CN108445356A - A kind of track plate insulation detection machine - Google Patents

A kind of track plate insulation detection machine Download PDF

Info

Publication number
CN108445356A
CN108445356A CN201810196966.5A CN201810196966A CN108445356A CN 108445356 A CN108445356 A CN 108445356A CN 201810196966 A CN201810196966 A CN 201810196966A CN 108445356 A CN108445356 A CN 108445356A
Authority
CN
China
Prior art keywords
contact
cylinder
detection
piece
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810196966.5A
Other languages
Chinese (zh)
Other versions
CN108445356B (en
Inventor
王加祥
薛长军
廉栋
张德新
张大伟
郭强
刘阳
辛明廉
焦作坤
赵浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong High Speed Railway Construction Equipment Co ltd
Original Assignee
SHANDONG HIGH-SPEED RAIL EQUIPMENT MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HIGH-SPEED RAIL EQUIPMENT MATERIAL Co Ltd filed Critical SHANDONG HIGH-SPEED RAIL EQUIPMENT MATERIAL Co Ltd
Priority to CN201810196966.5A priority Critical patent/CN108445356B/en
Publication of CN108445356A publication Critical patent/CN108445356A/en
Application granted granted Critical
Publication of CN108445356B publication Critical patent/CN108445356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The present invention relates to a kind of track plate insulation detection machines comprising supporting rack, middle beam and two end crossbeams;First cylinder is vertically installed, the piston rod of the first cylinder is arranged downward and the bottom end of piston rod is connected with the first contact base, and the first contact is equipped on the first contact base on middle beam;Slide vertically the second contact base for being equipped with and being driven by third cylinder below the crossbeam of end, the second contact base is the bar shaped seat being laterally extended, and multiple second contacts are installed in lateral separation on the second contact base;Two the second contacts corresponding with the both ends of same root longitudinal reinforcement form a pair of first pre-detection contact, first contact forms multipair actually detected contact with each second contact respectively as public contact, each each to be connect respectively to the first pre-detection contact and with insulation detecting circuit by conducting wire to actually detected contact.The present invention has the advantages that simple in structure, manipulation is convenient, detection is accurate and reliable and work efficiency is high.

Description

A kind of track plate insulation detection machine
Technical field
The present invention relates to track plates to produce and process field, specifically a kind of Insulation monitoring for track plates steel reinforcement cage Machine.
Background technology
With the continuous development of China express railway standard of construction, ballastless track structure form is generally used.It is perfect The ballastless track structure pattern under different operation conditions is adapted to, provides and has by force for the going global development strategy of China express railway The technical support of power, the Ministry of Railways organize III plate-type ballastless track structures of relevant unit's independent research CRTS.
III type track plates of CRTS in process of production, need to carry out following processing step, first have to clear mould, to ensure rail Guidance tape Surface Quality of Concrete, after template is cleaned out, one layer of releasing agent of even application;Secondly the installation of service sleeve is carried out Lifting, steel reinforcement cage be put into and mantle fiber, after mantle fiber, reinforcing bar just pre-tighten, reinforced bar stretching is carried out after placing into cushion block, Insulation monitoring is carried out after tensioning;Finally, put into and concrete and vibrate into mold, put after steam curing, tear open and Demoulding, then carry out water-bath maintenance.
Wherein, steel reinforcement cage shares upper layer and lower layer bar-mat reinforcement, and the bar-mat reinforcement on every layer is interweaved by transverse steel and longitudinal reinforcement It is formed, in order to ensure that the integral insulation performance of track plates, the insulation performance between every transverse steel and every longitudinal reinforcement are equal It needs to reach 2 megaohms or more.Therefore, when making steel reinforcement cage, it is first arranged insulating sleeve at the position of bar connecting point, then uses Steel wire tightens two reinforcing bars.But in specific implementation, often there is the problems such as casing is slipped or damaged, cause to connect individually The insulation performance of contact is deteriorated.Tie point on upper layer and lower layer bar-mat reinforcement is various, it is difficult to which it is which connection is pointed out to quickly detect Problem is showed, worker is needed to be detected one by one using tools such as megameters, operation is time-consuming and laborious, and labor intensity is big and working efficiency It is low.
Invention content
The technical problem to be solved in the present invention is to provide a kind of simple in structure, manipulations conveniently, detection is accurate and reliable and works Efficient track plate insulation detection machine.
In order to solve the above technical problems, the track plate insulation detection machine of the present invention is structurally characterized in that including supporting rack and indulges To three crossbeams being slidably mounted at the top of supporting rack, in three crossbeams positioned at centre be middle beam, both sides are two End crossbeam;First cylinder is vertically installed, the piston rod of the first cylinder is arranged downward and the bottom end of piston rod on middle beam Portion is connected with the first contact base, is equipped with and is driven by the second cylinder and what can be contacted with transverse steel first touches on the first contact base Head;The second contact base for being equipped with and being driven by third cylinder is slid vertically below the crossbeam of end, the second contact base is laterally to prolong The bar shaped seat stretched, lateral separation is equipped with multiple that is driven by the 4th cylinder and can be contacted with longitudinal reinforcement on the second contact base Two contacts, the quantity of the second contact are corresponding with the quantity of longitudinal reinforcement;Corresponding with the both ends of same root longitudinal reinforcement two A second contact forms a pair of first pre-detection contact, and the first contact forms with each second contact more respectively as public contact It is each each conducting wire and insulation detecting circuit to be passed through to the first pre-detection contact and respectively to actually detected contact to actually detected contact Connection.
Using the above structure, first by two end cross beam movements to the both ends of steel reinforcement cage to be detected so that each second touches Head is contacted with the end of each longitudinal reinforcement respectively, then moves middle beam so that the first contact is with transverse steel by piece-root grafting It touches, so as to be disposably detected to multiple intersection points, manipulation is convenient and work efficiency is high.
Detection contact is equivalent to a detection switch, and two contacts are equivalent to two contacts of switch, two contact difference Two test points are contacted, if the resistance between two test points is more than preset resistive value, the insulating properties between two test points Can be good, if the resistance between two test points less than preset resistive value, illustrates the insulation performance between two test points not It is good.When actually detected result is bad, you can it is intuitive learn be which root transverse steel and which root longitudinal reinforcement friendship There are Insulation Problems at point, to carry out insulation processing to the intersection position.
Detection contact includes the first pre-detection contact and actually detected contact.Wherein, two switches of actually detected contact Contact contacts a wherein transverse steel and a wherein longitudinal reinforcement respectively, before each contact energy reliable contacts to reinforcing bar It puts, it, then can the intuitive judgment root transverse steel and the root longitudinal reinforcement when actually detected result is that insulation performance is bad Intersection point insulation performance is bad.
Each contact in above-mentioned premise includes the first contact and the second contact, that is, in order to ensure the reliable of testing result Property, there are two preconditions:1)First contact and transverse steel reliable contacts;2)Second contact and longitudinal reinforcement reliable contacts. For how to ensure above-mentioned two reliable contacts, made a concrete analysis of below.
The formation of first pre-detection contact is by the way that a radicle crossbeam is respectively set at supporting rack both ends and then exists respectively Two radicle crossbeam bottoms are arranged what a set of second contact was just achieved.The setting of first pre-detection contact is to ensure Two contacts and longitudinal reinforcement reliable contacts.Specifically, for the first pre-detection contact, two switch contact contacts respectively The both ends of same root longitudinal reinforcement, reinforcing bar are conductive, it is clear that its resistance value is much smaller than preset insulating resistance value.But if The testing result of first pre-detection contact is that the insulation performance between two test points is bad, then can only illustrate two the second contacts At least one does not have reliable contacts to reinforcing bar, and actually detected result at this time is necessarily unreliable, needs staff couple second It can just continue to detect after contact maintenance.
For how to ensure the reliable contacts of the first contact and transverse steel, realized by the way that the second pre-detection contact is arranged , specifically:Installation two the first cylinders in interval on the middle beam, the piston rod bottom end of each first cylinder is respectively mounted one A first contact base, a set of first contact is respectively provided on each first contact base, and two the first contacts form a pair of second preliminary examination Contact is surveyed, the second pre-detection contact is connect by conducting wire with insulation detecting circuit.
Similar with the first pre-detection contact, for the second pre-detection contact, two switch contact contacts together respectively A piece transverse steel, transverse steel are also conductive, it is clear that its resistance value is much smaller than preset insulating resistance value.If second is pre- The testing result of detection contact is that the insulation performance between two test points is bad, then can only illustrate in two the first contacts at least There are one not having reliable contacts to reinforcing bar, actually detected result at this time is also insecure, and staff couple first is needed to touch It can just continue to detect after head maintenance.
Since steel reinforcement cage is divided into upper layer and lower layer bar-mat reinforcement, each contact is arranged in groups, every group of two contacts point The test point of the upper and lower is not corresponded to.Specifically:Second cylinder is installed in the both sides of first contact base respectively, each One piece of first vertically arranged contact yoke plate is connected on the piston rod of second cylinder, one is long and the other is short for two piece of first contact yoke plate, the One two one group of contact and the bottom end for being separately mounted to two piece of first contact yoke plate.The 4th cylinder each two is one group, One piece of second vertically arranged contact yoke plate, two piece of second contact yoke plate are respectively connected on every group of two the 4th cylinder piston rods One is long and the other is short, the second two one group of contact and the bottom end for being separately mounted to two piece of second contact yoke plate.
In above structure, pass through setting one is long and the other is short two pieces of contact yoke plates so that each group contact respectively with two layers of bar-mat reinforcement It is corresponding, since the movement of each contact is first to drop to certain altitude, reinforcing bar is then laterally pushed and contacted by cylinder, because This, the contact movement on two layers is non-interference so that and displacement of crossbeam can be carried out at the same time detection to the two layers of mesh of steel reinforcement cage, Detection efficiency higher.
For the specific mounting structure of crossbeam, support frame as described above is arranged in parallel and at interval top beam including two, top beam Bottom is supported by more root posts, and a main running rail is laid on every top beam, and the both ends of crossbeam are slidably mounted on main running rail, top beam On be fixed with the rack parallel with main running rail, the end of crossbeam is equipped with driving motor, pacifies on the power output shaft of driving motor Equipped with rack meshed gears.
For the structure that is slidably installed of the second contact base, the bottom of the end crossbeam is vertically connected with secondary sliding rail, the Two contact bases are slidably mounted on secondary sliding rail, and third cylinder is mounted on the bottom of end crossbeam, the bottom end of third cylinder piston rod It is connect with the second contact base.
The insulation detecting circuit includes multichannel megameter and display screen, each pair of detection contact respectively by conducting wire with megaohm The wherein input terminal connection all the way of table.Multiple megameters may be used to be separately connected each detection contact and be detected respectively The results show that this case is preferred, the switching signal that each detection contact is received with the megameter that multichannel inputs, switch letter are used It number is intuitively shown by display screen after microcontroller is handled.
In conclusion the present invention has the advantages that simple in structure, manipulation is convenient, detection is accurate and reliable and work efficiency is high.
Description of the drawings
Invention is further described in detail with reference to the accompanying drawings and detailed description:
Fig. 1 is the structural schematic diagram under working condition of the present invention;
Fig. 2 is the overall structure diagram of the present invention;
Fig. 3 is the portions the A enlarged structure schematic diagram in Fig. 2;
Fig. 4 is the specific mounting structure schematic diagram of the first contact;
Fig. 5 is the portions the B enlarged structure schematic diagram in Fig. 2;
Fig. 6 is the specific mounting structure schematic diagram of the second contact.
Specific implementation mode
With reference to attached drawing, track plate insulation detection machine of the invention includes that supporting rack and longitudinal sliding motion are mounted at the top of supporting rack Three crossbeams, in three crossbeams positioned at centre be middle beam 1, both sides are two end crossbeams 2;On middle beam 1 The first cylinder 3 vertically is installed, the piston rod of the first cylinder 3 is arranged downward and the bottom end of piston rod is connected with the first contact base 4, the first contact 6 that is driven by the second cylinder 5 and can be contacted with transverse steel is installed on the first contact base 4;End crossbeam 2 Lower section slides vertically the second contact base 8 for being equipped with and being driven by third cylinder 7, and the second contact base 8 is the bar shaped seat being laterally extended, 8 lateral separations are equipped with multiple the second contacts 10 that is driven by the 4th cylinder 9 and can be contacted with longitudinal reinforcement on second contact base, The quantity of second contact 10 is corresponding with the quantity of longitudinal reinforcement;Two second corresponding with the both ends of same root longitudinal reinforcement Contact 10 forms a pair of first pre-detection contact, and the first contact 6 forms with each second contact 10 more respectively as public contact It is each each conducting wire and insulation detecting circuit to be passed through to the first pre-detection contact and respectively to actually detected contact to actually detected contact Connection.
Using the above structure, two end crossbeams 2 are first moved to the both ends of steel reinforcement cage to be detected so that each second touches First 10 contact with the end of each longitudinal reinforcement respectively, then move middle beam 1 so that the first contact 6 and transverse steel by Piece-root grafting is touched, and so as to be disposably detected to multiple intersection points, manipulation is convenient and work efficiency is high.
Detection contact is equivalent to a detection switch, and two contacts are equivalent to two contacts of switch, two contact difference Two test points are contacted, if the resistance between two test points is more than preset resistive value, the insulating properties between two test points Can be good, if the resistance between two test points less than preset resistive value, illustrates the insulation performance between two test points not It is good.Preset resistive value is set according to specific standards, such as preset resistive value may be configured as 2 megaohms.When actually detected result is bad, Which root transverse steel can intuitively be learnt is and Insulation Problems occurs in the point of intersection of which root longitudinal reinforcement, to this Intersection position carries out insulation processing.
Detection contact includes the first pre-detection contact, the second pre-detection contact and actually detected contact.
Two switch contacts of actually detected contact contact a wherein transverse steel and a wherein longitudinal reinforcement respectively, Under the premise of energy reliable contacts are to reinforcing bar for each contact, when actually detected result is that insulation performance is bad, then can intuitively it sentence The intersection point insulation performance of the disconnected root transverse steel and the root longitudinal reinforcement is bad.
Each contact in above-mentioned premise includes the first contact 6 and the second contact 10, that is, can in order to ensure testing result By property, there are two preconditions:1)First contact 6 and transverse steel reliable contacts;2)Second contact 10 and longitudinal reinforcement are reliable Contact.For how to ensure above-mentioned two reliable contacts, made a concrete analysis of below.
The formation of first pre-detection contact is by the way that a radicle crossbeam 2 and then difference is respectively set at supporting rack both ends It is arranged what a set of second contact 10 was just achieved in two radicle crossbeams, 2 bottom.The setting of first pre-detection contact be in order to Ensure the second contact 10 and longitudinal reinforcement reliable contacts.Specifically, for the first pre-detection contact, two switch contact The both ends of same root longitudinal reinforcement are contacted respectively, reinforcing bar is conductive, it is clear that its resistance value is much smaller than preset insulating resistance value. But if the testing result of the first pre-detection contact is that insulation performance between two test points is bad, it can only illustrate two At least one does not have reliable contacts to reinforcing bar to a second contact 10, and actually detected result at this time is necessarily unreliable, needs work Make just continue to detect after the second contact of personnel couple 10 overhauls.
It is real by setting the second pre-detection contact for how to ensure the reliable contacts of the first contact 6 and transverse steel Existing, specifically:Installation two the first cylinders 3 in interval on middle beam 1, the piston rod bottom end of each first cylinder 3 is respectively mounted One the first contact base 4 is respectively provided with a set of first contact 6 on each first contact base 4, is located on different first contact bases 4 Two the first contacts 6 form a pair of second pre-detection contact, and the second pre-detection contact is connect by conducting wire with insulation detecting circuit.
Similar with the first pre-detection contact, for the second pre-detection contact, two switch contact contacts together respectively A piece transverse steel, transverse steel are also conductive, it is clear that its resistance value is much smaller than preset insulating resistance value.If second is pre- The testing result of detection contact is that the insulation performance between two test points is bad, then can only illustrate in two the first contacts at least There are one not having reliable contacts to reinforcing bar, actually detected result at this time is also insecure, and staff couple first is needed to touch It can just continue to detect after head maintenance.
Since steel reinforcement cage is divided into upper layer and lower layer bar-mat reinforcement, each contact is arranged in groups, every group of two contacts point The test point of the upper and lower is not corresponded to.Specifically, as shown, second gas is installed in the both sides of the first contact base 4 respectively Cylinder 5 connects one piece of first vertically arranged contact yoke plate 11, two piece of first contact yoke plate on the piston rod of each second cylinder 5 11 one is long and the other is short, the first 6 two one group of contact and the bottom end for being separately mounted to two piece of first contact yoke plate 11.4th cylinder 9 Each two is one group, and one piece of second vertically arranged contact yoke plate 12 is respectively connected on every group of two the 4th cylinder piston rods, One is long and the other is short for two piece of second contact yoke plate 12, the second 10 two one group of contact and is separately mounted to two piece of second contact yoke plate 12 Bottom end.
With reference to attached drawing, for the structure that is slidably installed of crossbeam, supporting rack is arranged in parallel and at interval top beam 13 including two, The bottom of top beam 13 is supported by more root posts 14, a main running rail 15 is laid on every top beam 13, the both ends of crossbeam are slidably installed On main running rail 15, the rack 16 parallel with main running rail 15 is fixed on top beam 13, the end of crossbeam is equipped with driving motor 17, It is equipped on the power output shaft of driving motor 17 and 16 meshed gears of rack.
With reference to attached drawing, for the structure that is slidably installed of the second contact base, the bottom of end crossbeam 2 is vertically connected with secondary cunning Rail 18, the second contact base 8 are slidably mounted on secondary sliding rail 18, and third cylinder 7 is mounted on the bottom of end crossbeam 2, third cylinder The bottom end of piston rod is connect with the second contact base 8.
So-called insulation detecting circuit is the circuit that each switching value is judged and exported, and may be used multiple megaohms Table be separately connected each detection contact and be detected respectively the results show that testing result can be used indicator light or display screen etc. into The intuitive display of row.This case is preferred, and insulation detecting circuit includes multichannel megameter and display screen, and each pair of detection contact passes through respectively The wherein input terminal connection all the way of conducting wire and megameter.Each detection contact is received using with the megameter that multichannel inputs Switching signal, switching signal are intuitively shown after microcontroller is handled by display screen.For the physical circuit knot of insulation detecting circuit Structure, according to foregoing description, those skilled in the art can realize that details are not described herein easily according to custom circuit.
In conclusion the present invention is not limited to above-mentioned specific implementation modes.Those skilled in the art are not departing from the present invention's Under the premise of spirit and scope, several change or modification can be done.Above-mentioned change or modification each fall within the protection model of this present invention It encloses.

Claims (7)

1. a kind of track plate insulation detection machine, it is characterized in that being mounted on three at the top of supporting rack including supporting rack and longitudinal sliding motion Crossbeam positioned at centre is middle beam in three crossbeams(1), both sides be two end crossbeams(2);Middle beam(1)On The first cylinder vertically is installed(3), the first cylinder(3)Piston rod be arranged downward and the bottom end of piston rod be connected with first touch Headstock(4), the first contact base(4)On be equipped with by the second cylinder(5)Driving and the first contact that can be contacted with transverse steel (6);End crossbeam(2)Lower section slide vertically and be equipped with by third cylinder(7)Second contact base of driving(8), the second contact Seat(8)For the bar shaped seat being laterally extended, on the second contact base(8)Lateral separation is equipped with multiple by the 4th cylinder(9)Driving and The second contact that can be contacted with longitudinal reinforcement(10), the second contact(10)Quantity it is corresponding with the quantity of longitudinal reinforcement;With it is same Corresponding two the second contacts in both ends of a piece longitudinal reinforcement(10)Form a pair of first pre-detection contact, the first contact(6) As public contact respectively with each second contact(10)Multipair actually detected contact is formed, it is each to the first pre-detection contact and each Actually detected contact is connect by conducting wire with insulation detecting circuit respectively.
2. track plate insulation detection machine as described in claim 1, it is characterized in that the middle beam(1)Install two in upper interval First cylinder(3), each first cylinder(3)Piston rod bottom end be respectively mounted first contact base(4), each first contact base (4)On be respectively provided with a set of first contact(6), it is located at different first contact bases(4)On two the first contacts(6)Form a pair of the Two pre-detection contacts, the second pre-detection contact are connect by conducting wire with insulation detecting circuit.
3. track plate insulation detection machine as claimed in claim 1 or 2, it is characterized in that first contact base(4)Both sides point It An Zhuan not second cylinder(5), each second cylinder(5)Piston rod on connect one piece of first vertically arranged contact yoke plate (11), two piece of first contact yoke plate(11)One is long and the other is short, the first contact(6)Two one group and it is separately mounted to two piece of first contact Yoke plate(11)Bottom end.
4. track plate insulation detection machine as claimed in claim 3, it is characterized in that the 4th cylinder(9)Each two is one group, One piece of second vertically arranged contact yoke plate is respectively connected on every group of two the 4th cylinder piston rods(12), two piece of second contact Yoke plate(12)One is long and the other is short, the second contact(10)Two one group and it is separately mounted to two piece of second contact yoke plate(12)Bottom end Portion.
5. railway plate die release agent spraying machine people as described in claim 1, it is characterized in that support frame as described above includes two flat Capable and spaced top beam(13), top beam(13)Bottom by more root posts(14)Support, every top beam(13)Upper laying one Main running rail(15), the both ends of crossbeam are slidably mounted on main running rail(15)On, top beam(13)On be fixed with and main running rail(15)It is flat Capable rack(16), the end of crossbeam is equipped with driving motor(17), driving motor(17)Power output shaft on be equipped with Rack(16)Meshed gears.
6. railway plate die release agent spraying machine people as described in claim 1, it is characterized in that the end crossbeam(2)Bottom Portion is vertically connected with secondary sliding rail(18), the second contact base(8)It is slidably mounted on secondary sliding rail(18)On, third cylinder(7)It is mounted on End crossbeam(2)Bottom, the bottom end of third cylinder piston rod and the second contact base(8)Connection.
7. railway plate die release agent spraying machine people as described in claim 1, it is characterized in that the insulation detecting circuit includes Multichannel megameter and display screen, each pair of detection contact pass through the wherein input terminal connection all the way of conducting wire and megameter respectively.
CN201810196966.5A 2018-03-10 2018-03-10 Track slab insulation detector Active CN108445356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810196966.5A CN108445356B (en) 2018-03-10 2018-03-10 Track slab insulation detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810196966.5A CN108445356B (en) 2018-03-10 2018-03-10 Track slab insulation detector

Publications (2)

Publication Number Publication Date
CN108445356A true CN108445356A (en) 2018-08-24
CN108445356B CN108445356B (en) 2022-09-16

Family

ID=63194591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810196966.5A Active CN108445356B (en) 2018-03-10 2018-03-10 Track slab insulation detector

Country Status (1)

Country Link
CN (1) CN108445356B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900821A (en) * 2019-12-26 2020-03-24 中铁四局集团第一工程有限公司 Automatic insulation detection system for steel bar net pieces of CRTS III type ballastless track plate
CN111308292A (en) * 2020-03-27 2020-06-19 山东交通学院 Method for detecting insulativity of prefabricated slab reinforcement cage by using insulation detector
CN111426878A (en) * 2020-03-27 2020-07-17 山东交通学院 Insulation detection method for steel reinforcement cage of prefabricated plate of high-speed rail way

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046493A (en) * 2006-03-30 2007-10-03 中铁八局集团有限公司 Track plate insulation detecting method
CN101078744A (en) * 2007-06-30 2007-11-28 中铁十七局集团有限公司 Slag-free track plate insulated checking method and insulated checking device
CN201615937U (en) * 2010-02-26 2010-10-27 中铁十九局集团第二工程有限公司 Rapid insulativity detector of nodes of reinforced bars
CN201903590U (en) * 2010-12-18 2011-07-20 中铁十二局集团第三工程有限公司 Insulation detecting instrument for mesh reinforcement
CN202023126U (en) * 2011-04-14 2011-11-02 中铁十二局集团有限公司 Insulating detection vehicle device for slab ballastless track concrete track slab
CN202177682U (en) * 2011-06-24 2012-03-28 中交一航局第三工程有限公司 Track board insulating property detecting system
JP2016011067A (en) * 2014-06-30 2016-01-21 東日本旅客鉄道株式会社 Signal current measuring instrument for dc track circuit, and short-circuiting part identification method
CN205910296U (en) * 2016-07-29 2017-01-25 江阴亨德拉科技有限公司 Semiconductor device high voltage insulation detection device
CN106680682A (en) * 2016-12-13 2017-05-17 宁波中车时代传感技术有限公司 Parallel testing apparatus of multichannel insulation and voltage resistance
CN107390101A (en) * 2017-08-18 2017-11-24 山东高速轨道设备材料有限公司 The reinforcing steel bar insulating automatic detection device of high ferro non-fragment orbit board assembly line
CN208255347U (en) * 2018-03-10 2018-12-18 山东高速轨道设备材料有限公司 A kind of track plate insulation detection machine

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101046493A (en) * 2006-03-30 2007-10-03 中铁八局集团有限公司 Track plate insulation detecting method
CN101078744A (en) * 2007-06-30 2007-11-28 中铁十七局集团有限公司 Slag-free track plate insulated checking method and insulated checking device
CN201615937U (en) * 2010-02-26 2010-10-27 中铁十九局集团第二工程有限公司 Rapid insulativity detector of nodes of reinforced bars
CN201903590U (en) * 2010-12-18 2011-07-20 中铁十二局集团第三工程有限公司 Insulation detecting instrument for mesh reinforcement
CN202023126U (en) * 2011-04-14 2011-11-02 中铁十二局集团有限公司 Insulating detection vehicle device for slab ballastless track concrete track slab
CN202177682U (en) * 2011-06-24 2012-03-28 中交一航局第三工程有限公司 Track board insulating property detecting system
JP2016011067A (en) * 2014-06-30 2016-01-21 東日本旅客鉄道株式会社 Signal current measuring instrument for dc track circuit, and short-circuiting part identification method
CN205910296U (en) * 2016-07-29 2017-01-25 江阴亨德拉科技有限公司 Semiconductor device high voltage insulation detection device
CN106680682A (en) * 2016-12-13 2017-05-17 宁波中车时代传感技术有限公司 Parallel testing apparatus of multichannel insulation and voltage resistance
CN107390101A (en) * 2017-08-18 2017-11-24 山东高速轨道设备材料有限公司 The reinforcing steel bar insulating automatic detection device of high ferro non-fragment orbit board assembly line
CN208255347U (en) * 2018-03-10 2018-12-18 山东高速轨道设备材料有限公司 A kind of track plate insulation detection machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900821A (en) * 2019-12-26 2020-03-24 中铁四局集团第一工程有限公司 Automatic insulation detection system for steel bar net pieces of CRTS III type ballastless track plate
CN111308292A (en) * 2020-03-27 2020-06-19 山东交通学院 Method for detecting insulativity of prefabricated slab reinforcement cage by using insulation detector
CN111426878A (en) * 2020-03-27 2020-07-17 山东交通学院 Insulation detection method for steel reinforcement cage of prefabricated plate of high-speed rail way

Also Published As

Publication number Publication date
CN108445356B (en) 2022-09-16

Similar Documents

Publication Publication Date Title
CN108445356A (en) A kind of track plate insulation detection machine
CN201788120U (en) Key testing mechanism of computer keyboard
CN114558815A (en) Novel robot and control method thereof
CN104841648B (en) Carbon brush resistance test machine
CN208255347U (en) A kind of track plate insulation detection machine
CN107356490A (en) A kind of construction material hardness determination and anti-seismic performance test device
KR102185253B1 (en) Apparatus and Method for pulling out pipes buried in buildings
CN113465906B (en) EOL test mechanism of door actuator and working method thereof
CN104723459B (en) A kind of concrete prefabricated sheet material production line is assembled with mould and provision for disengagement
CN109487411B (en) Large-scale mechanical automation three-dimensional integral square weaving equipment
CN202915860U (en) Screw height anomaly detection device
CN103383421A (en) Transformer automatic test device and method
CN113109155A (en) Multistation linkage cable mechanical property testing machine
CN209163872U (en) A kind of tunnel protection tunnel deformation detection prior-warning device
CN111337801A (en) Robot device suitable for detecting insulation performance of reinforcing steel bars of ballastless track plate of high-speed railway
CN203816940U (en) Testing machine for resistance of carbon brushes
CN202384304U (en) Dotting machine for chip testing
CN105810474A (en) Third assembling mechanism of limiting switch assembling machine
CN206440550U (en) A kind of pipeline compressive resistance experimental rig
CN111397477A (en) Reinforcing bar physical properties on-site measuring equipment
CN205103108U (en) Automatic detection device of ultra -thin type magnetic component
CN104155602A (en) Calculator key testing device
CN203993079U (en) A kind of semi-automatic clip kludge
CN214794802U (en) Detect cracked detection lever in tunnel top
CN111426878A (en) Insulation detection method for steel reinforcement cage of prefabricated plate of high-speed rail way

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 262604 No. 1020, Changxing Road, industrial park, Wujing Town, Linqu County, Weifang City, Shandong Province

Patentee after: Shandong High Speed Railway Construction Equipment Co.,Ltd.

Address before: 262604 No. 1020, Changxing Road, industrial park, Wujing Town, Linqu County, Weifang City, Shandong Province

Patentee before: SHANDONG HIGH SPEED RAIL EQUIPMENT MATERIAL Co.,Ltd.

CP01 Change in the name or title of a patent holder