CN108412185A - A kind of construction braced frame installation adjusting method - Google Patents
A kind of construction braced frame installation adjusting method Download PDFInfo
- Publication number
- CN108412185A CN108412185A CN201810227928.1A CN201810227928A CN108412185A CN 108412185 A CN108412185 A CN 108412185A CN 201810227928 A CN201810227928 A CN 201810227928A CN 108412185 A CN108412185 A CN 108412185A
- Authority
- CN
- China
- Prior art keywords
- support
- important actor
- hack lever
- support plate
- adjusting method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses a kind of construction braced frame installation adjusting methods, include the following steps:1) each liftable support important actor is correspondingly placed at each corner in rectangular house;2) support plate on important actor will be supported to drop to lowest position, support hack lever is placed in two support plates being oppositely arranged, supporting rack boom end is located in corresponding support plate;3) each support important actor and/or each support plate synchronize rising, and support hack lever is risen to construction height.The construction braced frame installation adjusting method reasonable design, simple in structure, connection structure is less, only need to will support hack lever be placed in support plate position, simple installation, can automatic height adjustment, without dismantle support hack lever.
Description
Technical field
The present invention relates to technical field of building construction, more particularly, to a kind of construction braced frame mounting and adjusting side
Method.
Background technology
Current bottom housing construction still overlaps scaffold, and overlap joint scaffold needs lapping construction in layer,
Complicated, connection structure is more, cumbersome for installation, and height adjusts inconvenience, is unfavorable for efficiently constructing.
Invention content
In view of the shortcomings of the prior art, technical problem to be solved by the invention is to provide a kind of construction braced frame peaces
Adjustment adjusting method, to achieve the purpose that mounting and adjusting simplicity.
In order to solve the above-mentioned technical problem, the technical solution adopted in the present invention is:
A kind of construction braced frame installation adjusting method, includes the following steps:
1) each liftable support important actor is correspondingly placed at each corner in rectangular house;
2) support plate on important actor will be supported to drop to lowest position, support hack lever is placed on two be oppositely arranged
On fagging, supporting rack boom end is located in corresponding support plate;
3) each support important actor and/or each support plate synchronize rising, and support hack lever is risen to construction height.
Wherein,
In the step 1), support important actor is fixed on the base, and positioning is unfolded in the balancing pole of each corner on pedestal.
It is oriented to equipped with vertical track between the support plate and support important actor.
The support plate is used to support the positioning groove that hack lever end is caught in equipped with one group, and supporting rack boom end is caught in fixed
Pass through locked clip device again in the groove of position.
Described that lifting platform is arranged in adjacent support important actor middle position, the top of lifting platform is equipped with positioning plate, positioning
Plate is equipped with and is used to support the locating slot that hack lever is caught in, to supporting the middle part of hack lever to form secure support.
The adjacent both sides of the support important actor are equipped with support plate, and two support plates are connected by connection reinforcement plate, the two fortune
It is dynamic to synchronize.
Compared with prior art, the present invention haing the following advantages:
The construction braced frame installation adjusting method reasonable design, simple in structure, connection structure is less, need to will only prop up
Stand place on the supporting plate position, simple installation, can automatic height adjustment, without dismantle support hack lever.
Description of the drawings
The content expressed by each width attached drawing of this specification and the label in figure are briefly described below:
Fig. 1 is support stand structural schematic diagram of the present invention.
Fig. 2 is support table structure schematic diagram one of the present invention.
Fig. 3 is support table structure schematic diagram two of the present invention.
In figure:
1. supporting important actor, 2. lifting support plates, 3. tracks, 4. elevating levers, 5. outer positioning grooves, positioning groove, 7. in 6.
Clip, 8. connection reinforcement plates, 9. sliding blocks, 10. pedestals, 11. balancing poles, 12. hydraulic stems, 13. support hack levers.
Specific implementation mode
Below against attached drawing, by the description of the embodiment, making to the specific implementation mode of the present invention further details of
Explanation.
The construction braced frame installation adjusting method, includes the following steps:
1) each liftable support important actor is correspondingly placed at each corner in rectangular house;
2) support plate on important actor will be supported to drop to lowest position, support hack lever is placed on two be oppositely arranged
On fagging, supporting rack boom end is located in corresponding support plate;
3) each support important actor and/or each support plate synchronize rising, and support hack lever is risen to construction height.
Wherein,
In step 1), support important actor is fixed on the base, and positioning is unfolded in the balancing pole of each corner on pedestal.
Support plate is used to support the positioning groove that hack lever end is caught in equipped with one group, and it is recessed that supporting rack boom end is caught in positioning
Again by locked clip device in slot, positioning is reliable.In adjacent support important actor middle position, lifting platform, the top of lifting platform are set
Equipped with positioning plate, positioning plate is equipped with and is used to support the locating slot that hack lever is caught in, to supporting the middle part of hack lever to form secure support.
The adjacent both sides of support important actor are equipped with support plate, and two support plates are connected by connection reinforcement plate, ensure the two fortune
It is dynamic to synchronize.
Simple in structure, connection structure is less, need to only be placed on support hack lever in support plate and position, simple installation,
Can automatic height adjustment, without dismantle support hack lever.
If Fig. 1 to Fig. 3 is utilized construction auxiliary mould by the construction braced frame installation adjusting method, building
Construction auxiliary mould is liftable frame structure, can be needed to adjust height according to construction.
Construction auxiliary mould includes one group of lifting support stand structure, and each lifting support stand is correspondingly arranged rectangular
At elbow;It includes pedestal and the support important actor that is located on pedestal that it, which lifts support stand, and support important actor 1 is rectangular important actor,
1 adjacent both sides of support important actor are equipped with support plate, and support plate is equipped with the positioning for placement positioning construction support hack lever
Structure, support important actor be can oscilaltion adjustment lifting important actor, it is adjacent lifting support stand support plate it is opposite, support hack lever
End is set forms frame structure on the supporting plate.
1 adjacent both sides of support important actor are equipped with support plate, and the opposite support important actor of support plate can oscilaltion adjustment.Support plate
Be equipped with for placement positioning construction support hack lever location structure, support important actor 1 be can oscilaltion adjustment hydraulic pressure
Important actor is lifted, the height of adjustable support plate adjusts so as to adjust 13 height of positioning supporting frame bar between two support important actors
Construction height.
Each support plate side is corresponded on support important actor 1 and is equipped with vertical track 3, is supported and is passed through rail between important actor and support plate
Road cooperation is oriented to, 3 preferred dovetail groove track of track, is avoided support hack lever in adjustment high process from shaking, is improved safety.
Further, two vertical dovetail groove tracks are arranged side by side in corresponding each support plate, lean on support plate opposite end
Setting, support plate up and down adjust it is reliable and stable, after support plate altitude location, can to support plate formed limit prevent from shaking.
The lower part of support important actor 1 is fixed on the middle position of pedestal, is corresponded on pedestal and is equipped with elevating lever below support plate
4, elevating lever 4 can be lead screw elevating lever or hydraulic lifting arm, and driving support plate is opposite to support important actor lift adjustment, support plate to be formed
Lift support plate 2, hack lever installation operation easy to support.
Location structure is the positioning groove set on the supporting plate, and positioning groove is adapted with the end of support hack lever.It is preferred that
, positioning groove is arc groove, and positioning groove is the interior positioning groove 6 being arranged side by side and outer positioning groove 5.Or positioning is recessed
Slot is one group be arranged side by side, forms one group of support hack lever between connected support important actor, it is ensured that the safety of construction.
10 lower part of pedestal is equipped with one group of idler wheel, and is equipped with exsertile balancing pole 11, one group of balancing pole, in each of pedestal
There is setting in corner, ensures stationarity.The inner end of balancing pole is hinged on the side of pedestal, and the outer end of balancing pole is equipped with support
Foot, is equipped with hydraulic stem 12 between the side and balancing pole of pedestal, the inner end of hydraulic stem is hinged on the side of pedestal, hydraulic stem it is outer
End is hinged on balancing pole.
Support plate is square platy structure, and the position of elevating lever setting is located at it of interior positioning groove and outer positioning groove
Between, it fits on the outside of the inside of support plate and support important actor, elevating lever is arranged by the outside of support plate, it is ensured that support plate is put down
It is steady reliable.
The clip 4 being equipped at positioning groove for locking support hack lever end is corresponded in support plate, supports the end of hack lever
Placement is fixed with positioning groove by locked clip device, avoids loosening.
It is connected by connection reinforcement plate 8 between adjacent support plate, is correspondingly connected at 8 position of reinforcing plate and sets on support important actor
Can slide up and down sliding block 9, and connection reinforcement plate is connected with sliding block, it is ensured that adjacent shore plates synchronism, all support hack levers
Be installed in place, can shape annular frame structure, it is reliable and stable.
Support important actor 1 is correspondingly arranged at rectangular elbow, and four support important actors are one group, after support important actor positioning, control
System support important actor and support plate are in lowest order, and supporting rack boom end is placed in the positioning groove of corresponding support important actor and is locked
Tightly, final shape frame structure, it is reliable and stable.Hydraulic-driven may be selected in all lifting structures, and synchronism is good, and with certain
Buffering, it is more reliable and more stable.
It such as supports hack lever longer, lifting platform is set in adjacent support important actor middle position, the top of lifting platform is equipped with
Positioning plate, positioning plate are equipped with and are used to support the locating slot that hack lever is caught in, and to supporting the middle part of hack lever to form secure support, improve
Structural stability.
It above are only and preferred embodiments of the present invention are illustrated, above-mentioned technical characteristic can form multiple hairs in any combination
Bright example scheme.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way
Limitation, as long as use the present invention design and technical solution carry out various unsubstantialities improvement, or it is not improved will
The design and technical solution of the present invention directly applies to other occasions, within protection scope of the present invention.
Claims (6)
1. a kind of construction braced frame installation adjusting method, it is characterised in that:The installation adjusting method includes following step
Suddenly:
1) each liftable support important actor is correspondingly placed at each corner in rectangular house;
2) support plate on important actor will be supported to drop to lowest position, support hack lever is placed on two support plates being oppositely arranged
On, supporting rack boom end is located in corresponding support plate;
3) each support important actor and/or each support plate synchronize rising, and support hack lever is risen to construction height.
2. construction braced frame installation adjusting method as described in claim 1, it is characterised in that:In the step 1), branch
Support important actor is fixed on the base, and positioning is unfolded in the balancing pole of each corner on pedestal.
3. construction braced frame installation adjusting method as described in claim 1, it is characterised in that:The support plate and support
It is oriented to equipped with vertical track between important actor.
4. construction braced frame installation adjusting method as described in claim 1, it is characterised in that:The support plate is equipped with
One group is used to support the positioning groove that hack lever end is caught in, and supporting rack boom end is caught in positioning groove passes through locked clip device again.
5. construction braced frame installation adjusting method as described in claim 1, it is characterised in that:It is described in adjacent support
Important actor middle position is arranged lifting platform, and the top of lifting platform is equipped with positioning plate, and positioning plate, which is equipped with, to be used to support hack lever and be caught in
Locating slot, to support hack lever middle part formed secure support.
6. construction braced frame installation adjusting method as described in claim 1, it is characterised in that:The support important actor is adjacent
Both sides are equipped with support plate, and two support plates are connected by connection reinforcement plate, and the two movement synchronizes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810227928.1A CN108412185A (en) | 2018-03-20 | 2018-03-20 | A kind of construction braced frame installation adjusting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810227928.1A CN108412185A (en) | 2018-03-20 | 2018-03-20 | A kind of construction braced frame installation adjusting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108412185A true CN108412185A (en) | 2018-08-17 |
Family
ID=63132970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810227928.1A Pending CN108412185A (en) | 2018-03-20 | 2018-03-20 | A kind of construction braced frame installation adjusting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108412185A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4887694A (en) * | 1986-11-14 | 1989-12-19 | Ho I Chung | High rise building fire escape/fire fighting and building maintenance system |
JPH08165791A (en) * | 1994-12-14 | 1996-06-25 | Murata Seisakusho:Kk | Vertically movable type scaffold |
KR20020062107A (en) * | 2001-03-19 | 2002-07-25 | 김행복 | Scaffolding pipe installation machine |
CN201040922Y (en) * | 2007-06-11 | 2008-03-26 | 江苏省建工集团有限公司 | Anti-slip hook for fixing and suspending scaffold |
KR20130000823U (en) * | 2011-07-26 | 2013-02-05 | 대우조선해양 주식회사 | Apparatus for high place working |
CN205531438U (en) * | 2016-02-03 | 2016-08-31 | 江苏瑞沃建设集团有限公司 | Portable bearing structure |
CN205742937U (en) * | 2016-05-13 | 2016-11-30 | 江苏业强脚手架科技发展有限公司 | A kind of scaffold being moved easily |
CN206784874U (en) * | 2017-05-26 | 2017-12-22 | 广东腾越建筑工程有限公司 | A kind of scaffold of architectural engineering |
CN206942199U (en) * | 2017-05-27 | 2018-01-30 | 金陵科技学院 | A kind of support meanss of construction |
-
2018
- 2018-03-20 CN CN201810227928.1A patent/CN108412185A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4887694A (en) * | 1986-11-14 | 1989-12-19 | Ho I Chung | High rise building fire escape/fire fighting and building maintenance system |
JPH08165791A (en) * | 1994-12-14 | 1996-06-25 | Murata Seisakusho:Kk | Vertically movable type scaffold |
KR20020062107A (en) * | 2001-03-19 | 2002-07-25 | 김행복 | Scaffolding pipe installation machine |
CN201040922Y (en) * | 2007-06-11 | 2008-03-26 | 江苏省建工集团有限公司 | Anti-slip hook for fixing and suspending scaffold |
KR20130000823U (en) * | 2011-07-26 | 2013-02-05 | 대우조선해양 주식회사 | Apparatus for high place working |
CN205531438U (en) * | 2016-02-03 | 2016-08-31 | 江苏瑞沃建设集团有限公司 | Portable bearing structure |
CN205742937U (en) * | 2016-05-13 | 2016-11-30 | 江苏业强脚手架科技发展有限公司 | A kind of scaffold being moved easily |
CN206784874U (en) * | 2017-05-26 | 2017-12-22 | 广东腾越建筑工程有限公司 | A kind of scaffold of architectural engineering |
CN206942199U (en) * | 2017-05-27 | 2018-01-30 | 金陵科技学院 | A kind of support meanss of construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350457B (en) | Method for falling of steel trough beam in bridge walking type pushing construction | |
CN107448689A (en) | A kind of hoisting bracket of horizontal pipeline | |
CN204916605U (en) | Prefab strutting arrangement | |
CN108389463A (en) | A kind of loading system suitable for armored concrete beam test practical teaching | |
CN108532743A (en) | The aerial steel vestibule Lift-on/Lift-off System of multilayer and its application method | |
CN205531438U (en) | Portable bearing structure | |
CN109399108A (en) | A kind of vertical transfer shipping unit of integral type extra-high voltage experiment reactor | |
CN208415485U (en) | The aerial steel vestibule Lift-on/Lift-off System of multilayer | |
CN108412185A (en) | A kind of construction braced frame installation adjusting method | |
CN103061216B (en) | Monolithic rail bed and turnout lifting support arrangement structure of subway short sleeper | |
CN206289963U (en) | For the climbing form system of section Core tube construction | |
CN105113536A (en) | Movable sidewall formwork erecting system for underground structure and construction method of system | |
CN108412181A (en) | Reliable and stable construction auxiliary mould | |
CN108797380B (en) | Suspension construction device and construction method for suspension irrigation continuous beam bracket | |
CN108385958A (en) | Architectural furniture | |
CN207108409U (en) | Repair of Transformer scaffold | |
CN205476584U (en) | Detachable supporting structure | |
CN108396951A (en) | A kind of tooling for construction | |
CN206616694U (en) | Prefabricated superposed beam quickly positions adjustment frock with prefabricated post junction | |
CN205534586U (en) | Petroleum pipeline supporting frame | |
TW201413094A (en) | Building method of cylindrical tank | |
CN204326613U (en) | A kind of 110kV transformer station installation component | |
KR101567736B1 (en) | Jack-Up Apparatus for Roof Structure Having Lifting Unit and Jack-Up Method for Roof Using the Same | |
CN209244047U (en) | A kind of type unitized curtain wall side hanging device | |
CN207744300U (en) | A kind of dual leveling micromodule pedestal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180817 |
|
RJ01 | Rejection of invention patent application after publication |