CN108414183A - A kind of bullet train wind-tunnel testing standard model roadbed - Google Patents

A kind of bullet train wind-tunnel testing standard model roadbed Download PDF

Info

Publication number
CN108414183A
CN108414183A CN201810185800.3A CN201810185800A CN108414183A CN 108414183 A CN108414183 A CN 108414183A CN 201810185800 A CN201810185800 A CN 201810185800A CN 108414183 A CN108414183 A CN 108414183A
Authority
CN
China
Prior art keywords
roadbed
model
track
model roadbed
balance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810185800.3A
Other languages
Chinese (zh)
Inventor
滕万秀
余以正
程亚军
孙健
盖杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Changchun Railway Vehicles Co Ltd
Original Assignee
CRRC Changchun Railway Vehicles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Changchun Railway Vehicles Co Ltd filed Critical CRRC Changchun Railway Vehicles Co Ltd
Priority to CN201810185800.3A priority Critical patent/CN108414183A/en
Publication of CN108414183A publication Critical patent/CN108414183A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/02Wind tunnels
    • G01M9/04Details
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M17/00Testing of vehicles
    • G01M17/08Railway vehicles
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/06Measuring arrangements specially adapted for aerodynamic testing
    • G01M9/062Wind tunnel balances; Holding devices combined with measuring arrangements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/08Aerodynamic models

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

A kind of bullet train wind-tunnel testing standard model roadbed, it is characterised in that:Including model roadbed front and back end and model roadbed middle section and track, model roadbed is made by aluminum alloy materials, inside uses cylindrical type honeycomb cavity structure, three parts correspond to head vehicle among model roadbed front and back end and model roadbed, trailer, the installation site of intermediate vehicle is respectively set there are three balance seat board, balance support leg upper part is machined with screw thread with a scale below balance seat board, balance support leg top passes through balance seat board and is fixed with nut, the front end angle of internal friction of model roadbed is 9.5 ° 11.5 °, side chamfer design is R30mm -40mm, the track front end angle of internal friction installed on model roadbed is 18.5 ° 22.5 °, the adjustable track gauge mechanism being connect with track is designed on model roadbed.This invention ensures that test accuracy;The level of model can be adjusted, to the accurate adjusting of implementation model, test accuracy is further improved while using manpower and material resources sparingly, is tested to meet wind tunnel test under the conditions of different gauges.

Description

A kind of bullet train wind-tunnel testing standard model roadbed
Technical field
The present invention relates to a kind of bullet train wind-tunnel test model roadbeds, belong to the high ferro technical field in rail traffic. More particularly to a kind of model road structure applied to the experiment of bullet train wind-tunnel.
Background technology
The aerodynamics problem of High-speed Train, the research means mainly used at present have model wind tunnel test, move Model test, numerical simulation calculation and real vehicle line test.Wherein, wind tunnel test is High-speed Train aerodynamics problem Main means.It provides verification foundation for numerical simulation calculation, also because of research that is easily controllable, can realizing more multi-state And it is more more convenient than real vehicle line test and moving model experiment and effective, thus have in terms of the design of bullet train and remodeling Irreplaceable role.
But there is huge challenges for wind tunnel test, because wind tunnel test is to test bullet train in tunnel simulation The train aerodynamics performance in actual motion.Other than wind tunnel test technology itself requires, also to model in wind tunnel sheet Body proposes very high requirement.Whether previous test shows the appearance and size of model roadbed, balance mounting means and can It is indeformable very big on the influence of wind tunnel test result in permanent experiment.In addition, with the strategy that national high ferro is walked out, and it is extra large The gauge of outer various countries' railway is different, other than 1435 millimeters of gauges are international standard gauge, also 1520 millis Meter or more broad gauge, the narrow gauge of 1067 millimeters of gauges below.As China will export to Russian bullet train gauge requirement It is 1524 millimeters, therefore for the different rail square in various countries, needs a kind of model in wind tunnel not only meeting domestic rule test Roadbed can also meet the model in wind tunnel roadbed of outlet testing requirement.
The ununified standard of domestic bullet train wind-tunnel test model roadbed before, every time at the trial it is main according to Past experience is come the roadbed that designs a model, and foundation engineer experiences such as roadbed front end inclination angle, side chamfering, global shape are even The design of aesthetic hobby, consequence caused in this way is exactly that wind tunnel test precision cannot be guaranteed, especially with real vehicle operating condition Error is larger when comparing, and wind tunnel experiment standard of comparison is inconsistent every time, can not be tested the ratio under same benchmark twice Compared with.It is produced and is processed for wood in addition, the making material of model roadbed is mainly used, when elongating experimental period, Dai Muhui It deforms, therefore is each used only once for wooden mold roadbed, input is caused to waste.In addition, being arranged during wind tunnel test Vehicle model is directly placed on day flat bearing, and when test needs that balance is adjusted, and cannot achieve accurate adjusting in the past, wind Hole experiment is scaled down model, and model error and actual error can be increased with being contracted with model than ratio, and wind tunnel test Model quality is larger, and when adjusting needs overhead traveling crane to coordinate, and can expend a large amount of manpower and time.In addition as Chinese high ferro becomes state Family's business card, country accelerate high ferro and walk out paces, and every country gauge is not consistent, and previous wind-tunnel roadbed gauge is main It is designed for Chinese Industrial Standards (CIS) gauge, does not have gauge regulatory function, so if China's high ferro Russia etc. to be exported It needs to redesign road structure again when national.
Invention content
The purpose of the present invention is to propose to a kind of wind tunnel test master pattern roadbeds, to reduce test error, to day flat bearing It carries out precisely adjusting and can meeting domestic and outlet testing requirement.
To achieve the goals above, the present invention provides a kind of bullet train wind-tunnel testing standard model roadbed, and feature exists In:Including model roadbed front and back end and model roadbed middle section and track, model roadbed is made by aluminum alloy materials, internal Using cylindrical type honeycomb cavity structure, among model roadbed front and back end and model roadbed three parts correspond to head vehicle, trailer, in Between the installation site of vehicle be respectively set there are three balance seat board, balance support leg upper part is machined with band below balance seat board The screw thread of scale, balance support leg top pass through and balance seat board and are fixed with nut, and the front end angle of internal friction of model roadbed is 9.5 °- 11.5 °, side chamfer design is R30mm-40mm, and the track front end angle of internal friction installed on model roadbed is 18.5 ° -22.5 °, mould The adjustable track gauge mechanism being connect with track is designed on type roadbed.
The front end angle of internal friction of the model roadbed is 10.5 °, and side chamfer design is R35mm, is installed on model roadbed Track front end angle of internal friction be 20.5 °.
The adjustable track gauge mechanism is that U bolt hole or slotted hole are provided on model roadbed.
The balance support leg is connected with track notch, for reducing the influence of balance support leg stream field.
The front end ramp angles of model roadbed of the present invention are 9.5 ° -11.5 °, when for carrying out wind in front of roadbed, the angle energy Enough generation for reducing flow separation and whirlpool to greatest extent, hereby it is ensured that test accuracy;Side chamfer design is R30mm-40mm, When carrying out wind for side, model trains leeward side will produce two big whirlpools, which can avoid damage to the two big whirlpools, to It ensure that true flow field structure when experiment;The front side rake angle of track be 18.5 ° -22.5 °, the angle reduce to greatest extent due to The generation of flow separation and whirlpool under the cross sectional shape and roadbed front end water conservancy diversion joint effect of track itself, hereby it is ensured that experiment Precision;Adjustable day flat bearing is mounted on model roadbed, therefore at the trial if it find that model is not on a horizontal plane, can To adjust the level of model, to the accurate adjusting of implementation model, experiment is further improved while using manpower and material resources sparingly Precision.Model roadbed is made by aluminum alloy materials, and inside uses cylindrical type honeycomb cavity structure, and it is enough both to have ensure that model had Rigidity, and make the quality of model in controlled range, ensure that model roadbed model can be repeatedly used for a long;By on roadbed Slotted hole realizes the flexible modulation of gauge, is tested to meet wind tunnel test under the conditions of different gauges.
Description of the drawings
Fig. 1 is the overall structure diagram of one embodiment of the present of invention;
Fig. 2 is roadbed docking facilities schematic diagram;
Fig. 3 is the schematic diagram of model roadbed front end;
Fig. 4 is model roadbed side schematic view;
Fig. 5 is model roadbed track schematic diagram;
Fig. 6 is variable track structural scheme of mechanism;
Fig. 7 is that model roadbed connect adjustable day flat bearing schematic diagram with car body model;
Fig. 8 is model roadbed cylindrical honeycomb cavity schematic diagram;
Fig. 9 is the present invention and train block mold scheme of installation.
Specific implementation mode
Core of the invention is to provide a kind of bullet train wind-tunnel Experiment Road based structures, to improve the experiment of bullet train wind-tunnel Measuring accuracy.
In order to make those skilled in the art more fully understand the present invention program, below in conjunction with the accompanying drawings with embodiment to this hair It is bright to be described in further detail.
With reference to figure 1- Fig. 5, for a case study on implementation of the invention, roadbed whole height is 85mm, and entire length is 14500mm, for convenience transport and installation, is divided into three parts by roadbed, and when experiment assembles three section roadbeds in wind-tunnel so that The transport of model roadbed and installation are very convenient.1 angle of internal friction of model roadbed front end is 9.5 ° -11.5 °, most preferably 10.5 °, should Angle is obtained by largely testing with test optimization.When carrying out wind in front of model roadbed, it is somebody's turn to do when 1 design angle of roadbed front end is more than When angular range, since roadbed front end guide functions make Incoming gas accelerate, to impulsive model train bottom and nose portion Point, it has no longer been true wind speed to test wind speed at this time, and test result is caused to have deviation, and flowing point can be caused when angle is excessive From the generation with whirlpool, inaccurate test result is even obtained at this time.When 1 design angle of roadbed front end is less than the angular range When, then roadbed front end elongation will increase, and when fluid flows through the surface of solids, boundary layer can be generated in the surface of solids, wherein Viscous force occurs in the fluid layer close to the surface of solids, when boundary layer advances remote enough relative to unfavorable barometric gradient, Can occur flow separation, flow separation the result is that a negative relative area is formed in front of train, to experimental test knot Fruit generates deviation.And best angle of internal friction is 10.5 ° in case study on implementation of the present invention, reduces the production of both the above phenomenon to greatest extent It is raw, hereby it is ensured that test accuracy.
2 chamfer design of model roadbed side is R30mm-40mm, and roadbed angle of internal friction is 30 ° in the present embodiment, train crosswind When wind tunnel test, two large scale eddy groups can be formed in train and roadbed leeward side.The two large scale eddies group generates to be normal, It should not destroy.If 2 chamfering of roadbed side is less than the range size, two whirlpool groups can be destroyed, to influence experiment knot Fruit;If it is greater than the chamfering, then windward side roadbed water conservancy diversion acceleration influences test result.Optimal case study on implementation side of the invention chamfering 2 are designed as R35mm, which can ensure that model roadbed stream field itself influences minimum when crosswind, to ensure that high crosswind When wind tunnel test precision.
Track 3 is mounted on 1 upper surface of model roadbed, cross sectional shape and the actual track cross sectional shape of track 3 by bolt Identical, most preferably 18.5 ° -22.5 ° of the angle of internal friction of track 3, the angle takes again by a large amount of experiment with test optimization , the top rake of track 3 is about twice of roadbed top rake.3 forefront of track is partially installed on roadbed inclination angle rearmost part Point, therefore orbit inclination angle can regard the extension at roadbed inclination angle as;So if the top rake of track is less than or equal to roadbed Inclination angle can cause the previously described flow separation of the present invention such as to generate, therefore the inclination angle has to be larger than roadbed front side rake angle;And angle It spends greatly, since the cross sectional shape of of track itself belongs to blunt form, excessive angle can form flow-disturbing, lead to the production of whirlpool group It is raw, to influence test result.Trade shape influences unavoidably test result, but its entire effect is less than the shadow of roadbed It rings, a case study on implementation roadbed angle of internal friction of the invention is chosen for 20.5 °, tests and calculation shows that the angle integrates test result It influences to be less than 0.5%.
With reference to figure 6, track installation can realize that gauge is adjusted in model roadbed U-shaped hole 10, by the U-shaped hole 10, this sets Meter ensure that gauge can be adjusted according to practical gauge equal proportion, bullet train under the gauge to meet world's country variant standard Wind tunnel test testing requirement.
With reference to figure 1, Fig. 7,4 show whole adjustable day flat bearing schematic diagram in Fig. 1.Whole adjustable day flat bearing is by nut 7, balance seat board 8, balance support leg 9 are constituted, and balance support leg upper part is machined with screw thread with a scale, on balance support leg Portion passes through balance seat board, and is respectively fixed with a nut in the upper and lower surface of balance seat board.When wind tunnel test, force balance is placed On balance seat board 8, then model is placed on force balance, by the bolt mounting holes on balance seat board 8 by model with Balance abutting joint, therefore by adjusting balance seat board that can adjust the horizontal position of test model.The nut 7 of its flat bearing can be with Directly adjust, and be accurate to millimetre-sized scale on balance support leg at screw thread, if therefore in experiment model not one On a horizontal plane, the level of model can be adjusted by adjusting nut 7, without adjusting mould by overhead traveling crane and a large amount of manpower Type, more need not using pad tagger etc. in the past frequently with measure adjust model level.To further decrease a day flat bearing The influence of leg stream field will cut off segment track, by 9 Position Design of balance support leg in track indentation, there, cleverly by balance The influence of support leg stream field is reduced to minimum.
With reference to figure 1, Fig. 8, designed using cylindrical type honeycomb cavity structure 5 inside roadbed overall structure, aluminum honeycomb cavity 5 is straight Diameter is 110mm, is highly 60mm, is placed in inside whole roadbed, while ensureing that roadbed has enough rigidity, reduces entirety Quality.It is computed, the quality of entire roadbed is only 87kg, is 2/3 using generation wood processing;Part can bear the people of a 75kg The impact of 5g acceleration and it is indeformable, under this support construction, roadbed can place Reusability and indeformable for a long time.
With reference to figure 9, when wind tunnel test, force balance is positioned on roadbed installation day flat bearing 4, by bullet train head Vehicle, intermediate vehicle, trailer are respectively placed on its corresponding force balance.High speed winds can blow to experiment mould from front and side Type can test out bullet train resistance, lift, lateral force and torque etc. by force balance, while by car body surface Arrange pressure tap, it can be with test carriage body surface pressure distribution.
Table 1 finds that train is each by train line measured data and model roadbed Train wind tunnel test of the present invention comparison Aerodynamic parameter wind tunnel test data and real steering vectors data are almost the same, under the conditions of the model roadbed:Wherein hinder Force coefficient wind tunnel test and real steering vectors error are only 1.1%, and lift coefficient wind tunnel test is 3.6% with real steering vectors error, Lateral force coefficient wind tunnel test is 2.7% with real steering vectors error;Show the model roadbed wind tunnel test result and real vehicle of the pattern Test result is coincide very well, can be used for replacing circuit real steering vectors substantially, and can be used as assessment bullet train traction braking The foundation of calculating.
Table 1:Test data analyzer
Performance parameter Resistance coefficient Lift coefficient Lateral force coefficient
Real vehicle line test 0.89 0.83 1.12
It is tested under model roadbed of the present invention 0.88 0.86 1.09
Wind tunnel test and real steering vectors error 1.1% 3.6% 2.7%

Claims (4)

1. a kind of bullet train wind-tunnel testing standard model roadbed, it is characterised in that:Including model roadbed front and back end and model road Base middle section and track, model roadbed are made by aluminum alloy materials, and inside uses cylindrical type honeycomb cavity structure, model road Among base front and back end and model roadbed three parts correspond to head vehicle, trailer, intermediate vehicle installation site be respectively set there are three Balance seat board, balance support leg upper part is machined with screw thread with a scale below balance seat board, and balance support leg top is worn It crosses balance seat board and is fixed with nut, the front end angle of internal friction of model roadbed is 9.5 ° -11.5 °, and side chamfer design is R30mm - 40mm, the track front end angle of internal friction installed on model roadbed are 18.5 ° -22.5 °, are designed on model roadbed and connect use with track Adjustable track gauge mechanism.
2. a kind of bullet train wind-tunnel testing standard model roadbed according to claim 1, it is characterised in that:The mould The front end angle of internal friction of type roadbed is 10.5 °, and side chamfer design is R35mm, the track front end angle of internal friction installed on model roadbed It is 20.5 °.
3. a kind of bullet train wind-tunnel testing standard model roadbed according to claim 1, it is characterised in that:Described can It is that U bolt hole or slotted hole are provided on model roadbed to adjust gauge mechanism.
4. a kind of bullet train wind-tunnel testing standard model roadbed according to claim 1, it is characterised in that:The day Flat bearing leg is connected with track notch, for reducing the influence of balance support leg stream field.
CN201810185800.3A 2018-03-07 2018-03-07 A kind of bullet train wind-tunnel testing standard model roadbed Pending CN108414183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810185800.3A CN108414183A (en) 2018-03-07 2018-03-07 A kind of bullet train wind-tunnel testing standard model roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810185800.3A CN108414183A (en) 2018-03-07 2018-03-07 A kind of bullet train wind-tunnel testing standard model roadbed

Publications (1)

Publication Number Publication Date
CN108414183A true CN108414183A (en) 2018-08-17

Family

ID=63130263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810185800.3A Pending CN108414183A (en) 2018-03-07 2018-03-07 A kind of bullet train wind-tunnel testing standard model roadbed

Country Status (1)

Country Link
CN (1) CN108414183A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112229655A (en) * 2020-09-25 2021-01-15 中车长春轨道客车股份有限公司 Rail train debugging layout and rail train dynamic debugging process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004061188A (en) * 2002-07-25 2004-02-26 Railway Technical Res Inst Aerodynamic testing method of moving object model, and moving object model for aerodynamic testings
CN103063451A (en) * 2012-12-26 2013-04-24 浙江大学 Rail transit train wholly moving load analog loading method and device
CN203414255U (en) * 2013-07-29 2014-01-29 同济大学 Model supporting device for wind tunnel test of high-speed train
CN103674473A (en) * 2013-12-18 2014-03-26 南车青岛四方机车车辆股份有限公司 Train model for train wind tunnel test
CN203672590U (en) * 2013-12-18 2014-06-25 南车青岛四方机车车辆股份有限公司 Train model for train wind tunnel test
CN208270172U (en) * 2018-03-07 2018-12-21 中车长春轨道客车股份有限公司 A kind of bullet train wind-tunnel testing standard model roadbed

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004061188A (en) * 2002-07-25 2004-02-26 Railway Technical Res Inst Aerodynamic testing method of moving object model, and moving object model for aerodynamic testings
CN103063451A (en) * 2012-12-26 2013-04-24 浙江大学 Rail transit train wholly moving load analog loading method and device
CN203414255U (en) * 2013-07-29 2014-01-29 同济大学 Model supporting device for wind tunnel test of high-speed train
CN103674473A (en) * 2013-12-18 2014-03-26 南车青岛四方机车车辆股份有限公司 Train model for train wind tunnel test
CN203672590U (en) * 2013-12-18 2014-06-25 南车青岛四方机车车辆股份有限公司 Train model for train wind tunnel test
CN208270172U (en) * 2018-03-07 2018-12-21 中车长春轨道客车股份有限公司 A kind of bullet train wind-tunnel testing standard model roadbed

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄志祥 等: "高速列车模型风洞试验的模拟方法研究", 铁道科学与工程学报, vol. 10, no. 3, 28 June 2013 (2013-06-28), pages 88 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112229655A (en) * 2020-09-25 2021-01-15 中车长春轨道客车股份有限公司 Rail train debugging layout and rail train dynamic debugging process
CN112229655B (en) * 2020-09-25 2022-09-02 中车长春轨道客车股份有限公司 Rail train debugging layout and rail train dynamic debugging process

Similar Documents

Publication Publication Date Title
Niu et al. Experimental study on the effect of Reynolds number on aerodynamic performance of high-speed train with and without yaw angle
CN208270172U (en) A kind of bullet train wind-tunnel testing standard model roadbed
CN104260643B (en) A kind of wind-proof overall steel bracket installation method
CN104573397B (en) A kind of method for calculating rail truck Dynamic Envelope
He et al. Parameter optimization for improved aerodynamic performance of louver-type wind barrier for train-bridge system
Orellano et al. Aerodynamic performance of a typical high-speed train
CN108414183A (en) A kind of bullet train wind-tunnel testing standard model roadbed
CN102322000A (en) Line rail symmetric three-throw turnout in urban rail traffic engineering
CN108240845A (en) Ambient wind monitoring method suffered by a kind of high-speed cruising vehicle
CN101774381B (en) Crosswind hazard inhibition method of train and device thereof
CN203795329U (en) Flow guide type wind barrier
CN202208869U (en) Symmetrical three-throw turnout for line rails of urban rail transit engineering
CN107339982A (en) High ferro wire plotting method
CN102304882B (en) Line rail symmetric turnout No 4.5 in urban rail transit engineering
CN104960585A (en) Method and system for performing active resistance reduction control on automobile based on jet actuators
CN202882449U (en) Positioning device for installing street lamp base seat
CN206974487U (en) A kind of gas turbine meter
CN206450403U (en) A kind of independent grid rudder model structure
CN108132132A (en) A kind of High Speed Train Models wind tunnel test standard roadbed
CN105923057B (en) A kind of FSAE racing cars curved surface outlet diffuser
CN109056432A (en) A kind of adjustable track beam structure of rigidity and magnetic-levitation test wire
CN205021055U (en) Wind -tunnel water conservancy diversion piece assembly welding device
CN107356399A (en) Automotive model wind tunnel test pavement simulating system and the method for testing using the system
CN106498862A (en) A kind of strong wind atmosphere leeward area railway windbreak transition section structure
CN106381831A (en) Method for determining aeration facility vent hole sectional area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination