CN108483238A - A kind of building bar cage boom hoisting and its application method - Google Patents

A kind of building bar cage boom hoisting and its application method Download PDF

Info

Publication number
CN108483238A
CN108483238A CN201810159061.0A CN201810159061A CN108483238A CN 108483238 A CN108483238 A CN 108483238A CN 201810159061 A CN201810159061 A CN 201810159061A CN 108483238 A CN108483238 A CN 108483238A
Authority
CN
China
Prior art keywords
block
hook
bar
boom hoisting
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810159061.0A
Other languages
Chinese (zh)
Inventor
周涛
罗斌
郑海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haining Ding He Engineering Technology Development Co Ltd
Original Assignee
Haining Ding He Engineering Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haining Ding He Engineering Technology Development Co Ltd filed Critical Haining Ding He Engineering Technology Development Co Ltd
Priority to CN201810159061.0A priority Critical patent/CN108483238A/en
Publication of CN108483238A publication Critical patent/CN108483238A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/34Crane hooks
    • B66C1/36Crane hooks with means, e.g. spring-biased detents, for preventing inadvertent disengagement of loads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Abstract

A kind of building bar cage boom hoisting of present invention offer and its application method, including hook, hoist block, even hanging block, the hook top is provided with bar, the hook is provided with fixed block far from the bar side, it is provided with round pin in the middle part of the fixed block, the round pin side is provided with pin, it is provided with connecting rod at the top of the hook, the connecting rod is provided with the even hanging block far from described hook one end, it is provided with fastening screw in the middle part of the even hanging block, the hoist block is internally provided with groove, it is provided with the fastening screw in the middle part of the hoist block, the hoist block upper surface is provided with bearing bar, the bearing bar is provided with hanging ring far from described hoist block one end.The reinforcement for architecture cage boom hoisting prevents steel reinforcement cage to be swung left and right because of the rotation of hook during lifting using the hook and the connecting rod integrated design, and steel reinforcement cage is avoided to be collided with foreign object.

