CN108406347A - A kind of novel power construction engineering project management device - Google Patents

A kind of novel power construction engineering project management device Download PDF

Info

Publication number
CN108406347A
CN108406347A CN201810237952.3A CN201810237952A CN108406347A CN 108406347 A CN108406347 A CN 108406347A CN 201810237952 A CN201810237952 A CN 201810237952A CN 108406347 A CN108406347 A CN 108406347A
Authority
CN
China
Prior art keywords
vestibule
stretching
face
main frame
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810237952.3A
Other languages
Chinese (zh)
Inventor
吴美俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810237952.3A priority Critical patent/CN108406347A/en
Publication of CN108406347A publication Critical patent/CN108406347A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q11/00Accessories fitted to machine tools for keeping tools or parts of the machine in good working condition or for cooling work; Safety devices specially combined with or arranged in, or specially adapted for use in connection with, machine tools
    • B23Q11/0042Devices for removing chips
    • B23Q11/0046Devices for removing chips by sucking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q5/00Driving or feeding mechanisms; Control arrangements therefor
    • B23Q5/02Driving main working members
    • B23Q5/04Driving main working members rotary shafts, e.g. working-spindles
    • B23Q5/10Driving main working members rotary shafts, e.g. working-spindles driven essentially by electrical means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of novel power construction engineering project management devices,Including main frame body,Fluting is equipped in the main frame body bottom end face,It is embedded with dust exhaust apparatus in the main frame body inner wall on the right side of the fluting,The dust exhaust apparatus bottom end is equipped with dust absorption nozzle,The dust absorption nozzle runs through the main frame body bottom end face,It is installed with tube body in the fluting inner left wall,The remote fluting inner left wall side of the tube body is rotatably assorted the first chuck of connection,The first vestibule of stretching, extension setting up and down is equipped in the main frame body on the left of the tube body,First hole intracavitary is slidably connected with the first slipping block,Unicom is equipped with port between first vestibule and the tube body,Be rotatably assorted the Coupling Shaft for being connected with and stretching setting to the right in first slipping block,Stretching, extension end penetrates in the port and is installed with splined sleeve in distal end faces on the right side of the Coupling Shaft.

Description

A kind of novel power construction engineering project management device
Technical field
The present invention relates to power construction apparatus field, specially a kind of novel power construction engineering project management device.
Background technology
During electric power construction, often needs are used cutting facility and are cut to power equipment, but existing market On power equipment with cutting facility be not easy to carry out assembling replacement with cutting facility to power equipment during use, The normal use of facility is cut to affect power equipment, while also reducing the use effect of power equipment cutting facility Rate, in addition, existing power equipment with cutting facility due to blade is exposed and do not have safeguard procedures, safety is low, and there are larger Security risk.
Invention content
The purpose of the present invention is to provide a kind of novel power construction engineering project management devices, for overcoming existing skill Drawbacks described above in art.
A kind of novel power construction engineering project management device according to the present invention, including main frame body, the main frame body It is equipped with fluting in bottom end face, dust exhaust apparatus, the dust suction dress are embedded in the main frame body inner wall on the right side of the fluting Bottom set end is equipped with dust absorption nozzle, and the dust absorption nozzle runs through the main frame body bottom end face, pipe is installed in the fluting inner left wall Body, the remote fluting inner left wall side of the tube body are rotatably assorted the first chuck of connection, the institute on the left of the tube body The first vestibule that stretching, extension setting up and down is equipped in main frame body is stated, first hole intracavitary is slidably connected with the first slipping block, Unicom is equipped with port between first vestibule and the tube body, is rotatably assorted to be connected in first slipping block and stretch to the right The Coupling Shaft of setting is opened up, stretching, extension end penetrates in the port and is installed with spline housing in distal end faces on the right side of the Coupling Shaft It manages, the spline for penetrating and being oppositely arranged in the tube body and with the splined sleeve is installed in the first chuck left end face Bar is slidably connected with the splined post for stretching setting to the left in the Coupling Shaft left end face, is stretched on the left of the splined post End to be opened up to be connected with the first motor power, first motor outer surface is embedded in the first vestibule inner left wall admittedly, The second vestibule, the master on the upside of second vestibule are equipped in the main frame body on the left of the first hole top of chamber stretch section It is equipped with third vestibule in frame body, is rotatably assorted between second vestibule and first vestibule and is connected with left and right stretching, extension setting First spiral bar, the first spiral bar left side stretching, extension end penetrates second hole intracavitary and end is installed with the first taper Wheel, the first spiral bar right side stretching, extension end penetrate first hole intracavitary and match with inner wall rotation on the right side of first vestibule Connection is closed, the first spiral bar of first hole intracavitary is connect with the first slipping block top section screw-thread fit, described The second motor is installed in part between third vestibule and second vestibule, the second motor bottom end be connected by power has The second taper cone pulley for penetrating second hole intracavitary and being connected with the first taper cone pulley power, fluting right side inner wall It is interior be equipped with stretching, extension setting upwards lead shifting chamber, it is described lead to move intracavitary and be slidably connected with connect block, it is described to connect left side in block Be rotatably assorted the second chuck for being connected with and being oppositely arranged with first chuck on end face, and third hole intracavitary, which is equipped with, to be adjusted Seaming element, main frame body left and right sides end face are additionally provided with irradiation unit.
Further technical solution, the main frame body top are equipped with manipulation frame hand.
Further technical solution, second chuck it is remote it is described connect ring on the end face of block side and set card is distributed with Outbound is equipped with bite between second chuck and the first chuck, on the bite ring set be distributed with to institute State the blocked hole that clamping pin is connected.
Further technical solution, the blending component include that sliding connection is arranged the of third hole intracavitary Two slipping blocks and the third motor being installed in the second slipping block top end surface, in the second slipping block bottom end face Screw-thread fit is connected with the second spiral bar for stretching down setting, the second spiral bar bottom stretching, extension end and second horse It is connected up to top end power, the third motor top end be connected by power, which has, stretches out the second slipping block top end surface It is rotatably assorted and is connected in outer third taper cone pulley, the third vestibule top section and the part led between moving top of chamber section Pivoted arm, the pivoted arm left distal end be connected by power have the 4th taper cone pulley for penetrating third hole intracavitary, pivoted arm right side end End be connected by power have penetrate it is described lead move intracavitary and with the third spiral bar for connecting block top section screw-thread fit and connecting, it is described It is installed with flange on the third bore inner walls between 4th taper cone pulley and second slipping block.
Further technical solution, ring, which is set, in the first chuck right end face is distributed with to sell phase with the clamping To the engaging hole of setting.
Further technical solution, the irradiation unit include at being fixedly mounted on the downside of the face of the main frame body left and right ends Lampshade, be embedded with irradiation light in the lampshade bottom end face.
The beneficial effects of the invention are as follows:Result of the present invention is simple, easy to operate, by the way that bite is moved to the first engaging Between disk and the second chuck, meanwhile, so that the blocked hole on bite is in relative position with clamping pin and engaging hole, then Bite is moved towards the second chuck side, so that clamping is sold out and is fully inserted into blocked hole, then pass through third motor control third Taper cone pulley rotates, and then realizes and drive the 4th taper cone pulley and pivoted arm to rotate by third taper cone pulley, meanwhile, third is driven by pivoted arm Spiral bar rotates, and is slided at this point, being driven by third spiral bar and connecting block towards the left direction for moving intracavitary is led, and is driven until leading and moving chamber Bite on second chuck and the second chuck is abutted against with the first chuck right end face, meanwhile, make clamping pin most Big degree penetrates in engaging hole, at this point, control third motor stops operating, then by the second motor drive the second spiral bar with And second taper cone pulley rotation, at this point, by the second spiral bar drive the second slipping block towards third hole intracavitary bottom direction slide, together When, the rotation of the first spiral bar is driven by the second taper cone pulley, drives the first slipping block towards the right side of the first hole intracavitary by the first spiral bar Side direction is slided, until when the second slipping block slides into the lowest position of third hole intracavitary, at this point, being driven by the first spiral bar First slipping block slides into the right-most position of the first hole intracavitary, meanwhile, so that the first slipping block is driven in Coupling Shaft right end Splined sleeve utmostly penetrate in tube body, and make splined sleeve and to penetrate the fully mated connection of spline rod in tube body, this When control the second motor and stop operating, splined post rotation is then driven by the first motor, and by splined post drive Coupling Shaft with And drive spline rod and the first chuck to rotate by the splined sleeve in Coupling Shaft, and then realize high efficiency cutting work, meanwhile, It can realize the locking work quickly assembled and automatically control dismantlement work, improve the operation stability of the present apparatus, pass through flower The disengaging work of key casing and spline rod substantially increases safety of the present apparatus when being not used.
Description of the drawings
Fig. 1 is a kind of novel power construction engineering project management device outside overall structure diagram in the present invention;
Fig. 2 is main frame body internal structure schematic diagram in the present invention;
Fig. 3 is the structural schematic diagram of bite in the present invention;
Fig. 4 is the left view of the second chuck in the present invention.
Specific implementation mode
With reference to Fig. 1-4, the present invention is described in detail.
Referring to Fig.1-4, a kind of novel power construction engineering project management device according to an embodiment of the invention, including Main frame body 6, is equipped with fluting 61 in 6 bottom end face of the main frame body, embedding in 6 inner wall of the main frame body on 61 right side of the fluting Equipped with dust exhaust apparatus 602,602 bottom end of the dust exhaust apparatus is equipped with dust absorption nozzle 601, and the dust absorption nozzle 601 runs through the main frame body 6 Bottom end face is installed with tube body 611,61 inner left walls of the remote fluting of the tube body 611 in 61 inner left walls of the fluting Side is rotatably assorted the first chuck 612 of connection, is equipped with stretching, extension up and down in the main frame body 6 in 611 left side of the tube body and sets The first vestibule 63 set is slidably connected with the first slipping block 631, first vestibule 63 and institute in first vestibule 63 Unicom is equipped with port 64 between stating tube body 611, is rotatably assorted in first slipping block 631 and is connected with stretching, extension setting to the right Coupling Shaft 632,632 right side stretching, extension end of the Coupling Shaft penetrate in the port 64 and are installed with splined sleeve in distal end faces 635, it is installed in 612 left end face of the first chuck and penetrates in the tube body 611 and opposite with the splined sleeve 635 The spline rod 613 of setting is slidably connected with the splined post for stretching setting to the left in 632 left end face of the Coupling Shaft 633,633 left side stretching, extension end of the splined post is connected with 634 power of the first motor, 634 outer surface of the first motor Admittedly in 63 inner left wall of the first vestibule, set in the main frame body 6 on the left of first vestibule, 63 top stretch section Have the second vestibule 64, be equipped with third vestibule 65 in the main frame body 6 of second vestibule, 64 upside, second vestibule 64 with It is rotatably assorted between first vestibule 63 and is connected with the first spiral bar 636 of left and right stretching, extension setting, the first spiral bar 636 Left side stretching, extension end penetrates in second vestibule 64 and end is installed with the first taper cone pulley 641, the first spiral bar 636 Right side stretching, extension end, which penetrates in first vestibule 63 and is rotatably assorted with first vestibule, 63 right side inner wall, to be connect, and described the The first spiral bar 636 in one vestibule 63 is connect with first slipping block, 631 top section screw-thread fit, the third hole The second motor 643 is installed in part between chamber 65 and second vestibule 64, second motor, 643 bottom end power connects It is connected to the second taper cone pulley 642 for penetrating and being connected in second vestibule 64 and with 641 power of the first taper cone pulley, it is described Slot and be equipped with leading for stretching, extension setting upwards in 61 right side inner walls and move chamber 62, it is described lead to move in chamber 62 to be slidably connected with connect block 621, it is described to connect second for being rotatably assorted in left end face in block 621 and being connected with and being oppositely arranged with first chuck 612 Chuck 623, the third vestibule 65 is interior to be equipped with blending component, and 6 left and right sides end face of the main frame body is additionally provided with irradiation unit.
Valuably or illustratively, 6 top of the main frame body is equipped with manipulation frame hand 7, to facilitate automatic control and adjustment Cutting angle meets the adjusting work of different cutting angles, substantially increases the working efficiency of cutting.
Valuably or illustratively, second chuck 623 is remote described connect ring on the end face of 621 side of block and sets point It is furnished with clamping pin 6231, is equipped with bite 8 between second chuck, 623 and first chuck 612, on the bite 8 Ring sets the blocked hole 81 being distributed with to be connected with the clamping pin 6231, to facilitate the fast assembling-disassembling work of bite 8 Make, substantially increases the working efficiency that assembling is replaced.
Valuably or illustratively, the blending component includes that sliding connection is arranged in the third vestibule 65 Second slipping block 651 and the third motor 653 being installed in 651 top end surface of the second slipping block, second sliding 651 bottom end face screw-internal thread fit of block is connected with the second spiral bar 652 for stretching down setting, 652 bottom of the second spiral bar Portion stretches end and is connected with second motor, 643 top end power, 653 top end be connected by power of the third motor There are the third taper cone pulley 654 stretched out outside 651 top end surface of the second slipping block, 65 top section of third vestibule to be led with described It is rotatably assorted in the part moved between 62 top section of chamber and is connected with pivoted arm 655,655 left distal end be connected by power of the pivoted arm is worn Enter the 4th taper cone pulley 656 in the third vestibule 65,655 right end be connected by power of the pivoted arm, which penetrates, described leads shifting chamber In 62 and with the third spiral bar 622 for connecting 621 top section screw-thread fit of block and connecting, the 4th taper cone pulley 656 and institute It states and is installed with flange 657 on 65 inner wall of third vestibule between the second slipping block 651, bite is automatically controlled to realize 8 unlatching and locking work, improves the stability and safety that bite 8 locks.
Valuably or illustratively, in 612 right end face of the first chuck ring set be distributed with to the clamping The engaging hole that pin 6231 is oppositely arranged.
Valuably or illustratively, the irradiation unit includes being fixedly mounted on the downside of 6 left and right ends face of the main frame body The lampshade 661 at place is embedded with irradiation light 662 in 661 bottom end face of the lampshade, to provide illuminating effect.
When original state, the first slipping block 631 is located at the left-most position in the first vestibule 63, at this point, by the first sliding Block 631 drives the splined sleeve 635 of 632 right end of Coupling Shaft to be fully located in port 64, meanwhile, make splined sleeve 635 most The remote spline rod 613 of big degree, at this point, driving 651 top end of the second slipping block and 657 bottom of flange by the second spiral bar 652 Portion end abuts against, meanwhile, so that the third taper cone pulley 654 of 653 top end of third motor and the cooperation of 656 power of the 4th taper cone pulley is connected It connects, at this point, it is located at the right-most position led and moved in chamber 62 by connecting block 621, meanwhile, drive the second chuck by connecting block 621 623 utmostly remote first chuck, 612 sides.
When needing to install and use, bite 8 is moved between the first chuck 612 and the second chuck 623 first, Meanwhile the blocked hole 81 on bite 8 being made to be in relative position with clamping pin 6231 and engaging hole, then towards the second chuck Bite 8 is moved in 623 sides, and clamping pin 6231 is made to be fully inserted into blocked hole 81, then controls third by third motor 653 Taper cone pulley 654 rotates, and then realizes and drive the 4th taper cone pulley 656 and pivoted arm 655 to rotate by third taper cone pulley 654, meanwhile, by Pivoted arm 655 drives third spiral bar 622 to rotate, and is moved in chamber 62 at this point, connecting block 621 by the drive of third spiral bar 622 towards leading Left direction slides, until leading the bite 8 and first moved on the second chuck 623 of drive of chamber 62 and the second chuck 623 612 right end face of chuck abuts against, meanwhile, so that clamping pin 6231 is utmostly penetrated in engaging hole, at this point, control third horse It stops operating up to 653, then drives the second spiral bar 652 and the second taper cone pulley 642 to rotate by the second motor 643, at this point, Drive the second slipping block 651 towards the bottom direction sliding in third vestibule 65 by the second spiral bar 652, meanwhile, by the second taper Wheel 642 drives the rotation of the first spiral bar 636, drives the first slipping block 631 towards the right side in the first vestibule 63 by the first spiral bar 636 Side direction is slided, until when the second slipping block 651 slides into the lowest position in third vestibule 65, at this point, by the first spiral Bar 636 drives the first slipping block 631 to slide into the right-most position in the first vestibule 63, meanwhile, so that the first slipping block 631 is driven Splined sleeve 635 in 632 right end of Coupling Shaft utmostly penetrates in tube body 611, and makes splined sleeve 635 and penetrate pipe 613 fully mated connection of spline rod in body 611, controls the second motor 643 and stops operating, then pass through the first motor at this time 634 drive splined post 633 to rotate, and by the drive Coupling Shaft 632 of splined post 633 and by the splined sleeve 635 in Coupling Shaft 632 Spline rod 613 and the rotation of the first chuck 612 are driven, and then realizes high efficiency cutting work.
The beneficial effects of the invention are as follows:Result of the present invention is simple, easy to operate, by the way that bite is moved to the first engaging Between disk and the second chuck, meanwhile, so that the blocked hole on bite is in relative position with clamping pin and engaging hole, then Bite is moved towards the second chuck side, so that clamping is sold out and is fully inserted into blocked hole, then pass through third motor control third Taper cone pulley rotates, and then realizes and drive the 4th taper cone pulley and pivoted arm to rotate by third taper cone pulley, meanwhile, third is driven by pivoted arm Spiral bar rotates, and is slided at this point, being driven by third spiral bar and connecting block towards the left direction for moving intracavitary is led, and is driven until leading and moving chamber Bite on second chuck and the second chuck is abutted against with the first chuck right end face, meanwhile, make clamping pin most Big degree penetrates in engaging hole, at this point, control third motor stops operating, then by the second motor drive the second spiral bar with And second taper cone pulley rotation, at this point, by the second spiral bar drive the second slipping block towards third hole intracavitary bottom direction slide, together When, the rotation of the first spiral bar is driven by the second taper cone pulley, drives the first slipping block towards the right side of the first hole intracavitary by the first spiral bar Side direction is slided, until when the second slipping block slides into the lowest position of third hole intracavitary, at this point, being driven by the first spiral bar First slipping block slides into the right-most position of the first hole intracavitary, meanwhile, so that the first slipping block is driven in Coupling Shaft right end Splined sleeve utmostly penetrate in tube body, and make splined sleeve and to penetrate the fully mated connection of spline rod in tube body, this When control the second motor and stop operating, splined post rotation is then driven by the first motor, and by splined post drive Coupling Shaft with And drive spline rod and the first chuck to rotate by the splined sleeve in Coupling Shaft, and then realize high efficiency cutting work, meanwhile, It can realize the locking work quickly assembled and automatically control dismantlement work, improve the operation stability of the present apparatus, pass through flower The disengaging work of key casing and spline rod substantially increases safety of the present apparatus when being not used.
Those skilled in the art can define, can in the case of not departing from overall spirit and the design of the present invention To make the various modifications for above example.It each falls within protection scope of the present invention.The protection scheme of the present invention It is subject to claims appended hereto.

Claims (6)

1. a kind of novel power construction engineering project management device, including main frame body, it is characterised in that:The main frame body bottom It is equipped with fluting in end face, dust exhaust apparatus, the dust exhaust apparatus bottom are embedded in the main frame body inner wall on the right side of the fluting End is equipped with dust absorption nozzle, and the dust absorption nozzle runs through the main frame body bottom end face, is installed with tube body in the fluting inner left wall, institute It states the remote fluting inner left wall side of tube body to be rotatably assorted the first chuck of connection, the body frame on the left of the tube body It is equipped with the first vestibule of stretching, extension setting up and down in vivo, first hole intracavitary is slidably connected with the first slipping block, and described the Unicom is equipped with port between one vestibule and the tube body, is rotatably assorted in first slipping block and is connected with stretching, extension setting to the right Coupling Shaft, stretching, extension end penetrates in the port and is installed with splined sleeve in distal end faces on the right side of the Coupling Shaft, described The spline rod for penetrating and being oppositely arranged in the tube body and with the splined sleeve is installed in first chuck left end face, it is described Be slidably connected with the splined post for stretching setting to the left in Coupling Shaft left end face, on the left of the splined post stretching, extension end with First motor power is connected, and first motor outer surface is embedded in the first vestibule inner left wall admittedly, and described first It is equipped with the second vestibule in the main frame body on the left of the top of chamber stretch section of hole, is set in the main frame body on the upside of second vestibule There is third vestibule, is rotatably assorted between second vestibule and first vestibule and is connected with the first spiral of left and right stretching, extension setting Bar, the first spiral bar left side stretching, extension end penetrates second hole intracavitary and end is installed with the first taper cone pulley, described Stretching, extension end penetrates first hole intracavitary and is rotatably assorted with inner wall on the right side of first vestibule and connect on the right side of first spiral bar, The first spiral bar of first hole intracavitary is connect with the first slipping block top section screw-thread fit, the third vestibule The second motor is installed in part between second vestibule, the second motor bottom end be connected by power penetrates described Second hole intracavitary and the second taper cone pulley being connected with the first taper cone pulley power, be equipped in inner wall on the right side of the fluting to Shifting chamber is led in upper stretching, extension setting, it is described lead to move intracavitary and be slidably connected with connect block, described connect in block turns in left end face Dynamic to be connected with the second chuck being oppositely arranged with first chuck, third hole intracavitary is equipped with blending component, End face is additionally provided with irradiation unit at left and right sides of the main frame body.
2. a kind of novel power construction engineering project management device according to claim 1, it is characterised in that:The master Manipulation frame hand is installed at the top of frame body.
3. a kind of novel power construction engineering project management device according to claim 1, it is characterised in that:Described Ring on the end face of block side is connected described in two chucks are remote and sets to be distributed with to be clamped sells, second chuck and the first chuck Between be equipped with bite, ring sets the blocked hole being distributed with to be connected with the clamping pin on the bite.
4. a kind of novel power construction engineering project management device according to claim 1, it is characterised in that:The tune Seaming element include sliding connection be arranged third hole intracavitary the second slipping block and be installed in it is described second sliding Third motor in block top end surface, the second slipping block bottom end face screw-internal thread fit, which is connected with, stretches down the of setting Two spiral bars, the second spiral bar bottom stretching, extension end are connected with the second motor top end power, the third Motor top end be connected by power has the third taper cone pulley stretched out outside the second slipping block top end surface, third vestibule top It is rotatably assorted in section and the part led between moving top of chamber section and is connected with pivoted arm, the pivoted arm left distal end be connected by power Have the 4th taper cone pulley for penetrating third hole intracavitary, the pivoted arm right end be connected by power penetrate it is described lead move intracavitary and With the third spiral bar for connecting block top section screw-thread fit and connecting, between the 4th taper cone pulley and second slipping block The third bore inner walls on be installed with flange.
5. a kind of novel power construction engineering project management device according to claim 1, it is characterised in that:Described Ring sets the engaging hole being distributed with to be oppositely arranged with the clamping pin in one chuck right end face.
6. a kind of novel power construction engineering project management device according to claim 1, it is characterised in that:The photograph Injection device includes the lampshade being fixedly mounted on the downside of the face of the main frame body left and right ends, is embedded in the lampshade bottom end face Irradiation light.
CN201810237952.3A 2018-03-22 2018-03-22 A kind of novel power construction engineering project management device Withdrawn CN108406347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810237952.3A CN108406347A (en) 2018-03-22 2018-03-22 A kind of novel power construction engineering project management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810237952.3A CN108406347A (en) 2018-03-22 2018-03-22 A kind of novel power construction engineering project management device

Publications (1)

Publication Number Publication Date
CN108406347A true CN108406347A (en) 2018-08-17

Family

ID=63133172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810237952.3A Withdrawn CN108406347A (en) 2018-03-22 2018-03-22 A kind of novel power construction engineering project management device

Country Status (1)

Country Link
CN (1) CN108406347A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100665206B1 (en) * 2006-04-13 2007-01-09 (주)성헌 Head for machine tools
CN201046530Y (en) * 2007-05-15 2008-04-16 慈溪市掌起镇科生五金塑料厂 Transmission means for automatic lathe main spindle case
CN201147852Y (en) * 2008-01-24 2008-11-12 德马数控机床(南京)有限公司 Power knife stand for turning center
CN202804686U (en) * 2012-08-09 2013-03-20 中国南方航空工业(集团)有限公司 Positioning and clamping device with internal spline part
CN205196327U (en) * 2015-11-12 2016-05-04 宁波爱乐吉电动工具有限公司 Quick swaging clamp device of machine of beating grass
CN105834484A (en) * 2016-04-29 2016-08-10 平顶山平煤机煤矿机械装备有限公司 Movable type center hole drilling machine
CN107662004A (en) * 2017-05-22 2018-02-06 广州方阁建筑工程技术开发有限公司 A kind of decorative panel for building installation perforating device
CN207058078U (en) * 2017-06-28 2018-03-02 广州森劲自动化科技有限公司 Process the special cutterhead of brake callipers

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100665206B1 (en) * 2006-04-13 2007-01-09 (주)성헌 Head for machine tools
CN201046530Y (en) * 2007-05-15 2008-04-16 慈溪市掌起镇科生五金塑料厂 Transmission means for automatic lathe main spindle case
CN201147852Y (en) * 2008-01-24 2008-11-12 德马数控机床(南京)有限公司 Power knife stand for turning center
CN202804686U (en) * 2012-08-09 2013-03-20 中国南方航空工业(集团)有限公司 Positioning and clamping device with internal spline part
CN205196327U (en) * 2015-11-12 2016-05-04 宁波爱乐吉电动工具有限公司 Quick swaging clamp device of machine of beating grass
CN105834484A (en) * 2016-04-29 2016-08-10 平顶山平煤机煤矿机械装备有限公司 Movable type center hole drilling machine
CN107662004A (en) * 2017-05-22 2018-02-06 广州方阁建筑工程技术开发有限公司 A kind of decorative panel for building installation perforating device
CN207058078U (en) * 2017-06-28 2018-03-02 广州森劲自动化科技有限公司 Process the special cutterhead of brake callipers

Similar Documents

Publication Publication Date Title
CN109203010A (en) A kind of cutter device
CN107186561B (en) A kind of decorative panel for building grinding device
CN107081656B (en) A kind of dustless decorative panel for building grinding device
CN108655855A (en) A kind of timber polissoir
CN111894458B (en) Improve geological prospecting machine of automatic extension drill bit of operational environment
CN108907961A (en) A kind of circular glass corner process equipment
CN108406347A (en) A kind of novel power construction engineering project management device
CN108480748A (en) A kind of power construction engineering project management device
CN108437092B (en) A kind of firm cutting robot
CN109148322A (en) A kind of follow-on semiconductor material production technology equipment
CN108393752A (en) One meridian line tyre renovation technology equipment
CN106761391A (en) A kind of sampling surface machine of portable auto-manual
CN108480716B (en) A kind of new material process equipment
CN109128282A (en) A kind of check-valves and its application method of compressor
CN108908513A (en) A kind of processing method of cross section hard wooden floor block
CN109129734A (en) A kind of new-type cutting robot
CN109290303A (en) A kind of efficient automatic cleaning equipment
CN108547568A (en) A kind of improved road constructing device
CN109128376A (en) A kind of reliable automatic robot
CN108972741A (en) A kind of process equipment of cross section hard wooden floor block
CN108857432A (en) A kind of hydraulic control component
CN218873850U (en) Fuse shell positioning and drilling tool provided with limiting mechanism
CN108481453A (en) A kind of cutting robot
CN108436140B (en) A kind of novel new material process equipment
CN109290304A (en) A kind of automatic cleaning equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180817