CN108442946A - Tunnel double-lining vault and abutment wall sealed maintenance device and method - Google Patents
Tunnel double-lining vault and abutment wall sealed maintenance device and method Download PDFInfo
- Publication number
- CN108442946A CN108442946A CN201810385854.4A CN201810385854A CN108442946A CN 108442946 A CN108442946 A CN 108442946A CN 201810385854 A CN201810385854 A CN 201810385854A CN 108442946 A CN108442946 A CN 108442946A
- Authority
- CN
- China
- Prior art keywords
- sealant
- steam
- jack
- abutment wall
- maintenance device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000007246 mechanism Effects 0.000 claims abstract description 51
- 239000000565 sealant Substances 0.000 claims abstract description 50
- 239000004567 concrete Substances 0.000 claims abstract description 45
- 238000007789 sealing Methods 0.000 claims abstract description 33
- 238000012544 monitoring process Methods 0.000 claims abstract description 20
- 230000000149 penetrating effect Effects 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 238000009413 insulation Methods 0.000 claims description 4
- 241001669679 Eleotris Species 0.000 claims description 3
- 230000009471 action Effects 0.000 claims description 3
- 238000006243 chemical reaction Methods 0.000 claims description 3
- 238000001816 cooling Methods 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 230000009467 reduction Effects 0.000 claims description 3
- 239000012812 sealant material Substances 0.000 claims description 2
- 239000007788 liquid Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 11
- 238000001723 curing Methods 0.000 description 11
- 230000000694 effects Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000006703 hydration reaction Methods 0.000 description 4
- 239000003795 chemical substances by application Substances 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- KEUKAQNPUBYCIC-UHFFFAOYSA-N ethaneperoxoic acid;hydrogen peroxide Chemical compound OO.CC(=O)OO KEUKAQNPUBYCIC-UHFFFAOYSA-N 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000002425 crystallisation Methods 0.000 description 1
- 230000008025 crystallization Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005538 encapsulation Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 239000004574 high-performance concrete Substances 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of tunnel double-lining vault and abutment wall sealed maintenance device and methods, it is related to concrete curing technical field, including sealing mechanism, penetrating mechanism, walking mechanism and steam generation control mechanism for monitoring, sealing mechanism includes sealant compatible with arch face shape, penetrating mechanism includes being set to the frame on the downside of sealant and the jack for ejection sealant on frame, walking mechanism includes the rail out of shape being connected on the rail row wheel and setting and ground of frame lower end, steam generation control mechanism for monitoring includes the steam generation mechanism being set on frame and control mechanism for monitoring, the steam pipework of steam generation mechanism is communicated in the steam jet on sealant, existing concrete curing has been solved to take effective measures, lining concrete is inferior strong, face checking, chip off-falling of peeling and other issues.
Description
Technical field
The present invention relates to concrete curing technical fields, more particularly to a kind of tunnel double-lining vault and abutment wall sealed maintenance
Device and method.
Background technology
Lining cutting is the important engineering measure for balancing surrouding rock stress, extending tunnel service life, ensureing safe operation.
With the technological progress of Tunnel Engineering, for tunnel-liner technology, initial stage combined bolting and shotcrete+flexibility is used comprehensively
The composite lining structure that waterproof layer+armored concrete two serves as a contrast, construction method is also by full section face (vault and side wall) lining trolley+pump
Concrete making technology is sent, instead of the lining methods of arch-wall method+small template assembly+artificial loading, construction efficiency is substantially carried
It rises.
Maintenance is one of important procedure of concrete construction, currently, there are commonly watering covering, curing agent spraying and steam
The methods of health.
After concrete casting complete, concrete carries out hydration reaction (cement granules are converted to crystallization) under static state,
Concrete gradually hardens (intensity gradually increases) under hydration, and early strength of concrete growth rate is very fast, later strength
Growth rate is gradually reduced.
Moisture in concrete proportioning is the primary condition for completing hydration reaction, and watering maintenance is for concrete component table
Face provides high humidity environment, concrete can be effectively prevent to be dehydrated, ensure that the abundant aquation of concrete, to ensure concrete most
Whole intensity;Spraying curing agent closes surface of concrete structure, can also concrete be effectively prevent to be dehydrated, and ensures concrete
Abundant aquation, to ensure concrete final strength;Steam curing is to provide high humility and higher temperatures simultaneously for concrete component
The environment of degree ensure that the abundant aquation of concrete also speeded up hydration reaction while ensure that concrete final strength
Speed can quickly improve the intensity of concrete in a short time.In tunnel double-lining concrete construction, steam curing effect is better than
Watering maintenance, spraying curing agent, are restricted by section configuration, construction environment, are more difficult to realize during practice of construction.
Previous tunnel construction technology is original, and construction cycle period is long, is in no hurry to form removal, template after lining concrete cast
Leakproofness blocked concrete moisture escape paths, (be known as curing in the mold effect), engineering practice verification for many years, even if not
Other maintenance measures are taken, the final strength of concrete will not be caused to significantly affect, tunnel double-lining concrete is formed and does not support
The inertial thinking of shield.
Due to the fast development of tunnel double-lining construction technology, the application of lining trolley+pumped concrete earth process, mechanization journey
Degree is substantially improved, and lining construction cycle period shortens, and two lining concrete curing in the mold effects is caused substantially to weaken.While with
The development of high-speed railway, more stringent requirements are proposed for the quality of the application of high performance concrete to concrete.In addition construction personnel
Inertial thinking, ignore the importance of two lining concrete curings, existing concrete curing caused to be taken effective measures, lining cutting coagulation
The inferior strong, face checking of soil, decortication chip off-falling and other issues take place frequently.
Invention content
The technical problem to be solved in the present invention is to provide a kind of tunnel double-lining vault and abutment wall sealed maintenance device and method,
It is taken effective measures with solving existing concrete curing existing in the prior art, the inferior strong, face checking of lining concrete, decortication are fallen
Block and other issues.
To solve the above problems, the technical solution adopted by the present invention is that providing a kind of tunnel double-lining vault and abutment wall sealing is supported
Protection unit and method, including sealing mechanism, penetrating mechanism, walking mechanism and steam generation control mechanism for monitoring, the sealer
Structure includes sealant compatible with arch face shape, and the penetrating mechanism includes the frame being set on the downside of the sealant and sets
In the jack for ejection sealant on frame, the walking mechanism includes being connected to rail row wheel and the setting of frame lower end
With the rail out of shape on ground, the steam generation control mechanism for monitoring includes the steam generation mechanism being set on frame and control
The steam pipework of mechanism for monitoring processed, the steam generation mechanism is communicated in the steam jet on sealant.
Preferably, the sealant material is light flexible thermal insulation plate, the edge of the sealant and arch face wall it
Between be extruded with air bag, the downside of the sealant is connect by sealing curtain with ground.
Preferably, the frame includes multiple crossbeams, longeron and the column being made by square light pipe, inside floor cross member
Concrete is poured, the jack is set on crossbeam and column, and the ejection direction of the jack is vertical ejection and cross
To ejection both direction, the very heavy top/bottom part is additionally provided with adjustment base, and the rail row wheel is installed on the downside of floor cross member, bottom
Screw jack is equipped between crossbeam and rail out of shape.
Preferably, the sealant is used to accept at the region of jack ejection and is equipped with using heterotype steel plate processing and fabricating
Contact surface horizontally or vertically, the back of the sealant and the corresponding position setting limit bearing of contact surface, the limit branch
Seat is clipped between sealant and arch face.
Preferably, the steam generation mechanism includes interconnected water tank, steam generator, and the steam generator is logical
It crosses steam pipework and is connected to the steam jet.
Preferably, the control mechanism for monitoring include two using parallel pipelines respectively with the jack and cross of vertical ejection
The hydraulic pump being connected to the jack of ejection, the electric air pump inflated for air bag, further include distribution box and control panel, institute
It states and cistern water level monitor, steam pressure monitor, prexxure of the hydraulic pump table, maintenance space temperature-humidity monitoring is installed in control panel
Instrument.
Preferably, it is additionally provided with sleeper between the rail out of shape and ground.
The device is arranged on rail out of shape for the application method of tunnel double-lining vault and abutment wall sealed maintenance device, (1),
The device is jacked using screw jack, conversion accepts system, by installation weight stepless action on rail out of shape, constrains frame
It moves freely;Starting vertical hydraulic system pushes sealant to be lifted to all vertical limit bearings and tunnel vault top upwards
Tightly;Startup transverse hydraulic systems force sealant is flared to all lateral limit bearings to both sides and is held out against with tunnel sidewalls;It opens
Dynamic electric air pump is pressed into compressed air into air bag and is allowed to expand rear enclosed sealant surrounding;It is close that hand fit puts down lower part
Curtain is sealed, introduced steam into the sealing space that sealing curtain is formed with side wall bottom with flexible pipe and is sealed with the surplus at sealing curtain both ends
Stifled end;
(2) start steam generator, steam be sent between sealant and sealing curtain and two linings, according to the temperature of monitoring and
Vapour amount is sent in humidity data, control and adjustment, according to it is quiet stop, heat up, constant temperature, cooling four-stage are conserved;
(3) after conserving, according to steam off generator → air bag release → transverse hydraulic system release → perpendicular
Sealing curtain → reduction screw jack sequence is packed up to hydraulic system release → human assistance to be operated.
The beneficial effects of the present invention are:The device is using sealing technique between waterproof and heat-insulating confined layer and two lining structures
Closed cavity is formed, vapor is sent into closed cavity, two lining concrete are conserved, reaches and quickly improves strong concrete
The purpose of degree, it is simple and quick.
Description of the drawings
The positive structure diagram of Fig. 1 devices provided in an embodiment of the present invention;
The side structure schematic view of Fig. 2 devices provided in an embodiment of the present invention.
Wherein, 1, sealant, 2, jack, 3, rail row wheel, 4, rail out of shape, 5, steam jet, 6, steam generator, 7,
Water tank, 8, air bag, 9, sealing curtain, 10, crossbeam, 12, column, 13, adjustment base, 14, screw jack, 15, arch face.
Specific implementation mode
In order to make technical problems, technical solutions and advantages to be solved be more clearly understood, tie below
Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only
To explain the present invention, it is not intended to limit the present invention.
It should be noted that when element is referred to as " being fixed on " or " being set to " another element, it can be directly another
On one element or it is connected on another element.When an element is known as " being connected to " another element, it can
To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", "upper", "lower", "front", "rear", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" "inner", "outside" is that orientation based on ... shown in the drawings or position are closed
System, is merely for convenience of description of the present invention and simplification of the description, not indicating or implying the indicated device or element must have
Specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more this feature.In the description of the present invention, " multiple ", " several " be meant that two or
Two or more, unless otherwise specifically defined.
The present invention is described in further detail in the following with reference to the drawings and specific embodiments:
As depicted in figs. 1 and 2, an embodiment of the present invention provides a kind of tunnel double-lining vault and abutment wall sealed maintenance device,
Mechanism for monitoring is controlled including sealing mechanism, penetrating mechanism, walking mechanism and steam generation, the sealing mechanism includes and arch face 15
The compatible sealant 1 of shape, the penetrating mechanism include being set to the frame of 1 downside of the sealant and on frame
For the jack 2 of ejection sealant 1, the walking mechanism include be connected to frame lower end rail row wheel 3 and setting and ground
On rail out of shape 4, steam generation control mechanism for monitoring includes that the steam generation mechanism being set on frame and control are supervised
Mechanism is surveyed, the steam pipework of the steam generation mechanism is communicated in the steam jet 5 on sealant 1.
The advantageous effect of the present embodiment is that the device is using sealing technique in waterproof and heat-insulating confined layer 1 and two lining structures
Between form closed cavity, vapor is sent into closed cavity, to two lining concrete conserve, reach quickly improve coagulation
The purpose of native intensity.Wherein sealant 1 is made of thermal insulation board and band steel band, and band steel band is according to a determining deviation in 1 inside of sealant
Vertical, circumferential anchor flat steel band.
Preferably, it is that as depicted in figs. 1 and 2,1 material of sealant is light that the present embodiment, which additionally provides preferred embodiment,
Type flexibility thermal insulation plate is extruded with air bag 8 between 15 wall of edge and arch face of the sealant 1, the sealant 1
Downside is connect by sealing curtain 9 with ground.Air bag 8 is installed in 1 both ends arc wheel profile of sealant and bottom edge;Using thicker
Waterproof cloth cuts sealing curtain 9, and both ends reserve enough end closing surpluses, will step up to be used in combination with band steel below on sealing curtain 9
Bolt is fixed, and each welding hanging ring is several on upper following band steel, the corresponding position welding equivalent hook on 9 bottom edge band steel of sealant.
Using air bag 8, the gap between close encapsulation layer 9 and tunnel cross-section forms complete confined space.
Preferably, it is that as depicted in figs. 1 and 2, frame includes by square light pipe that the present embodiment, which additionally provides preferred embodiment,
Multiple crossbeams 10, longeron and the column 12 being made, concrete has been poured inside floor cross member 10, and the jack 2 is arranged
In on crossbeam 10 and column 12, the ejection direction of the jack 2 is vertical ejection and lateral ejection both direction, described very heavy
Push up 2 bottoms and be additionally provided with adjustment base, the rail row wheel 3 is installed on 10 downside of floor cross member, floor cross member 10 and rail 4 out of shape it
Between be equipped with screw jack 14.Effect is, with the height of adjustment base or the work effective travel of length adjustment jack 2,
It is combined into trolley skeleton using square tube longeron, crossbeam 10 and column 12, enough overall stiffness are provided, with into floor cross member 10
Concrete perfusion improves frame downward rigidity, reduces whole center of gravity.Two sets of parallel hydraulic pipe networks are utilized respectively to vertical jack
2 pressurize with lateral jack 2, realize that the thrust under 2 stroke different condition of each jack is balanced.
Preferably, it is that as depicted in figs. 1 and 2, sealant 1 is for accepting that the present embodiment, which additionally provides preferred embodiment,
The contact surface horizontally or vertically using heterotype steel plate processing and fabricating is equipped at the region of 2 ejection of jack, the sealant 1
The corresponding position of back and contact surface setting limit bearing, limit bearing are clipped between sealant 1 and arch face 15.Limit bearing with
Band steel band uses screwed connection, limit bearing to expand forced area with tunneling contact face, that is, arch face and resilient rubbber cushion is added to prevent
Arch face is damaged.Using the limit bearing of 1 each 2 corresponding position of jack in behind of sealant, control sealant 1 is disconnected with tunnel
Spacing between face.
Preferably, it is that as depicted in figs. 1 and 2, steam generation mechanism includes that the present embodiment, which additionally provides preferred embodiment,
Interconnected water tank 7, steam generator 6, the steam generator 6 are connected to the steam jet 5 by steam pipework.
Preferably, it is that as depicted in figs. 1 and 2, control mechanism for monitoring includes that the present embodiment, which additionally provides preferred embodiment,
Two using parallel pipelines respectively with the jack of vertical ejection 2 and transverse direction ejection jack 2 be connected to hydraulic pumps, for filling
Gas air bag 8 inflate electric air pump, further include distribution box and control panel, be equipped in the control panel cistern water level monitor,
Steam pressure monitor, prexxure of the hydraulic pump table, maintenance space temperature-humidity monitoring instrument.Steam generation mechanism and control mechanism for monitoring are equal
It is arranged on being welded on the platform of frame.
Preferably, the present embodiment additionally provides preferred embodiment and is, as depicted in figs. 1 and 2, rail 4 out of shape and ground
Between be additionally provided with sleeper.The direction of travel of trolley is controlled using wheel rail system;Trolley height is adjusted using screw jack 14.
The application method of tunnel double-lining vault and abutment wall sealed maintenance device,
(1) device being arranged on rail 4 out of shape, the device is jacked using screw jack 14, conversion accepts system,
By installation weight stepless action on rail 4 out of shape, constraint frame moves freely;Start vertical hydraulic system and pushes sealant 1
All vertical limit bearings are lifted to upwards to hold out against with tunnel vault;Start transverse hydraulic systems force sealant 1 to both sides
All lateral limit bearings are flared to hold out against with tunnel sidewalls;Start electric air pump and is pressed into compressed air into air bag 8
It is allowed to expand 1 surrounding of rear enclosed sealant;Hand fit puts down lower seal curtain 9, with flexible pipe introduce steam into sealing curtain 9 with
End is blocked in the sealing space that side wall bottom is formed and with the surplus at 9 both ends of sealing curtain;
(2) start steam generator 6, steam is sent between being served as a contrast to sealant 1 and sealing curtain 9 and two, according to the temperature of monitoring
Vapour amount is sent in degree and humidity data, control and adjustment, according to it is quiet stop, heat up, constant temperature, cooling four-stage are conserved;
(3) conserve after, according to 8 releases of steam off 6 → air bag of generator → transverse hydraulic system release →
Vertical hydraulic system release → human assistance is packed up sealing curtain 9 → 14 sequence of reduction screw jack and is operated.
The beneficial effects of the present invention are:The device is using sealing technique between waterproof and heat-insulating confined layer and two lining structures
Closed cavity is formed, vapor is sent into closed cavity, two lining concrete are conserved, reaches and quickly improves strong concrete
The purpose of degree, it is simple and quick.
Claims (8)
1. a kind of tunnel double-lining vault and abutment wall sealed maintenance device, it is characterised in that:Including sealing mechanism, penetrating mechanism, row
Mechanism and steam generation control mechanism for monitoring are walked, the sealing mechanism includes sealant compatible with arch face shape, described to push away
Top mechanism includes being set to the frame on the downside of the sealant and the jack for ejection sealant on frame, described
Walking mechanism includes the rail out of shape being connected on the rail row wheel and setting and ground of frame lower end, the steam generation control prison
It includes the steam generation mechanism being set on frame and control mechanism for monitoring, the steam pipework of the steam generation mechanism to survey mechanism
The steam jet being communicated on sealant.
2. tunnel double-lining vault as described in claim 1 and abutment wall sealed maintenance device, it is characterised in that:The sealant material
Matter is light flexible thermal insulation plate, and air bag, the sealant are extruded between the edge and arch face wall of the sealant
Downside connect with ground by sealing curtain.
3. tunnel double-lining vault as described in claim 1 and abutment wall sealed maintenance device, it is characterised in that:The frame includes
Multiple crossbeams, longeron and the column being made by square light pipe have poured concrete, the jack setting inside floor cross member
In on crossbeam and column, the ejection direction of the jack is vertical ejection and lateral ejection both direction, the jack bottom
Portion is additionally provided with adjustment base, and the rail row wheel is installed on the downside of floor cross member, and spiral is equipped between floor cross member and rail out of shape
Jack.
4. tunnel double-lining vault as claimed in claim 3 and abutment wall sealed maintenance device, it is characterised in that:The sealant is used
The contact surface horizontally or vertically using heterotype steel plate processing and fabricating, the sealing are equipped at the region for accepting jack ejection
The back of layer and the corresponding position setting limit bearing of contact surface, the limit bearing are clipped between sealant and arch face.
5. tunnel double-lining vault as described in claim 1 and abutment wall sealed maintenance device, it is characterised in that:The steam generation
Mechanism includes interconnected water tank, steam generator, and the steam generator is connected to the steam jet by steam pipework.
6. tunnel double-lining vault as claimed in claim 3 and abutment wall sealed maintenance device, it is characterised in that:The control monitoring
Mechanism include two using parallel pipelines respectively with the jack of vertical ejection and transverse direction ejection jack be connected to hydraulic pumps,
Further include distribution box and control panel for the electric air pump of air bag inflation, cistern water level prison is installed in the control panel
Survey instrument, steam pressure monitor, prexxure of the hydraulic pump table, maintenance space temperature-humidity monitoring instrument.
7. tunnel double-lining vault and abutment wall sealed maintenance device as claimed in any one of claims 1 to 6, it is characterised in that:Institute
It states and is additionally provided with sleeper between rail out of shape and ground.
8. the application method of tunnel double-lining vault and abutment wall sealed maintenance device, it is characterised in that:
(1) device is arranged on rail out of shape, jacks the device using screw jack, conversion accepts system, by device
On rail out of shape, constraint frame moves freely for weight stepless action;Starting vertical hydraulic system pushes sealant to lift upwards
It is held out against to all vertical limit bearings with tunnel vault;Startup transverse hydraulic systems force sealant is flared to all to both sides
Lateral limit bearing is held out against with tunnel sidewalls;Startup electric air pump is pressed into after compressed air is allowed to expansion into air bag and seals
Close sealant surrounding;Hand fit puts down lower seal curtain, introduces steam into what sealing curtain was formed with side wall bottom with flexible pipe
End is blocked in sealing space and with the surplus at sealing curtain both ends;
(2) start steam generator, steam is sent between sealant and sealing curtain and two linings, according to the temperature and humidity of monitoring
Vapour amount is sent in data, control and adjustment, according to it is quiet stop, heat up, constant temperature, cooling four-stage are conserved;
(3) after conserving, according to steam off generator → air bag release → transverse hydraulic system release → vertical liquid
Pressure system release → human assistance is packed up sealing curtain → reduction screw jack sequence and is operated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810385854.4A CN108442946B (en) | 2018-04-26 | 2018-04-26 | Tunnel secondary lining vault and side wall sealing maintenance device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810385854.4A CN108442946B (en) | 2018-04-26 | 2018-04-26 | Tunnel secondary lining vault and side wall sealing maintenance device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108442946A true CN108442946A (en) | 2018-08-24 |
CN108442946B CN108442946B (en) | 2024-10-18 |
Family
ID=63201595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810385854.4A Active CN108442946B (en) | 2018-04-26 | 2018-04-26 | Tunnel secondary lining vault and side wall sealing maintenance device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108442946B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108894798A (en) * | 2018-09-25 | 2018-11-27 | 中国五冶集团有限公司 | A kind of mobile two linings concrete curing device |
CN109826651A (en) * | 2019-01-31 | 2019-05-31 | 中铁隧道集团二处有限公司 | A kind of single-track tunnel two serves as a contrast concrete automation steam curing system and construction method |
CN110656956A (en) * | 2019-09-12 | 2020-01-07 | 苏锦生 | Concrete-cast tunnel lining concave-convex gravel intelligent maintenance trolley |
CN111365023A (en) * | 2020-03-30 | 2020-07-03 | 安徽华骅桥梁设备制造有限公司 | Automatic maintenance equipment of high-efficient constant temperature and humidity tunnel |
CN112659340A (en) * | 2020-12-10 | 2021-04-16 | 赵佳康 | Concrete health preserving temperature automatic monitoring and insulation construction |
CN117489372A (en) * | 2024-01-03 | 2024-02-02 | 中铁上海工程局集团第七工程有限公司 | Tunnel construction supporting structure and construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107559021A (en) * | 2017-09-01 | 2018-01-09 | 燕山大学 | A kind of full rotation type tunnel secondary lining concrete curing spraying chassis |
CN107575247A (en) * | 2017-10-17 | 2018-01-12 | 中铁隧道集团二处有限公司 | A kind of tunnel arch wall steam curing trolley |
CN208122868U (en) * | 2018-04-26 | 2018-11-20 | 中铁十七局集团第三工程有限公司 | Tunnel double-lining vault and abutment wall sealed maintenance device |
-
2018
- 2018-04-26 CN CN201810385854.4A patent/CN108442946B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107559021A (en) * | 2017-09-01 | 2018-01-09 | 燕山大学 | A kind of full rotation type tunnel secondary lining concrete curing spraying chassis |
CN107575247A (en) * | 2017-10-17 | 2018-01-12 | 中铁隧道集团二处有限公司 | A kind of tunnel arch wall steam curing trolley |
CN208122868U (en) * | 2018-04-26 | 2018-11-20 | 中铁十七局集团第三工程有限公司 | Tunnel double-lining vault and abutment wall sealed maintenance device |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108894798A (en) * | 2018-09-25 | 2018-11-27 | 中国五冶集团有限公司 | A kind of mobile two linings concrete curing device |
CN108894798B (en) * | 2018-09-25 | 2023-08-22 | 中国五冶集团有限公司 | Portable two lining concrete curing means |
CN109826651A (en) * | 2019-01-31 | 2019-05-31 | 中铁隧道集团二处有限公司 | A kind of single-track tunnel two serves as a contrast concrete automation steam curing system and construction method |
CN110656956A (en) * | 2019-09-12 | 2020-01-07 | 苏锦生 | Concrete-cast tunnel lining concave-convex gravel intelligent maintenance trolley |
CN110656956B (en) * | 2019-09-12 | 2020-12-15 | 中信建设有限责任公司 | Concrete-cast tunnel lining concave-convex gravel intelligent maintenance trolley |
CN111365023A (en) * | 2020-03-30 | 2020-07-03 | 安徽华骅桥梁设备制造有限公司 | Automatic maintenance equipment of high-efficient constant temperature and humidity tunnel |
CN112659340A (en) * | 2020-12-10 | 2021-04-16 | 赵佳康 | Concrete health preserving temperature automatic monitoring and insulation construction |
CN117489372A (en) * | 2024-01-03 | 2024-02-02 | 中铁上海工程局集团第七工程有限公司 | Tunnel construction supporting structure and construction method |
CN117489372B (en) * | 2024-01-03 | 2024-03-19 | 中铁上海工程局集团第七工程有限公司 | Tunnel construction supporting structure and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108442946B (en) | 2024-10-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108442946A (en) | Tunnel double-lining vault and abutment wall sealed maintenance device and method | |
CN102996133B (en) | Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel | |
CN109653765B (en) | Warehouse-separated lining pressure relief supporting structure and method for various fillers | |
CN104047614B (en) | A kind of strong expansion argillization soft-rock tunnel displacement supporting method | |
CN105937407B (en) | A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket | |
CN206016824U (en) | A kind of stopping means for preventing shield sky from pushing away Segment displacement | |
CN106050245A (en) | Supporting structure for zero distance underneath pass of existing station of rectangular tunnel section and construction method | |
CN103748321A (en) | A method for constructing a tunnel course, and structural element for use by the method | |
CN105673039A (en) | Gob-side entryretaining roadway-side flexible and high-strength material bearing construction structure and construction method thereof | |
CN105603963A (en) | Flat belt lateral swelling combined vacuum pre-pressing foundation processing device and method | |
CN205475195U (en) | Bloated joint vacuum preloading ground processing apparatus of bandlet side | |
CN104612713A (en) | Construction method of tunnel in ultra-shallow buried section | |
CN106120803B (en) | Base pit stand construction in the case of artesian water | |
CN208122868U (en) | Tunnel double-lining vault and abutment wall sealed maintenance device | |
CN115369778A (en) | Construction method of steel cross beam rotating body structure | |
CN107893675A (en) | Support equipment of speedily carrying out rescue work for shield tunnel | |
CN113446031B (en) | Construction method of shield segment pre-reinforcing structure based on air bag steel ring | |
CN106988748B (en) | High-order parallel heading construction and capacity expansion revamping are the construction method of double line tunnel | |
CN105041332A (en) | Grid lining structure for tunnels and mounting method thereof | |
CN108678767B (en) | Excavation and yielding-rigid combined supporting construction method for extruded large-deformation surrounding rock tunnel | |
CN204457786U (en) | The large diameter shield tunnel that digs after the dismounting of a kind of B section of jurisdiction builds subway station | |
CN207177310U (en) | A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure | |
CN115890888A (en) | Tunnel lining concrete maintenance system | |
CN109026031B (en) | Reconstruction construction method for collapsed section of gas tunnel after strong earthquake | |
CN100489270C (en) | Supporting carrier die for filling soft rock laneway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |