CN108457291A - A kind of asymmetric piles support and change method and underpinning structure - Google Patents

A kind of asymmetric piles support and change method and underpinning structure Download PDF

Info

Publication number
CN108457291A
CN108457291A CN201810238016.4A CN201810238016A CN108457291A CN 108457291 A CN108457291 A CN 108457291A CN 201810238016 A CN201810238016 A CN 201810238016A CN 108457291 A CN108457291 A CN 108457291A
Authority
CN
China
Prior art keywords
abutment
asymmetric
piles
pile
transform beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810238016.4A
Other languages
Chinese (zh)
Inventor
王文通
徐梁
刘建国
李端书
丁华兴
黎心海
谢俊
章新华
钟勇
马晓宾
林辉
徐添华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Municipal Design and Research Institute Co Ltd
Original Assignee
Shenzhen Municipal Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Municipal Design and Research Institute Co Ltd filed Critical Shenzhen Municipal Design and Research Institute Co Ltd
Priority to CN201810238016.4A priority Critical patent/CN108457291A/en
Publication of CN108457291A publication Critical patent/CN108457291A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Abstract

The invention discloses a kind of asymmetric piles support and change methods, include the following steps:Small-scale pit is excavated in region outside under-traverse tunnel coverage, on the basis of meeting the requirement of pile foundation construction machinery clear height, carries out to ensure pile foundation underpinning and dig the stratum consolidation of stake safety;Region outside under-traverse tunnel coverage makes underpinned pile and pile cover, carries out vertical applied force system construction;Region outside under-traverse tunnel coverage makes transform beams, and transform beams are connect with abutment, and horizontal force system construction is integrally carried out to the connection of transform beams and abutment;Jack is set between pile cover and transform beams and jacking is set, the pile foundation of abutment position is underpined.The invention also discloses a kind of asymmetric piles underpinning structures.The asymmetric piles support and change method and underpinning structure for implementing the present invention, can underpin asymmetric piles, meet safety, economic, requirement easy to operation;Speed of application is fast, saves the duration.

Description

A kind of asymmetric piles support and change method and underpinning structure
Technical field
The present invention relates to constructing tunnel field more particularly to a kind of asymmetric piles support and change method and underpin knot Structure.
Background technology
In the prior art, when city tunnel needs underbridge beam pile foundation, it usually needs the construction of pile foundation underpinning is carried out, it is existing Some carries out support and change method and underpinning structure, because barricade asymmetric arrangement is influenced after by abutment and abutment, bridge to piles There are prodigious technical difficulty and risks for the underpinning construction of pile foundation at platform.
Therefore, there is an urgent need to a kind of new bridge Abutment Pile Foundation Underpinning Technology Applied in Construction to solve Abutment pile foundation underpinning Problem.
Invention content
Technical problem to be solved by the present invention lies in provide a kind of asymmetric piles support and change method and underpin knot Structure can underpin asymmetric piles, meet safety, economic, requirement easy to operation;Speed of application is fast, section Save the duration.
In order to solve the above-mentioned technical problem, an embodiment of the present invention provides a kind of asymmetric piles support and change method, On the basis of the barricade after tunnel underbridge beam pile foundation, the abutment and abutment that do not destroy a bridge, piles are carried out non- It is symmetrical actively to underpin, include the following steps:Small-scale pit is excavated in region outside under-traverse tunnel coverage, is meeting pile foundation On the basis of construction machinery clear height requires, carry out to ensure pile foundation underpinning and dig the stratum consolidation of stake safety;In under-traverse tunnel Region outside coverage makes underpinned pile and pile cover, carries out vertical applied force system construction;Outside under-traverse tunnel coverage Region makes transform beams, and transform beams are connect with abutment, and horizontal force system construction is integrally carried out to the connection of transform beams and abutment; Jack is set between pile cover and transform beams and jacking is set, the pile foundation of abutment position is underpined.
Wherein, it is attached to form asymmetric overall structure by horizontal direction bar planting between transform beams and abutment.
Wherein, jack is set between pile cover and transform beams and jacking is set, the pile foundation of abutment position is carried out underpining step Further include after rapid:The step of pile foundation cutting piles are carried out using transverse passage-way, vertical shaft or in tunnel.
Wherein, asymmetric piles support and change method performs within the scope of the low clearance of bridge lower space.
Wherein, the abutment of bridge is located at the junction of bridge and barricade, and one side is set as facing sky, and the other side is filled out for abutment Soil.
In order to solve the above technical problems, the invention also discloses a kind of asymmetric piles underpinning structure, to After the abutment and abutment that do not destroy a bridge on the basis of barricade, asymmetric is carried out to piles for tunnel underbridge beam pile foundation Actively underpin, including:It is located at the underpinned pile of under-traverse tunnel coverage exterior domain, the pile cover being fastened on underpinned pile, is located at down The transform beams of tunneling road coverage exterior domain and the jack being located between pile cover and transform beams, wherein:Transform beams and bridge Platform connects, and jack is set as jacking state.
Wherein, it is attached to form asymmetric overall structure by horizontal direction bar planting between transform beams and abutment.
Wherein, further include:To carry out the transverse passage-way or vertical shaft of cutting piles to bridge pile foundation.
Wherein, one end of the dams setting in bridge after abutment.
Wherein, abutment is located at the junction of bridge and barricade, and one side is set as facing sky, and the other side is banketed for abutment.
Implement asymmetric piles support and change method of the embodiment of the present invention and underpinning structure, has the advantages that: Small-scale pit is excavated in region outside under-traverse tunnel coverage, on the basis of meeting the requirement of pile foundation construction machinery clear height, into It goes to ensure pile foundation underpinning and dig the stratum consolidation of stake safety;Region outside under-traverse tunnel coverage make underpinned pile and Pile cover carries out vertical applied force system construction;Region outside under-traverse tunnel coverage makes transform beams, and transform beams connect with abutment It connects, horizontal force system construction is integrally carried out to the connection of transform beams and abutment;Jack is set between pile cover and transform beams And jacking is set, the pile foundation of abutment position is underpined, asymmetric piles can be underpined, meet safety, warp Ji, requirement easy to operation;Speed of application is fast, saves the duration.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the structural schematic diagram of the excavation pit of asymmetric piles underpinning structure of the present invention.
Fig. 2 is the structural schematic diagram for performing underpinned pile and pile cover of asymmetric piles underpinning structure of the present invention.
Fig. 3 is the structural schematic diagram for performing transform beams of asymmetric piles underpinning structure of the present invention.
Fig. 4 is asymmetric piles underpinning structure of the present invention by jacking the structural schematic diagram actively underpined.
Fig. 5 is the knot that pile foundation section stake is carried out by transverse passage-way and vertical shaft of asymmetric piles underpinning structure of the present invention Structure schematic diagram.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1-Fig. 5, the embodiment one of asymmetric piles underpinning structure is used for the present invention.
Asymmetric piles underpinning structure in the present embodiment, in the pile foundation 12 of tunnel underbridge beam 1, not break After the abutment 11 and abutment of bad bridge 1 on the basis of barricade 13, asymmetric is carried out to piles 12 and is actively underpined, is mainly related to And stratum consolidation, underpin pile driving construction, asymmetric underpinning structure, cushion cap be coupled etc. technological designs.
Asymmetric piles in the present embodiment refer to:The one end in bridge 1 is arranged in barricade 13 after abutment.Abutment 11 are located at the junction of bridge 1 and barricade 13 after abutment, and the side of abutment 11 is set as facing sky, and the other side of abutment 11 is filled out for abutment Soil is unsymmetric structure.Following pile foundation underpinning structures in the present embodiment can be good at solving asymmetric piles support Technical difficulty in changing and existing risk.
Asymmetric piles underpinning structure in the present embodiment, including:It is located at under-traverse tunnel coverage exterior domain Underpinned pile 2, be fastened on underpinned pile 2 pile cover 3, be located at the transform beams 4 of under-traverse tunnel coverage exterior domain and be located at Jack 5 between pile cover 3 and transform beams 4, wherein:Transform beams 4 are connect with abutment 11, and jack 5 is set as jacking state.
When it is implemented, perform underpinned pile 2, pile cover 3 and transform beams 4 using bridge Bridge 1 down space 1a, by transform beams 4 with After the connection of existing abutment 11 forms entirety, asymmetric is carried out to piles 12 using the jacking of jack 5 and is actively underpined, not After destruction abutment 11 and abutment in the case of barricade 13, underpining for Abutment pile foundation is realized.
Wherein:Transform beams 4 are coupled the whole effect of formation with existing abutment 11 is:When ensureing that pile foundation 12 underpins, abutment 11 it is complete, prevent the offset of abutment 11 or even the case where collapse.
Preferably, it is attached by horizontal direction bar planting 6 between transform beams 4 and abutment 11 and to form asymmetric and integrally tie Structure.In this way, on the basis of ensureing bonding strength, when ensureing that pile foundation 12 underpins, abutment 11 it is complete, it is inclined to prevent abutment 11 Move the case where even collapsing.
Further, further include:To carry out the transverse passage-way or vertical shaft 7 of cutting piles to bridge pile foundation 12.The structure Effect be:Jack 5 jacking to piles 12 carry out asymmetric actively underpin after, using transverse passage-way, vertical shaft or Underpinned pile cutting piles are carried out in Tunnel, are ready for tunnel underbridge beam pile foundation.
The present invention also provides a kind of asymmetric piles support and change method, in tunnel underbridge beam pile foundation 12, After the abutment 11 and abutment that do not destroy a bridge on the basis of barricade 13, asymmetric is carried out to piles 12 and is actively underpined.
Asymmetric piles in the present embodiment refer to:The one end in bridge 1 is arranged in barricade 13 after abutment.Abutment 11 are located at the junction of bridge 1 and barricade 13 after abutment, and the side of abutment 11 is set as facing sky, and the other side of abutment 11 is filled out for abutment Soil is unsymmetric structure.Following pile foundation underpinning structures in the present embodiment can be good at solving asymmetric piles support Technical difficulty in changing and existing risk.
When it is implemented, including the following steps:Small-scale pit 8 is excavated in region outside under-traverse tunnel coverage, full On the basis of sufficient pile foundation construction machinery clear height requires, carry out to ensure pile foundation underpinning and dig the stratum consolidation of stake safety;Under Region outside tunneling road coverage makes underpinned pile 2 and pile cover 3, carries out vertical applied force system construction;It is influenced in under-traverse tunnel Region outside range makes transform beams 4, and transform beams 4 are connect with abutment 11, and water is integrally carried out to the connection of transform beams 4 and abutment 11 Flat stress system construction;Jack 5 is set between pile cover 3 and transform beams 2 and pile foundation 12 of the jacking to 11 position of abutment is set It is underpined.
Since usually clear height is limited at abutment 11, applies man-hour requirement and first excavate out small-scale pit 8, meeting pile foundation construction machine Under the premise of tool clear height requires, stratum consolidation is carried out to ensure pile foundation underpinning and dig the safety of stake.Further, since needing to utilize bridge Beam Bridge 1 down space 1a performs underpinned pile 2, pile cover 3 and transform beams 4, and the construction needs of underpinned pile are completed within the scope of low clearance, because This pile foundation construction machinery should select special machine.Transform beams 4 are coupled with existing abutment 11 after forming entirety, utilize jack 5 Jacking carries out asymmetric to piles 12 and actively underpins, real in the case of barricade 13 after not destroying abutment 11 and abutment Existing Abutment pile foundation underpins.
Wherein:Transform beams 4 are coupled the whole effect of formation with existing abutment 11 is:When ensureing that pile foundation 12 underpins, abutment 11 it is complete, prevent the offset of abutment 11 or even the case where collapse.
Wherein, abutment 11 is often arranged by the way of the framing of left and right, before underpining, is needed transform beams 4 and abutment 11 Become entirety, when just can guarantee pile foundation underpinning, abutment it is complete, prevent and abutment displacement or even collapse.In the present embodiment, support It changes between beam 4 and abutment 11 and is attached to form asymmetric overall structure by horizontal direction bar planting 6.In this way, ensureing to connect On the basis of connecing intensity, when ensureing that pile foundation 12 underpins, complete, the feelings for preventing the offset of abutment 11 or even collapsing of abutment 11 Condition.
Further, further include:To carry out the transverse passage-way or vertical shaft 7 of cutting piles to bridge pile foundation 12.The structure Effect be:Jack 5 jacking to piles 12 carry out asymmetric actively underpin after, using transverse passage-way, vertical shaft or Underpinned pile cutting piles are carried out in Tunnel, are ready for tunnel underbridge beam pile foundation.
The asymmetric piles support and change method and underpinning structure for implementing the present invention, have the advantages that, under Small-scale pit is excavated in region outside tunneling road coverage, on the basis of meeting the requirement of pile foundation construction machinery clear height, is used To ensure pile foundation underpinning and dig the stratum consolidation of stake safety;Region outside under-traverse tunnel coverage makes underpinned pile and stake Cap carries out vertical applied force system construction;Region outside under-traverse tunnel coverage makes transform beams, and transform beams connect with abutment It connects, horizontal force system construction is integrally carried out to the connection of transform beams and abutment;Jack is set between pile cover and transform beams And jacking is set, the pile foundation of abutment position is underpined, asymmetric piles can be underpined, meet safety, warp Ji, requirement easy to operation;Speed of application is fast, saves the duration.

Claims (10)

1. a kind of asymmetric piles support and change method, in tunnel underbridge beam pile foundation, the abutment not destroyed a bridge and After abutment on the basis of barricade, asymmetric is carried out to piles and is actively underpined, which is characterized in that is included the following steps:
Small-scale pit is excavated in region outside under-traverse tunnel coverage, on the basis for meeting the requirement of pile foundation construction machinery clear height On, it carries out to ensure pile foundation underpinning and dig the stratum consolidation of stake safety;
Region outside under-traverse tunnel coverage makes underpinned pile and pile cover, carries out vertical applied force system construction;
Region outside under-traverse tunnel coverage makes transform beams, and transform beams are connect with abutment, to the transform beams and abutment Connection integrally carry out horizontal force system construction;
Jack is set between the pile cover and the transform beams and jacking is set, the pile foundation of abutment position is underpined.
2. asymmetric piles support and change method as described in claim 1, which is characterized in that the transform beams and the bridge It is attached to form asymmetric overall structure by horizontal direction bar planting between platform.
3. asymmetric piles support and change method as described in claim 1, which is characterized in that described in the pile cover and institute It states between transform beams setting jack and is arranged after jacking underpin step to the pile foundation of abutment position and further include:
The step of pile foundation cutting piles are carried out using transverse passage-way, vertical shaft or in tunnel.
4. asymmetric piles support and change method as described in claim 1, which is characterized in that the asymmetric abutment stake Base support and change method performs within the scope of the low clearance of bridge lower space.
5. asymmetric piles support and change method as described in claim 1, which is characterized in that the abutment of the bridge is located at The junction of bridge and barricade, one side are set as facing sky, and the other side is banketed for abutment.
6. a kind of asymmetric piles underpinning structure, in tunnel underbridge beam pile foundation, the abutment not destroyed a bridge and After abutment on the basis of barricade, asymmetric is carried out to piles and is actively underpined, which is characterized in that
Including:It is located at the underpinned pile of under-traverse tunnel coverage exterior domain, the pile cover being fastened on the underpinned pile, is located at down and wears The transform beams of tunnel coverage exterior domain and the jack being located between the pile cover and the transform beams, wherein:
The transform beams are connect with the abutment, and the jack is set as jacking state.
7. asymmetric piles underpinning structure as claimed in claim 6, which is characterized in that the transform beams and the bridge It is attached to form asymmetric overall structure by horizontal direction bar planting between platform.
8. asymmetric piles underpinning structure as claimed in claim 6, which is characterized in that further include:To bridge Pile foundation carries out the transverse passage-way or vertical shaft of cutting piles.
9. asymmetric piles underpinning structure as claimed in claim 6, which is characterized in that dams setting after the abutment In the one end of bridge.
10. asymmetric piles underpinning structure as claimed in claim 6, which is characterized in that the abutment is located at bridge With the junction of barricade, one side is set as facing sky, and the other side is banketed for abutment.
CN201810238016.4A 2018-03-22 2018-03-22 A kind of asymmetric piles support and change method and underpinning structure Pending CN108457291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810238016.4A CN108457291A (en) 2018-03-22 2018-03-22 A kind of asymmetric piles support and change method and underpinning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810238016.4A CN108457291A (en) 2018-03-22 2018-03-22 A kind of asymmetric piles support and change method and underpinning structure

Publications (1)

Publication Number Publication Date
CN108457291A true CN108457291A (en) 2018-08-28

Family

ID=63236444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810238016.4A Pending CN108457291A (en) 2018-03-22 2018-03-22 A kind of asymmetric piles support and change method and underpinning structure

Country Status (1)

Country Link
CN (1) CN108457291A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468873A (en) * 2019-09-16 2019-11-19 南京吉欧地下空间科技有限公司 Piles underpinning structure and application method under a kind of small space
CN112176853A (en) * 2020-11-04 2021-01-05 武汉大学 Pile-supported damping reinforced earth abutment and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672348A (en) * 2016-01-27 2016-06-15 重庆大学 Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
KR101653606B1 (en) * 2015-09-25 2016-09-02 우경기술주식회사 Method for constructing integral abutment bridge
CN208183779U (en) * 2018-03-22 2018-12-04 深圳市市政设计研究院有限公司 A kind of asymmetric piles underpinning structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101653606B1 (en) * 2015-09-25 2016-09-02 우경기술주식회사 Method for constructing integral abutment bridge
CN105672348A (en) * 2016-01-27 2016-06-15 重庆大学 Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN208183779U (en) * 2018-03-22 2018-12-04 深圳市市政设计研究院有限公司 A kind of asymmetric piles underpinning structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘力英等: "广州机场高速路高架桥桩基托换工程设计", 城市道桥与防洪, pages 75 - 77 *
王文通等: "深圳地铁7 号线彩虹桥桩基托换施工技术", 四川建筑, pages 99 - 101 *
黄晓东等: "南京地铁三号线主动桩基托换工程设计", 城市道桥与防洪, pages 92 - 94 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468873A (en) * 2019-09-16 2019-11-19 南京吉欧地下空间科技有限公司 Piles underpinning structure and application method under a kind of small space
CN112176853A (en) * 2020-11-04 2021-01-05 武汉大学 Pile-supported damping reinforced earth abutment and construction method thereof

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN103882881B (en) Go deep into rock construction method under water
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN203905018U (en) Supporting and protecting system with combined double-row piles in combination with oblique anchors
CN103074899B (en) Subdepot pier-type foundation pit support structure and construction method
CN208183779U (en) A kind of asymmetric piles underpinning structure
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
KR102195504B1 (en) Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN104652418A (en) Continuous wall underground pipeline position construction method
CN110761300B (en) Construction method for supporting impervious soft soil body on side slope of deep foundation pit of high-rise building through micro-expansion
CN111851523B (en) Settlement deviation prevention method for foundation pit construction
CN108457291A (en) A kind of asymmetric piles support and change method and underpinning structure
JP4663541B2 (en) Seismic reinforcement method for existing concrete pier
CN110468873A (en) Piles underpinning structure and application method under a kind of small space
JP3639294B1 (en) Seismic reinforcement structure for structures
CN113482011B (en) Large-diameter PHC pipe pile and cast-in-situ bored pile combined foundation pit supporting structure and method
CN104631489A (en) Bridge cushion cap force underpinning technology in underneath pass open trench tunnel construction
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN109235507B (en) Stratum reinforcing system and method for reinforcing existing tunnel
CN105421488A (en) Constriction method for changing support of foundation slab in underground composite enclosure system
JP2868651B2 (en) Earth retaining method above existing underground structure
CN213571956U (en) Combined construction method pile supporting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination