CN108422269B - A kind of slab movement speed accuracy control method - Google Patents
A kind of slab movement speed accuracy control method Download PDFInfo
- Publication number
- CN108422269B CN108422269B CN201810173552.0A CN201810173552A CN108422269B CN 108422269 B CN108422269 B CN 108422269B CN 201810173552 A CN201810173552 A CN 201810173552A CN 108422269 B CN108422269 B CN 108422269B
- Authority
- CN
- China
- Prior art keywords
- speed
- slab
- roller
- measuring device
- rotary shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q17/00—Arrangements for observing, indicating or measuring on machine tools
- B23Q17/10—Arrangements for observing, indicating or measuring on machine tools for indicating or measuring cutting speed or number of revolutions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23D—PLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
- B23D79/00—Methods, machines, or devices not covered elsewhere, for working metal by removal of material
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Abstract
The invention discloses a kind of mobile fast slab accuracy control methods of slab, it is carried out based on rotation beating type deburring machine, deburring machine includes at least the liftable rotary shaft of the band blade for transmitting the roller-way of slab, for removing flash removed, and each roller-way is respectively provided with speed measuring device and tests the speed;Along slab moving direction, successively at least three velocity measuring devices are arranged in interval between the roller-way and rotary shaft axle center of forefront;When closer from cutting point, using direct speed testing mode, slab position is determined by least three velocity measuring device, structure is simple and effective, it solves the problems, such as to cause the measurement of slab movement speed inaccurate because of reasons such as roller-way roll diameter changes, improves the reliability of measurement data;Meanwhile when from cutting point farther out, speed measuring device is respectively provided with using each roller-way and carries out indirect speed testing mode, reduces calculation amount, it is simple and quick.
Description
Technical field
The invention belongs to slab field of measuring technique, and in particular to measurement and control in continuous casting steel billet burr removal process
Method.
Background technique
Core process of the continuous casting as steel products, has decisive role to product quality, wherein how to solve continuous casting
Slab Burr Problem is even more the key element of Improving The Quality of Products.Slab burr is exactly during slab gas flame cuttiug in bottom
The high rigidity rigidity burr of formation.Burr goes not clean, with slab can enter subsequent hot rolled process, cause to damage to roll,
The problems such as roll loses flesh occurs, shortens the service life of roll, increases considerably a ton steel spare parts cost.Simultaneously as burr master
It to be impurity component, rolling will lead to strip and the mass defects such as scab, cracks, being mingled with together with slab, greatly reduce
Strip lumber recovery.
Currently, being both at home and abroad generally removed slab burr using scraper type burr grinding machine, but ineffective, there are hairs
The problems such as thorn bonding, residual.For this purpose, there is the rotation beating type deburring machine of development at present, working principle mainly utilizes knife
The centrifugal force of piece rotation is removed the burr of slab bottom.During entire deburring, slab movement speed and position
Precise measurement it is most important.It is universal measurement mode to the mode that slab movement speed measures, that is, uses encoder pair
Electric machines for roller revolving speed measures, and then carries out mathematic(al) manipulation according to parameters such as roller diameters, is converted to the movement speed (slab of slab
It is contacted with roller-way and roller-way is relied on to be driven, so the linear velocity of roller table surface is slab movement speed).But it was actually using
It is found in journey, due to roller-way abrasion, casting blank bending etc., this kind of slab movement speed measurement method causes to cast there are error
Base deburring is incomplete.
Summary of the invention
The technical problem to be solved by the present invention is providing a kind of slab movement speed accuracy control method, realize that slab moves
The precise measurement of dynamic speed is solved the problems, such as to cause the measurement of slab movement speed inaccurate because of reasons such as roller-way roll diameter changes, be improved
The reliability of measurement data realizes the Proper Match of slab shift position and rotating blade lifting time, so that slab deburring
Rate reaches 99.99% or more.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of mobile fast slab accuracy control method of slab, is carried out, the deburring based on rotation beating type deburring machine
Machine includes at least the liftable rotary shaft of the band blade for transmitting the roller-way of slab, for removing flash removed, and each roller-way is respectively provided with
Speed measuring device tests the speed;It is characterized by: along slab moving direction, between the roller-way and rotary shaft axle center of forefront successively
At least three velocity measuring devices of interval setting;
Before reaching the third speed measuring device nearest from the roller-way of forefront on slab head, tested the speed using each roller-way
Device tests the speed mode, obtains slab speed V1;
When slab head reaches the third speed measuring device nearest from the roller-way of forefront, record reaches initial time
t1;
When slab head, which continues to move along, reaches second speed measuring device, record reaches initial time t2;And
Tachometric survey mode is first to test the speed mode by each roller-way speed measuring device pattern switching that tests the speed at this time, is tested the speed in mode first,
Slab movement speed V2It is the horizontal distance c of third speed measuring device and second speed measuring device divided by initial time t2With
Initial time t1Difference, i.e.,
When slab head continues to move along and reaches First Speed measuring device, record reaches initial time t3, this
Shi Sudu measurement method is carried out according to first mode that tests the speed, and rotary shaft is begun to ramp up at this time;It tests the speed mode in the second photoelectric tube
In, slab movement speed V3It is the horizontal distance b of second speed measuring device and First Speed measuring device divided by initial time t3
With initial time t2Difference, i.e.,If First Speed measuring device and the horizontal distance of rotary shaft axis perpendicular line are
A, the highest point of blade and the vertical distance of roller plane are d, then slab head is from First Speed measuring device is touched to most
The time of arrival rotary shaft axis perpendicular line is afterwardsWhen slab head is reached right above the axle center of rotary shaft, in order to go in time
Flash removed blade must be completely attached to slab bottom, then in order to which the retention time is consistent, surveyed when slab head reaches First Speed
Amount device arrives, and blade rotary shaft is begun to ramp up, and the rotary shaft rate of climb is
When detecting that rotary shaft reaches highest order, system starts timing rotary shaft work belt cutting blade deburring, and works as
When cumulative time reaches the setting deburring time, rotary shaft is stopped rotating and fallen to be made knots with roller plane interval, underturner
Beam, system are automatically changeb to each roller-way speed measuring device and test the speed mode.
Further, the speed measuring device of each roller-way setting is encoder;Velocity measuring device is photoelectric tube.
Further, the slab head arrival rate measuring device moment is to shelter from the photoelectric tube signal moment.
Further, three velocity measuring devices are set.
Further, annular blade is arranged in the exterior circumferential interval of rotary shaft, and along the vertical direction, the periphery of blade is knife
Piece highest point.
Further, rotary shaft uses oil cylinder lifting device.
Further, the value range of c is 20mm-50mm;Wherein the value range of b is 10mm-20mm;The value model of a
It encloses for 5mm-10mm.
Indirect speed testing mode is become direct speed testing mode by the careless mistake of the existing measurement method of improvement by the present invention as a result,
It is combined with indirect speed testing mode, economical and efficient, it is quickly accurate;
When closer from cutting point, using direct speed testing mode, third speed measuring device, second speed measurement dress are set
It sets, First Speed measuring device, signal is blocked by photoelectric tube to determine slab position, and go up and down using the signal as rotary shaft
Enabling signal, structure is simple and effective, facilitates realization;Design has multiple groups photoelectric tube in system, and utilizes first and second group of photoelectric tube
The time difference of signal triggering and distance are realized the preliminary surveying of slab movement speed, while being believed using second and third group of photoelectric tube
Number triggering time difference and distance, realize the precise measurement of slab movement speed, solve because of reasons such as roller-way roll diameter changes
The problem for causing the measurement of slab movement speed inaccurate, improves the reliability of measurement data;
Meanwhile when from cutting point farther out, using general indirect speed testing mode, reduce calculation amount, it is simple and quick;
Meanwhile it is slab is mobile and blade lifting distance realizes accurate control, by the accurate measurement of slab movement speed,
And by the reasonable conversion of the parameters such as rotary shaft and roller plane distance, when realizing slab shift position and rotating blade lifting
Between Proper Match, so that slab deburring rate is increased to 99.99% or more.
Detailed description of the invention
Fig. 1 is the deburring machine layout of equipment that the method for the present invention is related to.
Fig. 2 is the control flow chart of control method of the present invention.
In Fig. 1-2 appended drawing reference correspondence it is as follows: roller-way 1, rotary shaft 2, blade 3, the first photoelectric tube 4, the second photoelectric tube 5,
Third photoelectric tube 6, slab 7, burr 8.
Specific embodiment
The invention will be further described for 1-2 and embodiment with reference to the accompanying drawing:
As shown in attached drawing 1, Fig. 2: the unhairing that the slab movement speed accuracy control method implemented according to the present invention is based on
It pierces machine equipment and includes at least roller-way 1, rotary shaft 2, blade 3, the first photoelectric tube 4, the second photoelectric tube 5, third photoelectric tube 6.Slab 7
By roller-way 1, there is the burr 8 for needing to remove below slab 7.Each roller-way 1 is respectively provided with photoelectric encoder and tests the speed.
Deburring machine equipment composition and the course of work are as follows: roller-way 1 is mainly rotated by itself to push slab 7 along roller-way
1 top roller plane moves forward;It is spaced set distance in front of the roller-way 1 of forefront, rotary shaft 2 is set, rotary shaft 2 is circumferential
Profile is provided with blade 3, and the periphery of blade 3 is d at a distance from roller plane, and is located at below roller plane;Under rotary shaft 2
Side's design has lifting cylinder, can push 3 integral elevating of rotary shaft 2 and blade.When slab 7 is close to 2 surface of rotary shaft, rotation
Axis 2 high speed rotation band cutting blade 3 generates biggish centrifugal force, and make under the action of lifting cylinder blade 3 rise and with slab 7
The burr 8 of bottom contacts, and burr 8 is removed by centrifugal force.
Based on the equipment, method of the invention is as follows:
Along 7 moving direction of slab, at least three speed of interval setting between 2 axle center of roller-way 1 and rotary shaft of forefront
Measuring device, in the present embodiment, velocity measuring device are the first photoelectric tube 4, the second photoelectric tube 5, third photoelectric tube 6;Interval
Set distance are as follows: a is divided between the first photoelectric tube 4 and rotary shaft 2, between the first photoelectric tube 4 and the second photoelectric tube 5 between be divided into
B, between the second photoelectric tube 5 and third photoelectric tube 6 between be divided into c, (a, b, c are the numerical value greater than 0, unit mm).
1. the rotation of roller-way 1 drives slab 7 mobile to 2 direction of rotary shaft, each roller-way encoder pair is used in moving process
1 motor speed of roller-way measures, and then carries out mathematic(al) manipulation according to roller diameter parameter, is converted to the movement speed V of slab 71(casting
Base contacts with roller-way and roller-way is relied on to be driven, so the linear velocity of roller table surface is slab movement speed);
2. record blocks initial time t when 6 signal of third photoelectric tube is blocked1;
3. record blocks initial time t when 5 signal of the second photoelectric tube is blocked2;And the mobile speed of system slab at this time
Degree measurement method is tested the speed by encoder to be switched to the first photoelectric tube and tests the speed mode, is tested the speed in mode in the first photoelectric tube: third light
The horizontal distance of fulgurite 6 and the second photoelectric tube 5 is c, then slab movement speed at this time isWherein preferred c takes
Value range is 20mm-50mm;
4. record blocks initial time t when slab 7 continues to move along and 4 signal of the first photoelectric tube is blocked3, casting
Base movement speed is carried out according to the second photoelectric tube mode that tests the speed, and rotary shaft 2 is begun to ramp up at this time.It tests the speed mould in the second photoelectric tube
In formula: the horizontal distance of the second photoelectric tube 5 and the first photoelectric tube 4 is b, and slab movement speed is at this timeWherein b
Value range be 10mm-20mm;Since the horizontal distance of the first photoelectric tube 4 and 2 axis perpendicular line of rotary shaft is a, blade 3
The vertical distance of periphery and roller plane is d.And the movement speed of slab is V at this time3, then 7 head of slab is from touching
One photoelectric tube 4 to arrive at 2 axis perpendicular line of rotary shaft time beWherein the value range of a is 5mm-10mm.Due to slab
When 7 head reaches the surface of rotary shaft 2, blade 3 must be completely attached to 7 bottom of slab, then in order to which the retention time is consistent,
When slab 7, which blocks 4 signal of the first photoelectric tube, to be generated, system can issue instruction raising speed to the lifting cylinder of rotary shaft 2, then rotate
2 rate of climb of axis isI.e.
5. the sensor inside lifting cylinder detects that rotary shaft 2 reaches highest order, system starts timing and carries out
Deburring, and when the cumulative time reaching 0.5s, rotary shaft 2 is stopped rotating and is fallen, and underturner makees to terminate, and system is from turn
Become encoder to test the speed, slab 7 moves on.
A kind of method that the present invention develops slab movement speed precise measurement, this method are blocked by photoelectric tube as a result,
Signal determines slab position, and the enabling signal that the signal is gone up and down as rotary shaft, structure are simple and effective;It is designed in system
There is multiple groups photoelectric tube, and utilize the time difference and distance of first and second group of photoelectric tube signal triggering, realizes slab movement speed
Preliminary surveying, while the time difference and distance of second and third group of photoelectric tube signal triggering are utilized, realize the essence of slab movement speed
Really measurement solves the problems, such as to cause the measurement of slab movement speed inaccurate because of reasons such as roller-way roll diameter changes, improves measurement number
According to reliability;By the accurate measurement of slab movement speed, and pass through the reasonable of the parameters such as rotary shaft and roller plane distance
Conversion, realizes the Proper Match of slab shift position Yu rotating blade lifting time, is increased to slab deburring rate
99.99% or more.
Claims (7)
1. a kind of slab movement speed accuracy control method is carried out based on rotation beating type deburring machine, the deburring machine is extremely
It less include the liftable rotary shaft of the band blade for transmitting the roller-way of slab, for removing flash removed, each roller-way, which is respectively provided with, to test the speed
Device tests the speed;It is characterized by: being successively spaced between the roller-way and rotary shaft axle center of forefront along slab moving direction
At least three velocity measuring devices are set;
Before reaching the third speed measuring device nearest from the roller-way of forefront on slab head, using each roller-way speed measuring device
Test the speed mode, obtains slab speed V1;
When slab head reaches the third speed measuring device nearest from the roller-way of forefront, record reaches initial time t1;
When slab head, which continues to move along, reaches second speed measuring device, record reaches initial time t2;And this speed per hour
Degree measurement method is first to test the speed mode by each roller-way speed measuring device pattern switching that tests the speed, and is tested the speed in mode first, slab moves
Dynamic speed V2It is the horizontal distance c of third speed measuring device and second speed measuring device divided by initial time t2When with starting
Carve t1Difference, i.e.,
When slab head continues to move along and reaches First Speed measuring device, record reaches initial time t3, speed at this time
Measurement method is carried out according to first mode that tests the speed, and rotary shaft is begun to ramp up at this time;It tests the speed in mode second, the mobile speed of slab
Spend V3It is the horizontal distance b of second speed measuring device and First Speed measuring device divided by initial time t3With initial time t2
Difference, i.e.,If First Speed measuring device and the horizontal distance of rotary shaft axis perpendicular line are a, blade is most
The vertical distance of high point and roller plane is d, then rotation is arrived at from First Speed measuring device is touched in slab head to the end
The time of axis axis perpendicular line isWhen slab head is reached right above the axle center of rotary shaft, in order to remove burr blade in time
It must be completely attached to slab bottom, then in order to which the retention time is consistent, when slab head reaches First Speed measuring device, knife
Piece and rotary shaft are begun to ramp up, and the rotary shaft rate of climb is
When detecting that rotary shaft reaches highest order, system starts timing rotary shaft work belt cutting blade deburring, and when accumulative
When time reaches the setting deburring time, rotary shaft is stopped rotating and fallen to be made to terminate with roller plane interval, underturner, is
System is automatically changeb to each roller-way speed measuring device and tests the speed mode.
2. slab movement speed accuracy control method according to claim 1, it is characterised in that: each roller-way setting is tested the speed
Device is encoder;Velocity measuring device is photoelectric tube.
3. slab movement speed accuracy control method according to claim 1, it is characterised in that: slab head arrival rate
The measuring device moment is to shelter from the photoelectric tube signal moment.
4. slab movement speed accuracy control method according to claim 1, it is characterised in that: three tachometric surveys of setting
Device.
5. slab movement speed accuracy control method according to claim 1 or 4, it is characterised in that: the outside of rotary shaft
It is provided at circumferentially spaced annular blade, along the vertical direction, the periphery of blade is blade highest point.
6. slab movement speed accuracy control method according to claim 1, it is characterised in that: rotary shaft uses oil cylinder liter
Falling unit.
7. slab movement speed accuracy control method according to claim 1, it is characterised in that: the value range of c is
20mm-50mm;Wherein the value range of b is 10mm-20mm;The value range of a is 5mm-10mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810173552.0A CN108422269B (en) | 2018-03-02 | 2018-03-02 | A kind of slab movement speed accuracy control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810173552.0A CN108422269B (en) | 2018-03-02 | 2018-03-02 | A kind of slab movement speed accuracy control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108422269A CN108422269A (en) | 2018-08-21 |
CN108422269B true CN108422269B (en) | 2019-09-24 |
Family
ID=63157482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810173552.0A Active CN108422269B (en) | 2018-03-02 | 2018-03-02 | A kind of slab movement speed accuracy control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108422269B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111408775A (en) * | 2020-05-07 | 2020-07-14 | 山东钢铁股份有限公司 | Rotary milling cutter type steel billet cutting end surface residue removing device |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59110548A (en) * | 1982-12-17 | 1984-06-26 | Toshiba Corp | Finishing device |
CN101602097B (en) * | 2009-07-20 | 2011-06-01 | 攀钢集团钢铁钒钛股份有限公司 | Movement parameter detection apparatus and method for continuous casting |
CN201684920U (en) * | 2010-05-07 | 2010-12-29 | 武汉钢铁(集团)公司 | Continuous casting burr removing device capable of detecting burrs |
CN105215057B (en) * | 2014-06-27 | 2017-04-26 | 宝山钢铁股份有限公司 | Control method of medium-thickness plate rolling and conveying speed |
CN204235498U (en) * | 2014-11-20 | 2015-04-01 | 武汉钢铁(集团)公司 | Motor for casting blank deburring machine takes over ring flange to middle regulator |
CN105171552B (en) * | 2015-09-21 | 2017-11-03 | 武汉钢铁有限公司 | Method and its device that strand bottom burr is removed are bent on conticaster |
JP6810998B2 (en) * | 2016-11-02 | 2021-01-13 | ダイヤモンドエンジニアリング株式会社 | Cylindrical steel piece rotation holding device and cylindrical steel piece deburring system using it |
CN107561303A (en) * | 2017-10-19 | 2018-01-09 | 商丘师范学院 | Two point Linear-speed measuring instrument sensor erecting bed and double dotted line speed measurement method |
-
2018
- 2018-03-02 CN CN201810173552.0A patent/CN108422269B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108422269A (en) | 2018-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105458846B (en) | Intelligent grinding machine | |
CN105798390B (en) | A kind of steel tube head cutting equipment | |
CN205008647U (en) | That gets rid of wheel hub compound die overlap goes compound die overlap quick -witted | |
CN105312963B (en) | The localization method of steel plate cutting to length | |
CN105772864B (en) | A kind of steel pipe base termination minimizing technology | |
CN108422269B (en) | A kind of slab movement speed accuracy control method | |
CN105522484A (en) | Machining control method for glass engraving and milling machine | |
CN112264982B (en) | Automatic length measuring and scribing device and method for plate blank | |
CN102974614A (en) | Upward rolling controlling device and automatic upward rolling controlling method for hot rolling temper mill | |
CN101602097B (en) | Movement parameter detection apparatus and method for continuous casting | |
CN205798548U (en) | Novel slab deburring | |
CN206105624U (en) | Grinding wheel wear is automatic to be detected and compensation arrangement | |
CN105710323A (en) | Cut-to-length measuring method and system for slabs | |
CN108723094B (en) | Method for improving position control precision of working roll changing trolley | |
CN113587875B (en) | Zero point positioning method for length measurement of vertical continuous casting billet | |
CN103837594A (en) | Magnetic flux leakage detecting device for steel pipe and detection method thereof | |
CN103464828A (en) | Blade-type plate blank deburring machine | |
CN115568615B (en) | Automatic detection and control method for feeding amount of grinding wheel on tobacco shredding line | |
CN103148820A (en) | Length detection device for rotary cutter | |
CN104511487B (en) | The detection method of shape wave steel plate length | |
CN205664743U (en) | Ripple cutting steel wire wave form detection device | |
CN206056477U (en) | A kind of parallelism detecting device of the leading screw of lathe and guide rail | |
CN205869617U (en) | Steel pipe both ends end cutting machine | |
CN107457571A (en) | A kind of strand scale system and method | |
CN209851256U (en) | Centrifugal mould-jumping early warning device for prestressed pipe pile mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |