CN108412156B CN201810556772.1A CN201810556772A CN108412156B CN 108412156 B CN108412156 B CN 108412156B CN 201810556772 A CN201810556772 A CN 201810556772A CN 108412156 B CN108412156 B CN 108412156B
Authority
CN
China
Prior art keywords
connecting tube
discharging pipe
smoke discharging
pipelines
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810556772.1A
Other languages
Chinese (zh)
Other versions
CN108412156A (en
Inventor
赵明伦
袁志勇
张朝友
袁世国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Environmental Engineering Co Ltd
Original Assignee
Guizhou Environmental Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Environmental Engineering Co Ltd filed Critical Guizhou Environmental Engineering Co Ltd
Priority to CN201810556772.1A priority Critical patent/CN108412156B/en
Publication of CN108412156A publication Critical patent/CN108412156A/en
Application granted granted Critical
Publication of CN108412156B publication Critical patent/CN108412156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/02Vertical ducts; Channels, e.g. for drainage for carrying away waste gases, e.g. flue gases; Building elements specially designed therefor, e.g. shaped bricks or sets thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/16Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
    • F16L3/20Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ventilation (AREA)

Abstract

The present patent application belongs to flue gas ash removal technical field, specifically discloses a kind of flue gas smoke exhaust pipe and support of pipelines, including smoke discharging pipe, smoke discharging pipe two sides are mounted with connecting tube, and the outside of smoke discharging pipe is fixed on support of pipelines;Connecting tube is in truncated cone-shaped, and connecting tube bigger diameter end is connected to smoke exhaust pipe, circumferentially distributed in connecting tube to have multiple rows of axially disposed stopper rod, stopper rod and connecting tube centerline parallel;Cavity is equipped in the tube wall of connecting tube, stopper rod one end is slidably and sealingly connected with cavity, and the outside of connecting tube is equipped with the mandril being slidably and sealingly connected with cavity;Mandril is equipped with the first magnetic patch far from one end of connecting tube, and smoke discharging pipe and connecting tube junction are hinged with fixed plate corresponding with mandril position, and fixed plate is equipped with the second magnetic patch.Compared with prior art, this flue gas smoke exhaust pipe and support of pipelines facilitate installation, can adjust height as needed, and can be collected dust using the mobilization of flue gas, use convenient for the cleaning of dust and the long-time of smoke discharging pipe.

Description

Flue gas smoke exhaust pipe and support of pipelines
Technical field
The invention belongs to flue gas ash removal technical field, a kind of flue gas smoke exhaust pipe and support of pipelines are specifically disclosed.
Background technique
At present in numerous industries such as metallurgy, building materials, electric power, chemical industry, flue gas largely containing dust can be all generated, in order to It protects the environment from pollution, such flue gas cannot be directly discharged in environment, need to be collected, and pass through unified dedusting, take off The processing such as sulphur are discharged again.In order to be collected and be uniformly processed to flue gas, smoke discharging pipe is essential.
Country's flue gas smoke discharging pipe mostly uses steel plate scene pipe crimping to be welded at present, for the ease of welding, in smoke exhaust pipe Do not make preservative treatment, priming paint, aluminium paint or pitch flue paint etc. are painted with outside smoke discharging pipe;Such smoke exhaust pipe can only play collection With the flow direction of guidance flue gas, can not be cooled down to flue gas, the processing such as dedusting, be easy to appear after prolonged use damage, Blocking etc..Meanwhile in order to which smoke exhaust pipe is preferably connected to other pipelines, the end of smoke discharging pipe is usually provided with compensation of pipeline Device, pipeline compensator mechanism complexity is more heavy, is unfavorable for installing.In addition, discharging fume to make smoke exhaust pipe adapt to desired height Pipe laying bracket is also usually needed on pipe, current support of pipelines high unity is not easy to adjust.This smoke exhaust pipe and pipeline branch Frame structure has that long construction period, quality are not easy to guarantee, install inconvenient, high cost.
Summary of the invention
The purpose of the present invention is providing a kind of flue gas smoke exhaust pipe and support of pipelines, to solve existing smoke exhaust pipe and pipeline branch The inconvenient problem of frame long construction period, installation.
In order to achieve the above object, base case of the invention are as follows: flue gas smoke exhaust pipe and support of pipelines, including smoke exhaust pipe Road, smoke discharging pipe two sides are mounted with connecting tube, and the outside of smoke discharging pipe is fixed on support of pipelines;The connecting tube is in rotary table Shape, connecting tube bigger diameter end are connected to smoke exhaust pipe, circumferentially distributed in connecting tube to have multiple rows of axially disposed stopper rod, stopper rod and company Adapter tube centerline parallel;Cavity is equipped in the tube wall of connecting tube, stopper rod one end is slidably and sealingly connected with cavity, the outside of connecting tube The mandril being slidably and sealingly connected with cavity is equipped with positioned at the side of stopper rod, the mandril is directed away from the position of connection tube hub line It sets;The mandril is equipped with the first magnetic patch far from one end of connecting tube, and the smoke discharging pipe is hinged with and pushes up with connecting tube junction The corresponding fixed plate in bar position, the fixed plate are equipped with the second magnetic patch being attracted with the first magnetic patch;
Supporting plate is equipped with inside the smoke discharging pipe, the supporting plate upper end rotation is equipped with shaft, is fixedly connected on the shaft There are impeller and roller bearing, the roller bearing is equipped with multiple cunning chambers perpendicular to shaft, and cunning is intracavitary to slidably connect slide bar, the smoke evacuation The scraper plate to offset with roller bearing upper end is equipped with inside pipeline;The bottom of the smoke discharging pipe is provided with dust leg, in the dust leg It is equipped with spiral equipped with horizontal axis, outside the horizontal axis and transmits leaf, described horizontal axis one end is stretched out dust leg and is located at outside smoke discharging pipe, institute It states dust leg and is detachably equipped with the gear door being connected to dust leg inside far from one end outside horizontal axis stretching;
The support of pipelines includes multiple telescopic units and tricing line, and the telescopic unit includes that multiple head and the tail are successively hinged The first strut, multiple head and the tail successively hinged the second strut and multiple T-bars, it is hinged in the middle part of the first strut and the second strut, The hinged place of two the first struts and the hinged place of two the second struts are fixedly connected to the cross bar being oppositely arranged, the T shape It is equipped with T shape chamber in bar, cross bar sealing is slidably connected to that T shape is intracavitary, and the sealing of the shape chamber lower end T slidably connects pull rod, and T shape is intracavitary to be set There is the tension spring fixed with pull rod;Pull rod is fixedly connected in tricing line far from one end of T-bar, the quantity of tricing line and flexible The quantity of unit is identical.
The working principle of this base case is: needing the place using smoke discharging pipe and support of pipelines, can will utilize Smoke discharging pipe is adjusted to desired height by support of pipelines, is connect using connecting tube with other pipelines, to realize the receipts to flue gas Collection and guidance.When adjusting the height of smoke discharging pipe by support of pipelines, the tricing line on each telescopic unit is pulled respectively, due to Pull rod on same telescopic unit is connected in same tricing line, and tricing line pulls, and can make all drawings on same telescopic unit Bar moves down, thus pull rod slide downward in T shape chamber.After pull rod moves down, the intracavitary air transfer of T shape can make two to set relatively The cross bar set is close to each other, to pull the first strut hinged place and the second strut hinged place close to each other;Again due to first The middle part of bar and the second strut is hinged, the hinged place of two the first struts and hinged place of two the second struts is close to each other makes It is opened between first strut, between the second strut, extends telescopic unit, thus realize to support of pipelines height adjustment, into One step enables the height of smoke discharging pipe to adjust, and after the position of support of pipelines is adjusted, can be fixed on tricing line flexible The bottom of unit.
After the position of support of pipelines determines, smoke discharging pipe is connected to other pipelines using connecting tube, when connection By other pipelines to connecting tube is turned, since connecting tube is in truncated cone-shaped, and bigger diameter end is connected to smoke discharging pipe, other pipelines compare appearance It can easily be nested in the outside of connecting tube, and offset with the outer wall of connecting tube.End and the outer wall phase of connecting tube when other pipelines To when, it will push the stopper rod of connection pipe outer wall, stopper rod will move into cavity, so that gas in cavity be made to shift, will push up Bar is released, and is resisted to the inner wall of other pipelines.In the axial direction for setting and being distributed in connecting tube in a row due to stopper rod and mandril, make When the circle of end one of other pipelines offsets with connecting tube, a circle stopper rod in connecting tube will push, and stretch out a circle mandril to it He resists inner wall of the pipe, to keep other pipelines and connecting tube tentatively fixed.Fixed plate will be rotated at this time, make itself and other pipelines Outer wall fitting, thus make the first magnetic patch and the second magnetic patch actuation, be fixedly connected with other pipelines with connecting tube.
In use, flue gas enters smoke discharging pipe through connecting tube to this smoke exhaust pipe, and the mobilization of flue gas will make leaf Wheel rotation, wheel rotation will will drive shaft and roller bearing rotates, in roller bearing rotation process, positioned at the sliding intracavitary slide bar in roller bearing lower part Roller bearing will be stretched out in the sliding chamber sliding of self gravitation effect lower edge, dedusting is filtered to flue gas, the dust in flue gas will be inhaled It is attached on slide bar.
With the rotation of roller bearing, the slide bar for adsorbing dust will turn to roller bearing top, within slide bar is still understood at this time certainly Body gravity slips into intracavitary, falls on roller bearing so that the dust accumulated outside slide bar be scraped.Due to smoke exhaust pipe The scraper plate to offset with roller bearing upper end is equipped with inside road, the dust fallen on roller bearing can be scraped by scraper plate to smoke discharging pipe Lower end.
Since the bottom of the smoke discharging pipe is provided with dust leg, it is equipped with horizontal axis in the dust leg, outside the horizontal axis Leaf is transmitted equipped with spiral, described horizontal axis one end is stretched out dust leg and is located at outside smoke discharging pipe, and the dust leg is stretched out far from horizontal axis External one end is detachably equipped with the gear door being connected to dust leg inside;The dust fallen in smoke discharging pipe interior lower end will be into Enter in dust leg, when flue gas stopping is passed through smoke discharging pipe, and is accumulated to certain dust in dust leg, opens gear door, and rotate Horizontal axis makes horizontal axis drive spiral transmission leaf rotation that the dust being accumulated in dust leg is discharged from gear door.
The beneficial effect of this base case is:
1, this flue gas smoke exhaust pipe and support of pipelines are not necessarily to site operation, easy for installation, can be quick installed at required position.
2, this support of pipelines can arbitrarily be adjusted according to desired height, the simple and quick convenience of regulative mode, and multiple flexible lists Member is supported, and can make this support of pipelines is very firm to be supported to smoke discharging pipe.
3, not only the fixation of fast and easy and other pipelines be connected to flue gas smoke exhaust pipe when in use, moreover it is possible to guarantee other pipelines with Smoke discharging pipe very firmly connects.
4, it is realized by connecting tube and quickly firmly connect other pipelines with smoke discharging pipe, and be not easy to fall after connecting.
5, roller bearing rotation is driven by impeller, part dust may filter that by roller bearing, and to the dust in smoke discharging pipe into Row collection processing, by dust leg, horizontal axis and spiral transmit leaf can will retain with smoke discharging pipe in dust collection and discharge, keep away Exempt from the use that dust accumulates excessive nutrition smoke discharging pipe.
Compared with prior art, this flue gas smoke exhaust pipe and support of pipelines facilitate installation, can adjust height as needed, and Dust can be collected using the mobilization of flue gas, be used convenient for the cleaning of dust and the long-time of smoke discharging pipe.
Further, the smoke discharging pipe interior lower end is equipped with row's magnetic stripe, and the slide bar is embedded with far from one end of roller bearing Magnetic powder, the slide bar are identical as sliding cavity length.The setting of magnetic stripe and magnetic powder, the more conducively slide bar of roller bearing lower part are from the intracavitary cunning of cunning Out, slide bar is identical as sliding cavity length, clears up convenient for scraper plate the dust of roller bearing upper surface.
Further, the outside of the mandril and connecting tube is towards the side of smoke discharging pipe in the angle less than 90 °, every row's plug Bar, every row's mandril are arranged along the axial direction of smoke discharging pipe, and multiple rows of mandril and multiple rows of stopper rod are uniformly distributed along the circumferential direction of connecting tube.Make Mandril is effectively supported and is pushed against to other inner wall of the pipes, thus further make other pipelines it is firm be connected to connecting tube On.
Further, the horizontal axis is located at one end outside smoke discharging pipe equipped with turntable, and the edge of the turntable is equipped with hand Handle.Turntable rotation can control not have by rotational handle, so that horizontal axis be made to rotate, this is arranged so that the rotation of horizontal axis is convenient for control.
Further, the telescopic unit is two, is connected between two telescopic units by more connecting rods.Two flexible It is enough is supported to smoke discharging pipe for unit, and connecting rod can make two telescopic units more firm.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of flue gas smoke exhaust pipe of the present invention and support of pipelines embodiment;
Fig. 2 is the side view of support of pipelines.
Specific embodiment
Below by specific embodiment, the present invention is described in further detail:
Appended drawing reference in Figure of description include: connecting tube 10, stopper rod 11, cavity 12, mandril 13, the first magnetic patch 14, Fixed plate 15, the second magnetic patch 16, smoke discharging pipe 20, supporting plate 21, shaft 22, impeller 23, roller bearing 24, sliding chamber 25, slide bar 26, scraper plate 27, magnetic stripe 28, dust leg 30, gear door 31, horizontal axis 32, spiral transmit leaf 33, turntable 34, handle 35, telescopic unit 40, first Bar 41, the second strut 42, cross bar 43, T-bar 44, T shape chamber 45, pull rod 46, tricing line 47, connecting rod 48.
As shown in Figure 1 and Figure 2, flue gas smoke exhaust pipe and support of pipelines, including smoke discharging pipe 20, the installation of 20 two sides of smoke discharging pipe Connecting tube 10, the outside of smoke discharging pipe 20 are fixed on support of pipelines;Connecting tube 10 be in truncated cone-shaped, 10 bigger diameter end of connecting tube with Smoke exhaust pipe is connected to, circumferentially distributed in connecting tube 10 to have multiple rows of axially disposed stopper rod 11, stopper rod 11 and 10 center of connecting tube Line is parallel.Cavity 12 is provided in the tube wall of connecting tube 10,11 one end of stopper rod is slidably and sealingly connected with cavity 12, connecting tube 10 The side that outside is located at stopper rod 11 is provided with the mandril 13 being slidably and sealingly connected with cavity 12, and mandril 13 is directed away from connecting tube 10 The position of center line.In the present embodiment, the outside of mandril 13 and connecting tube 10 is towards the side of smoke discharging pipe 20 in less than 90 ° Angle, every row's stopper rod 11, every row's mandril 13 are along the axial direction setting of smoke discharging pipe 20, and multiple rows of mandril 13 and multiple rows of stopper rod 11 are along even The circumferential direction of adapter tube 10 is uniformly distributed.Mandril 13 is provided with the first magnetic patch 14, smoke discharging pipe 20 and company far from one end of connecting tube 10 10 junction of adapter tube is hinged with fixed plate 15 corresponding with 13 position of mandril, is provided in fixed plate 15 and is attracted with the first magnetic patch 14 The second magnetic patch 16.
Supporting plate 21 is provided with inside smoke discharging pipe 20, the rotation of 21 upper end of supporting plate is provided with shaft 22, fixed company on shaft 22 It is connected to impeller 23 and roller bearing 24, multiple cunning chambers 25 perpendicular to shaft 22 are provided on roller bearing 24, are slidably connected in sliding chamber 25 Slide bar 26 is provided with the scraper plate 27 to offset with 24 upper end of roller bearing inside smoke discharging pipe 20.20 interior lower end of smoke discharging pipe is equipped with one Magnetic stripe 28 is arranged, slide bar 26 is embedded with magnetic powder far from one end of roller bearing 24, and slide bar 26 is identical as sliding 25 length of chamber.Smoke discharging pipe 20 Bottom is provided with dust leg 30, and horizontal axis 32 is provided in dust leg 30, spiral is provided with outside horizontal axis 32 and transmits leaf 33, horizontal axis 32 Left end is stretched out dust leg 30 and is located at outside smoke discharging pipe 20;The left end of horizontal axis 32 is provided with turntable 34, and the edge of turntable 34 is set Handle 35 is set.Dust leg 30 stretches out external one end far from horizontal axis 32 and is detachably provided with the gear being connected to inside dust leg 30 Door 31, lower end and the dust leg 30 that door 31 is kept off in the present embodiment are hinged, and the side wall of the upper end and dust leg 30 that keep off door 31 fastens connects It connects.
Support of pipelines includes multiple telescopic units 40 and tricing line 47, and telescopic unit 40 and tricing line 47 are equal in the present embodiment It is two, is connected between two telescopic units 40 by more connecting rods 48.Telescopic unit 40 includes that multiple head and the tail are successively hinged The first strut 41, multiple head and the tail successively hinged the second strut 42 and multiple T-bars 44, the first strut 41 and the second strut 42 Middle part is hinged, and the hinged place of two the first struts 41 and the hinged place of two the second struts 42, which are fixedly connected to, to be oppositely arranged Cross bar 43, T-bar 44 is interior to be provided with T shape chamber 45, and the sealing of cross bar 43 is slidably connected in T shape chamber 45, and the sealing of 45 lower end of T shape chamber is slided It is dynamic to be connected with pull rod 46, the tension spring fixed with pull rod 46 is provided in T shape chamber 45;The one end of pull rod 46 far from T-bar 44 is solid Surely it is connected in tricing line 47.
The place using smoke discharging pipe 20 and support of pipelines is being needed, can will adjusted smoke discharging pipe 20 using support of pipelines It to desired height, is connect using connecting tube 10 with other pipelines, to realize the collection and guidance to flue gas.Pass through support of pipelines When adjusting the height of smoke discharging pipe 20, the tricing line 47 on each telescopic unit 40 is pulled respectively, due to same telescopic unit 40 On pull rod 46 be connected in same tricing line 47, tricing line 47 pull, all pull rods 46 on same telescopic unit 40 can be made It moves down, thus the slide downward in T shape chamber 45 of pull rod 46.After pull rod 46 moves down, air transfer in T shape chamber 45 can make two The cross bar 43 being oppositely arranged is close to each other, to pull two 41 hinged places of the first strut and two 42 hinged place phases of the second strut It is mutually close;Again since the middle part of the first strut 41 and the second strut 42 is hinged, the hinged place of two the first struts 41 and two the The hinged place of two struts 42 is close to each other to be made to open between the first strut 41, between the second strut 42, makes telescopic unit 40 Elongation further enables the height of smoke discharging pipe 20 adjust, when support of pipelines to realize to support of pipelines height adjustment After position is adjusted, tricing line 47 can be fixed on to the bottom of telescopic unit 40.
After the position of support of pipelines determines, smoke discharging pipe 20 is connected to other pipelines using connecting tube 10, even By other pipelines to connecting tube 10 is turned when connecing, since connecting tube 10 is in truncated cone-shaped, and bigger diameter end is connected to smoke discharging pipe 20, other Pipeline is easier to be nested in the outside of connecting tube 10, and offsets with the outer wall of connecting tube 10.When other pipelines end with When the outer wall of connecting tube 10 offsets, it will the stopper rod 11 of 10 outer wall of connecting tube is pushed, stopper rod 11 will be moved into cavity 12, from And gas in cavity 12 is shifted, mandril 13 is released, the inner wall of other pipelines is resisted.Due to stopper rod 11 and mandril 13 at Row is arranged and is distributed in the axial direction of connecting tube 10, when the circle of end one of other pipelines being made to offset with connecting tube 10, the company of will push On adapter tube 10 one circle stopper rod 11, and make a circle mandril 13 stretching other inner wall of the pipes are resisted, thus make other pipelines with connect Pipe 10 is tentatively fixed.Fixed plate 15 will be rotated at this time, is bonded it with the outer wall of other pipelines, to make the first magnetic patch 14 and the Two magnetic patch 16 are attracted, and are fixedly connected with other pipelines with connecting tube 10.
In use, flue gas enters smoke discharging pipe 20 through connecting tube 10 to this smoke exhaust pipe, and the mobilization of flue gas will Rotate impeller 23, the rotation of impeller 23 will will drive shaft 22 and roller bearing 24 rotates, and in 24 rotation process of roller bearing, is located at roller bearing 24 Slide bar 26 in the sliding chamber 25 in lower part will be under self gravitation effect and magnetic stripe 28 is sliding to the sliding chamber 25 of the suction lower edge of magnetic powder It is dynamic to stretch out roller bearing 24, dedusting is filtered to flue gas, the dust in flue gas will be adsorbed on slide bar 26.
With the rotation of roller bearing 24, the slide bar 26 for adsorbing dust will turn to 24 top of roller bearing, and slide bar 26 is still at this time Self gravitation effect slips into sliding chamber 25 within meeting, falls to roller bearing 24 so that the dust accumulated outside slide bar 26 be scraped On.Due to being equipped with the scraper plate 27 to offset with 24 upper end of roller bearing inside smoke discharging pipe 20, the dust fallen on roller bearing 24 can be scraped Plate 27 is scraped to the lower end inside smoke discharging pipe 20.
Since the bottom of smoke discharging pipe 20 is provided with dust leg 30, it is equipped with horizontal axis 32 in dust leg 30, is set outside horizontal axis 32 There is spiral to transmit leaf 33,32 one end of horizontal axis is stretched out dust leg 30 and is located at outside smoke discharging pipe 20, and dust leg 30 is stretched far from horizontal axis 32 External one end is detachably equipped with the gear door 31 being connected to inside dust leg 30 out;Fall the powder in 20 interior lower end of smoke discharging pipe Dirt will enter in dust leg 30, when flue gas stopping is passed through smoke discharging pipe 20, and is accumulated to certain dust in dust leg 30, beat Gear door 31 is opened, and horizontal axis 32 is rotated by handle 35 and turntable 34, horizontal axis 32 is made to drive the spiral transmission rotation of leaf 33 that will be accumulated at Dust in dust leg 30 is discharged from gear door 31.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented Effect and patent practicability.

Claims (5)

1. flue gas smoke exhaust pipe and support of pipelines, which is characterized in that including smoke discharging pipe, smoke discharging pipe two sides are mounted with connecting tube, The outside of smoke discharging pipe is fixed on support of pipelines;The connecting tube is in truncated cone-shaped, and connecting tube bigger diameter end is connected to smoke exhaust pipe, even It is circumferentially distributed on adapter tube to have multiple rows of axially disposed stopper rod, stopper rod and connecting tube centerline parallel;In the tube wall of connecting tube Equipped with cavity, stopper rod one end is slidably and sealingly connected with cavity, and the side that the outside of connecting tube is located at stopper rod is equipped with to be slided with cavity The mandril of sealed connection, the mandril are directed away from the position of connection tube hub line;The mandril is set far from one end of connecting tube There is the first magnetic patch, the smoke discharging pipe and connecting tube junction are hinged with fixed plate corresponding with mandril position, the fixed plate It is equipped with the second magnetic patch being attracted with the first magnetic patch;
Supporting plate is equipped with inside the smoke discharging pipe, the supporting plate upper end rotation is equipped with shaft, is fixedly connected with leaf on the shaft Wheel and roller bearing, the roller bearing are equipped with multiple cunning chambers perpendicular to shaft, and cunning is intracavitary to slidably connect slide bar, the smoke discharging pipe Inside is equipped with the scraper plate to offset with roller bearing upper end;The bottom of the smoke discharging pipe is provided with dust leg, is equipped in the dust leg Horizontal axis, the horizontal axis outside are equipped with spiral and transmit leaf, and described horizontal axis one end is stretched out dust leg and is located at outside smoke discharging pipe, the collection Dirt pipe is detachably equipped with the gear door being connected to dust leg inside far from one end outside horizontal axis stretching;
The support of pipelines includes multiple telescopic units and tricing line, and the telescopic unit includes multiple head and the tail successively hinged One strut, multiple head and the tail successively hinged the second strut and multiple T-bars, it is hinged in the middle part of the first strut and the second strut, two The hinged place of first strut and the hinged place of two the second struts are fixedly connected to the cross bar being oppositely arranged, in the T-bar Equipped with T shape chamber, it is intracavitary that cross bar sealing is slidably connected to T shape, and the sealing of the shape chamber lower end T slidably connects pull rod, T shape is intracavitary be equipped with The fixed tension spring of pull rod;Pull rod is fixedly connected in tricing line far from one end of T-bar, the quantity and telescopic unit of tricing line Quantity it is identical.
2. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the smoke discharging pipe interior lower end is set There is row's magnetic stripe, the slide bar is embedded with magnetic powder far from one end of roller bearing, and the slide bar is identical as sliding cavity length.
3. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the outside of the mandril and connecting tube Towards the side of smoke discharging pipe in the angle less than 90 °, every row's stopper rod, every row's mandril are arranged along the axial direction of smoke discharging pipe, more Row's mandril and multiple rows of stopper rod are uniformly distributed along the circumferential direction of connecting tube.
4. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the horizontal axis is located at outside smoke discharging pipe The one end in portion is equipped with turntable, and the edge of the turntable is equipped with handle.
5. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the telescopic unit be two, two It is connected between a telescopic unit by more connecting rods.
CN201810556772.1A 2018-05-31 2018-05-31 Flue gas smoke exhaust pipe and support of pipelines Active CN108412156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810556772.1A CN108412156B (en) 2018-05-31 2018-05-31 Flue gas smoke exhaust pipe and support of pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810556772.1A CN108412156B (en) 2018-05-31 2018-05-31 Flue gas smoke exhaust pipe and support of pipelines

Publications (2)

Publication Number Publication Date
CN108412156A CN108412156A (en) 2018-08-17
CN108412156B true CN108412156B (en) 2019-07-16

Family

ID=63141237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810556772.1A Active CN108412156B (en) 2018-05-31 2018-05-31 Flue gas smoke exhaust pipe and support of pipelines

Country Status (1)

Country Link
CN (1) CN108412156B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110203710B (en) * 2019-07-16 2024-07-02 马鞍山钢铁股份有限公司 Automatic telescopic dust removal device for stacking of stacker and operation method of automatic telescopic dust removal device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2934287B1 (en) * 2008-07-23 2016-05-13 Poujoulat CLADDING DEVICE FOR THE LOWER END OF A SMOKE EXHAUST DUCT EXCEEDING A CEILING OR FALSE CEILING
CN103322305A (en) * 2012-03-22 2013-09-25 遵义市贵科科技有限公司 High temperature smoke gas exhausting pipe and pipe support
CN107023870A (en) * 2017-06-13 2017-08-08 湖州万隆住宅环保科技有限公司 A kind of smoke exhaust ventilator smoke exhaust pipe
CN107174875A (en) * 2017-06-30 2017-09-19 哈工大机器人集团(哈尔滨)华粹智能装备有限公司 A kind of automatic dust removing apparatus of intelligent engraving system
CN107890739A (en) * 2017-11-14 2018-04-10 遵义市贵科科技有限公司 A kind of fume dust remover

Also Published As

Publication number Publication date
CN108412156A (en) 2018-08-17

Similar Documents

Publication Publication Date Title
CN207076592U (en) A kind of metal tube spray-painting plant
CN205244735U (en) Spiral pipeline cleaning robot
CN109253342A (en) A kind of pipe walking robot
CN106794491B (en) Flexibility cleaning rifle locator guides equipment
CN103316872B (en) Round pipeline cleaning robot
CN106391533B (en) A kind of electric pole automatic cleaning equipment
CN108412156B (en) Flue gas smoke exhaust pipe and support of pipelines
CN108266141A (en) Mining-drilling machine and its dust hood and dust-extraction unit
CN109833023A (en) A kind of pendent lamp device for cleaning dust
CN104249059B (en) Cleaning sieve
CN107152585A (en) A kind of screw type pipeline inwall running gear
CN106861297A (en) Suspension type cleaner
CN110566748A (en) Anti-blocking device for elbow of dust removal pipe
CN110142267A (en) Sweeping robot in a kind of pipe
CN211977160U (en) Ventilation device for high-rise building
CN117268090A (en) Coulter dryer with tail gas treatment structure
CN209388813U (en) A kind of electric precipitation transformer flashing device
CN209020910U (en) A kind of workshop dust pelletizing system
CN215742385U (en) Air inducing device for bag filter
CN104492185A (en) Air inlet amount adjusting and controlling device of dust remover
CN206463664U (en) Atomic absorption cover
CN108514775A (en) A kind of cloth bag fast disassembly type dedusting environment friendly equipment
CN105059943B (en) Mortar conveying pipe
CN107598119A (en) A kind of aluminum alloy press casting machine fume extractor
CN209349195U (en) A kind of improved high-voltage motor collecting ring ash handling equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant