method
CN107245934A (en) * 2017-07-31 2017-10-13 哈尔滨工业大学 A kind of assembled steel profiled sheet concrete combined board small box girder

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘利军: "景家湾大桥波形钢腹板PC组合箱梁施工关键技术研究", 《公路》 *
朱晓明: "郑州市陇海路高架桥波形钢腹板施工关键技术", 《中外企业家》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110653918A (en) * 2019-09-26 2020-01-07 中交一公局第六工程有限公司 Construction method for synchronously pouring large-span corrugated steel inclined web precast beam with toothed block on top and bottom plates by post-tensioning method
CN110653918B (en) * 2019-09-26 2021-08-10 中交一公局第六工程有限公司 Construction method for synchronously pouring large-span corrugated steel inclined web precast beam with toothed block on top and bottom plates by post-tensioning method

Similar Documents

Publication Publication Date Title
CN109056548B (en) Steel arch construction method
CN108960621B (en) Bridge monitoring and evaluating method for passing through high-speed rail bridge under shield tunnel construction
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN106192769B (en) High pier slding form operation verticality control device and its application method
CN109457615A (en) A kind of construction method of installation of abnormity bowstring arch bridge arch ring
CN112060307A (en) Segment box girder short line matching control and prefabricating construction method
CN206090317U (en) High pier slip form construction perpendicularity control device
CN102888998A (en) Method and structure for lifting supporting steel column
CN214740055U (en) High-precision verticality adjusting device for steel pipe column
CN107489199A (en) Space Reticulated dome expands lifting construction method by ring
CN111254835A (en) Continuous matching construction method for steel box girder segments in factory
CN103437279A (en) Overhead cast-in-place box beam pressure-bearing strut and construction technology thereof
CN113463768A (en) 120 m-span prestressed triangular steel pipe truss girder construction method
CN110439301A (en) A kind of construction method that can precisely adjust angle tilt steel core concrete column and annular girder
CN102704413B (en) Construction method for jacking arch bridge
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN106223623A (en) Steel construction box arched roof truss installation method
CN215760673U (en) Temporary supporting structure for shuttle-shaped column
CN112342923A (en) Construction line type control technology for large-span ultra-wide steel box girder bridge
CN108487037A (en) Wavelike steel webplate pc combined box beam prefabricated construction engineering methods
CN110029585A (en) A kind of device and application method for precast segment assembly straight bridge alignment control
CN106400675B (en) A kind of steel anchor box and its installation method
CN218928178U (en) Short line method segment beam prefabrication system
CN102877657B (en) Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method
CN102279017A (en) Method and system for monitoring stability of midboard of highway multi-arch tunnel and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180904