CN108427831A - A method of optimizing dell building structure using outdoor scene modeling and BIM technology - Google Patents

A method of optimizing dell building structure using outdoor scene modeling and BIM technology Download PDF

Info

Publication number
CN108427831A
CN108427831A CN201810135276.9A CN201810135276A CN108427831A CN 108427831 A CN108427831 A CN 108427831A CN 201810135276 A CN201810135276 A CN 201810135276A CN 108427831 A CN108427831 A CN 108427831A
Authority
CN
China
Prior art keywords
dell
bim
building structure
model
outdoor scene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810135276.9A
Other languages
Chinese (zh)
Inventor
陈昊
何昌杰
周润东
郭节
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201810135276.9A priority Critical patent/CN108427831A/en
Publication of CN108427831A publication Critical patent/CN108427831A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

A method of optimizing dell building structure using outdoor scene modeling and BIM technology, first use outdoor scene modeling technique and space triangular encryption software, generate dell three-dimensional Geographic environmental model, BIM building structure models before design optimization are imported wherein, carry out collision detection, dynamic adjustment buildings model, completes force analysis, to form optimal structural design scheme.This method is suitable for the industry high with surrounding geographical environmental correclation degree and residential construction area, road and bridge field and field of water conservancy.

Description

A method of optimizing dell building structure using outdoor scene modeling and BIM technology
Technical field
The present invention relates to structure-design technique field and survey fields, and in particular to a kind of to utilize outdoor scene modeling and BIM The method of technical optimization dell building structure.
Background technology
Discarded pit be mining activity terminate that (mineral resources exhausted) generate afterwards leave discarded ground, be land resource A part, quantity, area are increasing with the passing of time.In people contradiction is increasingly sharpened, economic strength constantly enhances and Today that environmental protection consciousness is gradually increased, people increasingly pay attention to restoration of the ecosystem, transformation and the comprehensive utilization in discarded pit, Dell is built in discarded pit to be built into for a kind of feasible method in urban ecology reparation utilization, the design of dell building It is different from traditional architecture, in order to make building and dell environment reach harmonious, symbiosis, difficulty of construction is reduced, reduces the place to crater wall Reason generally requires to check the spatial relationship between crater wall and building structure, to optimize construction profile.
Invention content
The present invention solve the deficiencies in the prior art provide a kind of visualization, parametrization dell building optimization design mode, Make building and dell environment coordination, forms optimal Architectural Structure Design scheme, greatlys save human cost and construction cost Using outdoor scene modeling and BIM technology optimize dell building structure method.
It is including as follows the invention discloses a kind of method optimizing dell building structure using outdoor scene modeling and BIM technology Step:
A, surrounding geographical environmental images information is built using unmanned plane acquisition dell, is calculated with space triangular encryption software Drawing three-dimensional Geographic environmental model;
B, using BIM mapping softwares, the dell BIM models with three-dimensional Geographic environmental model ruler in proportion is drawn, are applied simultaneously Add edge-restraint condition;
Dell BIM models are imported into generated three-dimensional geographical ring by the c, coordinate system and engineer's scale of one or two of model of system In the model of border, the architectural design model with dell geographical environment is formd;
D, collision detection is carried out in architectural design model, and selection markers, and root are carried out to the structural unit to collide Parametric adjustment is carried out to dell BIM models according to collision detection result;
E, using civil structure analysis software, calculating analysis is carried out to the building structure after adjustment, determines dell BIM models Optimization design scheme.
In step a, the three-dimensional Geographic environmental model is built using oblique photograph measuring technique.
The dell BIM models be include cell node constraints parameter information and can to the dimensional parameters of unit, Spatial position and constraints carry out the dell BIM models of parametric control.
In step d, collision detection reflects the spatial relation of BIM buildings models and three-dimensional Geographic environmental model, and The structural unit to collide is subjected to selection markers.
Using the above method, the present invention only needs to use oblique photograph measuring technique by near-earth unmanned plane, passes through space three Angular measurement computations can quickly obtain complicated three-dimensional geographical environment, then imported into dell BIM models generated In three-dimensional Geographic environmental model, the architectural design model with dell geographical environment is formd, so as to the dell of image reflection Relationship between building and three-dimensional geographical environment substantially reduces difficulty of construction to be analyzed by optimizing, and reduces the place to crater wall Reason facilitates the spatial relationship checked between crater wall and building structure, to be optimized to dell building structure shape, saves significantly About human resources and production cost, make building and dell environment coordination.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific implementation mode
The present invention is further described in detail below with reference to the accompanying drawings and embodiments.
As described in Figure 1, a method of optimizing dell building structure using outdoor scene modeling and BIM technology, including walk as follows Suddenly:
The first step:Based on oblique photograph measuring principle, surrounding geographical environmental images information is obtained using unmanned plane, with sky Between triangle encryption software drawing three-dimensional Geographic environmental model, and correct the coordinate system of three-dimensional Geographic environmental model;
Second step:Using BIM mapping softwares, the dell building structure mould with three-dimensional Geographic environmental model ruler in proportion is drawn Type, while applying edge-restraint condition;
Third walks:It unites the coordinate system of one or two of model, BIM building structure models is imported into generated three-dimensional geographical ring In the model of border, collision detection is carried out, selection markers are carried out to the structural unit to collide;
4th step:Parametric adjustment is carried out to original building model according to collision detection result;
5th step:Using civil structure analysis software, calculating analysis is carried out to the building structure after adjustment, determines optimal set Meter scheme.
Embodiment:
Using unmanned plane (being based on oblique photograph measuring principle) acquisition surrounding geographical environmental images information, with " Context The space triangulars encryption software calculating and plotting three-dimensional Geographic environmental model such as Capture Master ", and correct three-dimensional geographical environment The coordinate system of model.
Using the BIM such as " REVIT " mapping softwares, the dell building structure with three-dimensional Geographic environmental model ruler in proportion is drawn Model, while applying edge-restraint condition.
It unites the coordinate system of one or two of model, BIM buildings models is imported into generated three-dimensional Geographic environmental model, shape At the architectural design model with dell geographical environment.
Collision detection is carried out in new established model, selection markers is carried out to the structural unit to collide, and according to collision Inspection result carries out parametric adjustment to original building model.
Using the civil structures analysis software such as such as " ANSYS ", " MIDAS ", the building structure after adjustment calculate and is divided Analysis, determines optimization design scheme.
Above-mentioned is the preferred embodiment of the present invention, but those skilled in the art should be understood that appended by not departing from In the spirit and scope of the present invention defined by claims, the various changes in form and details to made by the present invention Change, belongs to protection scope of the present invention.

Claims (4)

1. a kind of method optimizing dell building structure using outdoor scene modeling and BIM technology, which is characterized in that including walking as follows Suddenly:
A, surrounding geographical environmental images information is built using unmanned plane acquisition dell, with space triangular encryption software calculating and plotting Three-dimensional Geographic environmental model;
B, using BIM mapping softwares, the dell BIM models with three-dimensional Geographic environmental model ruler in proportion are drawn, while applying side Bound constrained condition;
Dell BIM models are imported into generated three-dimensional geographical environment mould by the c, coordinate system and engineer's scale of one or two of model of system In type, the architectural design model with dell geographical environment is formd;
D, collision detection is carried out in architectural design model, selection markers are carried out to the structural unit that collides, and according to touching It hits inspection result and parametric adjustment is carried out to dell BIM models;
E, using civil structure analysis software, calculating analysis is carried out to the building structure after adjustment, determines dell BIM models most Excellent design scheme.
2. the method according to claim 1 for being optimized dell building structure using outdoor scene modeling and BIM technology, feature are existed In:In step a, the three-dimensional Geographic environmental model is built using oblique photograph measuring technique.
3. the method according to claim 1 for being optimized dell building structure using outdoor scene modeling and BIM technology, feature are existed In:The dell BIM models be include cell node constraints parameter information and can be to unit dimensional parameters, space Position and constraints carry out the dell BIM models of parametric control.
4. the method according to claim 1 for being optimized dell building structure using outdoor scene modeling and BIM technology, feature are existed In:In step d, collision detection reflects the spatial relation of BIM buildings models and three-dimensional Geographic environmental model, and will occur The structural unit of collision carries out selection markers.
CN201810135276.9A 2018-02-09 2018-02-09 A method of optimizing dell building structure using outdoor scene modeling and BIM technology Withdrawn CN108427831A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810135276.9A CN108427831A (en) 2018-02-09 2018-02-09 A method of optimizing dell building structure using outdoor scene modeling and BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810135276.9A CN108427831A (en) 2018-02-09 2018-02-09 A method of optimizing dell building structure using outdoor scene modeling and BIM technology

Publications (1)

Publication Number Publication Date
CN108427831A true CN108427831A (en) 2018-08-21

Family

ID=63156720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810135276.9A Withdrawn CN108427831A (en) 2018-02-09 2018-02-09 A method of optimizing dell building structure using outdoor scene modeling and BIM technology

Country Status (1)

Country Link
CN (1) CN108427831A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111859507A (en) * 2020-07-21 2020-10-30 淮安市建筑科学研究院有限公司 Assembly type building construction scheme based on BIM technology
CN113112603A (en) * 2021-04-09 2021-07-13 北京沃东天骏信息技术有限公司 Method and device for optimizing three-dimensional model
CN113450453A (en) * 2021-07-06 2021-09-28 中国建筑第八工程局有限公司 Advanced cross construction method based on virtual-real model combination
CN117627528A (en) * 2024-01-25 2024-03-01 中建五局第三建设有限公司 Construction device and construction method of jumbolter for deep foundation pit
CN117627528B (en) * 2024-01-25 2024-05-03 中建五局第三建设有限公司 Construction device and construction method of jumbolter for deep foundation pit

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104794331A (en) * 2015-04-07 2015-07-22 上海大学 Deep foundation pit heath monitoring and management system and management method thereof
CN107090975A (en) * 2017-05-26 2017-08-25 中建五局第三建设有限公司 A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN107609900A (en) * 2017-08-25 2018-01-19 北京科技大学 A kind of room streetscape pricing method based on oblique photograph and BIM

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104794331A (en) * 2015-04-07 2015-07-22 上海大学 Deep foundation pit heath monitoring and management system and management method thereof
CN107090975A (en) * 2017-05-26 2017-08-25 中建五局第三建设有限公司 A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN107609900A (en) * 2017-08-25 2018-01-19 北京科技大学 A kind of room streetscape pricing method based on oblique photograph and BIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何建军 等: "三维扫描技术结合BIM 在佘山深坑酒店项目的应用", 《土木建筑工程信息技术》 *
杨田: "倾斜摄影测量与BIM技术实现三维模型的研究", 《中国优秀硕士学位论文全文数据库(基础科学辑)》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111859507A (en) * 2020-07-21 2020-10-30 淮安市建筑科学研究院有限公司 Assembly type building construction scheme based on BIM technology
CN113112603A (en) * 2021-04-09 2021-07-13 北京沃东天骏信息技术有限公司 Method and device for optimizing three-dimensional model
CN113450453A (en) * 2021-07-06 2021-09-28 中国建筑第八工程局有限公司 Advanced cross construction method based on virtual-real model combination
CN117627528A (en) * 2024-01-25 2024-03-01 中建五局第三建设有限公司 Construction device and construction method of jumbolter for deep foundation pit
CN117627528B (en) * 2024-01-25 2024-05-03 中建五局第三建设有限公司 Construction device and construction method of jumbolter for deep foundation pit

Similar Documents

Publication Publication Date Title
CN108460189A (en) A kind of curtain wall mounting design method based on BIM technology
CN103886152B (en) Drainage basin water catchment range manufacturing method based on urban concave downward flyover area DEM
CN102402728B (en) A kind of land utilization space planning forecast and virtual space scale-transformation method
CN105157590A (en) Construction health monitoring system based on three-dimensional laser scanning technology
CN108427831A (en) A method of optimizing dell building structure using outdoor scene modeling and BIM technology
CN104574512A (en) Multi-scale DEM (digital elevation model) construction method considering topographical semantic information
CN103970919A (en) Automatic building information modeling data processing method
CN107944203A (en) A kind of visual architectural design method of wind-velocity streamline
CN102222140A (en) Design drawing information extraction method of complex bridge structural analysis and modeling
CN105205283A (en) Rule modeling method integrating city design indexes and construction control indexes
CN110411422A (en) The planing method of builder's road based on BIM
CN104077394A (en) Urban historical map restoration method based on spatial grid hierarchical positioning
CN111046459A (en) Building model image design method based on 3D software
CN103970837A (en) Discontinuous DEM classified manufacturing method based on urban land and vertical planning
CN111125820B (en) BIM+GIS-based construction site space virtual construction method
CN109933821B (en) Method for analyzing space between residential buildings
CN115758530A (en) Bridge engineering forward planning method, device, equipment and storage medium
CN114937136A (en) Multi-scene three-dimensional model and 3D point cloud coordinate conversion system
Zhou et al. The application of digital technology in the design of landscape architecture and education reform
CN112150628A (en) Method for building three-dimensional data model in GIS platform by BIM data
CN104318029A (en) Aided design method of building structure
Yang Digital protection of ancient buildings based on BIM simulation technology
Bratoev et al. Designing and evaluating district heating networks with simulation based urban planning
Liau et al. Application of civil information modeling for constructability review for highway projects
Yu Earthwork Optimal Allocation Model of Road Engineering Based on BIM Technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180821

WW01 Invention patent application withdrawn after publication