CN108469581A - Multi-electrode observation system and its observation procedure for measurement of partial discharge - Google Patents

Multi-electrode observation system and its observation procedure for measurement of partial discharge Download PDF

Info

Publication number
CN108469581A
CN108469581A CN201810240816.XA CN201810240816A CN108469581A CN 108469581 A CN108469581 A CN 108469581A CN 201810240816 A CN201810240816 A CN 201810240816A CN 108469581 A CN108469581 A CN 108469581A
Authority
CN
China
Prior art keywords
electrode
rotating disk
control circuit
driving motor
measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810240816.XA
Other languages
Chinese (zh)
Inventor
陈庆国
孙佳馨
池明赫
张金烽
谭鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin University of Science and Technology
Original Assignee
Harbin University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin University of Science and Technology filed Critical Harbin University of Science and Technology
Priority to CN201810240816.XA priority Critical patent/CN108469581A/en
Publication of CN108469581A publication Critical patent/CN108469581A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/16Construction of testing vessels; Electrodes therefor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

For the multi-electrode observation system and its observation procedure of measurement of partial discharge, belong to technical field of electric equipment.Technical essential:Electrode system includes rotating disk, insulating telescopic pipe, three top electrodes.Control system realizes the selection of electrode, the control of electrode spacing, the debugging of high-speed camera and high pressure access in host computer terminal.Top electrode has cylinder electrode, needlepoint electrode, spheric electrode.On the rotating pan by the installation of cylinder electrode, needlepoint electrode and spheric electrode, according to experiment needs, by control system choose needed for the electrode that uses, then adjustment electrode spacing, telescopic rod drives the downward electrode movement of top electrode, infrared range-measurement system measuring electrode spacing, when electrode spacing reaches setting spacing, control system stops the movement of insulated telescopic rods, fixed top electrode.The startup of high-speed camera is equally controlled by control system, and control system can realize the function of the focusing to high-speed camera, calibration and video recording, then applied voltage test.The present invention is used for measurement of partial discharge.

Description

Multi-electrode observation system and its observation procedure for measurement of partial discharge
Technical field
The present invention relates to a kind of observation systems and its observation procedure for measurement of partial discharge, and in particular to one kind is used for The multi-electrode observation system and its observation procedure of measurement of partial discharge, belong to technical field of electric equipment.
Background technology
As the core equipment in electric system, power transformer can safely and steadily run the weight as power industry In it is weight.The service life of power transformer and the dielectric strength of the paper oil insulation of inside transformer are of close concern to each other.When oilpaper is exhausted After the disabler of edge, transformer will be unable to normal operation.Influence the i.e. internal office of one of principal element of paper oil insulation performance It discharges in portion.Inside insulating board when existing defects, compared to cardboard, other bear higher voltage, electric field collection to fault location everywhere In fault location cause the part occur shelf depreciation, with the extension of pressing time, shelf depreciation will continuous development finally lead The breakdown of insulating board is caused to cause failure of insulation.In order to preferably study the experimental phenomena and the rule of development of shelf depreciation, it would be highly desirable to A kind of multi-electrode observation system and observation procedure for measurement of partial discharge is devised, to improve the peace that traditional partial discharge measures Full property and stability, improve the ornamental of partial discharge phenomenon, and the research to analyze paper oil insulation shelf depreciation mechanism, which provides, more to be added Kind testing equipment.
Invention content
The brief overview about the present invention is given below, in order to provide about the basic of certain aspects of the invention Understand.It should be appreciated that this general introduction is not the exhaustive general introduction about the present invention.It is not intended to determine the pass of the present invention Key or pith, nor is it intended to limit the scope of the present invention.Its purpose only provides certain concepts in simplified form, In this, as the preamble in greater detail discussed later.
In consideration of it, to solve the above-mentioned problems, the present invention devises a kind of multi-electrode observation for measurement of partial discharge System and its observation procedure improve the ornamental of partial discharge phenomenon, are to improve the safety and stability that traditional partial discharge measures The research for analyzing paper oil insulation shelf depreciation mechanism provides more perfect testing equipment.
Scheme one:The present invention provides the multi-electrode observation systems for measurement of partial discharge, including electrode system, observation System and range-measurement system;The electrode system includes rotating disk, electronic insulated telescopic rods, cylinder electrode, needlepoint electrode, spherical electricity Pole, grounding electrode, test chamber, bottom plate and holder;The observation system is high-speed camera, and the range-measurement system is infrared ray Rangefinder;
The test chamber is placed on bottom plate, and rotating disk, which is placed in the surface of test chamber and is rotated with the top of holder, pacifies Dress, rotating disk are established by holder and bottom plate and are connected, and rotating disk driving motor drives rotating disk rotation, the cylinder electrode, needle Sharp electrode and spheric electrode are established a connection by electronic insulated telescopic rods with rotating disk, and electronic insulated telescopic rods are mounted on In rotating disk, cylinder electrode, needlepoint electrode and spheric electrode connect high pressure end and high-voltage electricity by being placed in above rotating disk Source connects, and the grounding electrode is placed in test chamber;The high-speed camera and infrared ambulator are mounted on the perpendicular of holder On straight part.
Further:The multi-electrode observation system for measurement of partial discharge further includes control system, the control System includes host computer, controller, angular transducer, high voltage power supply control circuit, high-speed camera control circuit, rotating disk biography Dynamic circuit for controlling motor and telescopic rod driving motor control circuit;The host computer is connect with controller, and controller is passed with angle Sensor, infrared ambulator, high voltage power supply control circuit, high-speed camera control circuit, rotating disk driving motor control circuit, Telescopic rod driving motor control circuit connects;The angular transducer, rotating disk driving motor control circuit and telescopic rod transmission Circuit for controlling motor is placed in the inside of rotating disk.
Further:The bottom of the test chamber is provided with bleeder plug.So set, being convenient for test operation.
Wherein, the rotating disk installs three kinds of measurement top electrodes, respectively cylinder electrode, needlepoint electrode and spheric electrode, Each measuring electrode is connected with an electronic insulated telescopic rods inside rotating disk, and electronic insulated telescopic rods can drive top electrode It moves up and down, to control the spacing between top electrode and lower electrode (i.e. grounding electrode).
Wherein, setting angle sensor, rotating disk driving motor control circuit and telescopic rod transmission electricity in the rotating disk Machine control circuit.When using different top electrodes, rotating disk turns over different angles.Rotating disk driving motor control circuit controls The rotation of rotating disk.When top electrode is located at right over lower electrode, telescopic rod driving motor control circuit drives driving motor fortune Row, telescopic rod drive the downward electrode movement of top electrode.
Wherein, the high-speed camera captures partial discharge phenomenon, the signal that controller spreads out of host computer into Row processing, and high-speed camera control circuit is driven to run, high-speed camera carries out focusing and recording function and will take Picture is back to host computer.
Wherein, after the host computer setting electrode spacing, infrared range-measurement system measures the spacing of upper/lower electrode, works as electrode spacing After reaching setting value, the power-off of telescopic rod driving motor control circuit, telescopic rod stop motion, to realize the control to electrode spacing System.
Wherein, the control system can realize control to system entirety by host computer, including top electrode selects, is electric Interpolar away from control, high-speed camera focusing and video recording setting, subsequent controller drives high voltage power supply control circuit, to be measured Sample carries out pressurization measurement, is measured rear control system decompression, and reset to single unit system, restores to before testing Idle state, in case using next time.
Scheme two:The present invention provides the observation procedures of the multi-electrode observation system for measurement of partial discharge, rely on It is realized for the multi-electrode observation system of measurement of partial discharge described in scheme one, specially:
Preparation stage:The electrode spacing used needed for setting in host computer, sample is placed at lower electrode, in host computer After the selected electrode spacing of setting, controller receives the signal from host computer, driving angle sensor, rotating disk driving motor control Circuit and telescopic rod driving motor control circuit processed, rotating disk are driven electrode and rotating disk rotation, angular transducer are driven to measure rotation Turntable rotation angle, after elected fixed electrode moves to right over lower electrode, i.e., angular transducer measures angle and required electricity Extremely corresponding angle is identical, and controller cuts off rotating disk driving motor control circuit, and rotating disk driving motor is stopped, electrode It is fixed;Subsequent controller drives telescopic rod driving motor control circuit, telescopic rod driving motor to drive telescopic rod elongation, telescopic rod Drive the downward electrode movement of top electrode;Infrared range-measurement system measures the spacing of upper/lower electrode, when the electrode spacing number of stadia surveying According to it is identical as host computer setting value when, controller cuts off telescopic rod driving motor control circuit, and telescopic rod stop motion is electric at this time Interpolar is away from the electrode spacing set for host computer;Then host computer is configured the focal length and recording function of high-speed camera, Controller drives the work of high-speed camera control circuit, high-speed camera that can be focused and be recorded a video according to the setting of host computer work( Can, so far, the preparation stage terminates;
Measuring phases:Upper computer selecting high pressure accesses, and signal is reached controller, and controller drives high voltage power supply control Circuit works, and carries out pressurized treatments to interelectrode sample, starts to test;It is depressured after measurement, upper computer selecting resets work( Can, testing equipment is integrally restored to the state to before testing by controller, in case next time, experiment used;If experimental enviroment is transformation Device oil, after the test releases the transformer oil inside test chamber.
Advantageous effect:
The required electrode used may be selected in control system in the present invention, and utilizes rotating disk by required electrode rotary to under The corresponding position of electrode.Insulating telescopic pipe pushes the downward electrode movement of top electrode, infrared distance measurement system after setting electrode spacing Unified test amount upper/lower electrode spacing, after electrode spacing reaches setting, control system stops the movement of telescopic rod, at this time top electrode It is fixed on setting position.Subsequent control system carries out high-speed camera the adjusting of focal length, so that host computer is showed clearly electric The image of pole.It can start pressurization after preparation is ready to measure.After measurement, system is depressured.Control system is logical Reset function is crossed to restore integral device to idle state.The safety and stability that traditional partial discharge measures is improved, is more improved The ornamental of partial discharge phenomenon, the present invention provide more perfect experiment to analyze the research of paper oil insulation shelf depreciation mechanism Equipment and test method.
Description of the drawings
Fig. 1 is the overall construction drawing of the multi-electrode observation system for measurement of partial discharge;
Fig. 2 is the multi-electrode observation system control structure figure for measurement of partial discharge;
Fig. 3 is rotary disk structure figure;
Fig. 4 is electrode and rotating disk installation relation schematic diagram.
In figure:1- rotating disks;The electronic insulated telescopic rods of 2-;3- cylinder electrodes;4- needlepoint electrodes;5- spheric electrodes;6- connects Ground electrode;7- test chambers;8- bottom plates;9- holders;10- high-speed cameras;11- infrared ambulators;12- connects high pressure end; 13- bleeder plugs.
Specific implementation mode
The exemplary embodiment of the present invention is described hereinafter in connection with attached drawing.For clarity and conciseness, All features of actual implementation mode are not described in the description.It should be understood, however, that developing any this actual implementation Much decisions specific to embodiment must be made during example, to realize the objectives of developer, for example, symbol Restrictive condition those of related to system and business is closed, and these restrictive conditions may have with the difference of embodiment Changed.In addition, it will also be appreciated that although development is likely to be extremely complex and time-consuming, to having benefited from the present invention For those skilled in the art of disclosure, this development is only routine task.
Herein, it is also necessary to which explanation is a bit, in order to avoid having obscured the present invention because of unnecessary details, in the accompanying drawings The apparatus structure closely related with scheme according to the present invention and/or processing step are illustrate only, and is omitted and the present invention The little other details of relationship.
Embodiment 1:As Figure 1-Figure 4, the multi-electrode observation system for measurement of partial discharge of the present embodiment, including Electrode system, control system, observation system and range-measurement system;The electrode system include rotating disk 1, electronic insulated telescopic rods 2, Cylinder electrode 3, needlepoint electrode 4, spheric electrode 5, grounding electrode 6, test chamber 7, bottom plate 8 and holder 9;The observation system is High-speed camera 10, the range-measurement system are infrared ambulator 11;The control system includes host computer, controller, angle Sensor, high voltage power supply control circuit, high-speed camera control circuit, rotating disk driving motor control circuit and telescopic rod transmission Circuit for controlling motor;
The test chamber 7 is placed on bottom plate 8, rotating disk 1 be placed in the surface of test chamber 7 and with the top of holder 9 Rotational installation, rotating disk 1 are established by holder 9 and bottom plate 8 and are connected, and rotating disk driving motor drives rotating disk 1 to rotate, the circle Column electrode 3, needlepoint electrode 4 and spheric electrode 5 are established a connection by electronic insulated telescopic rods 2 and rotating disk 1, electronic exhausted Edge telescopic rod 2 is mounted in rotating disk 1, and cylinder electrode 3, needlepoint electrode 4 and spheric electrode 5 are by being placed in above rotating disk 1 The high pressure end 12 that connects connect with high voltage power supply, the grounding electrode 6 is placed in test chamber 7;10 He of the high-speed camera Infrared ambulator 11 is mounted in the vertical portion of holder 9;The host computer is connect with controller, controller and angle sensor Device, high voltage power supply control circuit, high-speed camera control circuit, rotating disk driving motor control circuit, is stretched infrared ambulator Contracting bar driving motor control circuit connects;The angular transducer, rotating disk driving motor control circuit and telescopic rod transmission electricity Machine control circuit is placed in the inside of rotating disk 1;The bottom of the test chamber 7 is provided with bleeder plug 13.
Embodiment 2:The observation procedure of the multi-electrode observation system for measurement of partial discharge of the present embodiment, specially:
Preparation stage:The electrode spacing used needed for setting in host computer, sample is placed at lower electrode, in host computer After the selected electrode spacing of setting, controller receives the signal from host computer, driving angle sensor, rotating disk driving motor control Circuit and telescopic rod driving motor control circuit processed, rotating disk are driven electrode and rotating disk rotation, angular transducer are driven to measure rotation Turntable rotation angle, after elected fixed electrode moves to right over lower electrode, i.e., angular transducer measures angle and required electricity Extremely corresponding angle is identical, and controller cuts off rotating disk driving motor control circuit, and rotating disk driving motor is stopped, electrode It is fixed;Subsequent controller drives telescopic rod driving motor control circuit, telescopic rod driving motor to drive telescopic rod elongation, telescopic rod Drive the downward electrode movement of top electrode;Infrared range-measurement system measures the spacing of upper/lower electrode, when the electrode spacing number of stadia surveying According to it is identical as host computer setting value when, controller cuts off telescopic rod driving motor control circuit, and telescopic rod stop motion is electric at this time Interpolar is away from the electrode spacing set for host computer;Then host computer is configured the focal length and recording function of high-speed camera, Controller drives the work of high-speed camera control circuit, high-speed camera that can be focused and be recorded a video according to the setting of host computer work( Can, so far, the preparation stage terminates;
Measuring phases:Upper computer selecting high pressure accesses, and signal is reached controller, and controller drives high voltage power supply control Circuit works, and carries out pressurized treatments to interelectrode sample, starts to test;It is depressured after measurement, upper computer selecting resets work( Can, testing equipment is integrally restored to the state to before testing by controller, in case next time, experiment used;If experimental enviroment is transformation Device oil, after the test releases the transformer oil inside test chamber.
Although disclosed embodiment is as above, its content is only to facilitate understand the technical side of the present invention Case and the embodiment used, are not intended to limit the present invention.Any those skilled in the art to which this invention pertains, not Under the premise of being detached from disclosed core technology scheme, any modification and change can be made in form and details in implementation Change, but protection domain defined by the present invention, the range that the appended claims that must still be subject to limits.

Claims (4)

1. the multi-electrode observation system for measurement of partial discharge, which is characterized in that including electrode system, observation system and ranging System;The electrode system includes rotating disk (1), electronic insulated telescopic rods (2), cylinder electrode (3), needlepoint electrode (4), spherical shape Electrode (5), grounding electrode (6), test chamber (7), bottom plate (8) and holder (9);The observation system is high-speed camera (10), the range-measurement system is infrared ambulator (11);
The test chamber (7) is placed on bottom plate (8), rotating disk (1) be placed in the surface of test chamber (7) and with holder (9) Top rotational installation, rotating disk (1), which passes through holder (9) and bottom plate (8), to be established and connects, and rotating disk driving motor drives rotating disk (1) it rotates, the cylinder electrode (3), needlepoint electrode (4) and spheric electrode (5) pass through electronic insulated telescopic rods (2) and rotation Disk (1) establishes a connection, and electronic insulated telescopic rods (2) are mounted in rotating disk (1), cylinder electrode (3), needlepoint electrode (4) It is connect with high voltage power supply by being placed in the high pressure end (12) that connects of rotating disk (1) above with spheric electrode (5), the ground connection electricity Pole (6) is placed in test chamber (7);The high-speed camera (10) and infrared ambulator (11) are mounted on the perpendicular of holder (9) On straight part.
2. the multi-electrode observation system according to claim 1 for measurement of partial discharge, which is characterized in that multi-electrode is seen Examining system further includes control system, and the control system includes host computer, controller, angular transducer, high voltage power supply control electricity Road, high-speed camera control circuit, rotating disk driving motor control circuit and telescopic rod driving motor control circuit;It is described upper Machine is connect with controller, controller and angular transducer, infrared ambulator, high voltage power supply control circuit, high-speed camera control Circuit processed, rotating disk driving motor control circuit, the connection of telescopic rod driving motor control circuit;The angular transducer, rotation Disk driving motor control circuit and telescopic rod driving motor control circuit are placed in the inside of rotating disk (1).
3. the multi-electrode observation system according to claim 1 or 2 for measurement of partial discharge, which is characterized in that described The bottom of test chamber (7) is provided with bleeder plug (13).
4. the observation procedure of the multi-electrode observation system for measurement of partial discharge, which is characterized in that be specially:
Preparation stage:The electrode spacing used needed for setting in host computer, sample is placed at lower electrode, is arranged in host computer After selected electrode spacing, controller receives the signal from host computer, driving angle sensor, rotating disk driving motor control electricity Road and telescopic rod driving motor control circuit, rotating disk are driven electrode and rotating disk rotation, angular transducer are driven to measure rotating disk Rotation angle, after elected fixed electrode moves to right over lower electrode, i.e., angular transducer measures angle and required electrode pair The angle answered is identical, and controller cuts off rotating disk driving motor control circuit, and rotating disk driving motor is stopped, and electrode is solid It is fixed;Subsequent controller drives telescopic rod driving motor control circuit, telescopic rod driving motor to drive telescopic rod elongation, telescopic rod band The downward electrode movement of dynamic top electrode;Infrared range-measurement system measures the spacing of upper/lower electrode, when the electrode spacing data of stadia surveying When identical as host computer setting value, controller cuts off telescopic rod driving motor control circuit, telescopic rod stop motion, at this time electrode Spacing is the electrode spacing of host computer setting;Then host computer is configured the focal length and recording function of high-speed camera, control Device processed driving high-speed camera control circuit work, high-speed camera can be focused and be recorded a video according to the setting of host computer work( Can, so far, the preparation stage terminates;
Measuring phases:Upper computer selecting high pressure accesses, and signal is reached controller, and controller drives high voltage power supply control circuit Work carries out pressurized treatments to interelectrode sample, starts to test;It is depressured, upper computer selecting reset function, leads to after measurement It crosses controller and testing equipment is integrally restored to the state to before testing, in case next time, experiment used;If experimental enviroment is transformer oil, The transformer oil inside test chamber is released after the test.
CN201810240816.XA 2018-03-22 2018-03-22 Multi-electrode observation system and its observation procedure for measurement of partial discharge Pending CN108469581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810240816.XA CN108469581A (en) 2018-03-22 2018-03-22 Multi-electrode observation system and its observation procedure for measurement of partial discharge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810240816.XA CN108469581A (en) 2018-03-22 2018-03-22 Multi-electrode observation system and its observation procedure for measurement of partial discharge

Publications (1)

Publication Number Publication Date
CN108469581A true CN108469581A (en) 2018-08-31

Family

ID=63264720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810240816.XA Pending CN108469581A (en) 2018-03-22 2018-03-22 Multi-electrode observation system and its observation procedure for measurement of partial discharge

Country Status (1)

Country Link
CN (1) CN108469581A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109342895A (en) * 2018-10-26 2019-02-15 许继(厦门)智能电力设备股份有限公司 A kind of gas-insulated characteristic test device
CN111462599A (en) * 2020-03-10 2020-07-28 合肥工业大学 Gas discharge tube discharge experiment simulation device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204086472U (en) * 2014-06-18 2015-01-07 国家电网公司 A kind of insulation defect simulation test device for oil-filled transformer
CN104297654A (en) * 2014-10-22 2015-01-21 国家电网公司 Model for simulating multiple protrusion defects in oil immersion headstand type current transformer
CN104833908A (en) * 2015-05-29 2015-08-12 华北电力大学 Electrode distance adjusting device and control method thereof
CN204789875U (en) * 2015-05-04 2015-11-18 国家电网公司 Cubical switchboard partial discharge detector device
CN106646162A (en) * 2016-12-16 2017-05-10 河北省机电体化中试基地 High voltage switch cabinet cable partial discharge monitoring simulation system
US20170306757A1 (en) * 2016-03-31 2017-10-26 Shandong University Shield-carried noncontact frequency-domain electrical real-time advanced detection system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204086472U (en) * 2014-06-18 2015-01-07 国家电网公司 A kind of insulation defect simulation test device for oil-filled transformer
CN104297654A (en) * 2014-10-22 2015-01-21 国家电网公司 Model for simulating multiple protrusion defects in oil immersion headstand type current transformer
CN204789875U (en) * 2015-05-04 2015-11-18 国家电网公司 Cubical switchboard partial discharge detector device
CN104833908A (en) * 2015-05-29 2015-08-12 华北电力大学 Electrode distance adjusting device and control method thereof
US20170306757A1 (en) * 2016-03-31 2017-10-26 Shandong University Shield-carried noncontact frequency-domain electrical real-time advanced detection system and method
CN106646162A (en) * 2016-12-16 2017-05-10 河北省机电体化中试基地 High voltage switch cabinet cable partial discharge monitoring simulation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109342895A (en) * 2018-10-26 2019-02-15 许继(厦门)智能电力设备股份有限公司 A kind of gas-insulated characteristic test device
CN111462599A (en) * 2020-03-10 2020-07-28 合肥工业大学 Gas discharge tube discharge experiment simulation device

Similar Documents

Publication Publication Date Title
CN108469581A (en) Multi-electrode observation system and its observation procedure for measurement of partial discharge
CN106680682A (en) Parallel testing apparatus of multichannel insulation and voltage resistance
CN104062320B (en) Motor coil exposed surface insulating barrier damage detection device and detection method
CN105629135B (en) The electrical detection device and method of insulated tension pole
CN117471273A (en) Computer hardware detection table and use method thereof
CN104865417A (en) Plant leaf electrical parameter testing electrode capable of measuring and controlling on-line clamping force
CN105807189B (en) The experimental rig and test method of superconducting insulation material shelf depreciation development process
CN113884840A (en) Insulation performance detection device for high-voltage motor
CN203929929U (en) A kind of capacitor surge and ageing tester of mounting
CN203479967U (en) Device for observing stator coil and winding voltage withstanding tests of large generator
CN212060477U (en) Cable water-blocking buffer layer structure simulation test system with adjustable contact state and humidity
CN106443392A (en) Local discharge testing system and local discharge testing method for optical fibers under alternating current/direct current superposition voltage
CN204731368U (en) Rotating disc type aluminium base high-voltage testing device
CN208334504U (en) A kind of shielding case apparatus of measured resistivity
CN101776709B (en) Measurement method used for characterizing light current of ferroelectric film
CN115184357A (en) Appearance detection device is used in production of electron bee calling organ
CN211148832U (en) Auxiliary discharging device for high-voltage test
CN104502439B (en) Livewire work insulating tool defect detecting device
CN207601227U (en) A kind of insualtor detector for acquiring spark image
CN108181539A (en) A kind of electric power system leak current fault detection method and device
CN113589111A (en) Device and method for measuring arc breakdown critical voltage of flame-retardant polymer material
CN207456739U (en) A kind of quickcam image focusing verifying attachment
CN218068193U (en) Withstand voltage tester with automatic verification function
CN206788848U (en) A kind of test device of hard disc of computer
CN206635739U (en) A kind of ground loaded densification degree detector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180831

RJ01 Rejection of invention patent application after publication