Description

A kind of building bar cage boom hoisting and its application method
Technical field
The present invention relates to building field, specially a kind of building bar cage boom hoisting and its application method.
Background technology
In recent years, due to the rapid development of China's economy, each regional architecture engineering project is also at development like a raging fire Among state, and build height and scale also to higher and higher and more and more huger development, this is higher to require construction Technology and construction quality.In bridges and culverts or high-building construction, drive piles according to requiring to may require basis, method is to use Drilled using machine punching and water mill, and hole depth reaches design requirement, then transfer steel reinforcement cage to stake holes, be inserted into conduit into Row concrete is poured into a mould.Steel reinforcement cage primarily function is similarly, mainly to play drawing-resistant function, coagulation with the stress of pillar longitudinal reinforcement The compression strength of soil is high but tensile strength is very low.Steel reinforcement cage plays the role of constraint to pile concrete, makes it to bear one Fixed horizontal force.
Existing reinforcement cage hoisting technology mostly uses welding hanging ring, and traditional welding hanging ring is required for every time according to the practical feelings in scene Condition calculates hanging ring length and carries out welding hanging ring, and using needing to cut off hanging ring from steel reinforcement cage after primary, process is very cumbersome, shadow Working efficiency is rung, the working time is wasted.
Invention content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of building bar cage boom hoisting and its application method, It solves existing reinforcement cage hoisting technology mentioned above and mostly uses welding hanging ring, traditional welding hanging ring is required for every time according to existing Actual conditions calculate hanging ring length, carry out welding hanging ring, and using needing to cut off hanging ring from steel reinforcement cage after primary, process is non- Often it is cumbersome, waste the working time the problem of.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of building bar cage lifting It sets and its application method, including hook, hoist block, even hanging block, the hook top is provided with bar, and the hook is far from described in Bar side is provided with fixed block, is provided with round pin in the middle part of the fixed block, the round pin side is provided with pin, the hook Top is provided with connecting rod, and the connecting rod is provided with the even hanging block far from described hook one end, is set in the middle part of the even hanging block It is equipped with fastening screw, the hoist block is internally provided with groove, is provided with the fastening screw in the middle part of the hoist block, described Hanging block upper surface is provided with bearing bar, and the bearing bar is provided with hanging ring far from described hoist block one end.
In order to further increase the effect of muscle cage lifting, the fixed block and the welding hook, the round pin with it is described Fixed block is slidably connected.
In order to further increase the effect of muscle cage lifting, the pin and the round pin grafting, the bar and the extension Hook is hinged.
In order to further increase the effect of muscle cage lifting, the connecting rod and the welding hook, even hanging block and the institute State connecting rod welding.
In order to further increase the effect of muscle cage lifting, the groove takes shape in inside the hoist block, the fastening spiral shell Bar is bolted with the hoist block.
In order to further increase the effect of muscle cage lifting, the bearing bar and the lifting block welding, the hanging ring and institute State bearing bar welding.
In order to further increase the effect of muscle cage lifting, the even hanging block is slidably connected with the groove, the fastening spiral shell Bar is bolted with the even hanging block.In order to further increase safe effect, the invention also includes overload current open circuit protection dresses It sets, including mounting base (1), mounting hole (2) is offered on the mounting base (1), mounting base is equipped with damping at the top of (1) (17), the damping (17) is connected with mounting plate (7), the top difference of the mounting plate (7) by clamping mechanism (18) High-pressure vacuum breaker (10), overload monitoring device (22) are installed, the damping (17) includes damper (3), damping Device (3) is mounted on the top of mounting base (1), and the end of the damper (3) is fixed with cushion socket (4), and cushion socket (4) passes through card Connection mechanism (18) is clamped with mounting plate (7), and the clamping mechanism (18) includes card slot (5) and buckle (6), and card slot (5) is opened in On cushion socket (4), the buckle (6) is fixed on mounting plate (7), buckle (6) and card slot (5) snapping, the contact abrasion degree Monitoring device (19) includes reflectoscope (9), and reflectoscope (9) is mounted on the side of high-pressure vacuum breaker (10), and The side of reflectoscope (9) is equipped with alarm (8), and the vacuum degree monitoring device (20) includes vacuum degree measuring instrument (11), vacuum degree measuring instrument (11) is mounted on the side of high-pressure vacuum breaker (10), and the top of vacuum degree measuring instrument (11) Indicator light (12) is installed.The invention also includes lifting charging unit, the lower surface of bottom plate (B2) is upper with pedestal (B1) outer wall Surface is connected, and the upper surface of the bottom plate (B2) is equipped with brace (B5), lower surface and the bottom plate (B2) of the brace (B5) Upper surface is connected, and the right side of the bottom plate (B2) is equipped with fixed corner code (B6), the lower surface of the fixed corner code (B6) and bottom plate (B2) upper surface is connected, and the inner wall of the fixed corner code (B6) is equipped with brace (B4), the outer wall of the brace (B4) with it is solid The inner wall for determining corner brace (B6) is movably connected, and the outer wall of the inner wall and brace (B5) of the brace (B4) is movably connected, the brace (B5) inserted link (B8) is installed, the inner wall of the outer wall and brace (B5) of the inserted link (B8) is movably connected, described between inner wall The outer wall top of brace (B5) is equipped with shaft (B10), and the inner wall of the shaft (B10) is connected with the outer wall of brace (B5), institute The outer wall for stating shaft (B10) is equipped with pedestal (B9), and inner wall and shaft (B10) outer wall of the pedestal (B9) are movably connected, institute The top for stating strut (B4) is equipped with axis pin (B7), and the inner wall of the outer wall and brace (B5) of the axis pin (B7) is movably connected, described The upper surface of pedestal (B9) is equipped with ontology (B13), and the lower surface of the ontology (B13) is connected with the upper surface of pedestal (B9), Be connected with the upper surface of fixed corner code (B6) outer right wall of the ontology (B13) of the lower surface of the ontology (B13) is equipped with The left side outer wall of link (B11), the link (B11) is connected with the outer right wall of ontology (B13).
(3) advantageous effect
The present invention provides a kind of building bar cage boom hoisting and its application methods, have following advantageous effect:
1, the reinforcement for architecture cage boom hoisting prevents steel reinforcement cage using the hook and the connecting rod integrated design It is swung left and right because of the rotation of hook during lifting, steel reinforcement cage is avoided to be collided with foreign object.
2, the reinforcement for architecture cage boom hoisting, by the way that the bar is arranged, steel reinforcement cage is hung on the hook, and bar can be with It prevents steel reinforcement cage from being slid from the hook during lifting, avoids causing safety accident.
3, the reinforcement for architecture cage boom hoisting, by the way that the even hanging block is arranged, the even hanging block passes through with the hoist block The fastening screw connection, convenient disassembly save the working time, improve working efficiency.
The reinforcement for architecture cage boom hoisting, by the way that the groove is arranged, the groove takes shape in inside the hoist block, institute The company's of stating hanging block is put into the groove and is closely connect with the hoist block, improves bearing capacity.By clamping mechanism to damping machine Structure is assembled with mounting plate, easy for assemble or unload, convenient for being maintained or replaced to high-pressure vacuum breaker;
The vacuum degree inside high-pressure vacuum breaker is monitored by vacuum degree monitoring device, is adjusted and is filled by temperature It sets and the operating temperature of high-pressure vacuum breaker is adjusted, monitoring is accurate, easy to adjust, and it is disconnected to substantially increase high pressure vacuum The safety in utilization of road device.It overcomes existing modified form lifting charging pile and carries out touch screen by line stretcher and foot-operated head cover The adjusting of lifting and charging processing, the single disadvantage of utility function improve the charge efficiency of modified form lifting charging pile and make With the service life, avoids foot-operated head cover and the connection for the pile body that charges is unstable, it is very inconvenient using line stretcher in charging process, and And line stretcher will appear the case where tangled up and knotted.
4, the reinforcement for architecture cage boom hoisting, by being arranged the round pin, the round pin is by the bar and the fixation Block links together, and the pin is inserted into the round pin, convenient and efficient, improves security performance.
Description of the drawings
Fig. 1 is the structural schematic diagram of apparatus of the present invention;
Fig. 2 is the front view of apparatus of the present invention hoist block;
Fig. 3 is the front view of apparatus of the present invention round pin;
Fig. 4 is overload current broken circuit protecting equipment of the present invention;
Fig. 5 is present invention lifting charging unit.
In figure:A01 hooks, A02 fixed blocks, A03 round pins, A04 bars, A05 connecting rods, A06 connect hanging block, A07 hoist blocks, A08 fastening screws, A09 bearing bars, A10 hanging rings, A11 grooves, A12 pins, 1 mounting base, 2 mounting holes, 3 dampers, 4 dampings Seat, 5 card slots, 6 buckles, 7 mounting plates, 8 alarms, 9 reflectoscopes, 10 high-pressure vacuum breakers, 11 vacuum degree measuring instruments, 12 Indicator light, 13 temperature sensors, 14 thermoregulators, 15 current detecting instruments, 16 voltage monitoring instruments, 17 dampings, 18 clampings Mechanism, 19 contact abrasion degree monitoring devices, 20 vacuum degree monitoring devices, 21 temperature-adjusting devices, 22 overload monitoring devices, B1, Pedestal, B2, bottom plate, B3, crawler belt, B4, strut, B5, brace, B6, fixed corner code, B7, axis pin, B8, inserted link, B9, pedestal, B10, Shaft, B11, link, B12, hook, B13, ontology.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1-Figure 3, a kind of building bar cage boom hoisting, including hook A01, hoist block A07, even hanging block The top A06, hook A01 is provided with bar A04, and hook A01 is provided with fixed block A02, fixed block A02 far from the sides bar A04 Middle part is provided with round pin A03, and the sides round pin A03 are provided with pin A12, connecting rod A05, connecting rod are provided at the top of hook A01 A05 is provided with even hanging block A06 far from the one end hook A01, connects and is provided with fastening screw A08 in the middle part of hanging block A06, in hoist block A07 Fluted A11 is arranged in portion, is provided with fastening screw A08 in the middle part of hoist block A07, the upper surfaces hoist block A07 are provided with bearing bar A09, bearing bar A09 are provided with hanging ring A10 far from the one end hoist block A07.The invention also includes lifting charging unit, bottom plates (B2) Lower surface be connected with the upper surface of pedestal (B1) outer wall, the upper surface of the bottom plate (B2) is equipped with brace (B5), it is described tiltedly The lower surface of bar (B5) is connected with the upper surface of bottom plate (B2), and the right side of the bottom plate (B2) is equipped with fixed corner code (B6), described The lower surface of fixed corner code (B6) is connected with the upper surface of bottom plate (B2), and the inner wall of the fixed corner code (B6) is equipped with brace (B4), the inner wall of the outer wall and fixed corner code (B6) of the brace (B4) is movably connected, the inner wall and brace of the brace (B4) (B5) outer wall is movably connected, and is equipped with inserted link (B8) between the inner wall of the brace (B5), the outer wall of the inserted link (B8) with The inner wall of brace (B5) is movably connected, and the outer wall top of the brace (B5) is equipped with shaft (B10), the shaft (B10) Inner wall is connected with the outer wall of brace (B5), and the outer wall of the shaft (B10) is equipped with pedestal (B9), the inner wall of the pedestal (B9) Be movably connected with shaft (B10) outer wall, the top of the strut (B4) is equipped with axis pin (B7), the outer wall of the axis pin (B7) with tiltedly The inner wall of bar (B5) is movably connected, and the upper surface of the pedestal (B9) is equipped with ontology (B13), the following table of the ontology (B13) Face is connected with the upper surface of pedestal (B9), and the lower surface of the ontology (B13) is connected described with the upper surface of fixed corner code (B6) The outer right wall of ontology (B13) is equipped with link (B11), the left side outer wall of the link (B11) with outside the right side of ontology (B13) Wall is connected.
Concrete principle:First, steel wire rope hanging ring A10 is penetrated to fix, steel reinforcement cage is hung on hook A01, bar A04 with it is solid Determine block A02 to fix by round pin A03, pin A12 is inserted into round pin A03, prevents steel reinforcement cage from sliding during lifting and causes safety Even hanging block A06 is put into groove A11 by accident, and fastening screw A08 penetrates even hanging block A06 and hoist block A07 and is fixed, reinforcing bar Fastening screw A08 is unclamped after the completion of cage lifting, even hanging block A06 exits groove A11, pulls out pin A12, round pin A03 is exited solid Determine block A02 and bar A04, hook A01 is detached from steel reinforcement cage.
In conclusion the reinforcement for architecture cage boom hoisting prevents steel using hook A01 and connecting rod A05 integrated designs Muscle cage is swung left and right during lifting because of the rotation of hook A01, and steel reinforcement cage is avoided to be collided with foreign object.
Secondly, by the way that bar A04 is arranged, steel reinforcement cage is hung on hook A01, and bar A04 can prevent steel reinforcement cage from lifting by crane It is slid from hook A01 in the process, avoids causing safety accident.
Also, by setting even hanging block A06, connects hanging block A06 and connect by fastening screw A08 with hoist block A07, dismounting side Just, the working time is saved, working efficiency is improved.
Also, by the way that groove A11 is arranged, groove A11 takes shape in inside hoist block A07, and even hanging block A06 is put into groove A11 In closely connect with hoist block A07, improve bearing capacity.
Also, by the way that round pin A03 is arranged, round pin A03 links together bar A04 and fixed block A02, and pin A12 is inserted Enter round pin A03, convenient and efficient, raising security performance.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of building bar cage boom hoisting, it is characterised in that:Including hook (A01), hoist block (A07), even hanging block (A06), described hook top (A01) is provided with bar (A04), and the hook (A01) is arranged far from the side the bar (A04) There is fixed block (A02), is provided with round pin (A03) in the middle part of the fixed block (A02), round pin (A03) side is provided with pin (A12), connecting rod (A05) is provided at the top of the hook (A01), the connecting rod (A05) is far from described hook one end (A01) It is provided with the even hanging block (A06), fastening screw (A08), the hoist block (A07) are provided in the middle part of the even hanging block (A06) It is internally provided with groove (A11), the fastening screw (A08), the hoist block are provided in the middle part of the hoist block (A07) (A07) upper surface is provided with bearing bar (A09), and the bearing bar (A09) is provided with hanging ring far from the one end the hoist block (A07) (A10)。
2. a kind of building bar cage boom hoisting according to claim 1, it is characterised in that:The fixed block (A02) It is welded with the hook (A01), the round pin (A03) is slidably connected with the fixed block (A02).
3. a kind of building bar cage boom hoisting according to claim 1, it is characterised in that:The pin (A12) with Round pin (A03) grafting, the bar (A04) are hinged with the hook (A01).
4. a kind of building bar cage boom hoisting according to claim 1, it is characterised in that:The connecting rod (A05) It is welded with the hook (A01), the even hanging block (A06) is welded with the connecting rod (A05).
5. a kind of building bar cage boom hoisting according to claim 1, it is characterised in that:The groove (A11) at Type is internal in the hoist block (A07), and the fastening screw (A08) is bolted with the hoist block (A07).
6. a kind of building bar cage boom hoisting according to claim 1, it is characterised in that:The bearing bar (A09) It is welded with the hoist block (A07), the hanging ring (A10) is welded with the bearing bar (A09).
7. a kind of building bar cage boom hoisting according to claim 1, it is characterised in that:The even hanging block (A06) It is slidably connected with the groove (A11), the fastening screw (A08) is bolted with the even hanging block (A06).
8. a kind of application method of building bar cage boom hoisting, it is characterised in that:First, steel wire rope is penetrated into the hanging ring (A10) fixed, steel reinforcement cage is hung on the hook (A01), and the bar (A04) passes through the circle with the fixed block (A02) It sells (A03) to fix, the pin (A12) is inserted into the round pin (A03), prevents steel reinforcement cage from sliding during lifting and causes safety The even hanging block (A06) is put into the groove (A11) by accident, and the fastening screw (A08) penetrates the even hanging block (A06) It is fixed with the hoist block (A07), the fastening screw (A08), the even hanging block is unclamped after the completion of reinforcement cage hoisting (A06) exit the groove (A11), pull out the pin (A12), by the round pin (A03) exit the fixed block (A02) and The bar (A04), the hook (A01) are detached from steel reinforcement cage.
CN201810159061.0A 2018-02-26 2018-02-26 A kind of building bar cage boom hoisting and its application method Withdrawn CN108483238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810159061.0A CN108483238A (en) 2018-02-26 2018-02-26 A kind of building bar cage boom hoisting and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810159061.0A CN108483238A (en) 2018-02-26 2018-02-26 A kind of building bar cage boom hoisting and its application method

Publications (1)

Publication Number Publication Date
CN108483238A true CN108483238A (en) 2018-09-04

Family

ID=63340611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810159061.0A Withdrawn CN108483238A (en) 2018-02-26 2018-02-26 A kind of building bar cage boom hoisting and its application method

Country Status (1)

Country Link
CN (1) CN108483238A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1932480C2 (en) * 1969-06-26 1982-09-09 Fritz 6685 Schiffweiler Leh Cable block with brake - has sprung locking bolt engaging slotted brake disc, with pull ring operable to release roller
CN206359116U (en) * 2016-12-06 2017-07-28 池州市三力精工机械有限公司 A kind of special hook of anti-rotation type chain block
CN206705511U (en) * 2017-05-10 2017-12-05 象山杰尔德智能科技有限公司 A kind of hardware suspending connecting device
CN207330131U (en) * 2017-07-18 2018-05-08 青岛顺泰钢结构工程有限公司 H profile steel structure suspension hook

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1932480C2 (en) * 1969-06-26 1982-09-09 Fritz 6685 Schiffweiler Leh Cable block with brake - has sprung locking bolt engaging slotted brake disc, with pull ring operable to release roller
CN206359116U (en) * 2016-12-06 2017-07-28 池州市三力精工机械有限公司 A kind of special hook of anti-rotation type chain block
CN206705511U (en) * 2017-05-10 2017-12-05 象山杰尔德智能科技有限公司 A kind of hardware suspending connecting device
CN207330131U (en) * 2017-07-18 2018-05-08 青岛顺泰钢结构工程有限公司 H profile steel structure suspension hook

Similar Documents

Publication Publication Date Title
CN108483238A (en) A kind of building bar cage boom hoisting and its application method
CN204953094U (en) Novel jaw breaker monitoring system based on power line carrier
CN113668563A (en) Shallow foundation pit wall protection device and operation method
CN207079899U (en) A kind of construction coherent-wall scaffolding suspending apparatus
CN108502717A (en) A kind of reinforcement for architecture cage lifting robot and its application method
CN207374526U (en) Balance weight assembly before a kind of tractor
CN215104705U (en) A device that falls is prevented in construction for municipal bridge engineering
CN214940232U (en) Electric power tunnel formwork mounting structure
CN210665775U (en) From rectilinear current meter monitoring mount
CN211004171U (en) Steel reinforced concrete beam hanger dismounting device
CN103091021B (en) Device used for monitoring load of B 7 bolt in hydraulic automatic jumping formwork
CN208872443U (en) A kind of civil engineering prestressing force measuring device
CN113089501A (en) Self-locking type profile steel support frame for large cantilever bent cap construction
CN215107466U (en) Platform of unloading with overload early warning system
CN220789441U (en) Prepressing device of bridge girder erection machine
CN212801646U (en) Self-propelled bottom plate side form device
CN211419369U (en) A load detection device for tower crane
CN218708564U (en) Self-weighing tower crane hook
CN213265329U (en) Generator magnetic pole lifting device
CN216841414U (en) Climbing ladder for maintenance of water conservancy pump station unit
CN214993642U (en) Arresting grid for irrigation canal
CN211855290U (en) Bridge settlement detection device
CN104860209B (en) Movable arm tower crane height space-variant arm method
CN213476640U (en) Hanging basket for T-shaped beam construction
CN216277268U (en) Building construction safety monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180904