CN108479896A - A kind of building corrugation crushing equipment - Google Patents

A kind of building corrugation crushing equipment Download PDF

Info

Publication number
CN108479896A
CN108479896A CN201810178170.7A CN201810178170A CN108479896A CN 108479896 A CN108479896 A CN 108479896A CN 201810178170 A CN201810178170 A CN 201810178170A CN 108479896 A CN108479896 A CN 108479896A
Authority
CN
China
Prior art keywords
shaft
strut
block
corrugation
bearing seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810178170.7A
Other languages
Chinese (zh)
Other versions
CN108479896B (en
Inventor
邹宗春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yang Songmei
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810178170.7A priority Critical patent/CN108479896B/en
Publication of CN108479896A publication Critical patent/CN108479896A/en
Application granted granted Critical
Publication of CN108479896B publication Critical patent/CN108479896B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Transmission Devices (AREA)
  • Crushing And Pulverization Processes (AREA)

Abstract

The present invention relates to a kind of crushing equipment more particularly to a kind of building corrugation to crush equipment.The technical problem to be solved in the present invention is to provide one kind can corrugation is broken, broken comprehensive building corrugation crushing equipment.The present invention provides such a building corrugations to crush equipment, includes bottom plate, the first strut, first rotating shaft etc.;Left and right side is equipped with the first strut at the top of bottom plate, and the first strut top is connected with first bearing seat, is equipped with first rotating shaft in first bearing seat, first rotating shaft left part and right part are equipped with the first cam, and first rotating shaft right end is connected with the first hammer gear.Invention achieves can be crushed corrugation, be crushed comprehensive effect, the present invention is moved up to move down with pressing plate and convex block by framework and be matched, more preferably the corrugation in framework can be crushed faster, before each pressing plate and convex block are crushed corrugation, framework is shaken, so that the corrugation distribution in framework is evenly so that corrugation is broken more comprehensively.

Description

A kind of building corrugation crushing equipment
Technical field
The present invention relates to a kind of crushing equipment more particularly to a kind of building corrugation to crush equipment.
Background technology
Corrugation is the structure type of construction material, watt Gansu Province.It can be made by a variety of special materials.Multi-purpose aluminum, for anti-corrosion, Heat preservation.The size of corrugation is divided into:A, five type of B, C, E, F.Bad corrugation can be used for repairing road, directly by bad corrugation Be layered on road, then vehicle allowed directly to crush, this mode not can know that the amount for needing corrugation not only, but also open in vehicle it is out-of-date, Also it has corrugation to splash, leads to the generation of safety accident.
To sum up, research and development one kind is needed corrugation is broken, broken can comprehensively to build corrugation crushing equipment at present, to overcome Road directly is filled up using corrugation in the prior art, corrugation is caused to splash the shortcomings that safety accident occurs.
Invention content
(1)Technical problems to be solved
The present invention directly fills up road using corrugation in the prior art in order to overcome, and causes corrugation to splash and lacking for safety accident occurs Point, the technical problem to be solved in the present invention is to provide one kind can corrugation is broken, broken comprehensive building corrugation crushing equipment.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a building corrugations to crush equipment, includes bottom plate, first Strut, first bearing seat, first rotating shaft, the first cam, the first hammer gear, the first sliding rail, L-shaped sliding block, placing frame, framework, branch Frame, second bearing seat, the second shaft, the first belt pulley, second bevel gear, two-groove belt pulley, the first flat belt, mounting plate, electricity Machine, third shaft, the second belt pulley, the second flat belt, disk, annulus, the first guide rail, the first guide block, connecting rod, second Bar, the second sliding rail, the second sliding block, the second guide rail, the second guide block, third strut, pressing plate and convex block, bottom plate top left and right side It is equipped with the first strut, the first strut top is connected with first bearing seat, first rotating shaft, first rotating shaft are equipped in first bearing seat Left part and right part are equipped with the first cam, and first rotating shaft right end is connected with the first hammer gear, and bottom plate top left side is equipped with first and slides Rail, slidingtype is connected with L-shaped sliding block on the first sliding rail, and L-shaped slider top is connected with placing frame, framework is placed in placing frame, Bottom plate top right side is equipped with holder, and holder left lower and top is equipped with second bearing seat, and the is equipped in second bearing seat The second shaft middle part of two shafts, lower part is equipped with the first belt pulley, and the second shaft front end of lower part is connected with second bevel gear, the One hammer gear is engaged with second bevel gear, and the second shaft front end on top is connected with two-groove belt pulley, two-groove belt pulley and first The first flat belt is wound between belt pulley, the holder left upper portion on rear side of the second bearing seat on top is equipped with mounting plate, mounting plate Front side left part is equipped with motor, and third shaft is connected on the output shaft on front side of motor, the second belt is equipped in the middle part of third shaft Wheel is wound with the second flat belt between the second belt pulley and two-groove belt pulley, third shaft front end is connected with disk, and disk periphery is slided Dynamic formula is connected with annulus, and annulus coordinates with disk, and annulus left upper portion is equipped with the first guide rail, and the first guide rail inner sliding type is connected with First guide block, the first guide block and the first guide rail coordinate, and eccentric position is connected with connecting rod, connecting rod left end rotary type on front side of disk Be connected on the first guide block, holder left upper portion be equipped with two second struts, the second strut on front side of the second bearing seat on top, Second strut left end is connected with the second sliding rail, and the second sliding rail slidingtype is connected with the second sliding block, and the is connected on the left of the second sliding block Two guide rails, the second guide rail inner sliding type are connected with the second guide block, and the second guide block and the second guide rail coordinate, rotation on rear side of the second guide block Formula is connected on front side of the first guide block, and the second guide rail bottom left and right side are equipped with third strut, and third strut bottom end is connected with Pressing plate, for pressing plate above framework, pressing plate bottom is equipped with convex block.
Preferably, further include having shaking device, holder, which is equipped with, shakes device, and it includes the first spring, the to shake device One baffle, the 4th shaft, the second cam, third hand tap gear, the 4th bevel gear, the 4th strut and 3rd bearing seat, framework left wall Inside upper part and lower part are respectively connected with the first spring, and the first spring right end is connected with first baffle, and holder left lower is equipped with the Four struts, the 4th strut left end are connected with 3rd bearing seat, are equipped with the 4th shaft in 3rd bearing seat, placing frame lower wall right part is opened There is a first through hole, the 4th shaft passes through first through hole, and the 4th shaft top is equipped with the second cam, and the 4th shaft bottom end is connected with the Third hand tap gear, first rotating shaft right part are equipped with the 4th bevel gear, and the 4th bevel gear engages with third hand tap gear.
Preferably, further include having wheel, bottom is provided with race in placing frame, and framework bottom is equipped with wheel, and wheel is being taken turns In slot.
Preferably, further include having hinge, second baffle, bracing wire and plug, placing frame lower wall top left side is turned by hinge Dynamic formula is connected with second baffle, and second baffle top center is provided with the second through-hole, and it is recessed that placing frame lower wall top left side is provided with first Slot, for the first groove below the second through-hole, second baffle left upper portion is connected with bracing wire, and end of pulling is connected with plug, plug It is inserted into the second through-hole and the first groove.
Preferably, further include having second spring and block, be provided with the second groove at the top of the first sliding rail, bottom in the second groove It is connected with second spring, second spring top is connected with block.
Operation principle:When needing to carry out the crushing of corrugation using the equipment, user will need the corrugation crushed to be placed on In framework, then user's control motor rotates counterclockwise, and third shaft is driven to rotate counterclockwise, and then disc counter-clockwise is driven to turn It is dynamic, to drive connecting rod to rotate counterclockwise so that the first guide block rotates counterclockwise, and drives the second guide block to move down, in turn The second guide rail is driven to move down, to drive third strut to move down so that pressing plate and convex block move down, pressing plate and convex Block is moved down into when being contacted with the corrugation in framework, and pressing plate and convex block crush the corrugation in framework, in third shaft When rotating counterclockwise, the second pulley rotation is driven, and then drives the rotation of the second flat belt, to drive two-groove belt pulley to turn It is dynamic so that the first flat belt rotates, and drives the first pulley rotation, and then drives the rotation of the second shaft, to drive the second cone Gear rotates so that first rotating shaft rotates, and the first cam is driven to be rotated up, and the first cam is turned to be contacted with placement frame bottom When, push placing frame to move up, and then framework is driven to move up, framework is moved up moves down phase with pressing plate and convex block Cooperation can more preferably faster crush the corrugation in framework.When pressing plate and convex block stopping move down, user's control motor It rotates clockwise, third shaft is driven to rotate clockwise, and then disk is driven to rotate clockwise, to drive connecting rod clockwise Rotation so that the first guide block rotates clockwise, and the second guide block is driven to move up, and then the second guide rail is driven to move up, from And third strut is driven to move up so that pressing plate and convex block move up, when pressing plate and convex block move up reset, while Three shafts rotate clockwise, and the first cam is driven to rotate down reset, and placing frame and thereon device are under the effect of gravity to moving down It is dynamic to reset.Then user controls motor and rotates counterclockwise again, repeatedly so that pressing plate and convex block constantly carry out corrugation Broken, after the corrugation in framework is broken, after pressing plate and convex block move up reset, user's control motor stops work Make, then takes the corrugation being crushed in framework away.
Because further including having shaking device, holder, which is equipped with, shakes device, and it includes the first spring, first gear to shake device Plate, the 4th shaft, the second cam, third hand tap gear, the 4th bevel gear, the 4th strut and 3rd bearing seat, framework left wall inside Upper and lower part is respectively connected with the first spring, and the first spring right end is connected with first baffle, and holder left lower is equipped with the 4th Bar, the 4th strut left end are connected with 3rd bearing seat, are equipped with the 4th shaft in 3rd bearing seat, and placing frame lower wall right part is provided with the One through-hole, the 4th shaft pass through first through hole, the 4th shaft top to be equipped with the second cam, and the 4th shaft bottom end is connected with third cone Gear, first rotating shaft right part are equipped with the 4th bevel gear, and the 4th bevel gear engages with third hand tap gear.So pressing plate and convex block to When lower movement is not contacted with the corrugation in framework, first rotating shaft rotation drives the rotation of the 4th bevel gear, and then drives triconodont Wheel rotation so that the 4th shaft rotates, and then drives the rotation of the second cam, and the second cam turns to when being contacted with framework, pushes Framework is moved to the left so that first baffle is moved to the left, and the first spring is compressed, and frame is left when the second cam distalmost end turns to Body, the elongation of the first spring drive first baffle to move right resets, and then drive framework moves right reset, repeatedly, Before each pressing plate and convex block are crushed corrugation, framework is shaken so that the corrugation distribution in framework is evenly so that Corrugation is broken more comprehensively.
Because further including having wheel, bottom is provided with race in placing frame, and framework bottom is equipped with wheel, and wheel is in race It is interior.So wheel and race are more steady when framework can be allowed to move left and right.
Because further including having hinge, second baffle, bracing wire and plug, placing frame lower wall top left side passes through hinge rotary type It is connected with second baffle, second baffle top center is provided with the second through-hole, and placing frame lower wall top left side is provided with the first groove, the For one groove below the second through-hole, second baffle left upper portion is connected with bracing wire, and end of pulling is connected with plug, and plug is inserted into the In two through-holes and the first groove.So when user needs to remove framework and takes the corrugation in it away, user is by plug from second It is extracted in through-hole and the first groove, then second baffle is rotated down and is laid, then removes framework, then user is by second Baffle is rotated up reset, and then user turns back to plug in the second through-hole and the first groove, and bracing wire can prevent plug from losing, Second baffle is laid, user can be facilitated to remove framework.
Because further including having second spring and block, the second groove is provided at the top of the first sliding rail, bottom connects in the second groove It is connected to second spring, second spring top is connected with block.So second spring and block rushing of can mitigating that placing frame falls Power is hit, equipment is preferably protected, improves the service life of equipment.
(3)Advantageous effect
Invention achieves can corrugation is broken, be crushed comprehensive effect, the present invention by framework move up with pressing plate and Convex block, which moves down, to be matched, and can more preferably faster be crushed the corrugation in framework, each pressing plate and convex block to corrugation into Before row is broken, framework is shaken so that the corrugation distribution in framework is evenly so that corrugation is broken more comprehensively.
Description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the first part main structure diagram of the present invention.
Fig. 3 is second of part main structure diagram of the present invention.
Fig. 4 is the third part main structure diagram of the present invention.
Fig. 5 is the 4th kind of part main structure diagram of the present invention.
Label in attached drawing be:1- bottom plates, the first struts of 2-, 3- first bearing seats, 4- first rotating shafts, the first cams of 5-, 6- first hammers gear, the first sliding rails of 7-, 8-L shape sliding blocks, 9- placing frames, 10- frameworks, 11- holders, 12- second bearing seats, 13- into shape Second shaft, the first belt pulleys of 14-, 15- second bevel gears, 16- two-groove belt pulleys, the first flat belts of 17-, 18- mounting plates, 19- motors, 20- third shafts, the second belt pulleys of 21-, the second flat belts of 22-, 23- disks, 24- annulus, the first guide rails of 25-, The first guide blocks of 26-, 27- connecting rods, the second struts of 28-, the second sliding rails of 29-, the second sliding blocks of 30-, the second guide rails of 31-, 32- second Guide block, 33- third struts, 34- pressing plates, 35- convex blocks, 36- shake device, the first springs of 361-, 362- first baffles, 363- the One through-hole, the 4th shafts of 364-, the second cams of 365-, 366- third hand tap gears, the 4th bevel gears of 367-, the 4th struts of 368-, 369- 3rd bearing seats, 37- races, 38- wheels, 39- hinges, 40- second baffles, the first grooves of 41-, the second through-holes of 42-, 43- bracing wires, 44- plugs, the second grooves of 45-, 46- second springs, 47- blocks.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of building corrugation crushing equipment includes as shown in Figs. 1-5 bottom plate 1, the first strut 2,3, first turns of first bearing seat Axis 4, the first cam 5, first hammer gear 6, the first sliding rail 7, L-shaped sliding block 8, placing frame 9, framework 10, holder 11, second bearing seat 12, the second shaft 13, the first belt pulley 14, second bevel gear 15, two-groove belt pulley 16, the first flat belt 17, mounting plate 18, electricity Machine 19, third shaft 20, the second belt pulley 21, the second flat belt 22, disk 23, annulus 24, the first guide rail 25, the first guide block 26, connecting rod 27, the second strut 28, the second sliding rail 29, the second sliding block 30, the second guide rail 31, the second guide block 32, third strut 33, pressing plate 34 and convex block 35,1 top left side of bottom plate and right side are equipped with the first strut 2, and 2 top of the first strut is connected with first Bearing block 3, is equipped with first rotating shaft 4 in first bearing seat 3, and 4 left part of first rotating shaft and right part are equipped with the first cam 5, first turn 4 right end of axis is connected with the first hammer gear 6, and 1 top left side of bottom plate is equipped with the first sliding rail 7, and slidingtype is connected with L on the first sliding rail 7 Shape sliding block 8,8 top of L-shaped sliding block are connected with placing frame 9, framework 10 are placed in placing frame 9, and 1 top right side of bottom plate is equipped with holder 11,11 left lower of holder and top are equipped with second bearing seat 12, and the second shaft 13, lower part are equipped in second bearing seat 12 The middle part of the second shaft 13 be equipped with the first belt pulley 14,13 front end of the second shaft of lower part is connected with second bevel gear 15, first Hammer gear 6 is engaged with second bevel gear 15, and 13 front end of the second shaft on top is connected with two-groove belt pulley 16, two-groove belt pulley 16 The first flat belt 17 is wound between the first belt pulley 14,11 left upper portion of holder of 12 rear side of second bearing seat on top is equipped with Mounting plate 18,18 front side left part of mounting plate are equipped with motor 19, third shaft 20 are connected on the output shaft of 19 front side of motor, the Three shafts, 20 middle part is equipped with the second belt pulley 21, and the second flat belt 22 is wound between the second belt pulley 21 and two-groove belt pulley 16, 20 front end of third shaft is connected with disk 23, and 23 slid formula of disk is connected with annulus 24, and annulus 24 coordinates with disk 23, circle 24 left upper portion of ring is equipped with the first guide rail 25, and 25 inner sliding type of the first guide rail is connected with the first guide block 26, the first guide block 26 and the One guide rail 25 coordinates, and 23 front side eccentric position of disk is connected with connecting rod 27, and 27 left end rotary type of connecting rod is connected to first and leads On block 26,11 left upper portion of holder is equipped with two second struts 28, and the second strut 28 is in the front side of second bearing seat 12 on top, and the Two struts, 28 left end is connected with the second sliding rail 29, and 29 slidingtype of the second sliding rail is connected with the second sliding block 30,30 left side of the second sliding block It is connected with the second guide rail 31,31 inner sliding type of the second guide rail is connected with the second guide block 32, and the second guide block 32 is matched with the second guide rail 31 It closes, 32 rear side rotary type of the second guide block is connected to the front side of the first guide block 26, and 31 bottom left of the second guide rail and right side are equipped with the Three struts 33,33 bottom end of third strut are connected with pressing plate 34, and for pressing plate 34 above framework 10,34 bottom of pressing plate is equipped with convex block 35.
Embodiment 2
A kind of building corrugation crushing equipment includes as shown in Figs. 1-5 bottom plate 1, the first strut 2,3, first turns of first bearing seat Axis 4, the first cam 5, first hammer gear 6, the first sliding rail 7, L-shaped sliding block 8, placing frame 9, framework 10, holder 11, second bearing seat 12, the second shaft 13, the first belt pulley 14, second bevel gear 15, two-groove belt pulley 16, the first flat belt 17, mounting plate 18, electricity Machine 19, third shaft 20, the second belt pulley 21, the second flat belt 22, disk 23, annulus 24, the first guide rail 25, the first guide block 26, connecting rod 27, the second strut 28, the second sliding rail 29, the second sliding block 30, the second guide rail 31, the second guide block 32, third strut 33, pressing plate 34 and convex block 35,1 top left side of bottom plate and right side are equipped with the first strut 2, and 2 top of the first strut is connected with first Bearing block 3, is equipped with first rotating shaft 4 in first bearing seat 3, and 4 left part of first rotating shaft and right part are equipped with the first cam 5, first turn 4 right end of axis is connected with the first hammer gear 6, and 1 top left side of bottom plate is equipped with the first sliding rail 7, and slidingtype is connected with L on the first sliding rail 7 Shape sliding block 8,8 top of L-shaped sliding block are connected with placing frame 9, framework 10 are placed in placing frame 9, and 1 top right side of bottom plate is equipped with holder 11,11 left lower of holder and top are equipped with second bearing seat 12, and the second shaft 13, lower part are equipped in second bearing seat 12 The middle part of the second shaft 13 be equipped with the first belt pulley 14,13 front end of the second shaft of lower part is connected with second bevel gear 15, first Hammer gear 6 is engaged with second bevel gear 15, and 13 front end of the second shaft on top is connected with two-groove belt pulley 16, two-groove belt pulley 16 The first flat belt 17 is wound between the first belt pulley 14,11 left upper portion of holder of 12 rear side of second bearing seat on top is equipped with Mounting plate 18,18 front side left part of mounting plate are equipped with motor 19, third shaft 20 are connected on the output shaft of 19 front side of motor, the Three shafts, 20 middle part is equipped with the second belt pulley 21, and the second flat belt 22 is wound between the second belt pulley 21 and two-groove belt pulley 16, 20 front end of third shaft is connected with disk 23, and 23 slid formula of disk is connected with annulus 24, and annulus 24 coordinates with disk 23, circle 24 left upper portion of ring is equipped with the first guide rail 25, and 25 inner sliding type of the first guide rail is connected with the first guide block 26, the first guide block 26 and the One guide rail 25 coordinates, and 23 front side eccentric position of disk is connected with connecting rod 27, and 27 left end rotary type of connecting rod is connected to first and leads On block 26,11 left upper portion of holder is equipped with two second struts 28, and the second strut 28 is in the front side of second bearing seat 12 on top, and the Two struts, 28 left end is connected with the second sliding rail 29, and 29 slidingtype of the second sliding rail is connected with the second sliding block 30,30 left side of the second sliding block It is connected with the second guide rail 31,31 inner sliding type of the second guide rail is connected with the second guide block 32, and the second guide block 32 is matched with the second guide rail 31 It closes, 32 rear side rotary type of the second guide block is connected to the front side of the first guide block 26, and 31 bottom left of the second guide rail and right side are equipped with the Three struts 33,33 bottom end of third strut are connected with pressing plate 34, and for pressing plate 34 above framework 10,34 bottom of pressing plate is equipped with convex block 35.
Further include having to shake device 36, holder 11, which is equipped with, shakes device 36, and it includes the first spring to shake device 36 361, first baffle 362, the 4th shaft 364, the second cam 365, third hand tap gear 366, the 4th bevel gear 367, the 4th strut 368 and 3rd bearing seat 369,10 left wall inside upper part of framework and lower part are respectively connected with the first spring 361, and the first spring 361 is right End is connected with first baffle 362, and 11 left lower of holder is equipped with the 4th strut 368, and 368 left end of the 4th strut is connected with third axis Bearing 369, is equipped with the 4th shaft 364 in 3rd bearing seat 369, and 9 lower wall right part of placing frame is provided with first through hole 363, the 4th turn Axis 364 passes through first through hole 363,364 top of the 4th shaft to be equipped with the second cam 365, and 364 bottom end of the 4th shaft is connected with third Bevel gear 366,4 right part of first rotating shaft are equipped with the 4th bevel gear 367, and the 4th bevel gear 367 engages with third hand tap gear 366.
Embodiment 3
A kind of building corrugation crushing equipment includes as shown in Figs. 1-5 bottom plate 1, the first strut 2,3, first turns of first bearing seat Axis 4, the first cam 5, first hammer gear 6, the first sliding rail 7, L-shaped sliding block 8, placing frame 9, framework 10, holder 11, second bearing seat 12, the second shaft 13, the first belt pulley 14, second bevel gear 15, two-groove belt pulley 16, the first flat belt 17, mounting plate 18, electricity Machine 19, third shaft 20, the second belt pulley 21, the second flat belt 22, disk 23, annulus 24, the first guide rail 25, the first guide block 26, connecting rod 27, the second strut 28, the second sliding rail 29, the second sliding block 30, the second guide rail 31, the second guide block 32, third strut 33, pressing plate 34 and convex block 35,1 top left side of bottom plate and right side are equipped with the first strut 2, and 2 top of the first strut is connected with first Bearing block 3, is equipped with first rotating shaft 4 in first bearing seat 3, and 4 left part of first rotating shaft and right part are equipped with the first cam 5, first turn 4 right end of axis is connected with the first hammer gear 6, and 1 top left side of bottom plate is equipped with the first sliding rail 7, and slidingtype is connected with L on the first sliding rail 7 Shape sliding block 8,8 top of L-shaped sliding block are connected with placing frame 9, framework 10 are placed in placing frame 9, and 1 top right side of bottom plate is equipped with holder 11,11 left lower of holder and top are equipped with second bearing seat 12, and the second shaft 13, lower part are equipped in second bearing seat 12 The middle part of the second shaft 13 be equipped with the first belt pulley 14,13 front end of the second shaft of lower part is connected with second bevel gear 15, first Hammer gear 6 is engaged with second bevel gear 15, and 13 front end of the second shaft on top is connected with two-groove belt pulley 16, two-groove belt pulley 16 The first flat belt 17 is wound between the first belt pulley 14,11 left upper portion of holder of 12 rear side of second bearing seat on top is equipped with Mounting plate 18,18 front side left part of mounting plate are equipped with motor 19, third shaft 20 are connected on the output shaft of 19 front side of motor, the Three shafts, 20 middle part is equipped with the second belt pulley 21, and the second flat belt 22 is wound between the second belt pulley 21 and two-groove belt pulley 16, 20 front end of third shaft is connected with disk 23, and 23 slid formula of disk is connected with annulus 24, and annulus 24 coordinates with disk 23, circle 24 left upper portion of ring is equipped with the first guide rail 25, and 25 inner sliding type of the first guide rail is connected with the first guide block 26, the first guide block 26 and the One guide rail 25 coordinates, and 23 front side eccentric position of disk is connected with connecting rod 27, and 27 left end rotary type of connecting rod is connected to first and leads On block 26,11 left upper portion of holder is equipped with two second struts 28, and the second strut 28 is in the front side of second bearing seat 12 on top, and the Two struts, 28 left end is connected with the second sliding rail 29, and 29 slidingtype of the second sliding rail is connected with the second sliding block 30,30 left side of the second sliding block It is connected with the second guide rail 31,31 inner sliding type of the second guide rail is connected with the second guide block 32, and the second guide block 32 is matched with the second guide rail 31 It closes, 32 rear side rotary type of the second guide block is connected to the front side of the first guide block 26, and 31 bottom left of the second guide rail and right side are equipped with the Three struts 33,33 bottom end of third strut are connected with pressing plate 34, and for pressing plate 34 above framework 10,34 bottom of pressing plate is equipped with convex block 35.
Further include having to shake device 36, holder 11, which is equipped with, shakes device 36, and it includes the first spring to shake device 36 361, first baffle 362, the 4th shaft 364, the second cam 365, third hand tap gear 366, the 4th bevel gear 367, the 4th strut 368 and 3rd bearing seat 369,10 left wall inside upper part of framework and lower part are respectively connected with the first spring 361, and the first spring 361 is right End is connected with first baffle 362, and 11 left lower of holder is equipped with the 4th strut 368, and 368 left end of the 4th strut is connected with third axis Bearing 369, is equipped with the 4th shaft 364 in 3rd bearing seat 369, and 9 lower wall right part of placing frame is provided with first through hole 363, the 4th turn Axis 364 passes through first through hole 363,364 top of the 4th shaft to be equipped with the second cam 365, and 364 bottom end of the 4th shaft is connected with third Bevel gear 366,4 right part of first rotating shaft are equipped with the 4th bevel gear 367, and the 4th bevel gear 367 engages with third hand tap gear 366.
Further include having wheel 38, bottom is provided with race 37 in placing frame 9, and 10 bottom of framework is equipped with wheel 38, wheel 38 In race 37.
Embodiment 4
A kind of building corrugation crushing equipment includes as shown in Figs. 1-5 bottom plate 1, the first strut 2,3, first turns of first bearing seat Axis 4, the first cam 5, first hammer gear 6, the first sliding rail 7, L-shaped sliding block 8, placing frame 9, framework 10, holder 11, second bearing seat 12, the second shaft 13, the first belt pulley 14, second bevel gear 15, two-groove belt pulley 16, the first flat belt 17, mounting plate 18, electricity Machine 19, third shaft 20, the second belt pulley 21, the second flat belt 22, disk 23, annulus 24, the first guide rail 25, the first guide block 26, connecting rod 27, the second strut 28, the second sliding rail 29, the second sliding block 30, the second guide rail 31, the second guide block 32, third strut 33, pressing plate 34 and convex block 35,1 top left side of bottom plate and right side are equipped with the first strut 2, and 2 top of the first strut is connected with first Bearing block 3, is equipped with first rotating shaft 4 in first bearing seat 3, and 4 left part of first rotating shaft and right part are equipped with the first cam 5, first turn 4 right end of axis is connected with the first hammer gear 6, and 1 top left side of bottom plate is equipped with the first sliding rail 7, and slidingtype is connected with L on the first sliding rail 7 Shape sliding block 8,8 top of L-shaped sliding block are connected with placing frame 9, framework 10 are placed in placing frame 9, and 1 top right side of bottom plate is equipped with holder 11,11 left lower of holder and top are equipped with second bearing seat 12, and the second shaft 13, lower part are equipped in second bearing seat 12 The middle part of the second shaft 13 be equipped with the first belt pulley 14,13 front end of the second shaft of lower part is connected with second bevel gear 15, first Hammer gear 6 is engaged with second bevel gear 15, and 13 front end of the second shaft on top is connected with two-groove belt pulley 16, two-groove belt pulley 16 The first flat belt 17 is wound between the first belt pulley 14,11 left upper portion of holder of 12 rear side of second bearing seat on top is equipped with Mounting plate 18,18 front side left part of mounting plate are equipped with motor 19, third shaft 20 are connected on the output shaft of 19 front side of motor, the Three shafts, 20 middle part is equipped with the second belt pulley 21, and the second flat belt 22 is wound between the second belt pulley 21 and two-groove belt pulley 16, 20 front end of third shaft is connected with disk 23, and 23 slid formula of disk is connected with annulus 24, and annulus 24 coordinates with disk 23, circle 24 left upper portion of ring is equipped with the first guide rail 25, and 25 inner sliding type of the first guide rail is connected with the first guide block 26, the first guide block 26 and the One guide rail 25 coordinates, and 23 front side eccentric position of disk is connected with connecting rod 27, and 27 left end rotary type of connecting rod is connected to first and leads On block 26,11 left upper portion of holder is equipped with two second struts 28, and the second strut 28 is in the front side of second bearing seat 12 on top, and the Two struts, 28 left end is connected with the second sliding rail 29, and 29 slidingtype of the second sliding rail is connected with the second sliding block 30,30 left side of the second sliding block It is connected with the second guide rail 31,31 inner sliding type of the second guide rail is connected with the second guide block 32, and the second guide block 32 is matched with the second guide rail 31 It closes, 32 rear side rotary type of the second guide block is connected to the front side of the first guide block 26, and 31 bottom left of the second guide rail and right side are equipped with the Three struts 33,33 bottom end of third strut are connected with pressing plate 34, and for pressing plate 34 above framework 10,34 bottom of pressing plate is equipped with convex block 35.
Further include having to shake device 36, holder 11, which is equipped with, shakes device 36, and it includes the first spring to shake device 36 361, first baffle 362, the 4th shaft 364, the second cam 365, third hand tap gear 366, the 4th bevel gear 367, the 4th strut 368 and 3rd bearing seat 369,10 left wall inside upper part of framework and lower part are respectively connected with the first spring 361, and the first spring 361 is right End is connected with first baffle 362, and 11 left lower of holder is equipped with the 4th strut 368, and 368 left end of the 4th strut is connected with third axis Bearing 369, is equipped with the 4th shaft 364 in 3rd bearing seat 369, and 9 lower wall right part of placing frame is provided with first through hole 363, the 4th turn Axis 364 passes through first through hole 363,364 top of the 4th shaft to be equipped with the second cam 365, and 364 bottom end of the 4th shaft is connected with third Bevel gear 366,4 right part of first rotating shaft are equipped with the 4th bevel gear 367, and the 4th bevel gear 367 engages with third hand tap gear 366.
Further include having wheel 38, bottom is provided with race 37 in placing frame 9, and 10 bottom of framework is equipped with wheel 38, wheel 38 In race 37.
Further include having hinge 39, second baffle 40, bracing wire 43 and plug 44,9 lower wall top left side of placing frame passes through hinge 39 rotary types are connected with second baffle 40, and 40 top center of second baffle is provided with the second through-hole 42,9 lower wall top left side of placing frame It is provided with the first groove 41, for the first groove 41 below the second through-hole 42,40 left upper portion of second baffle is connected with bracing wire 43, bracing wire 43 ends are connected with plug 44, and plug 44 is inserted into the second through-hole 42 and the first groove 41.
Further include having second spring 46 and block 47, the top of the first sliding rail 7 is provided with the second groove 45, bottom in the second groove 45 Portion is connected with second spring 46, and 46 top of second spring is connected with block 47.
Operation principle:When needing to carry out the crushing of corrugation using the equipment, user will need the corrugation crushed to be placed on In framework 10, then user's control motor 19 rotates counterclockwise, and third shaft 20 is driven to rotate counterclockwise, and then drives disk 23 It rotates counterclockwise, to drive connecting rod 27 to rotate counterclockwise so that the first guide block 26 rotates counterclockwise, and drives the second guide block 32 It moves down, and then the second guide rail 31 is driven to move down, to drive third strut 33 to move down so that pressing plate 34 and convex Block 35 moves down, and pressing plate 34 and convex block 35 are moved down into when being contacted with the corrugation in framework 10, and pressing plate 34 and convex block 35 are right Corrugation in framework 10 is crushed, and when third shaft 20 rotates counterclockwise, drives the rotation of the second belt pulley 21, and then drive Second flat belt 22 rotates, to drive two-groove belt pulley 16 to rotate so that the first flat belt 17 rotates, and drives the first belt pulley 14 rotations, and then the rotation of the second shaft 13 is driven, to drive second bevel gear 15 to rotate so that first rotating shaft 4 rotates, and drives First cam 5 is rotated up, and the first cam 5 turns to when being contacted with 9 bottom of placing frame, pushes placing frame 9 to move up, in turn Framework 10 is driven to move up, framework 10, which is moved up, to be moved down and match with pressing plate 34 and convex block 35, can more preferably faster By in framework 10 corrugation crush.When pressing plate 34 and the stopping of convex block 35 move down, user's control motor 19 turns clockwise It is dynamic, drive third shaft 20 to rotate clockwise, and then disk 23 is driven to rotate clockwise, to drive connecting rod 27 to turn clockwise It is dynamic so that the first guide block 26 rotates clockwise, and the second guide block 32 is driven to move up, and then drives the second guide rail 31 to moving up It is dynamic, to drive third strut 33 to move up so that pressing plate 34 and convex block 35 move up, when pressing plate 34 and convex block 35 are upward It is mobile to reset, while third shaft 20 rotates clockwise, and the first cam 5 is driven to rotate down reset, placing frame 9 and thereon device Reset is moved down under the effect of gravity.Then user controls motor 19 and rotates counterclockwise again, repeatedly so that pressing plate 34 Constantly corrugation is crushed with convex block 35, after the corrugation in framework 10 is broken, waits for that pressing plate 34 and convex block 35 are upward After mobile reset, user's control motor 19 is stopped, and then takes the corrugation being crushed in framework 10 away.
Because further including having to shake device 36, holder 11, which is equipped with, shakes device 36, and it includes the first bullet to shake device 36 Spring 361, first baffle 362, the 4th shaft 364, the second cam 365, third hand tap gear 366, the 4th bevel gear 367, the 4th Bar 368 and 3rd bearing seat 369,10 left wall inside upper part of framework and lower part are respectively connected with the first spring 361, the first spring 361 Right end is connected with first baffle 362, and 11 left lower of holder is equipped with the 4th strut 368, and 368 left end of the 4th strut is connected with third Bearing block 369, is equipped with the 4th shaft 364 in 3rd bearing seat 369, and 9 lower wall right part of placing frame is provided with first through hole 363, and the 4th Shaft 364 passes through first through hole 363,364 top of the 4th shaft to be equipped with the second cam 365, and 364 bottom end of the 4th shaft is connected with the Third hand tap gear 366,4 right part of first rotating shaft are equipped with the 4th bevel gear 367, and the 4th bevel gear 367 engages with third hand tap gear 366. So pressing plate 34 and convex block 35 move down not with framework 10 in corrugation contact when, first rotating shaft 4 rotation drive the 4th cone Gear 367 rotates, and then third hand tap gear 366 is driven to rotate so that the 4th shaft 364 rotates, and then drives the second cam 365 Rotation, the second cam 365 turns to when being contacted with framework 10, and framework 10 is pushed to be moved to the left so that first baffle 362 is to moving to left Dynamic, the first spring 361 is compressed, and framework 10 is left when 365 distalmost end of the second cam turns to, and the elongation of the first spring 361 drives First baffle 362 moves right reset, and then framework 10 is driven to move right reset, repeatedly, in each pressing plate 34 and convex Before block 35 is crushed corrugation, framework 10 is shaken so that the corrugation distribution in framework 10 is evenly so that corrugation is broken It is broken more comprehensively.
Because further including having wheel 38, bottom is provided with race 37 in placing frame 9, and 10 bottom of framework is equipped with wheel 38, wheel Son 38 is in race 37.So wheel 38 and race 37 are more steady when framework 10 can be allowed to move left and right.
Because further including having hinge 39, second baffle 40, bracing wire 43 and plug 44,9 lower wall top left side of placing frame passes through 39 rotary type of hinge is connected with second baffle 40, and 40 top center of second baffle is provided with the second through-hole 42,9 lower wall of placing frame top Left side is provided with the first groove 41, and for the first groove 41 below the second through-hole 42,40 left upper portion of second baffle is connected with bracing wire 43, 43 end of bracing wire is connected with plug 44, and plug 44 is inserted into the second through-hole 42 and the first groove 41.So needing to remove in user When framework 10 takes the corrugation in it away, user extracts plug 44 out of the second through-hole 42 and the first groove 41, then by the Two baffles 40, which rotate down, lays, and then removes framework 10, then second baffle 40 is rotated up reset by user, is then used Family turns back to plug 44 in second through-hole 42 and the first groove 41, and bracing wire 43 can prevent plug 44 from losing, by second baffle 40 It lays, user can be facilitated to remove framework 10.
Because further including having second spring 46 and block 47,7 top of the first sliding rail is provided with the second groove 45, the second groove 45 Interior bottom is connected with second spring 46, and 46 top of second spring is connected with block 47.So second spring 46 and block 47 can be with Mitigate the impact force that placing frame 9 is fallen, preferably protects equipment, improve the service life of equipment.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (5)

1. a kind of building corrugation crushes equipment, which is characterized in that include bottom plate(1), the first strut(2), first bearing seat (3), first rotating shaft(4), the first cam(5), first hammer gear(6), the first sliding rail(7), L-shaped sliding block(8), placing frame(9), frame Body(10), holder(11), second bearing seat(12), the second shaft(13), the first belt pulley(14), second bevel gear(15), it is double Slot belt pulley(16), the first flat belt(17), mounting plate(18), motor(19), third shaft(20), the second belt pulley(21)、 Second flat belt(22), disk(23), annulus(24), the first guide rail(25), the first guide block(26), connecting rod(27), second Bar(28), the second sliding rail(29), the second sliding block(30), the second guide rail(31), the second guide block(32), third strut(33), pressing plate (34)And convex block(35), bottom plate(1)Top left side and right side are equipped with the first strut(2), the first strut(2)Top is connected with One bearing block(3), first bearing seat(3)It is interior to be equipped with first rotating shaft(4), first rotating shaft(4)It is convex that left part and right part are equipped with first Wheel(5), first rotating shaft(4)Right end is connected with the first hammer gear(6), bottom plate(1)Top left side is equipped with the first sliding rail(7), first Sliding rail(7)Upper slidingtype is connected with L-shaped sliding block(8), L-shaped sliding block(8)Top is connected with placing frame(9), placing frame(9)Interior placement There is framework(10), bottom plate(1)Top right side is equipped with holder(11), holder(11)Left lower and top are equipped with second bearing seat (12), second bearing seat(12)Inside it is equipped with the second shaft(13), the second shaft of lower part(13)Middle part is equipped with the first belt pulley (14), the second shaft of lower part(13)Front end is connected with second bevel gear(15), the first hammer gear(6)With second bevel gear(15) Engagement, second shaft on top(13)Front end is connected with two-groove belt pulley(16), two-groove belt pulley(16)With the first belt pulley (14)Between be wound with the first flat belt(17), the second bearing seat on top(12)The holder of rear side(11)Left upper portion is equipped with installation Plate(18), mounting plate(18)Front side left part is equipped with motor(19), motor(19)Third shaft is connected on the output shaft of front side (20), third shaft(20)Middle part is equipped with the second belt pulley(21), the second belt pulley(21)With two-groove belt pulley(16)Spaced winding There is the second flat belt(22), third shaft(20)Front end is connected with disk(23), disk(23)Slid formula is connected with annulus (24), annulus(24)With disk(23)Cooperation, annulus(24)Left upper portion is equipped with the first guide rail(25), the first guide rail(25)Interior cunning Dynamic formula is connected with the first guide block(26), the first guide block(26)With the first guide rail(25)Cooperation, disk(23)Front side eccentric position connects It is connected to connecting rod(27), connecting rod(27)Left end rotary type is connected to the first guide block(26)On, holder(11)Left upper portion is equipped with Two second struts(28), the second strut(28)Second bearing seat on top(12)Front side, the second strut(28)Left end connects There is the second sliding rail(29), the second sliding rail(29)Slidingtype is connected with the second sliding block(30), the second sliding block(30)Left side is connected with Two guide rails(31), the second guide rail(31)Inner sliding type is connected with the second guide block(32), the second guide block(32)With the second guide rail(31) Cooperation, the second guide block(32)Rear side rotary type is connected to the first guide block(26)Front side, the second guide rail(31)Bottom left and right side It is equipped with third strut(33), third strut(33)Bottom end is connected with pressing plate(34), pressing plate(34)In framework(10)Top, pressing plate (34)Bottom is equipped with convex block(35).
2. a kind of building corrugation according to claim 1 crushes equipment, which is characterized in that further include having shaking device (36), holder(11)It is equipped with and shakes device(36), shake device(36)It include the first spring(361), first baffle (362), the 4th shaft(364), the second cam(365), third hand tap gear(366), the 4th bevel gear(367), the 4th strut (368)With 3rd bearing seat(369), framework(10)Left wall inside upper part and lower part are respectively connected with the first spring(361), the first bullet Spring(361)Right end is connected with first baffle(362), holder(11)Left lower is equipped with the 4th strut(368), the 4th strut (368)Left end is connected with 3rd bearing seat(369), 3rd bearing seat(369)Inside it is equipped with the 4th shaft(364), placing frame(9)Under Wall right part is provided with first through hole(363), the 4th shaft(364)Across first through hole(363), the 4th shaft(364)Top is equipped with Second cam(365), the 4th shaft(364)Bottom end is connected with third hand tap gear(366), first rotating shaft(4)Right part is equipped with the 4th Bevel gear(367), the 4th bevel gear(367)With third hand tap gear(366)Engagement.
3. a kind of building corrugation according to claim 2 crushes equipment, which is characterized in that further include having wheel(38), put Set frame(9)Interior bottom is provided with race(37), framework(10)Bottom is equipped with wheel(38), wheel(38)In race(37)It is interior.
4. a kind of building corrugation according to claim 3 crushes equipment, which is characterized in that further include having hinge(39), Two baffles(40), bracing wire(43)And plug(44), placing frame(9)Lower wall top left side passes through hinge(39)Rotary type is connected with Two baffles(40), second baffle(40)Top center is provided with the second through-hole(42), placing frame(9)Lower wall top left side is provided with first Groove(41), the first groove(41)In the second through-hole(42)Lower section, second baffle(40)Left upper portion is connected with bracing wire(43), draw Line(43)End is connected with plug(44), plug(44)It is inserted into the second through-hole(42)With the first groove(41)It is interior.
5. a kind of building corrugation according to claim 4 crushes equipment, which is characterized in that further include having second spring(46) And block(47), the first sliding rail(7)Top is provided with the second groove(45), the second groove(45)Interior bottom is connected with second spring (46), second spring(46)Top is connected with block(47).
CN201810178170.7A 2018-03-05 2018-03-05 Building flute crushing equipment Active CN108479896B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810178170.7A CN108479896B (en) 2018-03-05 2018-03-05 Building flute crushing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810178170.7A CN108479896B (en) 2018-03-05 2018-03-05 Building flute crushing equipment

Publications (2)

Publication Number Publication Date
CN108479896A true CN108479896A (en) 2018-09-04
CN108479896B CN108479896B (en) 2020-04-21

Family

ID=63341432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810178170.7A Active CN108479896B (en) 2018-03-05 2018-03-05 Building flute crushing equipment

Country Status (1)

Country Link
CN (1) CN108479896B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106423375A (en) * 2016-10-27 2017-02-22 包晨杰 Abandoned garbage fast crusher for electrical and mechanical equipment production
CN206064492U (en) * 2016-08-31 2017-04-05 九江泽美硅材料有限公司 A kind of chemical industry cam-type solid waste quick crashing device
CN206064487U (en) * 2016-08-26 2017-04-05 江西华东船业有限公司 A kind of ship disposed waste efficiency crushing processing meanss
CN206304795U (en) * 2016-11-21 2017-07-07 郑州航空工业管理学院 A kind of discarded tile disc cam type disintegrating apparatus for building
CN206382050U (en) * 2016-11-28 2017-08-08 无锡同心塑料制品有限公司 A kind of electron wastes rocking type pre-processing device
CN107159361A (en) * 2017-07-26 2017-09-15 刘世荣 A kind of urban construction obsolete material break process equipment
CN206853781U (en) * 2017-06-23 2018-01-09 李翔 A kind of mining industry ore quick crashing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206064487U (en) * 2016-08-26 2017-04-05 江西华东船业有限公司 A kind of ship disposed waste efficiency crushing processing meanss
CN206064492U (en) * 2016-08-31 2017-04-05 九江泽美硅材料有限公司 A kind of chemical industry cam-type solid waste quick crashing device
CN106423375A (en) * 2016-10-27 2017-02-22 包晨杰 Abandoned garbage fast crusher for electrical and mechanical equipment production
CN206304795U (en) * 2016-11-21 2017-07-07 郑州航空工业管理学院 A kind of discarded tile disc cam type disintegrating apparatus for building
CN206382050U (en) * 2016-11-28 2017-08-08 无锡同心塑料制品有限公司 A kind of electron wastes rocking type pre-processing device
CN206853781U (en) * 2017-06-23 2018-01-09 李翔 A kind of mining industry ore quick crashing device
CN107159361A (en) * 2017-07-26 2017-09-15 刘世荣 A kind of urban construction obsolete material break process equipment

Also Published As

Publication number Publication date
CN108479896B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN206968035U (en) A kind of waste recovery pop can compression set
JP2021159905A (en) Fine-crushing device capable of ensuring uniformity of crushed coal grain size
CN107115910A (en) A kind of road construction ratchel efficiency crushing equipment
CN207126588U (en) A kind of workshop processing waste material crushing and screening device
CN207169864U (en) Efficient pulverizing device is used in a kind of building waste recovery
CN107663829A (en) A kind of new picture zebra line apparatus of road equipment
CN108083163B (en) A kind of small-sized rack of municipal works summer circuit emergency maintenance
CN107754982A (en) Device is broken in a kind of multi-faceted impact of town road making stone into pieces
CN206597603U (en) A kind of energy-saving discarded soap reducing mechanism
CN206319237U (en) A kind of urban construction efficient repair apparatus of road
CN201721948U (en) Flat bottle straightening machine
CN206676494U (en) A kind of motor-driven mill
CN108479896A (en) A kind of building corrugation crushing equipment
CN114003112A (en) Computer machine case auxiliary heat dissipation protection device
CN206649900U (en) A kind of abundant Deperming Facility of hard disc of computer
CN107555038A (en) Dustbin is placed in a kind of refuse classification with compression function
CN208959964U (en) A kind of bad corrugation crushing plant
CN111974496A (en) Decoration rubbish crushing equipment for building
CN206358742U (en) A kind of Electromechanical Transportation in Coal Mine transmission device
CN212441313U (en) Concrete crusher that construction used
CN109994761B (en) Fuel cell aerating device
CN208976749U (en) A kind of cast waste sand baking polishing regenerating unit
CN205722177U (en) A kind of intelligent rainproof charging pile
CN207970902U (en) Device is broken in a kind of impact of municipal administration road construction stone multiple location into pieces
CN112718049A (en) Remove stone machine degree of depth rubble device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200324

Address after: 325000 Room 1302, Building 5, Jindong Home Group 2, Huangzhai Road, Nanhui Street, Lucheng District, Wenzhou City, Zhejiang Province

Applicant after: Yang Songmei

Address before: 511400 Guangzhou Addition Machinery Design Co., Ltd., No. 106 Fengze East Road, Nansha District, Guangzhou, Guangdong Province, X1301-B328

Applicant before: Zou Zongchun

GR01 Patent grant
GR01 Patent grant