CN108448545A - A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker - Google Patents

A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker Download PDF

Info

Publication number
CN108448545A
CN108448545A CN201810325901.6A CN201810325901A CN108448545A CN 108448545 A CN108448545 A CN 108448545A CN 201810325901 A CN201810325901 A CN 201810325901A CN 108448545 A CN108448545 A CN 108448545A
Authority
CN
China
Prior art keywords
fault
breaker
segmentation
branch switch
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810325901.6A
Other languages
Chinese (zh)
Other versions
CN108448545B (en
Inventor
杨志淳
杨帆
周志强
沈煜
姚尧
康兵
蒋伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Hubei Electric Power Co Ltd
Priority to CN201810325901.6A priority Critical patent/CN108448545B/en
Publication of CN108448545A publication Critical patent/CN108448545A/en
Application granted granted Critical
Publication of CN108448545B publication Critical patent/CN108448545B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/06Details with automatic reconnection
    • H02H3/066Reconnection being a consequence of eliminating the fault which caused disconnection

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of formula feeder automation fault handling method of coincidence on the spot based on breaker, including:1) substation exit breaker configuration delay fast tripping protection and single shot reclosing function, block switch and branch switch configure breaker along the line;2) the time-delay closing time T of setting segmentation and branch switch1With combined floodgate acknowledging time T2;3) fault trip;4) Fault Isolation and the power supply of upstream load restoration;5) fault down stream load restoration is powered:By remote control or manual mode of operation's combined floodgate interconnection switch, restore the power supply of fault down stream load.The present invention solves the problems, such as that the automatic circuits formula feeder automation such as conventional voltage time type and voltage and current time type needs to configure reclosing twice, multiple shot reclosing influence to load of the automatic circuit formula feeder automation in fault treating procedure is avoided, power supply reliability and the good service for greatly improving distribution line are horizontal.

Description

A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker
Technical field
The present invention relates to distribution network technology fields, more particularly to be a kind of formula of the coincidence on the spot feeder line based on breaker from Dynamicization fault handling method.
Background technology
Feeder automation mainly overlaps including concentrated feeder automation, intelligent distribution type feeder automation and on the spot formula Feeder automation, on the spot overlap formula feeder automation have independent of communication and power distribution automation main station carry out fault location, The advantage be isolated and restored electricity is widely applied.
It includes voltage-time type and voltage and current time type, then, traditional electricity to overlap formula feeder automation on the spot mainly Press time type feeder automation using the strategy of " decompression separating brake, incoming call time-delay closing ", in line failure substation exit After circuit breaker trip, no matter whether faulty electric current by can all cause voltage-time type switch trip, causes to switch on circuit Multiple action, influence switch service life;And conventional voltage time type feeder automation needs substation exit breaking Device configuration reclosing, voltage and current time type feeder automation twice needs to configure reclosing three times, this leads to a large amount of substations Outlet breaker does not have twice and the above reclosing function or does not allow configuration twice and the circuit of the above reclosing can not answer With coincidence formula feeder automation on the spot.
Based on the above issues, by the way that the logical action characteristic of each distribution power automation terminal is rationally arranged, realize that type is presented on the spot Organic cooperation of line automation and single shot reclosing is of great significance.
Invention content
The present invention provides a kind of formula feeder automation fault handling method of coincidence on the spot based on breaker, solves tradition The automatic circuits formula feeder automation such as voltage-time type and voltage and current time type needs to configure reclosing problem twice, avoids Multiple shot reclosing influence to load and Switch main body of the automatic circuit formula feeder automation in fault treating procedure, it is only necessary to become The single shot reclosing of power station outlet breaker can realize distribution line failure positioning, be isolated and restore electricity, and be greatly improved The power supply reliability of distribution line and good service are horizontal.
The present invention adopts the following technical scheme that:
A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker, includes the following steps:
Step (1), substation exit breaker configure delay fast tripping protection and single shot reclosing function, along the line block switch And branch switch configures breaker;
The time-delay closing time T of step (2), setting segmentation and branch switch1With combined floodgate acknowledging time T2
Step (3), fault trip:Substation exit circuit breaker trip after generation phase fault, if segmentation and branch Switch detects decompression and faulty electric current record then trips, if segmentation and branch switch detect decompression but non-faulty current is remembered Record is not tripped then;
Step (4), Fault Isolation and the power supply of upstream load restoration:Substation exit breaker single shot reclosing, segmentation and Branch switch is delayed T successively1It closes a floodgate, the after accelerated protection when the nearest segmentation in fault point upstream or branch switch He Zhong Library Action is tripped again, and the nearest segmentation in fault point upstream or branch switch are less than combined floodgate acknowledging time due to closing a floodgate to opening time T2And be latched, the nearest segmentation of trouble point downstream or branch switch are examined residual voltage and are latched;
Step (5), the power supply of fault down stream load restoration:It is extensive by remote control or manual mode of operation's combined floodgate interconnection switch Multiple fault down stream load power supply.
Further, the time-delay closing time T of segmentation and branch switch in the step (2)1More than combined floodgate acknowledging time T2
Further, after breaking down in the step (3), segmentation and branch switch only detect decompression and have event Barrier electric current record can just trip, the segmentation of fault down stream or other not faulty electric current records and branch line will not because of decompression and Tripping.
Further, after step (4) the substation exit breaker single shot reclosing, when nearest point in fault point upstream After accelerated protection action is tripped again when section or branch switch He Zhong Library, and the other segmentations in fault point upstream or branch switch are not It can again trip because failure is coincided with.
The present invention technological merit be:After failure generation, segmentation and branch switch only have while meeting decompression the present invention And faulty electric current record can just trip, i.e., the switch only on failure path can trip, and the switch on non-faulting path is only examined It measures decompression and non-faulty current record will not trip;Simultaneously after substation exit breaker single shot reclosing, it is segmented and divides When Zhi Kaiguan coincides with failure successively, fault point upstream switchs and trips and be latched by after accelerated protection recently, without drawing again Substation exit switch trip is played, therefore substation exit breaker only needs to configure single shot reclosing and can realize distribution line event Barrier positioning, isolation solve the automatic circuits formula feeder automation such as conventional voltage time type and voltage and current time type needs and match Reclosing problem twice is set, power supply reliability and the good service for greatly improving distribution line are horizontal.
Description of the drawings
Fig. 1 is the flow diagram for overlapping formula feeder automation fault handling method on the spot the present invention is based on breaker;
Fig. 2 is fault treating procedure schematic diagram of the present invention in backbone;
Fig. 3 is fault treating procedure schematic diagram of the present invention in branch line.
Specific implementation mode
With reference to the drawings and specific embodiments in the present invention, the technical solution in the present invention is carried out clear, complete Ground describes.
With reference to figure 1, the present invention provides a kind of formula feeder automation fault handling method of coincidence on the spot based on breaker, packet Include following steps:
Step (1), substation exit breaker configure delay fast tripping protection and single shot reclosing function, along the line block switch And branch switch configures breaker;
The time-delay closing time T of step (2), setting segmentation and branch switch1With combined floodgate acknowledging time T2
Step (3), fault trip:Substation exit circuit breaker trip after generation phase fault, if segmentation and branch Switch detects decompression and faulty electric current record then trips, if segmentation and branch switch detect decompression but non-faulty current is remembered Record is not tripped then;
Step (4), Fault Isolation and the power supply of upstream load restoration:Substation exit breaker single shot reclosing, segmentation and Branch switch is delayed T successively1It closes a floodgate, the after accelerated protection when the nearest segmentation in fault point upstream or branch switch He Zhong Library Action is tripped again, and the nearest segmentation in fault point upstream or branch switch are less than combined floodgate acknowledging time due to closing a floodgate to opening time T2And be latched, the nearest segmentation of trouble point downstream or branch switch are examined residual voltage and are latched;
Step (5), the power supply of fault down stream load restoration:It is extensive by remote control or manual mode of operation's combined floodgate interconnection switch Multiple fault down stream load power supply.
Specifically, the time-delay closing time T of segmentation and branch switch1More than combined floodgate acknowledging time T2
Specifically, after breaking down, segmentation and branch switch only detect decompression and the just meeting of faulty electric current record Tripping, the segmentation of fault down stream or other not faulty electric current records and branch line will not trip because of decompression.
Specifically, after substation exit breaker single shot reclosing, when the nearest segmentation in fault point upstream or branch switch After accelerated protection action is tripped again when He Zhong Library, and the other segmentations in fault point upstream or branch switch will not be because of coinciding with Failure and he trips again..
It is automatic below according to the formula feeder line of coincidence on the spot based on breaker shown in Fig. 1 in order to which the above method is expanded on further Change troubleshooting process, in conjunction with a specific example to further detailed description of the invention.
Backbone troubleshooting, as shown in Fig. 2, in figure QF be substation exit breaker, configuration delay fast tripping protection and 0.15 second QF delay tripping time is arranged in single shot reclosing function;QL1~QL3 is breaker block switch, and QL4~QL6 is disconnected The time-delay closing time T of QL1~QL6 is arranged in road device branch switch1It is 5 seconds, combined floodgate acknowledging time T2It is 3 seconds;QL7 is breaker Interconnection switch.
A) distribution line normal power supply.
B) permanent fault occurs for F points, and substation exit circuit breaker Q F detects that line fault, protection act tripping are divided Duan Kaiguan QL1 and QL2 detect decompression and faulty electric current then trips, block switch QL3 and branch switch QL4~QL6 inspections It measures decompression but non-faulty current does not trip then.
C) substation exit circuit breaker Q F reclosings;
D) after 5 seconds time-delay closing time, block switch QL1 closes a floodgate;After combined floodgate acknowledging time 3 seconds, do not close a floodgate to fault point, QL1 no longer separating brakes;
E) after 5 seconds time-delay closing time, block switch QL2 closes a floodgate.
F) because of block switch QL2 He Zhong Libraries point then Accelerated trip, and since the combined floodgate for being not up to 3 seconds after combined floodgate confirms Time is then latched after block switch QL2 trippings;
G) block switch QL3 detects short circuit incoming call and non-faulty current records, then trips and be latched;So far failure is completed Isolation and the power supply of failure upstream region load.
H) by remote control or manual mode of operation's combined floodgate interconnection switch, restore the load power supply of fault down stream region.
Branch line troubleshooting, as shown in figure 3, substation exit circuit breaker Q F, breaker branch switch QL1 in figure~ The configuration of QL6 and breaker interconnection switch QL7 are identical as setting when backbone failure.
A) distribution line normal power supply.
B) permanent fault occurs for F points, and substation exit circuit breaker Q F detects that line fault, protection act tripping are divided Duan Kaiguan QL1 and branch switch QL5 detect decompression and faulty electric current then trips, and block switch QL2, QL3 and branch open Pass QL4, QL6 detect decompression but non-faulty current does not trip then.
C) substation exit circuit breaker Q F reclosings;
D) after 5 seconds time-delay closing time, block switch QL1 closes a floodgate;After combined floodgate acknowledging time 3 seconds, do not close a floodgate to fault point, QL1 no longer separating brakes;
E) after 5 seconds time-delay closing time, branch switch QL5 closes a floodgate.
F) because of branch switch QL5 He Zhong Libraries point then Accelerated trip, and since the combined floodgate for being not up to 3 seconds after combined floodgate confirms Time is then latched after branch switch QL5 trippings;So far Fault Isolation and the power supply of fault zone load are completed.
It should be noted that the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, although ginseng According to above-described embodiment, invention is explained in detail, those of ordinary skills in the art should understand that:It still can be with It modifies or equivalent replacement, and any modification without departing from the scope of the invention or equally replaces to the specific implementation mode of the present invention It changes, is intended to be within the scope of the claims of the invention.

Claims (4)

1. a kind of formula feeder automation fault handling method of coincidence on the spot based on breaker, it is characterised in that including following step Suddenly:
1) substation exit breaker configures delay fast tripping protection and single shot reclosing function, along the line block switch and branch switch Configure breaker;
2) the time-delay closing time T of block switch is set1With combined floodgate acknowledging time T2
3) fault trip:Substation exit circuit breaker trip after generation phase fault, if segmentation and branch switch detect Decompression and faulty electric current, which record, then to trip, and is not jumped if segmentation and branch switch detect that decompression but non-faulty current record Lock;
4) Fault Isolation and the power supply of upstream load restoration:Substation exit breaker single shot reclosing, segmentation and branch switch according to Secondary delay T1It closes a floodgate, when the nearest segmentation in fault point upstream or branch switch He Zhong Library, after accelerated protection is acted and jumped again Lock, the nearest segmentation in fault point upstream or branch switch are less than combined floodgate acknowledging time T due to closing a floodgate to opening time2And be latched, The nearest segmentation of trouble point downstream or branch switch are examined residual voltage and are latched;
5) fault down stream load restoration is powered:By remote control or manual mode of operation's combined floodgate interconnection switch, restore fault down stream Load is powered.
2. the coincidence on the spot formula feeder automation fault handling method according to claim 1 based on breaker, feature It is:The time-delay closing time T of segmentation and branch switch1More than combined floodgate acknowledging time T2
3. the coincidence on the spot formula feeder automation fault handling method according to claim 1 based on breaker, feature It is:After breaking down in the step (3), segmentation and branch switch only detect decompression and faulty electric current record It can trip, the segmentation of fault down stream or other not faulty electric current records and branch line will not trip because of decompression.
4. the coincidence on the spot formula feeder automation fault handling method according to claim 1 based on breaker, feature It is:After step (4) the substation exit breaker single shot reclosing, when the nearest segmentation in fault point upstream or branch switch After accelerated protection action is tripped again when He Zhong Library, and the other segmentations in fault point upstream or branch switch will not be because of coinciding with Failure and he trips again.
CN201810325901.6A 2018-04-12 2018-04-12 A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker Active CN108448545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810325901.6A CN108448545B (en) 2018-04-12 2018-04-12 A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810325901.6A CN108448545B (en) 2018-04-12 2018-04-12 A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker

Publications (2)

Publication Number Publication Date
CN108448545A true CN108448545A (en) 2018-08-24
CN108448545B CN108448545B (en) 2019-05-03

Family

ID=63199740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810325901.6A Active CN108448545B (en) 2018-04-12 2018-04-12 A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker

Country Status (1)

Country Link
CN (1) CN108448545B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110649578A (en) * 2019-08-07 2020-01-03 珠海许继电气有限公司 Fault isolation method and system for distributed feeder automation power distribution terminal
CN111781465A (en) * 2020-06-28 2020-10-16 云南电网有限责任公司电力科学研究院 Fault positioning system and method for ungrounded power grid
CN111884177A (en) * 2020-07-03 2020-11-03 国网浙江省电力有限公司电力科学研究院 In-situ feeder automation method based on voltage and current protection
CN111952940A (en) * 2020-07-08 2020-11-17 国网江西省电力有限公司电力科学研究院 In-situ feeder automation improvement strategy
CN112165090A (en) * 2020-09-29 2021-01-01 国电南瑞南京控制系统有限公司 Cooperative self-healing system and method
CN112421615A (en) * 2020-11-05 2021-02-26 江苏其厚智能电气设备有限公司 Power distribution station self-healing control method and system based on intelligent breaker action
CN112510658A (en) * 2020-11-11 2021-03-16 广西电网有限责任公司电力科学研究院 Multi-power-supply-point 10kV line feeder automation method with high power supply reliability
CN113690834A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Overlapping type feeder automation line short circuit fault interval detection system on spot
CN113690835A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Detection method for short-circuit fault section of in-situ overlapping type feeder automation line
CN113991622A (en) * 2021-10-29 2022-01-28 武汉市速隔迅联电力科技有限公司 Feeder automation voltage-loss brake-separating delay strategy and setting method
CN114094554A (en) * 2021-12-02 2022-02-25 广东电网有限责任公司 Master station in-place cooperative self-healing error isolation prevention method and related device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5940260A (en) * 1993-12-09 1999-08-17 Gelbien; Lawrence J. Apparatus and method for distributing electrical power
CN102916409A (en) * 2012-11-13 2013-02-06 山东电力集团公司济南供电公司 Voltage-time type feeder automation running method based on parameter adjustment
CN106026051A (en) * 2016-07-26 2016-10-12 国电南瑞科技股份有限公司 Fixed-value adaptive voltage and current time type on-site feeder automation method
CN106300285A (en) * 2016-08-04 2017-01-04 国家电网公司 It is independent of the self adaptation type feeder automation fault handling method on the spot of network topology
CN106786425A (en) * 2017-01-16 2017-05-31 中国电力科学研究院 A kind of coincidence formula failure separation method and system on the spot

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5940260A (en) * 1993-12-09 1999-08-17 Gelbien; Lawrence J. Apparatus and method for distributing electrical power
CN102916409A (en) * 2012-11-13 2013-02-06 山东电力集团公司济南供电公司 Voltage-time type feeder automation running method based on parameter adjustment
CN106026051A (en) * 2016-07-26 2016-10-12 国电南瑞科技股份有限公司 Fixed-value adaptive voltage and current time type on-site feeder automation method
CN106300285A (en) * 2016-08-04 2017-01-04 国家电网公司 It is independent of the self adaptation type feeder automation fault handling method on the spot of network topology
CN106786425A (en) * 2017-01-16 2017-05-31 中国电力科学研究院 A kind of coincidence formula failure separation method and system on the spot

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110649578A (en) * 2019-08-07 2020-01-03 珠海许继电气有限公司 Fault isolation method and system for distributed feeder automation power distribution terminal
CN111781465A (en) * 2020-06-28 2020-10-16 云南电网有限责任公司电力科学研究院 Fault positioning system and method for ungrounded power grid
CN111884177B (en) * 2020-07-03 2022-10-14 国网浙江省电力有限公司电力科学研究院 In-situ feeder automation method based on voltage and current protection
CN111884177A (en) * 2020-07-03 2020-11-03 国网浙江省电力有限公司电力科学研究院 In-situ feeder automation method based on voltage and current protection
CN111952940A (en) * 2020-07-08 2020-11-17 国网江西省电力有限公司电力科学研究院 In-situ feeder automation improvement strategy
CN112165090A (en) * 2020-09-29 2021-01-01 国电南瑞南京控制系统有限公司 Cooperative self-healing system and method
CN112421615A (en) * 2020-11-05 2021-02-26 江苏其厚智能电气设备有限公司 Power distribution station self-healing control method and system based on intelligent breaker action
CN112510658A (en) * 2020-11-11 2021-03-16 广西电网有限责任公司电力科学研究院 Multi-power-supply-point 10kV line feeder automation method with high power supply reliability
CN112510658B (en) * 2020-11-11 2022-11-22 广西电网有限责任公司电力科学研究院 Multi-power-point 10kV line feeder automation method with high power supply reliability
CN113690835A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Detection method for short-circuit fault section of in-situ overlapping type feeder automation line
CN113690834A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Overlapping type feeder automation line short circuit fault interval detection system on spot
CN113991622A (en) * 2021-10-29 2022-01-28 武汉市速隔迅联电力科技有限公司 Feeder automation voltage-loss brake-separating delay strategy and setting method
CN113991622B (en) * 2021-10-29 2023-07-18 武汉市速隔迅联电力科技有限公司 Feeder line automatic voltage-losing and switching-off delay strategy and setting method
CN114094554A (en) * 2021-12-02 2022-02-25 广东电网有限责任公司 Master station in-place cooperative self-healing error isolation prevention method and related device
CN114094554B (en) * 2021-12-02 2023-06-30 广东电网有限责任公司 Method and related device for preventing error isolation by master station in-situ cooperative self-healing

Also Published As

Publication number Publication date
CN108448545B (en) 2019-05-03

Similar Documents

Publication Publication Date Title
CN108448545B (en) A kind of formula feeder automation fault handling method of coincidence on the spot based on breaker
CN108376974B (en) A kind of power distribution network relay protection system based on current limliting Graded coordination
CN106300285A (en) It is independent of the self adaptation type feeder automation fault handling method on the spot of network topology
CN104113048B (en) A kind of power distribution network intelligent protection system
CN107433883B (en) Railway traction power supply arm integrated monitoring system
CN108051706A (en) Automatic throw-in equipment of emergency power supply fault recognition method and system
CN104113141B (en) A kind of intelligence longitudinally interconnects feeder automation control method
CN101662144A (en) Feeder automation processing method and device of distribution network
CN105071357A (en) Fault processing method based on multistage extreme difference protection and power distribution network automation system
CN109245072B (en) Self-adaptive in-situ feeder automation fault processing method based on regional sequence number
CN102611082B (en) Self-adaptive feeder neighborhood interactive fault-tolerant relay protection method for power distribution network
CN102882195A (en) Intelligent longitudinally-interconnected feeder automation system
CN112165090A (en) Cooperative self-healing system and method
CN109494695A (en) A kind of method and system of middle straightening stream distribution network failure isolation and fault recovery
CN104124672B (en) For the method that voltage-type fault section front end restores electricity
CN109687405A (en) A kind of combined hybrid dc circuit breaker of multiport and control method
CN102738777A (en) Rapid distribution network fault self-recovery method based on generic object oriented substation event (GOOSE) message
CN113258545B (en) In-situ feeder automation method and system based on multi-stage time step difference protection
CN109818410A (en) A kind of rapidly self-healing method of urban track traffic ac power supply system
CN106129970B (en) A kind of simple bus bar protecting method for intelligent substation low-voltage bus bar
CN108390354A (en) Adaptive reclosing switch and the feeder automation control method based on the switch
CN101895101A (en) Distributed station domain protecting method for switching station
CN111505438B (en) Improved self-adaptive feeder automation method
CN102646966A (en) Three-phase fault processing method of distributing line
CN110970876A (en) Feeder automation fault isolation method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yang Zhichun

Inventor after: Yang Fan

Inventor after: Shen Yu

Inventor after: Yao Yao

Inventor after: Zhou Zhiqiang

Inventor after: Jiang Wei

Inventor after: Kang Bing

Inventor before: Yang Zhichun

Inventor before: Yang Fan

Inventor before: Zhou Zhiqiang

Inventor before: Shen Yu

Inventor before: Yao Yao

Inventor before: Kang Bing

Inventor before: Jiang Wei

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant