CN108412156A - Flue gas smoke exhaust pipe and support of pipelines - Google Patents
Flue gas smoke exhaust pipe and support of pipelines Download PDFInfo
- Publication number
- CN108412156A CN108412156A CN201810556772.1A CN201810556772A CN108412156A CN 108412156 A CN108412156 A CN 108412156A CN 201810556772 A CN201810556772 A CN 201810556772A CN 108412156 A CN108412156 A CN 108412156A
- Authority
- CN
- China
- Prior art keywords
- connecting tube
- discharging pipe
- smoke discharging
- pipelines
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/02—Vertical ducts; Channels, e.g. for drainage for carrying away waste gases, e.g. flue gases; Building elements specially designed therefor, e.g. shaped bricks or sets thereof
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/16—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe
- F16L3/20—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with special provision allowing movement of the pipe allowing movement in transverse direction
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ventilation (AREA)
Abstract
The present patent application belongs to flue gas ash removal technical field, specifically discloses a kind of flue gas smoke exhaust pipe and support of pipelines, including smoke discharging pipe, smoke discharging pipe both sides are mounted with connecting tube, and the external stability of smoke discharging pipe is on support of pipelines;Connecting tube is in truncated cone-shaped, and connecting tube bigger diameter end is connected to smoke exhaust pipe, circumferentially distributed in connecting tube to have multiple rows of axially disposed stopper rod, stopper rod and connecting tube centerline parallel;Cavity is equipped in the tube wall of connecting tube, stopper rod one end is slidably and sealingly connected with cavity, and the outside of connecting tube is equipped with the mandril being slidably and sealingly connected with cavity;The one end of mandril far from connecting tube is equipped with the first magnetic patch, and smoke discharging pipe and connecting tube junction are hinged with fixed plate corresponding with mandril position, and fixed plate is equipped with the second magnetic patch.Compared with prior art, this flue gas smoke exhaust pipe and support of pipelines facilitate installation, can adjust height as needed, and the mobilization of flue gas can be utilized to be collected dust, be used convenient for the cleaning of dust and the long-time of smoke discharging pipe.
Description
Technical field
The invention belongs to flue gas ash removal technical field, a kind of flue gas smoke exhaust pipe and support of pipelines are specifically disclosed.
Background technology
At present in numerous industries such as metallurgy, building materials, electric power, chemical industry, the largely flue gas containing dust can be all generated, in order to
It protects the environment from pollution, such flue gas cannot be directly discharged in environment, need to be collected, and passed through unified dedusting, taken off
The processing such as sulphur are discharged again.In order to be collected and be uniformly processed to flue gas, smoke discharging pipe is essential.
Country's flue gas smoke discharging pipe mostly uses steel plate scene pipe crimping and is welded at present, for the ease of welding, in smoke exhaust pipe
Do not make preservative treatment, priming paint, aluminium paint or pitch flue paint etc. are painted with outside smoke discharging pipe;Such smoke exhaust pipe can only play collection
With the flow direction of guiding flue gas, can not be cooled down to flue gas, the processing such as dedusting, be susceptible to after prolonged use damage,
Block etc..Meanwhile in order to which smoke exhaust pipe is preferably connected to other pipelines, the end of smoke discharging pipe is usually provided with compensation of pipeline
Device, pipeline compensator mechanism complexity is more heavy, is unfavorable for installing.In addition, in order to make smoke exhaust pipe adapt to desired height, discharging fume
Usually pipe laying holder, current support of pipelines high unity is also needed to be not easy to adjust on pipe.This smoke exhaust pipe and pipeline branch
Frame structure has that long construction period, quality are not easy to ensure, install inconvenient, high cost.
Invention content
The purpose of the present invention is in a kind of flue gas smoke exhaust pipe of offer and support of pipelines, to solve existing smoke exhaust pipe and pipeline branch
The inconvenient problem of frame long construction period, installation.
In order to achieve the above object, base case of the invention is:Flue gas smoke exhaust pipe and support of pipelines, including smoke exhaust pipe
Road, smoke discharging pipe both sides are mounted with connecting tube, and the external stability of smoke discharging pipe is on support of pipelines;The connecting tube is in round platform
Shape, connecting tube bigger diameter end are connected to smoke exhaust pipe, circumferentially distributed in connecting tube to have multiple rows of axially disposed stopper rod, stopper rod and company
Take over centerline parallel;Cavity is equipped in the tube wall of connecting tube, stopper rod one end is slidably and sealingly connected with cavity, the outside of connecting tube
The mandril being slidably and sealingly connected with cavity is equipped with positioned at the side of stopper rod, the mandril is directed away from the position of connection tube hub line
It sets;The one end of the mandril far from connecting tube is equipped with the first magnetic patch, and the smoke discharging pipe is hinged with and pushes up with connecting tube junction
The corresponding fixed plate in bar position, the fixed plate are equipped with the second magnetic patch being attracted with the first magnetic patch;
The smoke discharging pipe is internally provided with support plate, and the support plate upper end rotation is equipped with shaft, is fixedly connected on the shaft
There are impeller and roller bearing, the roller bearing to be equipped with multiple cunning chambers perpendicular to shaft, sliding intracavitary slidably connects slide bar, the smoke evacuation
Pipeline is internally provided with the scraper plate to offset with roller bearing upper end;The bottom of the smoke discharging pipe is provided with dust leg, in the dust leg
It is equipped with spiral equipped with horizontal axis, outside the horizontal axis and transmits leaf, described horizontal axis one end is stretched out dust leg and is located at outside smoke discharging pipe, institute
State the gear door that dust leg is detachably equipped with far from one end outside horizontal axis stretching and dust leg inside is connected to;
The support of pipelines includes multiple telescopic units and tricing line, and the telescopic unit includes that multiple head and the tail are hinged successively
The first strut, multiple head and the tail the second hinged strut and multiple T-bars successively, it is hinged in the middle part of the first strut and the second strut,
The hinged place of two the first struts and the hinged place for connecting second strut are fixedly connected with the cross bar being oppositely arranged, the T shapes
T shape chambers are equipped in bar, cross bar sealing is slidably connected to T shape intracavitary, and the sealing of T shape chambers lower end slidably connects pull rod, and T shape intracavitary is set
Have and the fixed tension spring of pull rod;The one end of pull rod far from T-bar is fixedly connected in tricing line, the quantity of tricing line with it is flexible
The quantity of unit is identical.
The operation principle of this base case is:The place using smoke discharging pipe and support of pipelines is being needed, can will utilized
Smoke discharging pipe is adjusted to desired height by support of pipelines, is connect with other pipelines using connecting tube, to realize the receipts to flue gas
Collection and guiding.When adjusting the height of smoke discharging pipe by support of pipelines, the tricing line on each telescopic unit is pulled respectively, due to
Pull rod on same telescopic unit is connected in same tricing line, and tricing line pulls, and can make all drawings on same telescopic unit
Bar moves down, to pull rod slide downward in T shape chambers.After pull rod moves down, the air transfer of T shape intracavitary can make two to set relatively
The cross bar set is close to each other, to pull the first strut hinged place and the second strut hinged place close to each other;Again due to first
The middle part of bar and the second strut is hinged, and the hinged place of the hinged place of two the first struts and even the second strut is close to each other to be made
It is opened between first strut, between the second strut, telescopic unit is made to extend, support of pipelines height is adjusted to realize, into
One step enables the height of smoke discharging pipe to adjust, and after the position of support of pipelines is adjusted, can be fixed on tricing line flexible
The bottom of unit.
After the location determination of support of pipelines, smoke discharging pipe is connected to other pipelines using connecting tube, when connection
By other pipelines to turning connecting tube, since connecting tube is in truncated cone-shaped, and bigger diameter end is connected to smoke discharging pipe, other pipelines compare appearance
It can easily be nested in the outside of connecting tube, and offset with the outer wall of connecting tube.When the outer wall phase of the end of other pipelines and connecting tube
To when, it will push the stopper rod of connection pipe outer wall, stopper rod will move into cavity, to make gas in cavity shift, will push up
Bar is released, and is resisted to the inner wall of other pipelines.Since stopper rod and mandril are set in a row and are distributed in the axial direction of connecting tube, make
When the circle of end one of other pipelines offsets with connecting tube, a circle stopper rod in connecting tube can be pushed, and a circle mandril is made to stretch out to it
He resists inner wall of the pipe, to keep other pipelines tentatively fixed with connecting tube.Fixed plate will be rotated at this time, make itself and other pipelines
Outer wall fitting so that other pipelines is fixedly connected with connecting tube to make the actuation of the first magnetic patch and the second magnetic patch.
In use, flue gas enters smoke discharging pipe to this smoke exhaust pipe through connecting tube, and the mobilization of flue gas will make leaf
Wheel rotation, wheel rotation will drive shaft and roller bearing to rotate, and in roller bearing rotation process, be located at the slide bar that intracavitary is slided in roller bearing lower part
Chamber sliding will be slided in self gravitation effect lower edge and stretch out roller bearing, dedusting is filtered to flue gas, the dust in flue gas will be inhaled
It is attached on slide bar.
With the rotation of roller bearing, roller bearing top will be turned to by adsorbing the slide bar of dust, within slide bar is still understood at this time certainly
Body gravity slips into sliding intracavitary, is fallen on roller bearing to scrape the dust accumulated outside slide bar.Due to smoke exhaust pipe
Road is internally provided with the scraper plate to offset with roller bearing upper end, and the dust fallen on roller bearing can be scraped by scraper plate to smoke discharging pipe
Lower end.
Since the bottom of the smoke discharging pipe is provided with dust leg, it is equipped with horizontal axis in the dust leg, outside the horizontal axis
Leaf is transmitted equipped with spiral, described horizontal axis one end is stretched out dust leg and is located at outside smoke discharging pipe, and the dust leg is stretched out far from horizontal axis
External one end is detachably equipped with the gear door being connected to dust leg inside;The dust fallen in smoke discharging pipe interior lower end will be into
Enter in dust leg, when flue gas stopping is passed through smoke discharging pipe, and is accumulated to certain dust in dust leg, opens gear door, and rotate
Horizontal axis makes horizontal axis drive spiral transmission leaf rotation that the dust being accumulated in dust leg is discharged from gear door.
The advantageous effect of this base case is:
1, this flue gas smoke exhaust pipe and support of pipelines are not necessarily to site operation, easy for installation, can be quick installed at required position.
2, this support of pipelines can arbitrarily be adjusted according to desired height, the simple and quick convenience of regulative mode, and multiple flexible lists
Member is supported, and can make this support of pipelines is very firm to be supported to smoke discharging pipe.
3, not only the fixation of fast and easy and other pipelines be connected to flue gas smoke exhaust pipe when in use, moreover it is possible to ensure other pipelines with
Smoke discharging pipe very firmly connects.
4, it is realized by connecting tube and quickly firmly connect other pipelines with smoke discharging pipe, and be not easy to fall after connecting.
5, roller bearing rotation is driven by impeller, part dust may filter that by roller bearing, and to the dust in smoke discharging pipe into
Row collection handle, by dust leg, horizontal axis and spiral transmit leaf can will retain with smoke discharging pipe in dust collection and discharge, keep away
Exempt from the use that dust accumulates excessive nutrition smoke discharging pipe.
Compared with prior art, this flue gas smoke exhaust pipe and support of pipelines facilitate installation, can adjust height as needed, and
The mobilization of flue gas can be utilized to be collected dust, be used convenient for the cleaning of dust and the long-time of smoke discharging pipe.
Further, the smoke discharging pipe interior lower end is equipped with row's magnetic stripe, and the one end of the slide bar far from roller bearing is embedded with
Magnetic powder, the slide bar are identical as sliding cavity length.The setting of magnetic stripe and magnetic powder, the more conducively slide bar of roller bearing lower part are slided from sliding intracavitary
Go out, slide bar is identical as sliding cavity length, is cleared up the dust of roller bearing upper surface convenient for scraper plate.
Further, the outside of the mandril and connecting tube is in the angle for being less than 90 ° towards the side of smoke discharging pipe, and often row fills in
Bar, often row's mandril is arranged along the axial direction of smoke discharging pipe, and multiple rows of mandril and multiple rows of stopper rod are uniformly distributed along the circumferential direction of connecting tube.Make
Mandril to other inner wall of the pipes effectively support and push against, to further make other pipelines it is firm be connected to connecting tube
On.
Further, the horizontal axis be located at and smoke discharging pipe outside one end be equipped with turntable, the edge of the turntable is equipped with
Handle.Turntable rotation can control not have by rotational handle, to make horizontal axis rotate, this is arranged so that the rotation of horizontal axis is convenient for control
System.
Further, the telescopic unit is two, is connected by more connecting rods between two telescopic units.Two flexible
It is enough is supported to smoke discharging pipe for unit, and connecting rod can make two telescopic units more firm.
Description of the drawings
Fig. 1 is flue gas smoke exhaust pipe of the present invention and the structural schematic diagram of support of pipelines embodiment;
Fig. 2 is the side view of support of pipelines.
Specific implementation mode
Below by specific implementation mode, the present invention is described in further detail:
Reference numeral in Figure of description includes:Connecting tube 10, stopper rod 11, cavity 12, mandril 13, the first magnetic patch 14,
Fixed plate 15, the second magnetic patch 16, smoke discharging pipe 20, support plate 21, shaft 22, impeller 23, roller bearing 24, sliding chamber 25, slide bar 26, scraper plate
27, magnetic stripe 28, dust leg 30, gear door 31, horizontal axis 32, spiral transmission leaf 33, turntable 34, handle 35, telescopic unit 40, first
Bar 41, the second strut 42, cross bar 43, T-bar 44, T shapes chamber 45, pull rod 46, tricing line 47, connecting rod 48.
As shown in Figure 1 and Figure 2, flue gas smoke exhaust pipe and support of pipelines, including smoke discharging pipe 20, the installation of 20 both sides of smoke discharging pipe
Connecting tube 10, the external stability of smoke discharging pipe 20 is on support of pipelines;Connecting tube 10 be in truncated cone-shaped, 10 bigger diameter end of connecting tube with
Smoke exhaust pipe is connected to, circumferentially distributed in connecting tube 10 to have multiple rows of axially disposed stopper rod 11, stopper rod 11 and 10 center of connecting tube
Line is parallel.Cavity 12 is provided in the tube wall of connecting tube 10,11 one end of stopper rod is slidably and sealingly connected with cavity 12, connecting tube 10
The side that outside is located at stopper rod 11 is provided with the mandril 13 being slidably and sealingly connected with cavity 12, and mandril 13 is directed away from connecting tube 10
The position of center line.In the present embodiment, the outside of mandril 13 and connecting tube 10 towards the side of smoke discharging pipe 20 be in less than 90 °
Angle often arranges stopper rod 11, often arranges mandril 13 along the axial direction setting of smoke discharging pipe 20, and multiple rows of mandril 13 and multiple rows of stopper rod 11 are along even
The circumferential direction of take over 10 is uniformly distributed.The one end of mandril 13 far from connecting tube 10 is provided with the first magnetic patch 14, smoke discharging pipe 20 and company
10 junction of take over is hinged with fixed plate 15 corresponding with 13 position of mandril, is provided in fixed plate 15 and is attracted with the first magnetic patch 14
The second magnetic patch 16.
20 inside of smoke discharging pipe is provided with support plate 21, and 21 upper end of support plate, which rotates, is provided with shaft 22, fixed on shaft 22 to connect
It is connected to impeller 23 and roller bearing 24, multiple cunning chambers 25 perpendicular to shaft 22 are provided on roller bearing 24, are slidably connected in sliding chamber 25
Slide bar 26,20 inside of smoke discharging pipe are provided with the scraper plate 27 to offset with 24 upper end of roller bearing.20 interior lower end of smoke discharging pipe is equipped with one
Magnetic stripe 28 is arranged, the one end of slide bar 26 far from roller bearing 24 is embedded with magnetic powder, and slide bar 26 is identical as sliding 25 length of chamber.Smoke discharging pipe 20
Bottom is provided with dust leg 30, and horizontal axis 32 is provided in dust leg 30, and 32 outside of horizontal axis is provided with spiral and transmits leaf 33, horizontal axis 32
Left end stretches out dust leg 30 and is located at outside smoke discharging pipe 20;The left end of horizontal axis 32 is provided with turntable 34, and the edge of turntable 34 is set
Handle 35 is set.Dust leg 30 stretches out external one end far from horizontal axis 32 and is detachably provided with the gear being connected to 30 inside of dust leg
Door 31, the lower end of gear door 31 is hinged with dust leg 30 in the present embodiment, and the side wall of the upper end for keeping off door 31 and dust leg 30, which fastens, to be connected
It connects.
Support of pipelines includes multiple telescopic units 40 and tricing line 47, and telescopic unit 40 and tricing line 47 are equal in the present embodiment
It is two, is connected by more connecting rods 48 between two telescopic units 40.Telescopic unit 40 includes that multiple head and the tail are hinged successively
The first strut 41, multiple head and the tail hinged the second strut 42 and multiple T-bars 44 successively, the first strut 41 and the second strut 42
Middle part is hinged, and the hinged place of two the first struts 41 and the even hinged place of the second strut 42, which are fixedly connected with, to be oppositely arranged
Cross bar 43, T-bar 44 is interior to be provided with T shapes chamber 45, and the sealing of cross bar 43 is slidably connected in T shapes chamber 45, and the sealing of 45 lower end of T shapes chamber is slided
It is dynamic to be connected with pull rod 46, it is provided with and 46 fixed tension spring of pull rod in T shapes chamber 45;The one end of pull rod 46 far from T-bar 44 is solid
Surely it is connected in tricing line 47.
The place using smoke discharging pipe 20 and support of pipelines is being needed, can will adjusted smoke discharging pipe 20 using support of pipelines
It to desired height, is connect with other pipelines using connecting tube 10, to realize collection and guiding to flue gas.Pass through support of pipelines
When adjusting the height of smoke discharging pipe 20, the tricing line 47 on each telescopic unit 40 is pulled respectively, due to same telescopic unit 40
On pull rod 46 be connected in same tricing line 47, tricing line 47 pull, all pull rods 46 on same telescopic unit 40 can be made
It moves down, to the slide downward in T shapes chamber 45 of pull rod 46.After pull rod 46 moves down, the air transfer in T shapes chamber 45 can make two
The cross bar 43 being oppositely arranged is close to each other, to pull two 41 hinged places of the first strut and even 42 hinged place phase of the second strut
It is mutually close;Again since the middle part of the first strut 41 and the second strut 42 is hinged, the hinged place of two the first struts 41 and Lian Ge
The hinged place of two struts 42 is close to each other to be made to open between the first strut 41, between the second strut 42, makes telescopic unit 40
Elongation adjusts support of pipelines height to realize, so that the height of smoke discharging pipe 20 is adjusted, when support of pipelines
After position is adjusted, tricing line 47 can be fixed on to the bottom of telescopic unit 40.
After the location determination of support of pipelines, smoke discharging pipe 20 is connected to other pipelines using connecting tube 10, even
By other pipelines to turning connecting tube 10 when connecing, since connecting tube 10 is in truncated cone-shaped, and bigger diameter end is connected to smoke discharging pipe 20, other
Pipeline is easier to be nested in the outside of connecting tube 10, and offsets with the outer wall of connecting tube 10.When the end of other pipelines with
When the outer wall of connecting tube 10 offsets, it will push the stopper rod 11 of 10 outer wall of connecting tube, stopper rod 11 that will be moved into cavity 12, from
And gas in cavity 12 is made to shift, mandril 13 is released, the inner wall of other pipelines is resisted.Due to stopper rod 11 and mandril 13 at
Row is arranged and is distributed in the axial direction of connecting tube 10, can the company of promotion when the circle of end one of other pipelines being made to offset with connecting tube 10
A circle stopper rod 11 on take over 10, and a circle mandril 13 stretching is made to resist other inner wall of the pipes, to make other pipelines and connect
Pipe 10 is tentatively fixed.Fixed plate 15 will be rotated at this time, it is made to be bonded with the outer wall of other pipelines, to make the first magnetic patch 14 and the
Two magnetic patch 16 are attracted, other pipelines is further made to be fixedly connected with connecting tube 10.
In use, flue gas enters smoke discharging pipe 20 to this smoke exhaust pipe through connecting tube 10, and the mobilization of flue gas will
Impeller 23 is set to rotate, the rotation of impeller 23 will drive shaft 22 and roller bearing 24 to rotate, and in 24 rotation process of roller bearing, be located at roller bearing 24
It slides the slide bar 26 in chamber 25 and chamber 25 will be slided to the suction lower edge of magnetic powder and slided with magnetic stripe 28 under self gravitation effect in lower part
It is dynamic to stretch out roller bearing 24, dedusting is filtered to flue gas, the dust in flue gas will be adsorbed on slide bar 26.
With the rotation of roller bearing 24,24 top of roller bearing will be turned to by adsorbing the slide bar 26 of dust, and slide bar 26 is still at this time
Self gravitation effect slips into sliding chamber 25 within meeting, and roller bearing 24 is fallen to which the dust for accumulating 26 outside of slide bar scrapes
On.Since smoke discharging pipe 20 is internally provided with the scraper plate 27 to offset with 24 upper end of roller bearing, the dust fallen on roller bearing 24 can be scraped
Plate 27 is scraped to the lower end inside smoke discharging pipe 20.
Since the bottom of smoke discharging pipe 20 is provided with dust leg 30, it is equipped with horizontal axis 32 in dust leg 30, is set outside horizontal axis 32
There is spiral to transmit leaf 33,32 one end of horizontal axis is stretched out dust leg 30 and is located at outside smoke discharging pipe 20, and dust leg 30 is stretched far from horizontal axis 32
Go out external one end and is detachably equipped with the gear door 31 being connected to 30 inside of dust leg;Fall the powder in 20 interior lower end of smoke discharging pipe
Dirt will enter in dust leg 30, when flue gas stopping is passed through smoke discharging pipe 20, and is accumulated to certain dust in dust leg 30, beat
Gear door 31 is opened, and horizontal axis 32 is rotated by handle 35 and turntable 34, horizontal axis 32 is made to drive the spiral transmission rotation of leaf 33 that will be accumulated at
Dust in dust leg 30 is discharged from gear door 31.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme
Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art
Several modifications and improvements are made, these should also be considered as protection scope of the present invention, these all do not interfere with what the present invention was implemented
Effect and patent practicability.
Claims (5)
1. flue gas smoke exhaust pipe and support of pipelines, which is characterized in that including smoke discharging pipe, smoke discharging pipe both sides are mounted with connecting tube,
The external stability of smoke discharging pipe is on support of pipelines;The connecting tube is in truncated cone-shaped, and connecting tube bigger diameter end is connected to smoke exhaust pipe, even
Take over it is circumferentially distributed have multiple rows of axially disposed stopper rod, stopper rod and connecting tube centerline parallel;In the tube wall of connecting tube
Equipped with cavity, stopper rod one end is slidably and sealingly connected with cavity, and the side that the outside of connecting tube is located at stopper rod is equipped with and cavity slides
The mandril of sealed connection, the mandril are directed away from the position of connection tube hub line;The one end of the mandril far from connecting tube is set
There are the first magnetic patch, the smoke discharging pipe and connecting tube junction to be hinged with fixed plate corresponding with mandril position, the fixed plate
It is equipped with the second magnetic patch being attracted with the first magnetic patch;
The smoke discharging pipe is internally provided with support plate, and the support plate upper end rotation is equipped with shaft, leaf is fixedly connected on the shaft
Wheel and roller bearing, the roller bearing are equipped with multiple cunning chambers perpendicular to shaft, and sliding intracavitary slidably connects slide bar, the smoke discharging pipe
It is internally provided with the scraper plate to offset with roller bearing upper end;The bottom of the smoke discharging pipe is provided with dust leg, is equipped in the dust leg
Horizontal axis, the horizontal axis outside are equipped with spiral and transmit leaf, and described horizontal axis one end is stretched out dust leg and is located at outside smoke discharging pipe, the collection
The gear door that dirt pipe is detachably equipped with far from one end outside horizontal axis stretching and dust leg inside is connected to;
The support of pipelines includes multiple telescopic units and tricing line, and the telescopic unit includes multiple head and the tail successively hinged
The second hinged strut and multiple T-bars, the first strut and the second strut middle part are hinged successively for one strut, multiple head and the tail, two
The hinged place of first strut and the even hinged place of the second strut are fixedly connected with the cross bar being oppositely arranged, in the T-bar
Equipped with T shape chambers, cross bar sealing is slidably connected to T shape intracavitary, and the sealing of T shape chambers lower end slidably connects pull rod, T shape intracavitary be equipped with
The fixed tension spring of pull rod;The one end of pull rod far from T-bar is fixedly connected in tricing line, the quantity and telescopic unit of tricing line
Quantity it is identical.
2. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the smoke discharging pipe interior lower end is set
There are row's magnetic stripe, the one end of the slide bar far from roller bearing to be embedded with magnetic powder, the slide bar is identical as sliding cavity length.
3. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the outside of the mandril and connecting tube
It is in often to arrange that stopper rod, often row's mandril is arranged along the axial direction of smoke discharging pipe less than 90 ° of angle towards the side of smoke discharging pipe, it is more
Row's mandril and multiple rows of stopper rod are uniformly distributed along the circumferential direction of connecting tube.
4. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the horizontal axis is located at and smoke discharging pipe
External one end is equipped with turntable, and the edge of the turntable is equipped with handle.
5. flue gas smoke exhaust pipe as described in claim 1 and support of pipelines, which is characterized in that the telescopic unit be two, two
It is connected by more connecting rods between a telescopic unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810556772.1A CN108412156B (en) | 2018-05-31 | 2018-05-31 | Flue gas smoke exhaust pipe and support of pipelines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810556772.1A CN108412156B (en) | 2018-05-31 | 2018-05-31 | Flue gas smoke exhaust pipe and support of pipelines |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108412156A true CN108412156A (en) | 2018-08-17 |
CN108412156B CN108412156B (en) | 2019-07-16 |
Family
ID=63141237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810556772.1A Active CN108412156B (en) | 2018-05-31 | 2018-05-31 | Flue gas smoke exhaust pipe and support of pipelines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108412156B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110203710A (en) * | 2019-07-16 | 2019-09-06 | 马鞍山钢铁股份有限公司 | A kind of stacker windrow automatic telescopic dust-extraction unit and its operating method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2148118A1 (en) * | 2008-07-23 | 2010-01-27 | Poujoulat | Covering device for flue end section sticking out of a ceiling |
CN103322305A (en) * | 2012-03-22 | 2013-09-25 | 遵义市贵科科技有限公司 | High temperature smoke gas exhausting pipe and pipe support |
CN107023870A (en) * | 2017-06-13 | 2017-08-08 | 湖州万隆住宅环保科技有限公司 | A kind of smoke exhaust ventilator smoke exhaust pipe |
CN107174875A (en) * | 2017-06-30 | 2017-09-19 | 哈工大机器人集团(哈尔滨)华粹智能装备有限公司 | A kind of automatic dust removing apparatus of intelligent engraving system |
CN107890739A (en) * | 2017-11-14 | 2018-04-10 | 遵义市贵科科技有限公司 | A kind of fume dust remover |
-
2018
- 2018-05-31 CN CN201810556772.1A patent/CN108412156B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2148118A1 (en) * | 2008-07-23 | 2010-01-27 | Poujoulat | Covering device for flue end section sticking out of a ceiling |
CN103322305A (en) * | 2012-03-22 | 2013-09-25 | 遵义市贵科科技有限公司 | High temperature smoke gas exhausting pipe and pipe support |
CN107023870A (en) * | 2017-06-13 | 2017-08-08 | 湖州万隆住宅环保科技有限公司 | A kind of smoke exhaust ventilator smoke exhaust pipe |
CN107174875A (en) * | 2017-06-30 | 2017-09-19 | 哈工大机器人集团(哈尔滨)华粹智能装备有限公司 | A kind of automatic dust removing apparatus of intelligent engraving system |
CN107890739A (en) * | 2017-11-14 | 2018-04-10 | 遵义市贵科科技有限公司 | A kind of fume dust remover |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110203710A (en) * | 2019-07-16 | 2019-09-06 | 马鞍山钢铁股份有限公司 | A kind of stacker windrow automatic telescopic dust-extraction unit and its operating method |
Also Published As
Publication number | Publication date |
---|---|
CN108412156B (en) | 2019-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104249059B (en) | Cleaning sieve | |
CN209163853U (en) | A kind of underground coal mine ventilation device | |
CN108266141A (en) | Mining-drilling machine and its dust hood and dust-extraction unit | |
KR20100094918A (en) | Coating-layer removal device for regenerating superannuated pipes | |
CN108412156B (en) | Flue gas smoke exhaust pipe and support of pipelines | |
CN109833023A (en) | A kind of pendent lamp device for cleaning dust | |
CN103499217B (en) | Dust removing system of intermediate frequency furnace | |
CN108905019A (en) | Dust subsequent explosion back draught switchs explosion suppression device | |
CN108671640B (en) | Cyclone mechanical cooling equipment | |
CN110566748A (en) | Anti-blocking device for elbow of dust removal pipe | |
CN207729810U (en) | A kind of ventilating duct for air-conditioner filter plate quick-disassembly structure | |
CN104613485B (en) | A kind of ash handling equipment of fluidization boiler back end ductwork | |
CN110142267A (en) | Sweeping robot in a kind of pipe | |
CN210623913U (en) | Anti-blocking device for elbow of dust removal pipe | |
CN208230493U (en) | A kind of integrated dust hood of smelting furnace with automatic clearing function | |
CN206924587U (en) | A kind of grease proofing easy-to-clean ash filter bag of water repellent | |
CN206676120U (en) | A kind of vertical circular dry method flue gas administers sack cleaner | |
CN105059943B (en) | Mortar conveying pipe | |
CN206631340U (en) | A kind of suspension type cleaner | |
CN209020910U (en) | A kind of workshop dust pelletizing system | |
CN211562352U (en) | Blast furnace gas gravity dust removal system | |
CN212497100U (en) | Rust removal and corrosion prevention device for inner surface of pipe for oil exploitation | |
CN209349195U (en) | A kind of improved high-voltage motor collecting ring ash handling equipment | |
CN211287786U (en) | Tunnel ventilation pipe strutting arrangement | |
CN219120746U (en) | Supporting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |