CN108436391A - A kind of quiet disk forging process methods of turbo-compressor STR - Google Patents

A kind of quiet disk forging process methods of turbo-compressor STR Download PDF

Info

Publication number
CN108436391A
CN108436391A CN201810204059.0A CN201810204059A CN108436391A CN 108436391 A CN108436391 A CN 108436391A CN 201810204059 A CN201810204059 A CN 201810204059A CN 108436391 A CN108436391 A CN 108436391A
Authority
CN
China
Prior art keywords
workpiece
temperature
area
meshbeltfurnace
forging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810204059.0A
Other languages
Chinese (zh)
Other versions
CN108436391B (en
Inventor
郭国民
徐玉峰
王国兴
杨敏
姚富强
钟耀权
傅翔
陈智宏
王明强
王锦元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG YIFENG MACHINERY Co Ltd
Original Assignee
ZHEJIANG YIFENG MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG YIFENG MACHINERY Co Ltd filed Critical ZHEJIANG YIFENG MACHINERY Co Ltd
Priority to CN201810204059.0A priority Critical patent/CN108436391B/en
Publication of CN108436391A publication Critical patent/CN108436391A/en
Application granted granted Critical
Publication of CN108436391B publication Critical patent/CN108436391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04CROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; ROTARY-PISTON, OR OSCILLATING-PISTON, POSITIVE-DISPLACEMENT PUMPS
    • F04C29/00Component parts, details or accessories of pumps or pumping installations, not provided for in groups F04C18/00 - F04C28/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Forging (AREA)

Abstract

The present invention relates to forging process method and technology field, especially a kind of quiet disk forging process methods of turbo-compressor STR specifically comprise the following steps:(1)Blanking,(2)Optical crosstalk processing,(3)Heating,(4)Blocking,(5)Epithelium processing,(6)Heating,(7)Molding,(8)Heat treatment,(9)Finishing,(10)Shot Blasting.A kind of obtained quiet disk forging process methods of turbo-compressor STR of the present invention can effectively ensure molding and the quality of forging by rational technique and parameter designing, and use workpiece blocking, and epithelium processing is carried out after blocking, it is ensured that the stability of forging, processability higher.

Description

A kind of quiet disk forging process methods of turbo-compressor STR
Technical field
The present invention relates to forging process method and technology field, especially a kind of quiet disk forging process sides turbo-compressor STR Method.
Background technology
Have in technology, in the quiet disk forging processes of worm gear compressor STR, since forging is complicated, forging deflection Greatly, it is susceptible to cracking, local phenomena such as lacking material, the yield rate of product is low.
Invention content
The purpose of the present invention is to solve the deficiencies of the above technologies and provide forging quality is high, high yield rate turbine pressure The quiet disk forging process methods of contracting machine STR.
In order to achieve the above object, a kind of quiet disk forging process methods of turbo-compressor STR designed by the present invention, specifically Include the following steps:
(1)Steel are carried out to cut into round pie workpiece;
(2)It puts the workpiece in bur removing device for card clothing and carries out optical crosstalk processing, the optical crosstalk time is 30-80min, and light polishing machine frequency is 40-70Hz, is gone out Expect time control in 5-20min;Then it is cleaned, drying and processing is carried out after drying, drying temperature is 70-120 DEG C, dryer Frequency is in 40-60Hz;
(3)By the Workpiece transfer after optical crosstalk to rotary hearth furnace, to workpiece heat to 400-490 DEG C, and 60min or more is kept the temperature;
(4)Preform Die is heated to 200-280 DEG C, and the uniform smearing release agent in die cavity, the workpiece after heating is put into Blocking is carried out in Preform Die;
(5)Workpiece transfer after blocking to epithelium processing station is subjected to epithelium processing, by 210-260 DEG C of rotary hearth furnace heating, The workpiece being packed into after blocking keeps the temperature 10min or more, is taken out in workpiece immersion film agent with pliers and is taken out after 2-8s, utilizes workpiece Workpiece is dried and cooled to room temperature by waste heat, and the wherein temperature of film agent is less than or equal to 90 DEG C;
(6)By epithelium, treated that workpiece is sent to rotary hearth furnace, and rotary hearth furnace is preheated to 400-490 DEG C, keeps the temperature 60min or more, starts Then piece installing carries out workpiece being heated to 500-510 DEG C;
(7)Mold is heated to 200-350 DEG C, spiral shape even application releasing agent is then pressed, the workpiece after heating is put to mould Compression moulding in tool;Using rational mold temperature, forging can effectively be avoided to generate phenomena such as lacking side, crackle, promote forging product Matter and yield rate.
(8)The meshbeltfurnace that two overall lengths are 8-10m is connected, and is provided with quenching liquid between the two, the meshbeltfurnace of front end Four areas are uniformly divided into, 1st area of solid solution, 2nd area of solid solution, 3rd area of solid solution, 4th area of solid solution are followed successively by, wherein the temperature for being dissolved 1st area is 505- 525 DEG C, the temperature in 2nd area of solid solution is 500-520 DEG C, and 3rd area of solid solution and the temperature for being dissolved 4th area are 495-515 DEG C, and workpiece is from front end Meshbeltfurnace to enter to the time of output be 60-80min, subsequently into quenching liquid, quenching liquid temperature should be less than 60 DEG C, by work Part cooling at least 10min in quenching liquid;It enters back into the meshbeltfurnace of rear end, the temperature of the meshbeltfurnace of rear end is controlled in 180- 220 DEG C, and workpiece enters to the time of output as 350-380min from the meshbeltfurnace of rear end;
(9)Workpiece is carried out to be refined to size requirement, obtains the thick embryo of forging;
(10)The thick embryo of forging is put into shot-blasting machine and carries out Shot Blasting, the ball blast time is 10-25min, obtains forging.
A kind of obtained quiet disk forging process methods of turbo-compressor STR of the present invention, pass through rational technique and parameter Design can effectively ensure molding and the quality of forging, and use workpiece blocking, and epithelium processing is carried out after blocking, really Protect the stability of forging, processability higher.
Specific implementation mode
The present invention is further described by the following embodiment.
Embodiment 1:
A kind of quiet disk forging process methods of turbo-compressor STR of the present embodiment description, specifically comprise the following steps:
(1)Steel are carried out to cut into round pie workpiece;
(2)It puts the workpiece in bur removing device for card clothing and carries out optical crosstalk processing, the optical crosstalk time is 40min, and light polishing machine frequency is 40Hz, discharging time Control is in 8min;Then it is cleaned, drying and processing is carried out after drying, drying temperature is 80 DEG C, and drying unit frequency is in 45Hz;
(3)By the Workpiece transfer after optical crosstalk to rotary hearth furnace, to workpiece heat to 400 DEG C, and 60min or more is kept the temperature;
(4)Preform Die is heated to 200 DEG C, and the uniform smearing release agent in die cavity, the workpiece after heating is put into blocking Blocking is carried out in mold;
(5)Workpiece transfer after blocking to epithelium processing station is subjected to epithelium processing, 215 DEG C of rotary hearth furnace heating are packed into Workpiece after blocking keeps the temperature 10min or more, is taken out in workpiece immersion film agent with pliers and is taken out after 2s, will using workpiece waste heat Workpiece is dried and cooled to room temperature, and the wherein temperature of film agent is less than or equal to 90 DEG C;
(6)By epithelium, treated that workpiece is sent to rotary hearth furnace, and rotary hearth furnace is preheated to 400 DEG C, keeps the temperature 60min or more, starts piece installing, Then workpiece is carried out being heated to 500 DEG C;
(7)Mold is heated to 220 DEG C, spiral shape even application releasing agent is then pressed, the workpiece after heating is put to mold Compression moulding;
(8)The meshbeltfurnace that two overall lengths are 8-10m is connected, and is provided with quenching liquid between the two, the meshbeltfurnace of front end is uniform It is divided into four areas, is followed successively by 1st area of solid solution, 2nd area of solid solution, 3rd area of solid solution, 4th area of solid solution, wherein the temperature for being dissolved 1st area is 510 DEG C, Gu The temperature in molten 2nd area is 505 DEG C, and 3rd area of solid solution and the temperature for being dissolved 4th area are 500 DEG C, and workpiece enters to defeated from the meshbeltfurnace of front end The time gone out is 65min, and subsequently into quenching liquid, quenching liquid temperature should be less than 60 DEG C, and workpiece is cooled in quenching liquid Few 10min;It enters back into the meshbeltfurnace of rear end, the temperature of the meshbeltfurnace of rear end is controlled at 195 DEG C, and workpiece is from the guipure of rear end The time that stove enters to output is 360min;
(9)Workpiece is carried out to be refined to size requirement, obtains the thick embryo of forging;
(10)The thick embryo of forging is put into shot-blasting machine and carries out Shot Blasting, the ball blast time is 15min, obtains forging.
Embodiment 2:
A kind of quiet disk forging process methods of turbo-compressor STR of the present embodiment description, specifically comprise the following steps:
(1)Steel are carried out to cut into round pie workpiece;
(2)It puts the workpiece in bur removing device for card clothing and carries out optical crosstalk processing, the optical crosstalk time is 70min, and light polishing machine frequency is 50Hz, discharging time Control is in 15min;Then it is cleaned, drying and processing is carried out after drying, drying temperature is 110 DEG C, and drying unit frequency is in 50Hz;
(3)By the Workpiece transfer after optical crosstalk to rotary hearth furnace, to workpiece heat to 450 DEG C, and 60min or more is kept the temperature;
(4)Preform Die is heated to 250 DEG C, and the uniform smearing release agent in die cavity, the workpiece after heating is put into blocking Blocking is carried out in mold;
(5)Workpiece transfer after blocking to epithelium processing station is subjected to epithelium processing, 255 DEG C of rotary hearth furnace heating are packed into Workpiece after blocking keeps the temperature 10min or more, is taken out in workpiece immersion film agent with pliers and is taken out after 5s, will using workpiece waste heat Workpiece is dried and cooled to room temperature, and the wherein temperature of film agent is less than or equal to 90 DEG C;
(6)By epithelium, treated that workpiece is sent to rotary hearth furnace, and rotary hearth furnace is preheated to 460 DEG C, keeps the temperature 60min or more, starts piece installing, Then workpiece is carried out being heated to 505 DEG C;
(7)Mold is heated to 320 DEG C, spiral shape even application releasing agent is then pressed, the workpiece after heating is put to mold Compression moulding;
(8)The meshbeltfurnace that two overall lengths are 8-10m is connected, and is provided with quenching liquid between the two, the meshbeltfurnace of front end is uniform It is divided into four areas, is followed successively by 1st area of solid solution, 2nd area of solid solution, 3rd area of solid solution, 4th area of solid solution, wherein the temperature for being dissolved 1st area is 520 DEG C, Gu The temperature in molten 2nd area is 515 DEG C, and 3rd area of solid solution and the temperature for being dissolved 4th area are 510 DEG C, and workpiece enters to defeated from the meshbeltfurnace of front end The time gone out is 75min, and subsequently into quenching liquid, quenching liquid temperature should be less than 60 DEG C, and workpiece is cooled in quenching liquid Few 10min;It enters back into the meshbeltfurnace of rear end, the temperature of the meshbeltfurnace of rear end is controlled at 205 DEG C, and workpiece is from the guipure of rear end The time that stove enters to output is 375min;
(9)Workpiece is carried out to be refined to size requirement, obtains the thick embryo of forging;
(10)The thick embryo of forging is put into shot-blasting machine and carries out Shot Blasting, the ball blast time is 20min, obtains forging.
Embodiment 3:
A kind of quiet disk forging process methods of turbo-compressor STR of the present embodiment description, specifically comprise the following steps:
(1)Steel are carried out to cut into round pie workpiece;
(2)It puts the workpiece in bur removing device for card clothing and carries out optical crosstalk processing, the optical crosstalk time is 60min, and light polishing machine frequency is 45Hz, discharging time Control is in 10min;Then it is cleaned, drying and processing is carried out after drying, drying temperature is 100 DEG C, and drying unit frequency is in 45Hz;
(3)By the Workpiece transfer after optical crosstalk to rotary hearth furnace, to workpiece heat to 490 DEG C, and 60min or more is kept the temperature;
(4)Preform Die is heated to 240 DEG C, and the uniform smearing release agent in die cavity, the workpiece after heating is put into blocking Blocking is carried out in mold;
(5)Workpiece transfer after blocking to epithelium processing station is subjected to epithelium processing, 240 DEG C of rotary hearth furnace heating are packed into Workpiece after blocking keeps the temperature 10min or more, is taken out in workpiece immersion film agent with pliers and is taken out after 4s, will using workpiece waste heat Workpiece is dried and cooled to room temperature, and the wherein temperature of film agent is less than or equal to 90 DEG C;
(6)By epithelium, treated that workpiece is sent to rotary hearth furnace, and rotary hearth furnace is preheated to 490 DEG C, keeps the temperature 60min or more, starts piece installing, Then workpiece is carried out being heated to 505 DEG C;
(7)Mold is heated to 300 DEG C, spiral shape even application releasing agent is then pressed, the workpiece after heating is put to mold Compression moulding;
(8)The meshbeltfurnace that two overall lengths are 8-10m is connected, and is provided with quenching liquid between the two, the meshbeltfurnace of front end is uniform It is divided into four areas, is followed successively by 1st area of solid solution, 2nd area of solid solution, 3rd area of solid solution, 4th area of solid solution, wherein the temperature for being dissolved 1st area is 510 DEG C, Gu The temperature in molten 2nd area is 505 DEG C, and 3rd area of solid solution and the temperature for being dissolved 4th area are 500 DEG C, and workpiece enters to defeated from the meshbeltfurnace of front end The time gone out is 70min, and subsequently into quenching liquid, quenching liquid temperature should be less than 60 DEG C, and workpiece is cooled in quenching liquid Few 10min;It enters back into the meshbeltfurnace of rear end, the temperature of the meshbeltfurnace of rear end is controlled at 200 DEG C, and workpiece is from the guipure of rear end The time that stove enters to output is 375min;
(9)Workpiece is carried out to be refined to size requirement, obtains the thick embryo of forging;
(10)The thick embryo of forging is put into shot-blasting machine and carries out Shot Blasting, the ball blast time is 15min, obtains forging.

Claims (1)

1. a kind of quiet disk forging process methods of turbo-compressor STR, it is characterized in that:Specifically comprise the following steps:
(1)Steel are carried out to cut into round pie workpiece;
(2)It puts the workpiece in bur removing device for card clothing and carries out optical crosstalk processing, the optical crosstalk time is 30-80min, and light polishing machine frequency is 40-70Hz, is gone out Expect time control in 5-20min;Then it is cleaned, drying and processing is carried out after drying, drying temperature is 70-120 DEG C, dryer Frequency is in 40-60Hz;
(3)By the Workpiece transfer after optical crosstalk to rotary hearth furnace, to workpiece heat to 400-490 DEG C, and 60min or more is kept the temperature;
(4)Preform Die is heated to 200-280 DEG C, and the uniform smearing release agent in die cavity, the workpiece after heating is put into Blocking is carried out in Preform Die;
(5)Workpiece transfer after blocking to epithelium processing station is subjected to epithelium processing, by 210-260 DEG C of rotary hearth furnace heating, The workpiece being packed into after blocking keeps the temperature 10min or more, is taken out in workpiece immersion film agent with pliers and is taken out after 2-8s, utilizes workpiece Workpiece is dried and cooled to room temperature by waste heat, and the wherein temperature of film agent is less than or equal to 90 DEG C;
(6)By epithelium, treated that workpiece is sent to rotary hearth furnace, and rotary hearth furnace is preheated to 400-490 DEG C, keeps the temperature 60min or more, starts Then piece installing carries out workpiece being heated to 500-510 DEG C;
(7)Mold is heated to 201-350 DEG C, spiral shape even application releasing agent is then pressed, the workpiece after heating is put to mould Compression moulding in tool;
(8)The meshbeltfurnace that two overall lengths are 8-10m is connected, and is provided with quenching liquid between the two, the meshbeltfurnace of front end is uniform It is divided into four areas, is followed successively by 1st area of solid solution, 2nd area of solid solution, 3rd area of solid solution, 4th area of solid solution, wherein the temperature for being dissolved 1st area is 505-525 DEG C, the temperature in 2nd area of solid solution is 500-520 DEG C, and 3rd area of solid solution and the temperature for being dissolved 4th area are 495-515 DEG C, and workpiece is from front end The time that meshbeltfurnace enters to output is 60-80min, and subsequently into quenching liquid, quenching liquid temperature should be less than 60 DEG C, by workpiece The cooling at least 10min in quenching liquid;It enters back into the meshbeltfurnace of rear end, the temperature of the meshbeltfurnace of rear end is controlled in 180-220 DEG C, and workpiece enters to the time of output as 350-380min from the meshbeltfurnace of rear end;
(9)Workpiece is carried out to be refined to size requirement, obtains the thick embryo of forging;
(10)The thick embryo of forging is put into shot-blasting machine and carries out Shot Blasting, the ball blast time is 10-25min, obtains forging.
CN201810204059.0A 2018-03-13 2018-03-13 Machining method for STR static disc forged piece of turbo compressor Active CN108436391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810204059.0A CN108436391B (en) 2018-03-13 2018-03-13 Machining method for STR static disc forged piece of turbo compressor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810204059.0A CN108436391B (en) 2018-03-13 2018-03-13 Machining method for STR static disc forged piece of turbo compressor

Publications (2)

Publication Number Publication Date
CN108436391A true CN108436391A (en) 2018-08-24
CN108436391B CN108436391B (en) 2020-02-21

Family

ID=63194850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810204059.0A Active CN108436391B (en) 2018-03-13 2018-03-13 Machining method for STR static disc forged piece of turbo compressor

Country Status (1)

Country Link
CN (1) CN108436391B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158362A (en) * 1996-12-06 1997-09-03 魁永生 Multicomponent alloyed cast and forged wearing, corrosion resistant and high toughness grinding balls and its prodn. method
CN101070582A (en) * 2007-06-12 2007-11-14 江阴康瑞不锈钢制品有限公司 Austenite cold-forged stainless-steel and steel wire making method
CN102059525A (en) * 2011-01-10 2011-05-18 周志勇 Manufacturing method of fishing line wheel footstand
CN102581556A (en) * 2012-02-23 2012-07-18 绍兴康健镁业有限公司 Processing technology of static iron core of electromagnetic valve
JP2015018231A (en) * 2013-06-14 2015-01-29 日東電工株式会社 Double-refraction lenticular lens film, manufacturing method of double-refraction lenticular lens film, polarizing plate with double-refraction lenticular lens film, and image display device
CN104551546A (en) * 2014-11-19 2015-04-29 塞里姆株式会社 Manufacturing method for clutch lever of fishing reel component and manufacturing device for clutch lever
CN105983816A (en) * 2015-01-27 2016-10-05 佛山市南海中宇渔具有限公司 Integral forming method for reel throwing line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1158362A (en) * 1996-12-06 1997-09-03 魁永生 Multicomponent alloyed cast and forged wearing, corrosion resistant and high toughness grinding balls and its prodn. method
CN101070582A (en) * 2007-06-12 2007-11-14 江阴康瑞不锈钢制品有限公司 Austenite cold-forged stainless-steel and steel wire making method
CN102059525A (en) * 2011-01-10 2011-05-18 周志勇 Manufacturing method of fishing line wheel footstand
CN102581556A (en) * 2012-02-23 2012-07-18 绍兴康健镁业有限公司 Processing technology of static iron core of electromagnetic valve
JP2015018231A (en) * 2013-06-14 2015-01-29 日東電工株式会社 Double-refraction lenticular lens film, manufacturing method of double-refraction lenticular lens film, polarizing plate with double-refraction lenticular lens film, and image display device
CN104551546A (en) * 2014-11-19 2015-04-29 塞里姆株式会社 Manufacturing method for clutch lever of fishing reel component and manufacturing device for clutch lever
CN105983816A (en) * 2015-01-27 2016-10-05 佛山市南海中宇渔具有限公司 Integral forming method for reel throwing line

Also Published As

Publication number Publication date
CN108436391B (en) 2020-02-21

Similar Documents

Publication Publication Date Title
CN106624659B (en) A kind of manufacturing process of automobile wheel rim
CN101648254B (en) Process for forging hydrogenated titanium alloy forging blade
CN105344900A (en) Forging process for lock case
CN110421224A (en) A kind for the treatment of process improving 4Cr13 material brazing member hardness
CN105734214A (en) Annealing process for H13 steel
CN108436391A (en) A kind of quiet disk forging process methods of turbo-compressor STR
CN102152083A (en) Manufacturing method of spinning pot
CN104439986B (en) Method for continuously producing large long shaft type forged pieces through casting-forging heat
CN108057827A (en) A kind of forging technology of high tenacity stamping parts
CN203668469U (en) Die capable of controlling quenching distortion of large thin-walled inner gear ring and separation device
CN108356489A (en) A kind of turbo-compressor STR Moving plates forging process method
CN104191174A (en) Hot bending-quenching compound forming technology for lower front arc deck
CN110216421A (en) A kind of processing method of gland
CN105695701A (en) 40Cr quenching and tempering technology
CN110039313A (en) A kind of energy-saving hot forming steel class part substep Forming Equipments and technique
CN107263542A (en) A kind of manufacture method of robot casing
CN105618701B (en) A kind of casting method of wear-resisting steel part
CN203602659U (en) Quenching line process unit
CN105779706B (en) 12Cr18Ni9 stainless steel rivet solid solution treatment processes
CN106984749A (en) A kind of oil cylinder production method
CN109468578A (en) A kind of molding of automobile die and surface Hardening Treatment technique
CN107160106A (en) A kind of flame proof seat production method
CN110252959A (en) A kind of press machine lower and upper cross-member casting technique
CN103468896A (en) Vacuum quenching and cooling method of H13 steel
CN108977627A (en) A kind of heat-treatment processing process of hot die steel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant