CN108425539A - Clamping device for cross arm of tower - Google Patents
Clamping device for cross arm of tower Download PDFInfo
- Publication number
- CN108425539A CN108425539A CN201810436978.0A CN201810436978A CN108425539A CN 108425539 A CN108425539 A CN 108425539A CN 201810436978 A CN201810436978 A CN 201810436978A CN 108425539 A CN108425539 A CN 108425539A
- Authority
- CN
- China
- Prior art keywords
- bolt
- angle plate
- adjustment groove
- plate
- adjustment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
技术领域technical field
本发明涉及配电设备领域,具体涉及用于杆塔横担的夹持机构。The invention relates to the field of power distribution equipment, in particular to a clamping mechanism for a tower cross arm.
背景技术Background technique
配电网是指从输电网或地区发电厂接收电能,通过配电设施分配或按电压逐级分配给各类用户的电力网,是由架空线路、电缆、杆塔、配电变压器、隔离开关、无功补偿器及一些附属设施组成的,在电力网中起分配电能作用的网络。The distribution network refers to the power network that receives electric energy from the transmission network or regional power plants, distributes it through power distribution facilities or distributes it to various users step by step according to voltage, and is composed of overhead lines, cables, towers, distribution transformers, isolating switches, wireless It is a network composed of power compensators and some ancillary facilities, which plays a role in distributing electric energy in the power grid.
配电网按电压等级大致分为高压配电网、中压配电网和低压配电网三类。其中,10kV配电网属于中压配电网。According to the voltage level, the distribution network can be roughly divided into three categories: high-voltage distribution network, medium-voltage distribution network and low-voltage distribution network. Among them, the 10kV distribution network belongs to the medium voltage distribution network.
杆塔起着支撑输电线的作用,是配电网重要的设备之一。在杆塔上搭接引流线的过程中,带电搭接引流线是配网不停电作业中常见的工作,对于提高电力部门的供电可靠性有着极为重要的意义。The tower plays the role of supporting the transmission line and is one of the important equipment of the distribution network. In the process of lapping the drain wires on the tower, the live lap drain wires are a common work in the distribution network without power interruption, which is of great significance for improving the power supply reliability of the power department.
现有技术中,当需要在杆塔的金属横担上安装瓷横担时,由于金属横担上并未预设有眼孔,需要工作人员现场在横杆上开设用于安装瓷横担的眼孔,然而,在金属横担上开设眼孔,以及对所开设的眼孔大小进行调试需要耗费较多的时间且工作难度大,瓷横担的安装速度慢、工作人员的安装效率低;同时,长时间的高空带电作业,使得工作人员的安全存在风险。In the prior art, when it is necessary to install the porcelain cross-arm on the metal cross-arm of the tower, since the metal cross-arm is not preset with eyelets, it is necessary for the staff to open holes for installing the porcelain cross-arm on the cross-arm on site. However, setting eyelets on the metal cross-arm and debugging the size of the opened eyeholes will take a lot of time and the work is difficult. The installation speed of the porcelain cross-arm is slow and the installation efficiency of the staff is low; at the same time , Long-term high-altitude live working, making the safety of the staff at risk.
发明内容Contents of the invention
本发明的目的在于提供用于杆塔横担的夹持机构,以解决现有技术中工作人员需要在横杆上开设眼孔以安装瓷横担所造成的瓷横担安装速度慢、工作人员安装效率低以及工作人员的安全存在风险的问题。The purpose of the present invention is to provide a clamping mechanism for the cross-arm of the pole tower, to solve the slow installation speed of the porcelain cross-arm caused by the staff needing to open holes on the cross-arm in the prior art to install the porcelain cross-arm Inefficiencies and risks to staff safety.
本发明通过下述技术方案实现:The present invention realizes through following technical scheme:
用于杆塔横担的夹持机构,包括第一直角板和第二直角板,所述第一直角板和第二直角板通过铰链连接;第一直角板的水平段上设置有上眼孔、第一调节槽,第一直角板的竖直段上设置有第二调节槽,第二直角板的水平段上设置有下眼孔、第三调节槽,第二直角板的竖直段上设置有第四调节槽,其中,第一调节槽、第二调节槽、第三调节槽、第四调节槽的位置被配置为,当上眼孔的中轴线与下眼孔的中轴线共线时,所述第一调节槽与第三调节槽对齐、所述第二调节槽与第四调节槽对齐;还包括第一螺栓、第二螺栓以及与第一螺栓、第二螺栓相匹配的螺母,所述第一螺栓的尺寸与第一调节槽、第三调节槽的尺寸相匹配,所述第二螺栓的尺寸与第二调节槽、第四调节槽的尺寸相匹配。The clamping mechanism used for the cross-arm of the pole and tower includes a first right-angle plate and a second right-angle plate, and the first right-angle plate and the second right-angle plate are connected by hinges; the horizontal section of the first right-angle plate is provided with upper eyelets, The first adjustment groove, the vertical section of the first right-angle plate is provided with the second adjustment groove, the horizontal section of the second right-angle plate is provided with the lower eye hole, the third adjustment groove, and the vertical section of the second right-angle plate is provided with There is a fourth adjustment groove, wherein the positions of the first adjustment groove, the second adjustment groove, the third adjustment groove and the fourth adjustment groove are configured so that when the central axis of the upper eye hole is collinear with the central axis of the lower eye hole , the first adjustment slot is aligned with the third adjustment slot, and the second adjustment slot is aligned with the fourth adjustment slot; it also includes a first bolt, a second bolt, and a nut matching the first bolt and the second bolt, The size of the first bolt matches the size of the first adjusting slot and the third adjusting slot, and the size of the second bolt matches the size of the second adjusting slot and the fourth adjusting slot.
目前,在带电搭接引流线的过程中,由于横担尺寸不同,对瓷横担的安装位置要求不同等多种原因,横担上通常不会预设有用于安装瓷横担的眼孔。因此,工作人员通常需要现场在金属横担上开眼孔,这样操作会带来诸多问题。首先,开设眼孔需要耗费一定时间,这个时间通常较长,因为需要对开孔位置进行计算、开孔过程中眼孔的中轴线是否倾斜等等,同时,工作人员需要带较多的设备爬上杆塔,操作较为复杂;其次,开孔完成后,对眼孔的尺寸的调试等一系列操作同样会延长工时;再次,由于是在杆塔上带电作业,复杂的工作流程使得工作人员的安全风险较大。综上,现场开设眼孔不仅耗时长、步骤繁琐导致安装效率低,同时,工作人员的安全存在风险,这种方式不具备推广价值。At present, in the process of hot lapping the drain wire, due to various reasons such as different cross-arm sizes and different requirements for the installation position of the porcelain cross-arm, the cross-arm is usually not preset with eyelets for installing the porcelain cross-arm. Therefore, the staff usually needs to open holes on the metal cross-arm on the spot, and this operation will bring many problems. First of all, it takes a certain amount of time to open the eyehole, which is usually longer, because the position of the hole needs to be calculated, whether the central axis of the eyehole is inclined during the hole opening process, etc. At the same time, the staff needs to bring more equipment to climb The operation of erecting the pole tower is more complicated; secondly, after the hole opening is completed, a series of operations such as adjusting the size of the eye hole will also prolong the working hours; thirdly, because the live work is carried out on the pole tower, the complicated work process makes the safety risk of the staff larger. To sum up, setting eyelets on site is not only time-consuming and cumbersome, but also leads to low installation efficiency. At the same time, there are risks to the safety of the staff. This method has no promotion value.
为了解决上述问题,本装置提供一种用于杆塔横担的夹持机构,该夹持机构用于夹持在金属横担上,利用其预设的眼孔即可安装瓷横担,安装步骤简单、耗时短,有利于提高工作人员的工作效率,确保工作人员的操作安全。In order to solve the above problems, this device provides a clamping mechanism for the cross-arm of the tower. The clamping mechanism is used for clamping on the metal cross-arm, and the ceramic cross-arm can be installed by using its preset eyelets. The installation steps It is simple and time-consuming, which is conducive to improving the work efficiency of the staff and ensuring the safety of the staff.
具体地,本装置包括第一直角板和第二直角板。所述第一直角板、第二直角板均包括水平段和竖直段,其中,水平段的一个端面与竖直段的一个端面连接,水平段与竖直段相互垂直。之所以采用直角板的结构是因为金属横担为角铁,因此,在使用时,第一直角板和第二直角板的水平段夹持金属横担的水平段,而第一直角板和第二直角板的竖直段夹持金属横担的竖直段,本领域技术人员应当理解,为了夹持角钢,第二直角板的尺寸应当小于第一直角板的尺寸以适应角钢自身的厚度。第一直角板和第二直角板通过铰链连接,铰链连接使得第二直角板能够相对于第一直角板翻转,铰链连接可以有多种实施方式,例如通过设置活页铰接,或者在第一直角板、第二直角板上设置销孔,利用销轴穿过销孔完成第一直角板和第二直角板的铰接,又或者通过在第一直角板上设置销孔,在第二直角板上设置销轴构成铰接。由于铰链连接这种连接方式本身为现有技术,在此不再赘述并不对具体的铰链实施方式进行限定。Specifically, the device includes a first right-angle plate and a second right-angle plate. Both the first right-angle plate and the second right-angle plate include a horizontal section and a vertical section, wherein one end surface of the horizontal section is connected to one end surface of the vertical section, and the horizontal section and the vertical section are perpendicular to each other. The reason why the structure of the right-angle plate is used is that the metal cross-arm is an angle iron. Therefore, when in use, the horizontal sections of the first and second right-angle plates clamp the horizontal section of the metal cross-arm, while the first and second right-angle plates clamp the horizontal section of the metal cross-arm. The vertical section of the two right-angle plates clamps the vertical section of the metal cross arm. Those skilled in the art should understand that in order to clamp the angle steel, the size of the second right-angle plate should be smaller than the size of the first right-angle plate to adapt to the thickness of the angle steel itself. The first right-angle plate and the second right-angle plate are connected by a hinge, and the hinge connection enables the second right-angle plate to turn over relative to the first right-angle plate. 1. A pin hole is set on the second right-angle plate, and the pin shaft passes through the pin hole to complete the hinge joint between the first right-angle plate and the second right-angle plate, or by setting a pin hole on the first right-angle plate, setting The pin shaft constitutes the hinge. Since the hinge connection itself is a prior art, it will not be repeated here and does not limit the specific hinge implementation.
在第一直角板的水平段上设置有上眼孔、第一调节槽,第一直角板的竖直段上设置有第二调节槽,第二直角板的水平段上设置有下眼孔、第三调节槽,第二直角板的竖直段上设置有第四调节槽。此处提到的上眼孔、下眼孔的上和下是因为在使用时,第一直角板位于第二直角板的上方,第一直角板和第二直角板之间的缝隙用于夹持金属横担,因此,为了便于理解,将第一直角板上的眼孔定义为上眼孔,第二直角板上的眼孔定义为下眼孔,优选地,上眼孔和下眼孔直径相同。第一调节槽、第二调节槽、第三调节槽、第四调节槽的位置被配置为,当上眼孔的中轴线与下眼孔的中轴线共线时,所述第一调节槽与第三调节槽对齐、所述第二调节槽与第四调节槽对齐。此处提到的术语对齐是指,当第二直角板翻转并贴合在金属横担上时,上眼孔和下眼孔的中轴线对齐,以形成连通第一直角板上表面和第二直角板下表面的通孔,用于安装瓷横担,与此同时第一调节槽和第三调节槽对齐,即形成连通第一直角板上表面和第二直角板下表面的水平调节槽,该水平调节槽用于安装第一螺栓,而第二调节槽和第四调节槽对齐,形成连通第一直角板外表面和第二直角板内表面的竖直调节槽,该竖直调节槽用于安装第二螺栓。通过第一螺栓、第二螺栓及其相匹配的螺母的紧固作用,能够使得第一直角板和第二直角板稳固地夹持位于两者之间的横担,同时,第一螺栓能够限制该夹持机构沿水平方向的移动,第二螺栓能够限制夹持机构沿竖直方向的移动,进一步提高稳定性。第一螺栓的尺寸与第一调节槽、第三调节槽的尺寸相匹配,第一螺栓能够穿过第一调节槽、第三调节槽,但同时第一螺栓应当拥有足够的直径以对夹持机构形成水平方向的限位;同理,第二螺栓的尺寸与第二调节槽、第四调节槽的尺寸相匹配是指第二螺栓能够穿过第二调节槽、第四调节槽,但同时第二螺栓应当拥有足够的直径以对夹持机构形成竖直方向的限位。优选地,第一螺栓的直径略小于第一调节槽、第三调节槽的宽度,第二螺栓的直径略小于第二调节槽的宽度。优选地,第一调节槽、第二调节槽、第三调节槽、第四调节槽均为条形槽,即,其长度大于其宽度,以使得夹持机构能够适应于不同尺寸的金属横担,例如,当金属横担的水平段较长时,可以调节第一螺栓在第一调节槽和第三调节槽中的位置以对金属横担形成稳定的夹持,又例如,当金属横担的竖直段较长时,可以调节第二螺栓在第二调节槽和第四调节槽中的位置。通过各调节槽,使得本装置能够应用于多种不同尺寸的横担,大大提高了本装置的应用范围,使得本装置具备良好的普适性。The horizontal section of the first right-angle plate is provided with an upper eye hole and a first adjustment groove, the vertical section of the first right-angle plate is provided with a second adjustment groove, and the horizontal section of the second right-angle plate is provided with a lower eye hole, The third adjustment groove, the fourth adjustment groove is arranged on the vertical section of the second rectangular plate. The above and below of the upper eyelet and the lower eyelet mentioned here are because when in use, the first right-angle plate is above the second right-angle plate, and the gap between the first right-angle plate and the second right-angle plate is used to clamp To hold a metal cross arm, therefore, for ease of understanding, the eyelets on the first rectangular plate are defined as upper eyelets, and the eyelets on the second rectangular plate are defined as lower eyelets, preferably, the upper eyelet and the lower eyelet same diameter. The positions of the first adjustment groove, the second adjustment groove, the third adjustment groove, and the fourth adjustment groove are configured such that when the central axis of the upper eye hole is collinear with the central axis of the lower eye hole, the first adjustment groove is aligned with the central axis of the lower eye hole. The third adjustment groove is aligned, and the second adjustment groove is aligned with the fourth adjustment groove. The term alignment mentioned here means that when the second right-angle plate is turned over and attached to the metal cross-arm, the central axis of the upper eye hole and the lower eye hole are aligned to form a connection between the upper surface of the first right-angle plate and the second The through hole on the lower surface of the right-angle plate is used to install the porcelain cross-arm. At the same time, the first adjustment groove and the third adjustment groove are aligned to form a horizontal adjustment groove connecting the upper surface of the first right-angle plate and the lower surface of the second right-angle plate. The horizontal adjustment groove is used to install the first bolt, and the second adjustment groove and the fourth adjustment groove are aligned to form a vertical adjustment groove connecting the outer surface of the first right-angle plate and the inner surface of the second right-angle plate. to install the second bolt. Through the fastening effect of the first bolt, the second bolt and their matching nuts, the first right-angle plate and the second right-angle plate can firmly clamp the cross arm between them, and at the same time, the first bolt can restrict The clamping mechanism moves along the horizontal direction, and the second bolt can limit the clamping mechanism's movement along the vertical direction, further improving stability. The size of the first bolt matches the size of the first adjustment slot and the third adjustment slot. The first bolt can pass through the first adjustment slot and the third adjustment slot, but at the same time the first bolt should have enough diameter to clamp The mechanism forms a limit in the horizontal direction; similarly, matching the size of the second bolt with the size of the second adjustment slot and the fourth adjustment slot means that the second bolt can pass through the second adjustment slot and the fourth adjustment slot, but at the same time The second bolt should have a sufficient diameter to form a vertical limit for the clamping mechanism. Preferably, the diameter of the first bolt is slightly smaller than the widths of the first adjusting groove and the third adjusting groove, and the diameter of the second bolt is slightly smaller than the width of the second adjusting groove. Preferably, the first adjustment groove, the second adjustment groove, the third adjustment groove, and the fourth adjustment groove are all bar-shaped grooves, that is, their length is greater than their width, so that the clamping mechanism can be adapted to metal cross-arms of different sizes , for example, when the horizontal section of the metal cross-arm is long, the position of the first bolt in the first adjustment groove and the third adjustment groove can be adjusted to form a stable clamping on the metal cross-arm, and for example, when the metal cross-arm When the vertical section is longer, the position of the second bolt in the second adjustment groove and the fourth adjustment groove can be adjusted. Through each adjustment slot, the device can be applied to cross arms of various sizes, greatly improving the application range of the device, and making the device have good universality.
使用时,工人穿戴好全套绝缘防护用具,进入绝缘斗臂车操作斗内,再通过绝缘臂的调整缓慢进入作业位置,然后对周围可能触及的带电体和接地体进行绝缘遮蔽。遮蔽完成后,将预先选定的安装位置上的绝缘遮蔽移开,将第一直角板放置于安装位置的横担上,调整第一直角板的位置以使得第一直角板的直角部分,即水平段和竖直段的连接部分与横担的直角部分紧密贴合,之后朝横担的方向翻转第二直角板,使得第二直角板与横担接触,第一直角板和第二直角板对金属横担构成夹持。之后,将第一螺栓依次穿过第一调节槽和第三调节槽,同时,第一螺栓的侧面紧贴金属横担的一个端面并拧紧第一螺栓、螺母;之后将第二螺栓依次穿过第二调节槽和第四调节槽,同时第二螺栓的侧面紧贴金属横担的另一个端面并拧紧第二螺栓、螺母。When in use, workers wear a full set of insulating protective equipment, enter the operating bucket of the insulating arm truck, and then slowly enter the working position through the adjustment of the insulating arm, and then insulate and shield the surrounding electrified bodies and grounding bodies that may be touched. After the shielding is completed, remove the insulation shielding at the pre-selected installation position, place the first right-angle plate on the crossarm at the installation position, and adjust the position of the first right-angle plate so that the right-angle part of the first right-angle plate, that is The connecting part of the horizontal section and the vertical section is closely attached to the right-angle part of the cross arm, and then the second right-angle plate is turned towards the direction of the cross-arm, so that the second right-angle plate is in contact with the cross-arm, the first right-angle plate and the second right-angle plate It is clamped to the metal cross arm. Afterwards, pass the first bolt through the first adjustment groove and the third adjustment groove in turn, at the same time, the side of the first bolt is close to one end face of the metal cross arm and tighten the first bolt and nut; then pass the second bolt through The second adjustment slot and the fourth adjustment slot, while the side of the second bolt is close to the other end face of the metal cross arm and the second bolt and the nut are tightened.
通过上述结构,工作人员在进行带电搭线作业时,无需在金属横担上开孔,只需要简单地夹持金属横担、拧紧螺栓即可完成夹持机构的安装,且夹持机构上的眼孔是预设好的,无需现场对尺寸进行调整,可以根据不同的需求使用不同尺寸眼孔的夹持机构,操作简便、耗时短,大幅地提高了瓷横担的安装效率,同时由于避免了工作人员长时间穿戴绝缘服所造成的过渡疲劳,因而降低了操作人员的操作风险;另外,通过第一调节槽、第二调节槽、第三调节槽、第四调节槽,使得本装置能够适用于不同尺寸的金属横担,大大提高了本装置的应用范围,具有广泛地推广价值。Through the above-mentioned structure, when the staff is carrying out the work of live wiring, there is no need to open holes on the metal cross-arm, and only need to simply clamp the metal cross-arm and tighten the bolts to complete the installation of the clamping mechanism, and the clamping mechanism on the The eyelets are preset, and there is no need to adjust the size on site. The clamping mechanism of different sizes of eyelets can be used according to different needs. The operation is simple and time-consuming, which greatly improves the installation efficiency of the porcelain cross-arm. It avoids the transitional fatigue caused by the staff wearing insulating clothing for a long time, thus reducing the operating risk of the operator; in addition, through the first adjustment slot, the second adjustment slot, the third adjustment slot, and the fourth adjustment slot, the device The utility model can be applied to metal cross-arms of different sizes, greatly improves the application range of the device, and has extensive popularization value.
作为本发明第一直角板和第二直角板的优选的铰接方式,所述第一直角板的水平段的端面上设置有旋转铰链,所述第二直角板的水平段的端面与旋转铰链连接。即,第一直角板的水平段的一个端面与竖直段连接,另一个端面上设置旋转铰链,该与旋转铰链连接的端面为第一直角板的铰接端,第二直角板的水平段的一个端面与竖直段连接,另一个端面与旋转铰链连接,该与旋转铰链连接的端面为第二直角板的铰接端。通过上述结构,第一直角板的一个端面和第二直角板的一个端面铰接,旋转铰链的具体设置方式可以是多种,例如在第一直角板的水平段上设置销孔,在第二直角板的水平段上设置销轴,使销孔穿过销轴完成铰接,也可以是第一直角板上设置销轴,第二直角板上设置销孔,也可以是第一直角板上和第二直角板上均设置突出的销孔,两者的销孔对其后利用销轴穿过销孔实现铰接。通过上述设置,第一直角板的铰接端和第二直角板的铰接端通过旋转铰链连接。优选地,上眼孔位于第一调节槽和第一直角板的铰接端之间的区域,下眼孔位于第二调节槽和第二直角板的铰接端之间的区域。As the preferred hinge mode of the first right-angle plate and the second right-angle plate in the present invention, a rotary hinge is arranged on the end surface of the horizontal section of the first right-angle plate, and the end surface of the horizontal section of the second right-angle plate is connected with the rotary hinge . That is, one end face of the horizontal section of the first right-angle plate is connected with the vertical section, and a rotary hinge is arranged on the other end face. One end face is connected with the vertical section, and the other end face is connected with the rotary hinge, and the end face connected with the rotary hinge is the hinged end of the second right-angle plate. Through the above structure, one end face of the first right-angle plate and one end face of the second right-angle plate are hinged. A pin shaft is set on the horizontal section of the plate, so that the pin hole passes through the pin shaft to complete the hinge, or the pin shaft is set on the first right angle plate, and the pin hole is set on the second right angle plate, or it can be the first right angle plate and the second right angle plate. Protruding pin holes are all arranged on the two right-angle plates, and the pin holes of the two are then hinged by pin shafts passing through the pin holes. Through the above arrangement, the hinged end of the first right-angled plate and the hinged end of the second right-angled plate are connected through a rotary hinge. Preferably, the upper eyehole is located in the area between the first adjusting slot and the hinged end of the first right-angle plate, and the lower eyehole is located in the area between the second adjusting slot and the hinged end of the second right-angled plate.
进一步地,所述第一直角板的水平段的长度大于第一直角板的竖直段的长度,所述第二直角板的水平段的长度大于第二直角板的竖直段的长度。优选地,第一直角板的水平段的长度为第一直角板竖直段的长度的1.5-1.8倍。Further, the length of the horizontal section of the first right-angle plate is longer than the length of the vertical section of the first right-angle plate, and the length of the horizontal section of the second right-angle plate is longer than the length of the vertical section of the second right-angle plate. Preferably, the length of the horizontal section of the first right-angle plate is 1.5-1.8 times the length of the vertical section of the first right-angle plate.
进一步地,作为各调节槽尺寸的优选方案,所述第一调节槽、第二调节槽、第三调节槽、第四调节槽的尺寸相同。此处的尺寸相同是指四个调节槽的槽长彼此相同、槽宽彼此相同。且所述第一调节槽的长度是第一调节槽的宽度的2~5倍。若调节槽的长度过长,容易导致第一直角板、第二直角板的力学性能差,若调节槽长度过短则夹持机构的适用范围较窄,在时间过程中,在确保第一直角板、第二直角板具有足够的力学性能的前提下,将调节槽的长度设置为调节槽宽度的2~5倍。Further, as a preferred solution for the size of each adjustment groove, the dimensions of the first adjustment groove, the second adjustment groove, the third adjustment groove and the fourth adjustment groove are the same. The same size here means that the lengths of the four adjusting grooves are the same and the widths of the grooves are the same. And the length of the first adjusting groove is 2-5 times of the width of the first adjusting groove. If the length of the adjustment groove is too long, it will easily lead to poor mechanical properties of the first right-angle plate and the second right-angle plate. If the length of the adjustment groove is too short, the applicable range of the clamping mechanism will be narrow. On the premise that the plate and the second right-angle plate have sufficient mechanical properties, the length of the adjusting groove is set to be 2 to 5 times the width of the adjusting groove.
作为本发明的一个优选的实施方案,第一直角板的水平段的上表面设置有第一螺栓保护机构,所述第一螺栓保护机构包括轨道,所述轨道上滑动设置有两个壳体,当两个壳体相互接触时,两个壳体的内部形成保护腔,所述保护腔覆盖第一调节槽;保护腔内设置有两块挡板,所述挡板上设置有弹簧,所述弹簧连接壳体。As a preferred embodiment of the present invention, the upper surface of the horizontal section of the first right-angle plate is provided with a first bolt protection mechanism, and the first bolt protection mechanism includes a track, and two housings are slidably arranged on the track, When the two housings are in contact with each other, a protection cavity is formed inside the two housings, and the protection cavity covers the first adjustment groove; two baffle plates are arranged in the protection cavity, and a spring is arranged on the baffle plate, and the The spring connects the housing.
在实际应用过程中发现,在部分区域,由于环境因素例如酸雨,在长时间使用过程中,酸雨持续与第一螺栓的螺纹接触,且由于第一螺栓设置于水平段上,酸雨无法流动,仅能缓慢挥发,因此在检修或更换夹持机构时会发现,第一螺栓容易生锈并卡死在水平调节槽中,为工作人员的拆卸、检修工作造成了很大的困扰,不仅延长了作业时间,且在实在无法取下的情况下只能损坏夹持机构,造成使用成本的提高和作业难度的增加。During the actual application, it was found that in some areas, due to environmental factors such as acid rain, the acid rain continued to contact the thread of the first bolt during long-term use, and because the first bolt was set on the horizontal section, the acid rain could not flow, only It can volatilize slowly, so when the clamping mechanism is overhauled or replaced, it will be found that the first bolt is easy to rust and get stuck in the horizontal adjustment groove, which causes great troubles for the disassembly and overhaul of the staff, and not only prolongs the working time. time, and can only damage the clamping mechanism if it cannot be removed, resulting in increased use costs and increased operational difficulty.
为了解决上述问题,本发明在第一直角板的水平段的上表面设置了第一螺栓保护机构,此处所说的上表面是为了便于理解,当夹持机构安装在金属横担上时,第一直角板的水平段放置在金属横担的水平段上,第一直角板的下表面与金属横担接触,上表面上设置有用于保护第一螺栓的第一螺栓保护机构。In order to solve the above problems, the present invention provides a first bolt protection mechanism on the upper surface of the horizontal section of the first right-angle plate. The upper surface mentioned here is for easy understanding. The horizontal section of the right angle plate is placed on the horizontal section of the metal cross arm, the lower surface of the first right angle plate is in contact with the metal cross arm, and the first bolt protection mechanism for protecting the first bolt is arranged on the upper surface.
所述第一螺栓保护机构包括轨道,优选地,轨道有两根,且两根轨道相互平行,两根轨道关于第一调节槽的连通第一调节槽的两端的中轴线对称。轨道上滑动设置有两个壳体,即两个壳体可以在沿轨道相向或背向滑动,优选地,轨道的截面可以为工字型的,避免工作人员在工作时由于操作不当导致壳体从轨道上脱轨。优选地,轨道上可以涂覆醇酸磁漆,以减少酸雨对部分轨道的腐蚀,由于轨道表面相对于第一螺栓、第二螺栓表面的螺纹结构更加简单,因此相对于第一螺栓和第二螺栓螺纹中残留的不易去除的酸雨,轨道表面的酸雨更容易通过表面流动的空气挥发和去除,因此对轨道的防酸雨措施仅通过涂覆类似醇酸磁漆的尤其进行一定程度的保护即可。壳体内部是中空的,当两个壳体相互接触时两个壳体的内部形成顶部封闭的保护腔,该保护腔覆盖第一调节槽,避免了雨水进入保护腔中与第一调节槽、第三调节槽、第一螺栓及螺母接触,从而有效地杜绝了酸雨对上述保护腔中的零部件造成腐蚀。优选地,壳体的上表面倾斜,倾斜方向为靠近另一个壳体的一端所处的高度高于远离另一个壳体的一端所处的高度,通过该设置,使得壳体的上表面不会堆积雨水,雨水不会通过两个壳体之间的缝隙进入至壳体内部的保护腔。保护腔内还设置有两块挡板,挡板与壳体一一对应,优选地,两个挡板分别位于第一调节槽的两端。挡板上设置有弹簧,弹簧一端固定在挡板上,另一端固定在壳体上,弹簧始终处于拉伸状态,即弹簧始终提供弹性力以使得壳体朝向对应的挡板移动。优选地,壳体之间设置有密封垫,以进一步消除两个壳体之间结合的缝隙,避免雨水从缝隙中落入保护腔内部。The first bolt protection mechanism includes rails, preferably, there are two rails, and the two rails are parallel to each other, and the two rails are symmetrical about the central axis of the first adjustment groove that communicates with the two ends of the first adjustment groove. There are two housings slidingly arranged on the track, that is, the two housings can slide toward each other or back along the track. Preferably, the cross section of the track can be I-shaped, so as to prevent the staff from causing the housing to be damaged due to improper operation during work. Get off the track. Preferably, the track can be coated with alkyd enamel to reduce the corrosion of part of the track by acid rain. Since the surface of the track is simpler than the thread structure of the surface of the first bolt and the second bolt, compared with the first bolt and the second bolt The acid rain remaining in the threads is not easy to remove, and the acid rain on the surface of the track is easier to volatilize and remove through the air flowing on the surface. Therefore, the anti-acid rain measures for the track can only be protected to a certain extent by coating similar alkyd enamel. The inside of the casing is hollow, and when the two casings are in contact with each other, a protective chamber with a closed top is formed inside the two casings, and the protective chamber covers the first adjustment groove, preventing rainwater from entering the protection chamber and interacting with the first adjustment groove, The third adjusting groove, the first bolt and the nut are in contact, thereby effectively preventing acid rain from corroding the parts in the above-mentioned protective chamber. Preferably, the upper surface of the housing is inclined, and the inclination direction is that the height of one end close to the other housing is higher than the height of the end far away from the other housing. Through this setting, the upper surface of the housing will not The rainwater is accumulated, and the rainwater will not enter the protective cavity inside the shell through the gap between the two shells. Two baffles are also provided in the protection cavity, and the baffles correspond to the housing one by one. Preferably, the two baffles are respectively located at the two ends of the first adjustment slot. A spring is arranged on the baffle, one end of the spring is fixed on the baffle, and the other end is fixed on the housing. The spring is always in a stretched state, that is, the spring always provides elastic force to make the housing move toward the corresponding baffle. Preferably, a gasket is provided between the housings to further eliminate the joint gap between the two housings and prevent rainwater from falling into the protection chamber from the gap.
工作人员在拆卸第一螺栓时,首先将两个壳体向相互远离的方向推动以开启保护腔,并露出第一螺栓,之后拧松第一螺栓即可完成第一螺栓的拆卸,在安装第一螺栓时,同样,将两个壳体向相互远离的方向推动以开启保护腔,露出第一调节槽,之后拧紧第一螺栓。拆卸或安装第一螺栓后,放开壳体,两个壳体在弹簧的作用下沿轨道相向滑动,最终紧密地贴合在一起。在工作状态时,两个壳体始终紧密贴合在一起,避免恶劣天气例如酸雨、冰雹对第一螺栓造成影响,大大提高了第一螺栓的使用寿命,避免第一螺栓受到腐蚀后卡在水平调节槽中无法取出的情况,便于工作人员拆卸、检修夹持机构,降低了夹持机构的使用成本和检修作业难度。同时,挡板、弹簧和部分轨道均位于保护腔内,也能避免酸雨对这部分零部件的腐蚀。When disassembling the first bolt, the worker first pushes the two housings away from each other to open the protective cavity and expose the first bolt, and then loosen the first bolt to complete the disassembly of the first bolt. When a bolt is used, similarly, the two housings are pushed away from each other to open the protection cavity, exposing the first adjusting groove, and then tighten the first bolt. After the first bolt is removed or installed, the casing is released, and the two casings slide toward each other along the track under the action of the spring, and finally fit together tightly. In the working state, the two shells are always tightly fitted together to avoid the impact of bad weather such as acid rain and hail on the first bolt, which greatly improves the service life of the first bolt and prevents the first bolt from being stuck in the horizontal position after being corroded. The situation that it cannot be taken out from the adjustment groove is convenient for the staff to disassemble and overhaul the clamping mechanism, which reduces the use cost and difficulty of overhauling the clamping mechanism. At the same time, the baffle, spring and part of the track are all located in the protection chamber, which can also avoid the corrosion of these parts by acid rain.
作为第一螺栓保护机构的一种优选实施方式,所述壳体外部的侧面上设置有放置台,所述放置台上设置有通孔,所述通孔内滑动设置有定位销;所述第一直角板的水平段的上表面上设置有限位孔,所述限位孔的尺寸与定位销的尺寸相匹配。上述机构使得在工作人员拨开两个壳体时,当定位销滑动至限位孔时,两个壳体的放置台上的定位销的底端能够在重力的作用下滑落至限位孔中,使得壳体不会在弹性力的作用下在轨道上产生移动,从而使得工作人员做安装或拆卸第一螺栓时,无需一直用手撑开两个壳体,进一步简化了操作步骤,提高了工作效率和工作的安全性。As a preferred implementation of the first bolt protection mechanism, a placement platform is provided on the side of the exterior of the housing, and a through hole is provided on the placement platform, and a positioning pin is slidably arranged in the through hole; the second A limit hole is arranged on the upper surface of the horizontal section of the right angle plate, and the size of the limit hole matches the size of the positioning pin. The above-mentioned mechanism enables the bottom ends of the positioning pins on the placement table of the two housings to fall into the limiting hole under the action of gravity when the positioning pin slides to the limiting hole when the staff pulls apart the two housings , so that the shell will not move on the track under the action of the elastic force, so that when the staff installs or removes the first bolt, it is not necessary to keep the two shells open by hand, which further simplifies the operation steps and improves the Work efficiency and work safety.
进一步地,所述壳体上设置有拨动块。由于工作人员在作业时带有绝缘手套,因此,拨动块有利于工作人员推开两个壳体,露出第一螺栓或第一调节槽,进一步方便工作人员安装或拆卸第一螺栓。Further, the housing is provided with a toggle block. Since the worker wears insulating gloves during operation, the toggle block is beneficial for the worker to push away the two housings to expose the first bolt or the first adjusting groove, which further facilitates the worker to install or remove the first bolt.
作为本发明的另一个优选的实施方案,所述第一直角板的竖直段的外表面上设置有第二螺栓保护机构,所述第二螺栓保护机构包括位于第二调节槽上方的固定板,所述固定板上铰链连接有翻转板。所述翻转板为L形结构,所述第一直角板的竖直段的外表面上开设有位于固定板上方的插孔,所述插孔用于放置翻转板的活动端。基于设计第一螺栓保护机构相同的原因,本发明设计有第二螺栓保护机构。但不同于第一螺栓的情况,由于竖直段在工作时是处于竖直状态的,因此酸雨会在重力的作用下逐渐下滑最终脱离竖直段,所以,仅需减少第二螺栓与酸雨接触的机会即可。为了降低夹持机构整体的成本和重量,第二螺栓保护机构包括固定在第二直角板竖直段外壁上的固定板,该固定板位于第二调节槽上方,优选地,固定板平行于水平面,使固定板本身具备一定的挡雨作用。固定板另一端上铰链连接有L形的翻转板,该铰链连接的方式可以是前文提到的多种情况,在此不再赘述。通过铰链连接,翻转板一端可以围绕固定板向上或向下翻转,在防雨状态下,翻转板的竖直段的内壁与固定板的下表面构成保护腔以保护第二螺栓和第三调节槽,在检修状态下,工作人员可以绕铰接端旋转翻转板,并将翻转板的活动端插在插孔中,在完成安装或拆卸第二螺栓后,放下翻转板,使其对第二螺栓和第三调节槽进行保护。通过上述结构,提高了第二螺栓的使用寿命,避免第二螺栓受到腐蚀后卡在竖直调节槽中无法取出的情况,进一步便于工作人员拆卸、检修夹持机构,进一步降低了夹持机构的使用成本和检修作业难度。As another preferred embodiment of the present invention, a second bolt protection mechanism is provided on the outer surface of the vertical section of the first right-angle plate, and the second bolt protection mechanism includes a fixing plate located above the second adjustment slot , the hinge on the fixed plate is connected with a turnover plate. The flipping plate has an L-shaped structure, and the outer surface of the vertical section of the first right-angled plate is provided with a socket above the fixing plate, and the socket is used to place the movable end of the flipping plate. Based on the same reasons for designing the first bolt protection mechanism, the present invention is designed with a second bolt protection mechanism. However, unlike the case of the first bolt, since the vertical section is in a vertical state during operation, the acid rain will gradually slide down under the action of gravity and finally break away from the vertical section. Therefore, it is only necessary to reduce the contact between the second bolt and the acid rain opportunity. In order to reduce the overall cost and weight of the clamping mechanism, the second bolt protection mechanism includes a fixed plate fixed on the outer wall of the vertical section of the second rectangular plate, the fixed plate is located above the second adjustment slot, preferably, the fixed plate is parallel to the horizontal plane , so that the fixed plate itself has a certain rain-shielding effect. The other end of the fixing plate is hinged to an L-shaped overturning plate, and the hinged connection can be in various ways mentioned above, which will not be repeated here. Through the hinge connection, one end of the flip plate can be turned up or down around the fixed plate. In the rainproof state, the inner wall of the vertical section of the flip plate and the lower surface of the fixed plate form a protective cavity to protect the second bolt and the third adjustment groove. , in the overhaul state, the staff can rotate the overturning plate around the hinged end, and insert the movable end of the overturning plate into the jack, after completing the installation or removal of the second bolt, put down the overturning plate, so that it is opposite to the second bolt and The third adjustment slot is protected. Through the above structure, the service life of the second bolt is improved, and the situation that the second bolt is corroded and stuck in the vertical adjustment groove and cannot be taken out is further facilitated for the staff to disassemble and repair the clamping mechanism, and further reduces the clamping mechanism. Cost of use and difficulty of maintenance operations.
本发明与现有技术相比,具有如下的优点和有益效果:Compared with the prior art, the present invention has the following advantages and beneficial effects:
1、本发明使得工作人员在进行带电搭线作业时,无需在金属横担上开孔,只需要简单地夹持金属横担、拧紧螺栓即可完成夹持机构的安装,且夹持机构上的眼孔是预设好的,无需现场对尺寸进行调整,可以根据不同的需求使用不同尺寸眼孔的夹持机构,操作简便、耗时短,大幅地提高了瓷横担的安装效率,同时由于避免了工作人员长时间穿戴绝缘服所造成的过渡疲劳,因而降低了操作人员的操作风险;另外,通过第一调节槽、第二调节槽、第三调节槽、第四调节槽,使得本装置能够适用于不同尺寸的金属横担,大大提高了本装置的应用范围,具有广泛地推广价值;1. The present invention enables the staff to install the clamping mechanism simply by clamping the metal cross-arm and tightening the bolts without opening holes in the metal cross-arm when carrying out live wire-taking operations, and the clamping mechanism is installed The eyelets are preset, and there is no need to adjust the size on site. The clamping mechanism of different sizes of eyelets can be used according to different needs. The operation is simple and time-consuming, which greatly improves the installation efficiency of the porcelain cross-arm. Since the transitional fatigue caused by the staff wearing insulating clothing for a long time is avoided, the operating risk of the operator is reduced; in addition, through the first adjustment slot, the second adjustment slot, the third adjustment slot, and the fourth adjustment slot, the The device can be applied to metal cross-arms of different sizes, which greatly improves the application range of the device and has extensive promotion value;
2、本发明通过第一螺栓保护机构,在工作状态时,两个壳体始终紧密贴合在一起,避免恶劣天气例如酸雨、冰雹对第一螺栓造成影响,大大提高了第一螺栓的使用寿命,避免第一螺栓受到腐蚀后卡在水平调节槽中无法取出的情况,便于工作人员拆卸、检修夹持机构,降低了夹持机构的使用成本和检修作业难度;2. The present invention uses the first bolt protection mechanism. In the working state, the two shells are always tightly fitted together, avoiding the influence of bad weather such as acid rain and hail on the first bolt, and greatly improving the service life of the first bolt , to avoid the situation that the first bolt is stuck in the horizontal adjustment groove and cannot be taken out after being corroded, it is convenient for the staff to disassemble and repair the clamping mechanism, and reduces the use cost and difficulty of maintenance of the clamping mechanism;
3、本发明通过第二螺栓保护机构,提高了第二螺栓的使用寿命,避免第二螺栓受到腐蚀后卡在竖直调节槽中无法取出的情况,进一步便于工作人员拆卸、检修夹持机构,进一步降低了夹持机构的使用成本和检修作业难度。3. The present invention improves the service life of the second bolt through the second bolt protection mechanism, avoids the situation that the second bolt is stuck in the vertical adjustment groove after being corroded and cannot be taken out, and further facilitates the disassembly and maintenance of the clamping mechanism by the staff. The use cost and maintenance work difficulty of the clamping mechanism are further reduced.
附图说明Description of drawings
此处所说明的附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。在附图中:The drawings described here are used to provide a further understanding of the embodiments of the present invention, constitute a part of the application, and do not limit the embodiments of the present invention. In the attached picture:
图1为本发明具体实施例的结构示意图;Fig. 1 is the structural representation of the specific embodiment of the present invention;
图2为本发明具体实施例工作状态下的安装示意图;Fig. 2 is the installation schematic diagram under the working state of the specific embodiment of the present invention;
图3为本发明具体实施例的结构示意图;Fig. 3 is the structural representation of the specific embodiment of the present invention;
图4为本发明具体实施例中第一螺栓保护机构的俯视图。Fig. 4 is a top view of the first bolt protection mechanism in the specific embodiment of the present invention.
附图中标记及对应的零部件名称:Marks and corresponding parts names in the attached drawings:
1-第一直角板,2-第二直角板,3-旋转铰链,4-第一调节槽,5-第二调节槽,6-第三调节槽,7-第四调节槽,8-上眼孔,9-下眼孔,10-横担,11-第一螺栓,12-第二螺栓,13-壳体,14-拨动块,15-定位销,16-放置台,17-挡板,18-弹簧,19-限位孔,20-固定板,21-翻转板,22-插孔,23-轨道。1-first right-angle plate, 2-second right-angle plate, 3-rotary hinge, 4-first adjustment slot, 5-second adjustment slot, 6-third adjustment slot, 7-fourth adjustment slot, 8-up Eyelet, 9-lower eyehole, 10-crossarm, 11-first bolt, 12-second bolt, 13-housing, 14-toggle block, 15-locating pin, 16-placement table, 17-block Plate, 18-spring, 19-limiting hole, 20-fixed plate, 21-overturn plate, 22-jack, 23-track.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples and accompanying drawings. As a limitation of the present invention.
实施例1:Example 1:
如图1和图2所示的用于杆塔横担的夹持机构,包括第一直角板1和第二直角板2,所述第一直角板1和第二直角板2通过铰链连接;第一直角板1的水平段上设置有上眼孔8、第一调节槽4,第一直角板1的竖直段上设置有第二调节槽5,第二直角板2的水平段上设置有下眼孔9、第三调节槽6,第二直角板2的竖直段上设置有第四调节槽7,其中,第一调节槽4、第二调节槽5、第三调节槽6、第四调节槽7的位置被配置为,当上眼孔8的中轴线与下眼孔9的中轴线共线时,所述第一调节槽4与第三调节槽6对齐、所述第二调节槽5与第四调节槽7对齐;还包括第一螺栓11、第二螺栓12以及与第一螺栓11、第二螺栓12相匹配的螺母,所述第一螺栓11的尺寸与第一调节槽4、第三调节槽6的尺寸相匹配,所述第二螺栓12的尺寸与第二调节槽5、第四调节槽7的尺寸相匹配;所述第一直角板1的水平段的端面上设置有旋转铰链3,所述第二直角板2的水平段的端面与旋转铰链3连接;所述第一直角板1的水平段的长度大于第一直角板1的竖直段的长度,所述第二直角板2的水平段的长度大于第二直角板2的竖直段的长度;所述第一调节槽4、第二调节槽5、第三调节槽6、第四调节槽7的尺寸相同;第一调节槽4的长度是第一调节槽4的宽度的2~5倍。The clamping mechanism for the tower cross arm shown in Figure 1 and Figure 2 includes a first right-angle plate 1 and a second right-angle plate 2, and the first right-angle plate 1 and the second right-angle plate 2 are connected by a hinge; The horizontal section of the right-angle plate 1 is provided with upper eyelet 8 and the first adjustment groove 4, the vertical section of the first right-angle plate 1 is provided with the second adjustment groove 5, and the horizontal section of the second right-angle plate 2 is provided with The lower eyelet 9, the third adjustment groove 6, the fourth adjustment groove 7 is arranged on the vertical section of the second rectangular plate 2, wherein, the first adjustment groove 4, the second adjustment groove 5, the third adjustment groove 6, the first adjustment groove The positions of the four adjustment grooves 7 are configured such that when the central axis of the upper eye hole 8 is collinear with the central axis of the lower eye hole 9, the first adjustment groove 4 is aligned with the third adjustment groove 6, and the second adjustment groove 4 is aligned with the third adjustment groove 6. The groove 5 is aligned with the fourth adjusting groove 7; it also includes a first bolt 11, a second bolt 12 and nuts matched with the first bolt 11 and the second bolt 12, and the size of the first bolt 11 is consistent with that of the first adjusting groove 4. The size of the third adjustment slot 6 matches, the size of the second bolt 12 matches the size of the second adjustment slot 5 and the fourth adjustment slot 7; the end surface of the horizontal section of the first right angle plate 1 A rotary hinge 3 is provided, and the end face of the horizontal section of the second right-angle plate 2 is connected with the rotary hinge 3; the length of the horizontal section of the first right-angle plate 1 is greater than the length of the vertical section of the first right-angle plate 1, so The length of the horizontal section of the second rectangular plate 2 is greater than the length of the vertical section of the second rectangular plate 2; the first adjustment groove 4, the second adjustment groove 5, the third adjustment groove 6, the fourth adjustment groove 7 The dimensions are the same; the length of the first adjusting groove 4 is 2 to 5 times the width of the first adjusting groove 4 .
作为本发明优选的尺寸,第一直角板1和第二直角板2的厚度为4mm,第一调节槽4、第二调节槽5、第三调节槽6、第四调节槽7的槽长为60mm,第一直角板1的水平段长度为200mm,第一直角板1的竖直段长度为120mm,第一直角板1的宽度为60mm,上眼孔8和下眼孔9的直径为16mm。As the preferred size of the present invention, the thickness of the first right-angle plate 1 and the second right-angle plate 2 is 4mm, and the groove length of the first adjustment groove 4, the second adjustment groove 5, the third adjustment groove 6, and the fourth adjustment groove 7 is 60mm, the length of the horizontal section of the first right-angle plate 1 is 200mm, the length of the vertical section of the first right-angle plate 1 is 120mm, the width of the first right-angle plate 1 is 60mm, and the diameter of the upper eyelet 8 and the lower eyelet 9 is 16mm .
使用时,工人穿戴好全套绝缘防护用具,进入绝缘斗臂车操作斗内,再通过绝缘臂的调整缓慢进入作业位置,然后对周围可能触及的带电体和接地体进行绝缘遮蔽。遮蔽完成后,将预先选定的安装位置上的绝缘遮蔽移开,将第一直角板1放置于安装位置的横担10上,调整第一直角板1的位置以使得第一直角板1的直角部分与横担10的直角部分紧密贴合,之后朝横担10的方向翻转第二直角板2,使得第二直角板2与横担10接触,第一直角板1和第二直角板2对横担10构成夹持。之后,将第一螺栓11依次穿过第一调节槽4和第三调节槽6,同时,第一螺栓11的侧面紧贴横担10的一个端面并拧紧第一螺栓11、螺母;之后将第二螺栓12依次穿过第二调节槽5和第四调节槽7,同时第二螺栓12的侧面紧贴横担10的另一个端面并拧紧第二螺栓12、螺母。When in use, workers wear a full set of insulating protective equipment, enter the operating bucket of the insulating arm truck, and then slowly enter the working position through the adjustment of the insulating arm, and then insulate and shield the surrounding electrified bodies and grounding bodies that may be touched. After the shielding is completed, the insulation shielding on the pre-selected installation position is removed, the first right-angle plate 1 is placed on the cross-arm 10 at the installation position, and the position of the first right-angle plate 1 is adjusted so that the first right-angle plate 1 The right-angle part is closely attached to the right-angle part of the cross arm 10, and then the second right-angle plate 2 is turned over in the direction of the cross arm 10, so that the second right-angle plate 2 is in contact with the cross arm 10, the first right-angle plate 1 and the second right-angle plate 2 The cross arm 10 is clamped. Afterwards, pass the first bolt 11 through the first adjusting groove 4 and the third adjusting groove 6 in turn, and at the same time, the side surface of the first bolt 11 is close to an end face of the cross arm 10 and the first bolt 11 and the nut are tightened; The two bolts 12 pass through the second adjusting groove 5 and the fourth adjusting groove 7 in sequence, and at the same time, the side surface of the second bolt 12 is close to the other end surface of the cross arm 10 and the second bolt 12 and the nut are tightened.
通过上述结构,工作人员在进行带电搭线作业时,无需在横担10上开孔,只需要简单地夹持横担10、拧紧螺栓即可完成夹持机构的安装,且夹持机构上的眼孔是预设好的,无需现场对尺寸进行调整,可以根据不同的需求使用不同尺寸眼孔的夹持机构,操作简便、耗时短,大幅地提高了瓷横担的安装效率,同时由于避免了工作人员长时间穿戴绝缘服所造成的过渡疲劳,因而降低了操作人员的操作风险;另外,通过第一调节槽4、第二调节槽5、第三调节槽6、第四调节槽7,使得本装置能够适用于不同尺寸的横担10,大大提高了本装置的应用范围,具有广泛地推广价值。Through the above-mentioned structure, the worker does not need to open holes on the cross-arm 10 when carrying out the live-wire operation, and only needs to simply clamp the cross-arm 10 and tighten the bolts to complete the installation of the clamping mechanism, and the clamping mechanism on the The eyelets are preset, and there is no need to adjust the size on site. The clamping mechanism of different sizes of eyelets can be used according to different needs. The operation is simple and time-consuming, which greatly improves the installation efficiency of the porcelain cross-arm. It avoids the transitional fatigue caused by the staff wearing insulating clothing for a long time, thus reducing the operating risk of the operator; in addition, through the first adjustment slot 4, the second adjustment slot 5, the third adjustment slot 6, and the fourth adjustment slot 7 , so that the device can be applied to cross-arms 10 of different sizes, greatly improving the application range of the device, and having extensive popularization value.
实施例2:Example 2:
如图3和图4所示,在实施例1的基础上,本实施例还设置有第一螺栓保护机构和第二螺栓保护机构。具体地,第一直角板1的水平段的上表面设置有第一螺栓保护机构,所述第一螺栓保护机构包括轨道23,所述轨道23上滑动设置有两个壳体13,当两个壳体13相互接触时,两个壳体13的内部形成保护腔,所述保护腔覆盖第一调节槽4;保护腔内设置有两块挡板17,所述挡板17上设置有弹簧18,所述弹簧18连接壳体13;所述壳体13外部的侧面上设置有放置台16,所述放置台16上设置有通孔,所述通孔内滑动设置有定位销15;所述第一直角板1的水平段的上表面上设置有限位孔19,所述限位孔19的尺寸与定位销15的尺寸相匹配;所述壳体13上设置有拨动块14;所述第一直角板1的竖直段的外表面上设置有第二螺栓保护机构,所述第二螺栓保护机构包括位于第二调节槽5上方的固定板20,所述固定板20上铰链连接有翻转板21;翻转板21为L形结构,所述第一直角板1的竖直段的外表面上开设有位于固定板20上方的插孔22,所述插孔22用于放置翻转板21的活动端。As shown in Figure 3 and Figure 4, on the basis of Embodiment 1, this embodiment is further provided with a first bolt protection mechanism and a second bolt protection mechanism. Specifically, a first bolt protection mechanism is provided on the upper surface of the horizontal section of the first right-angle plate 1, and the first bolt protection mechanism includes a track 23 on which two housings 13 are slidably arranged. When the housings 13 are in contact with each other, a protection cavity is formed inside the two housings 13, and the protection cavity covers the first adjustment groove 4; two baffles 17 are arranged in the protection cavity, and a spring 18 is arranged on the baffles 17 , the spring 18 is connected to the housing 13; the outer side of the housing 13 is provided with a placement platform 16, and the placement platform 16 is provided with a through hole, and a positioning pin 15 is slidably arranged in the through hole; The upper surface of the horizontal section of the first right angle plate 1 is provided with a limit hole 19, the size of the limit hole 19 matches the size of the positioning pin 15; the housing 13 is provided with a toggle block 14; The outer surface of the vertical section of the first right-angle plate 1 is provided with a second bolt protection mechanism, and the second bolt protection mechanism includes a fixed plate 20 positioned above the second adjustment groove 5, and the fixed plate 20 is hingedly connected with Turnover plate 21; the turnover plate 21 is an L-shaped structure, and the outer surface of the vertical section of the first rectangular plate 1 is provided with a jack 22 above the fixed plate 20, and the jack 22 is used to place the turnover plate 21 the active end.
安装或拆卸第一螺栓11时,通过拨动拨动块14,沿轨道23拨开两块壳体13,露出壳体13的内部保护腔,当壳体13移动至限位孔19附近时,放置台16上的定位销15由于重力作用落入限位孔19中,使得壳体13不再在轨道23上移动,壳体13定位后,工作人员可完成对第一螺栓11的安装或拆卸工作,完成后,提起定位销15,两块壳体13在弹簧18的作用下相互移动并最终紧密地贴合在一起,形成顶部封闭的保护腔,对保护腔内部的第一螺栓11、挡板17、弹簧18和第一调节槽4进行保护,避免酸雨侵蚀上述零部件。安装或拆卸第二螺栓12时,翻转翻转板21并将翻转板21的活动端插入至插孔22中,之后完成第二螺栓12的安装或拆卸工作,完成后,放下翻转板21,翻转板21的竖直段的内壁和固定板20的下表面构成的保护腔能够对第二螺栓12和第三调节槽6起到一定的保护作用。When installing or dismounting the first bolt 11, by moving the toggle block 14, the two housings 13 are pushed apart along the track 23 to expose the inner protection cavity of the housing 13. When the housing 13 moves to the vicinity of the limit hole 19, The positioning pin 15 on the placement table 16 falls into the limit hole 19 due to gravity, so that the housing 13 no longer moves on the track 23. After the housing 13 is positioned, the staff can complete the installation or removal of the first bolt 11 After the work is completed, the positioning pin 15 is lifted, and the two shells 13 move with each other under the action of the spring 18 and finally fit together tightly to form a protective cavity with a closed top. The plate 17, the spring 18 and the first regulating tank 4 are protected to prevent acid rain from corroding the above parts. When installing or dismounting the second bolt 12, turn over the turning plate 21 and insert the movable end of the turning plate 21 into the jack 22, and then complete the installation or removal of the second bolt 12. After completion, put down the turning plate 21, turn the plate The protection cavity formed by the inner wall of the vertical section of 21 and the lower surface of the fixing plate 20 can protect the second bolt 12 and the third adjusting groove 6 to a certain extent.
通过上述机构,大大提高了第一螺栓11、第二螺栓12的使用寿命,避免第一螺栓11、第二螺栓12受到腐蚀后卡在调节槽中无法取出,便于工作人员拆卸、检修夹持机构,进一步降低了夹持机构的使用成本和检修作业难度。Through the above mechanism, the service life of the first bolt 11 and the second bolt 12 is greatly improved, and the first bolt 11 and the second bolt 12 are prevented from being stuck in the adjustment groove after being corroded and cannot be taken out, which is convenient for the staff to disassemble and repair the clamping mechanism , which further reduces the use cost and maintenance difficulty of the clamping mechanism.
本文中所使用的“第一”、“第二”、“第三”、“第四”等(例如第一螺栓保护机构、第二螺栓保护机构等)只是为了描述清楚起见而对相应部件进行区别,不旨在限制任何次序或者强调重要性等。此外,在本文中使用的术语“连接”在不进行特别说明的情况下,可以是直接相连,也可以使经由其他部件间接相连。"First", "second", "third", "fourth" and so on (such as the first bolt protection mechanism, the second bolt protection mechanism, etc.) used herein are only for the purpose of describing the corresponding parts clearly The distinction is not intended to limit any order or emphasize importance, etc. In addition, the term "connection" used herein may be directly connected or indirectly connected via other components unless otherwise specified.
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The specific embodiments described above have further described the purpose, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above descriptions are only specific embodiments of the present invention and are not intended to limit the scope of the present invention. Protection scope, within the spirit and principles of the present invention, any modification, equivalent replacement, improvement, etc., shall be included in the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810436978.0A CN108425539A (en) | 2018-05-09 | 2018-05-09 | Clamping device for cross arm of tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810436978.0A CN108425539A (en) | 2018-05-09 | 2018-05-09 | Clamping device for cross arm of tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108425539A true CN108425539A (en) | 2018-08-21 |
Family
ID=63162438
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810436978.0A Pending CN108425539A (en) | 2018-05-09 | 2018-05-09 | Clamping device for cross arm of tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108425539A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109449848A (en) * | 2018-10-26 | 2019-03-08 | 国网四川省电力公司广元供电公司 | A kind of wire jumper bar magnet mounting structure for taking fire suitable for livewire work |
| CN119260639A (en) * | 2024-10-31 | 2025-01-07 | 合肥工业大学 | Portable weathering steel rust protection fixture |
| CN119572061A (en) * | 2025-02-08 | 2025-03-07 | 浙江大红门电力设备有限公司 | A high-strength non-standard metal angle steel crossarm |
Citations (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11289643A (en) * | 1998-04-06 | 1999-10-19 | Toshin Denki Kk | Lock device for steel tower bolt |
| CN2582815Y (en) * | 2002-11-18 | 2003-10-29 | 添鼎兴业股份有限公司 | Guide structure to reduce frictional resistance between dust covers |
| CN203509266U (en) * | 2013-10-08 | 2014-04-02 | 李冬庆 | Combined type protection cover for wire cutting machine tool screw rod guide rail |
| CN204418775U (en) * | 2014-11-27 | 2015-06-24 | 国家电网公司 | A kind of steel tower fixture |
| CN204868283U (en) * | 2015-08-20 | 2015-12-16 | 常州精华数控设备有限公司 | Move in line tool magazine of gate -type |
| CN205004715U (en) * | 2015-07-31 | 2016-01-27 | 国家电网公司 | Lightning -arrest wave drag ware downlead support |
| CN205173885U (en) * | 2015-11-18 | 2016-04-20 | 四川汇源光通信有限公司 | Install in iron tower scissor holder's ptz support |
| CN205720324U (en) * | 2016-06-27 | 2016-11-23 | 国网河南省电力公司平顶山供电公司 | Circuit filth test insulator fixing device |
| CN205937424U (en) * | 2016-08-22 | 2017-02-08 | 国网河南省电力公司南阳供电公司 | Bolt protection device |
| CN206020764U (en) * | 2016-09-18 | 2017-03-15 | 国家电网公司 | A kind of double cables of high voltage substation OPGW draw lower fastener |
| CN107370070A (en) * | 2017-07-27 | 2017-11-21 | 国网河南省电力公司内乡县供电公司 | A kind of cross-arm hanging point device |
| CN206752498U (en) * | 2017-06-05 | 2017-12-15 | 左伟华 | Power steel pipe rod anchor bolt protective cover |
| CN107567897A (en) * | 2017-10-15 | 2018-01-12 | 黄石禾呈电子商务有限公司 | A kind of vegetables and fruits protective cover of extending/drawing back type |
| CN207239809U (en) * | 2017-03-31 | 2018-04-17 | 东莞市恒鼎自动化设备有限公司 | An organ-type telescopic protective cover applied to machine tools |
-
2018
- 2018-05-09 CN CN201810436978.0A patent/CN108425539A/en active Pending
Patent Citations (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11289643A (en) * | 1998-04-06 | 1999-10-19 | Toshin Denki Kk | Lock device for steel tower bolt |
| CN2582815Y (en) * | 2002-11-18 | 2003-10-29 | 添鼎兴业股份有限公司 | Guide structure to reduce frictional resistance between dust covers |
| CN203509266U (en) * | 2013-10-08 | 2014-04-02 | 李冬庆 | Combined type protection cover for wire cutting machine tool screw rod guide rail |
| CN204418775U (en) * | 2014-11-27 | 2015-06-24 | 国家电网公司 | A kind of steel tower fixture |
| CN205004715U (en) * | 2015-07-31 | 2016-01-27 | 国家电网公司 | Lightning -arrest wave drag ware downlead support |
| CN204868283U (en) * | 2015-08-20 | 2015-12-16 | 常州精华数控设备有限公司 | Move in line tool magazine of gate -type |
| CN205173885U (en) * | 2015-11-18 | 2016-04-20 | 四川汇源光通信有限公司 | Install in iron tower scissor holder's ptz support |
| CN205720324U (en) * | 2016-06-27 | 2016-11-23 | 国网河南省电力公司平顶山供电公司 | Circuit filth test insulator fixing device |
| CN205937424U (en) * | 2016-08-22 | 2017-02-08 | 国网河南省电力公司南阳供电公司 | Bolt protection device |
| CN206020764U (en) * | 2016-09-18 | 2017-03-15 | 国家电网公司 | A kind of double cables of high voltage substation OPGW draw lower fastener |
| CN207239809U (en) * | 2017-03-31 | 2018-04-17 | 东莞市恒鼎自动化设备有限公司 | An organ-type telescopic protective cover applied to machine tools |
| CN206752498U (en) * | 2017-06-05 | 2017-12-15 | 左伟华 | Power steel pipe rod anchor bolt protective cover |
| CN107370070A (en) * | 2017-07-27 | 2017-11-21 | 国网河南省电力公司内乡县供电公司 | A kind of cross-arm hanging point device |
| CN107567897A (en) * | 2017-10-15 | 2018-01-12 | 黄石禾呈电子商务有限公司 | A kind of vegetables and fruits protective cover of extending/drawing back type |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109449848A (en) * | 2018-10-26 | 2019-03-08 | 国网四川省电力公司广元供电公司 | A kind of wire jumper bar magnet mounting structure for taking fire suitable for livewire work |
| CN119260639A (en) * | 2024-10-31 | 2025-01-07 | 合肥工业大学 | Portable weathering steel rust protection fixture |
| CN119572061A (en) * | 2025-02-08 | 2025-03-07 | 浙江大红门电力设备有限公司 | A high-strength non-standard metal angle steel crossarm |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108425539A (en) | Clamping device for cross arm of tower | |
| CN208168521U (en) | The clamping device of 10kV power distribution network cross arm of tower | |
| WO2016023141A1 (en) | Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line | |
| CN106786160B (en) | A kind of method and its Special combined tools of ground potential method charged for replacement arrester | |
| CN103326304B (en) | 10kV charged drainage wire supporting device | |
| CN103904444A (en) | Power transmission line grounding wire horizontal installation device | |
| CN204382187U (en) | A kind of contact net inclined cantilever insulator replacement tool | |
| CN205123131U (en) | Insulating guard shield mounting tool | |
| CN105186370B (en) | Straight line pole overhead transmission line take-up | |
| CN204045535U (en) | A kind of alternative having damaged fuse switch | |
| CN103199483A (en) | Lightning arrester device capable of being dismounted and installed in charged state | |
| CN209486224U (en) | A general-purpose T-shaped cable terminal free test device | |
| CN109193454A (en) | Replace the operational method and its closed fixture yoke plate device of 500kV aerodynamic type insulator | |
| CN205070294U (en) | Straight line pole is take -up for overhead line | |
| CN206331993U (en) | A kind of 35 kilovoltage transformer limiting fuse wiring end cap devices | |
| CN206353689U (en) | An outdoor high voltage cable branch box | |
| CN220420912U (en) | A lightning protection grounding component | |
| CN209104749U (en) | A kind of cable protection fixture | |
| CN115762927A (en) | A ground potential installation stereoplasm insulation protection casing for lightning protection strain insulator | |
| CN203871501U (en) | Horizontal-installation ground wire apparatus for power transmission line | |
| CN207588355U (en) | It is a kind of can live installation of bird repeller installation tool | |
| CN208166354U (en) | GIS device replaces disc insulator except scarce with light-duty boom hoisting | |
| CN105741990B (en) | Horizontal high-pressure insulator protection device | |
| CN213505674U (en) | Electric tower overhead ground wire hoisting device convenient to installation | |
| CN107069560B (en) | Power circuit maintenance device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180821 |