CN108401270A - The method for obligating resource of uplink control channel determines method, base station and terminal - Google Patents
The method for obligating resource of uplink control channel determines method, base station and terminal Download PDFInfo
- Publication number
- CN108401270A CN108401270A CN201710069558.9A CN201710069558A CN108401270A CN 108401270 A CN108401270 A CN 108401270A CN 201710069558 A CN201710069558 A CN 201710069558A CN 108401270 A CN108401270 A CN 108401270A
- Authority
- CN
- China
- Prior art keywords
- uplink control
- resource
- control channel
- channel resource
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/16—Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
- H04W28/26—Resource reservation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signaling, i.e. of overhead other than pilot signals
- H04L5/0055—Physical resource allocation for ACK/NACK
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/04—Wireless resource allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/121—Wireless traffic scheduling for groups of terminals or users
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
Abstract
The invention discloses a kind of method for obligating resource of uplink control channel, determine that method, base station and terminal, method include:The descending transmission channel resource of downlink information is used for transmission for terminal scheduling;According to descending transmission channel resource, corresponding uplink control channel resource is reserved for terminal;The response message or other control information that terminal is sent are received by uplink control channel resource.The descending transmission channel resource that the base station of the present invention passes through scheduling is that terminal reserves corresponding uplink control channel resource, realizes the scheduling and instruction of uplink transmission resource;Further, terminal feeds back response message or other control information when receiving downlink information, by the uplink control channel resource so that base station stops repeating to send downlink information, while meeting the requirement of business low time delay high reliability, and further save network transmission resource.
Description
Technical field
The present invention relates to field of communication technology more particularly to a kind of method for obligating resource of uplink control channel, determination sides
Method, base station and terminal.
Background technology
Compared with previous mobile communication system, following 5G mobile communication system needs to adapt to more diversified scene
And business demand.The prevailing scenario of 5G includes mobile broadband enhancing eMBB, extensive Internet of Things mMTC, the reliable ultralow time delay of superelevation
URLLC is communicated, these scenes propose the requirements such as highly reliable, low time delay, big bandwidth, wide covering to system.For certain scenes
Business need low delay and highly reliable transmission.To ensure low time delay requirement, reducing the length of time slot, reducing loopback delay is
Effective means.For guarantee high reliability transport, need to consider some diversity transmission mechanism, such as time diversity, space diversity,
Code domain diversity etc..At present for general LTE business, Downlink Control Information is transmitted with service data information in a subframe,
The resource of uplink control channel is implicitly obtained according to downstream grants, and can not be determined URLLC business in the prior art and be transmitted
Uplink control channel resource.
Invention content
An embodiment of the present invention provides a kind of method for obligating resource of uplink control channel, determine method, base station and terminal,
To solve the problems, such as not determining the uplink control channel resource of URLLC business transmission in the prior art.
In a first aspect, an embodiment of the present invention provides a kind of method for obligating resource of uplink control channel, it is applied to base station,
Including:
The descending transmission channel resource of downlink information is used for transmission for terminal scheduling;
According to descending transmission channel resource, corresponding uplink control channel resource is reserved for terminal;
The response message or other control information that terminal is sent are received by uplink control channel resource;Wherein, response is believed
Breath or other control information include at least:Response feedback information corresponding with down control channel in descending transmission channel resource.
Second aspect, the embodiment of the present invention additionally provide a kind of resource determining method of uplink control channel, are applied to eventually
End, including:
Detect the descending transmission channel resource for being used for transmission downlink information of base station scheduling;
According to the descending transmission channel resource detected, corresponding uplink control channel resource is determined;
By uplink control channel resource a response message or other control information are sent to base station;Wherein, response message
Or other control information include at least:Response feedback information corresponding with down control channel in descending transmission channel resource.
The third aspect, an embodiment of the present invention provides a kind of base stations, including:
Scheduler module, the descending transmission channel resource for being used for transmission downlink information for terminal scheduling;
Reserved module, for according to descending transmission channel resource, corresponding uplink control channel resource to be reserved for terminal;
Receiving module, for receiving the response message or other control letters that terminal is sent by uplink control channel resource
Breath;Wherein, response message or other control information include at least:It is corresponding with down control channel in descending transmission channel resource
Response feedback information.
Fourth aspect, an embodiment of the present invention provides a kind of terminals, including:
Detection module, the descending transmission channel resource for being used for transmission downlink information for detecting base station scheduling;
Processing module, for according to the descending transmission channel resource detected, determining corresponding uplink control channel resource;
Sending module, for sending a response message or other control information to base station by uplink control channel resource;
Wherein, response message or other control information include at least:With down control channel is corresponding in descending transmission channel resource answers
Answer feedback information.
In this way, the descending transmission channel resource that the base station of the embodiment of the present invention passes through scheduling, which is terminal, reserves corresponding uplink
Control channel resource, to realize the scheduling and instruction of uplink transmission resource;Further, terminal is after receiving downlink information,
Response message or other control information are fed back by the uplink control channel resource so that base station stops repeating to send downlink letter
Breath, while meeting business low time delay high reliability request, and further saves network transmission resource.
Description of the drawings
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained without creative efforts
Example, shall fall within the protection scope of the present invention.
Fig. 1 shows the flow charts of the method for obligating resource of the uplink control channel of first embodiment of the invention;
Fig. 2 indicates the flow chart one of the method for obligating resource of the uplink control channel of second embodiment of the invention;
Fig. 3 indicates the flowchart 2 of the method for obligating resource of the uplink control channel of second embodiment of the invention;
Fig. 4 indicates the module diagram one of the base station of third embodiment of the invention;
Fig. 5 indicates the module diagram two of the base station of third embodiment of the invention;
Fig. 6 indicates the base station block diagram of fourth embodiment of the invention;
Fig. 7 indicates the flow chart of the resource determining method of the uplink control channel of fifth embodiment of the invention;
Fig. 8 shows the flow charts one of the resource determining method of the uplink control channel of sixth embodiment of the invention;
Fig. 9 indicates the flowchart 2 of the resource determining method of the uplink control channel of sixth embodiment of the invention;
Figure 10 indicates the module diagram one of the terminal of seventh embodiment of the invention;
Figure 11 indicates the module diagram two of the terminal of seventh embodiment of the invention;
Figure 12 indicates the terminal block diagram of eighth embodiment of the invention.
Specific implementation mode
Exemplary embodiment of the present invention is more fully described below with reference to accompanying drawings.Although showing the present invention in attached drawing
Exemplary embodiment, it being understood, however, that may be realized in various forms the present invention without should be by embodiments set forth here
It is limited.It is to be able to be best understood from the present invention on the contrary, providing these embodiments, and can be by the scope of the present invention
Completely it is communicated to those skilled in the art.
First embodiment
As shown in Figure 1, the method for obligating resource of the uplink control channel of the embodiment of the present invention, is applied to base station, it is specific to wrap
Include following steps:
Step 101:The descending transmission channel resource of downlink information is used for transmission for terminal scheduling.
Wherein, downlink information includes:Downlink Control Information and downlink data information, corresponding descending transmission channel resource packet
It includes:Down control channel resources and downstream data channel resource.Base station is the downlink biography that terminal scheduling is used for transmission downlink information
Defeated channel resource, and terminal can be sent to by Downlink Control Information (such as DCI information), or pass through broadcast or other systems message
It is sent to terminal, so that terminal knows the descending transmission channel resource of base station scheduling.
Step 102:According to descending transmission channel resource, corresponding uplink control channel resource is reserved for terminal.
Here it is to say, according to the mapping relations of preset uplink control channel resource and descending transmission channel resource, for eventually
Corresponding uplink control channel resource is reserved at end, to enable the terminals to send uplink information by the uplink control channel resource.
Step 103:The response message or other control information that terminal is sent are received by uplink control channel resource.
Base station receives the response message or other control information that terminal is sent by reserved uplink control channel resource.Its
In, response message or other control information include at least:Response corresponding with down control channel in descending transmission channel resource
Feedback information.Further, response message or other control information further include:Believe with downlink data in descending transmission channel resource
The corresponding response feedback information in road.Wherein, response message is response feedback/non-response feedback (ACK/NACK), other control letters
Breath is the ascending control information in addition to response message.Further, when terminal does not receive downlink information, base station passes through this
Uplink control channel resource does not receive ACK feedback information, then will continue to repeat to send the downlink information to terminal, until receiving
To ACK feedback information.After i.e. terminal receives downlink information, ACK feedbacks are sent by corresponding uplink control channel resource, are made
Base station is obtained to stop sending the downlink information under current transmission.Wherein, downlink information includes control information and data information, and downlink passes
Defeated channel resource includes:Down control channel resources and downstream data channel resource, base station are connect by uplink control channel resource
The response message received or other control information include:Response corresponding with down control channel in descending transmission channel resource is anti-
Feedforward information, and response feedback information corresponding with downstream data channel in descending transmission channel resource.That is, terminal can respectively
Control information and data information carries out ACK feedbacks respectively, when terminal receives control information and do not receive data information, only
The ACK feedbacks of control information are sent by corresponding uplink control channel, at this moment, base station is connect by the uplink control channel resource
ACK feedback information corresponding with down control channel is received, then stops sending control information and individually continuing to repeat to send number
It is believed that breath, until receiving ACK feedback information corresponding with downstream data channel, to reduce the ratio special open of control information
Pin saves network transmission resource.
The method for obligating resource of the uplink control channel of the embodiment of the present invention, base station is according to the downlink transfer for terminal scheduling
Channel resource reserves corresponding uplink control channel resource so that terminal is fed back corresponding by the uplink control channel resource
Ascending control information, base station determine the need for retransmitting downlink information according to the ascending control information, meet business in this way
The requirement of low time delay high reliability, and further save network transmission resource.
Second embodiment
First embodiment above to the present invention uplink control channel method for obligating resource simple introduction, below this reality
It will be described further in conjunction with attached drawing and concrete application scene by applying example.
Specifically, by taking URLLC business transmitting scenes as an example, to ensure the reliability of URLLC business transmission, ensure 1-10-5
Reliability, for TB (Transport Block, transmission), base station (gNB) may be transmitted several times to a terminal (UE)
Control information and data.Until UE feeding back ACKs, gNB just stops transmission.Control information load is smaller, and reliability requirement is higher, phase
Over the ground, data information load is larger, is properly received accordingly, it is possible to there is control information, but data information needs are repeatedly weighed
The scene of biography, i.e., in URLLC business transmitting scenes, gNB is that a UE repeats to send control information and data information until UE is anti-
ACK is presented, gNB just stops transmission.Specifically, in URLLC business transmitting scenes, time diversity can be used in control information and date
(TDM) mode, alternatively, dispatching multiple mini-slot (mini-slot) for a downstream grants.Separately below just control information and
Data information transfer scene elaborates to the method for obligating resource of the uplink control channel of the embodiment of the present invention.
Scene one:For thinking that the corresponding response message of Downlink Control Information reserves transfer resource, as shown in Fig. 2, this hair
The method for obligating resource of the uplink control channel of bright embodiment is applied to base station, specifically includes following steps:
Step 201:The descending transmission channel resource of Downlink Control Information is used for transmission for terminal scheduling.
Wherein, the descending transmission channel resource of base station scheduling can pass through Downlink Control Information, broadcast or other systems message
It is sent to terminal.
Step 202:According to the starting control channel unit CCE of the downstream grants information in descending transmission channel resource, it is
Terminal reserves corresponding first uplink control channel resource.
Wherein, according to different transmitting scenes and multiplex mode, uplink control channel is determined according to descending transmission channel resource
The mode of resource is different.Specifically, TDM modes and FDM modes can be used in control information and data information.It below will respectively just not
It is introduced with transmitting scene and multiplex mode.
When control information and data information uses TDM or FDM modes, and the PRB indexes of URLLC business and other business
When (such as eMBB) is using unified PRB (Physical Resource Block, Physical Resource Block) indexes, i.e., entire frequency domain band
Width, even if there is different numerical value configurations (Numerology), PRB is by low frequency to high frequency Unified number.Under this scene, base station is logical
It crosses following manner and reserves uplink control channel resource:
According toDetermine the first channel number corresponding with starting CCE;
For the first uplink control channel resource that terminal channel reservation number is the first channel number;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel
The starting CCE of downstream grants information in resource,Indicate the uplink control channel money of the business control channel of high-rise configuration
The offset in source.
When control information and data information uses TDM or FDM modes, but the PRB indexes of URLLC business and other business
When (such as eMBB) is indexed using the PRB (Physical Resource Block, Physical Resource Block) of difference, i.e., entire frequency domain band
In width, different numerical value configures (Numerology), and PRB is numbered respectively.Under this scene, base station passes through with lower section
Formula reserves uplink control channel resource:
According toDetermine that the first channel corresponding with starting CCE is compiled
Number;
For the first uplink control channel resource that terminal channel reservation number is the first channel number;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel
The starting CCE of downstream grants information in resource,ForFunction, the lower phases of different numerical value configuration
TogetherIt is correspondingDifference,Indicate the uplink control of the business control channel of high-rise configuration
The offset of channel resource processed.
Wherein,In addition to indicating in descending transmission channel resource other than the starting CCE of downstream grants information, may be used also
To be the minimum value in descending transmission channel resource in the CCE of downstream grants information.
For different numerical value configuration CCE respectively number when, due to different numerical value configuration (Numerology) there may be
It repeats to number, therefore in uplink transport channel resource and descending transmission channel resource impact, needs to pass throughMapping function distinguishes identical CCE numbers, such as:The CCE that Numerology1 is used numbers as 1-100,
In some resource be used for Numerology2, number be 1-80.At this point, there are two types of schemes to solve potential conflict, the first
Different Numerology are distributed differentOffset, second is identicalOffset passes through a mapping
Function is distinguished.Such as the function of Numerology2 is
WhereinThe sum numbered for the CCE of other Numerology.
Step 203:Terminal is received by the first uplink control channel resource according to the response that Downlink Control Information is sent to be believed
Breath or other control information.
Wherein, base station receives terminal by the first reserved uplink control channel resource and controls letter according to the downlink received
Cease the response message or other ascending control informations sent.Wherein, response message or other control information include at least:With downlink
The corresponding response feedback information of down control channel in transmission channel resources.When terminal does not receive Downlink Control Information, base
Stand when failing to receive ACK feedback information corresponding with down control channel by the first uplink control channel resource, continue to
Terminal repeats to send the Downlink Control Information, until when terminal has correctly received Downlink Control Information, sends an ACK feedback letters
Breath after base station receives ACK feedback information corresponding with down control channel by first uplink control channel resource, stops
Downlink Control Information is sent to terminal.In order to avoid causing base station to repeat to send downlink control letter always because network state is poor
The problem of breath, the maximum transmission times once transmitted can be pre-set, such base station sends Downlink Control Information in repetition and reaches
When maximum transmission times, also stop the transmission of the Downlink Control Information.
Specifically, base station can notify terminal by DCI, and the maximum transmission times of Downlink Control Information are in primary transmission
4 times.The wherein different corresponding grade of transmission of maximum transmission times are different, and specific bit can be added in DCI information to indicate to pass
Defeated grade, the grade of transmission wherein indicated by the value difference of tag bit is different, and corresponding maximum transmission times are different.For example,
Maximum 4 transmission are indicated by 11 in 2bit, and maximum 8 transmission are indicated by 00 in 2bit.In this way, once transmitting
In, terminal sends an ACK feedback information after being successfully received Downlink Control Information, and base station is not repeated to send identical downlink control
Information processed.Terminal when not receiving Downlink Control Information and reaching maximum transmission times, by the first upload control believed by base station
Road receives a NACK feedback informations, and base station is again scheduled the terminal after receiving NACK feedback informations.That is terminal
Downlink Control Information is not received, and base station receives terminal transmission after continuously transmitting 4 times by the ascending control information
NACK feedback informations are again scheduled the terminal.
Scene two:For thinking that the corresponding response message of downlink service data information reserves transfer resource, as shown in figure 3,
The method for obligating resource of the uplink control channel of the embodiment of the present invention is applied to base station, specifically includes following steps:
Step 301:The descending transmission channel resource of downlink service data information is used for transmission for terminal scheduling.
Base station can will transmit the scheduling information of the descending transmission channel resource of downlink service data information, with transmission downlink control
The scheduling information of the descending transmission channel resource of information processed is sent to terminal jointly, to reduce transmission times.
Step 302:According to the starting Physical Resource Block for transmitting downlink service data information in descending transmission channel resource
PRB reserves corresponding second uplink control channel resource for terminal.
Wherein, similar with step 202, it is true according to descending transmission channel resource according to different transmitting scenes and multiplex mode
The mode for determining uplink control channel resource is different.Specifically, TDM modes and FDM modes can be used in control information and data information.
It will be introduced in different transmitting scenes and multiplex mode respectively below.
When control information and data information uses TDM or FDM modes, and the PRB indexes of URLLC business and other business
When (such as eMBB) is using unified PRB (Physical Resource Block, Physical Resource Block) indexes, i.e., entire frequency domain band
Width, even if there is different numerical value configurations (Numerology), PRB is by low frequency to high frequency Unified number.Under this scene, base station is logical
It crosses following manner and reserves uplink control channel resource:
According toDetermine that the second channel answered with starting PRB pair is numbered;
For the second uplink control channel resource that terminal channel reservation number is second channel number;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIndicate descending transmission channel money
The starting PRB of downlink service data information is transmitted in source,Indicate the upload control of the traffic data channel of high-rise configuration
The offset of channel resource.
Further, if there is multiple and different terminal multiplexings, base station can join according to the starting PRB of DSCH Downlink Shared Channel with demodulation
Examine signal (DMRS) port numbers (i.e. nDMRS) common determining,
Wherein F (nDMRS) be DMRS port number mapping function, such as F (nDMRS)=nDMRS-nDMRS both port of origination number values, DMRS initiating terminal slogans
Numerical value may be 7,8, then the function will be mapped to DMRS port number 1,2.
When control information and data information uses TDM or FDM modes, but the PRB indexes of URLLC business and other business
When (such as eMBB) is indexed using the PRB (Physical Resource Block, Physical Resource Block) of difference, i.e., entire frequency domain band
In width, different numerical value configures (Numerology), and PRB is numbered respectively.Under this scene, base station passes through with lower section
Formula reserves uplink control channel resource:
According toDetermine that the second channel answered with starting PRB pair is compiled
Number;
For the second uplink control channel resource that terminal channel reservation number is second channel number;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIndicate descending transmission channel money
Starting PRB, the F (n of downlink service data information are transmitted in sourcePRB_start) it is nPRB_startFunction, under the configuration of different numerical value
nPRB_startCorresponding F (n when identicalPRB_start) different,Indicate the upload control of the traffic data channel of high-rise configuration
The offset of channel resource.
Wherein, nPRB_startIn addition to indicating in descending transmission channel resource other than the starting PRB of downlink service data information, also
Can be the PRB that low-limit frequency index is corresponding in descending transmission channel resource.
For different numerical value (Numerology) PRB respectively number when, since different Numerology may have repetition
Number, therefore in uplink transport channel resource and when descending transmission channel resource impact, need to use F (nPRB_start) should set
Resource number of the function region split-phase with PRB index values.For example, the PRB that Numerology1 is used numbers for 1-100, wherein having one
Part resource is used for Numerology2, and number is 1-80.At this point, there are two types of schemes to solve potential conflict, the first is not to
It is distributed with numerology differentOffset, second is identicalOffset passes through a mapping letter
Number is distinguished.Such as the function of Numerology2 isIts
InThe sum numbered for the PRB of other Numerology.
Step 303:Terminal is received by the second uplink control channel resource to be answered according to what downlink service data information was sent
Answer information or other control information.
Wherein, response message or other control information further include:With downstream data channel pair in descending transmission channel resource
The response feedback information answered.When terminal does not receive downlink data information or data decoding error, base station passes through the second uplink
When control channel resource fails to receive ACK feedback information corresponding with downstream data channel, continue to repeat to send to terminal to be somebody's turn to do
Downlink service data information sends an ACK feedback information, base station passes through until when terminal receives downlink service data information
After second uplink control channel resource receives ACK feedback information corresponding with downstream data channel, stop sending to terminal
Downlink service data information and control channel information.Similarly in order to avoid base station caused by due to network state is poor repeats to send
The problem of, the maximum transmission times once transmitted can be pre-set, when terminal does not receive downlink service data information and reaches
When maximum transmission times, base station is received by the second uplink control channel and sends a NACK feedback informations, and base station is receiving
After NACK feedback informations, the terminal is scheduled again.The instruction of wherein maximum transmission times can refer to the side in scene one
Formula, therefore details are not described herein.
To sum up, base station is provided by reserving the first uplink control channel of response information transmission or other control information for terminal
Source so that UE can carry out response feedback to control information and data information, the feeding back ACK when UE receives control information, gNB
It will stop follow-up sending and control information, transmission data information.Control resource overhead can be saved in this way.When UE decoding datas just
True feeding back ACK, gNB transmit the repetition for stopping current transmission block, start next new transmission.Specifically, terminal is in mini
Time slot n receives Downlink Control Information, is delayed as k0, that is, its HARQ is fed back in n+k0mini time slots.Terminal is received in mini time slots n
To data, it is delayed and is fed back in n+k1mini time slots for k1, i.e. its HARQ.
The method for obligating resource of the uplink control channel of the embodiment of the present invention, base station is according to the downlink transfer for terminal scheduling
Channel resource reserves corresponding uplink control channel resource so that terminal is fed back corresponding by the uplink control channel resource
Ascending control information, base station determine the need for retransmitting downlink information according to the ascending control information, meet business in this way
The requirement of low time delay high reliability, and further save network transmission resource.
3rd embodiment
First embodiment above and second embodiment describe the money of the uplink control channel under different scenes in detail respectively
Source method for obligating, below the present embodiment its corresponding base station will be described further in conjunction with attached drawing.
As shown in figure 4, the base station 400 of the embodiment of the present invention, can realize in first embodiment and second embodiment to be terminal
Scheduling is used for transmission the descending transmission channel resource of downlink information;It is reserved corresponding for terminal according to descending transmission channel resource
Uplink control channel resource;The response message or other control information approaches that terminal is sent are received by uplink control channel resource
Details, and reach identical effect, which specifically includes following functions module:
Scheduler module 410, the descending transmission channel resource for being used for transmission downlink information for terminal scheduling;
Reserved module 420, for according to descending transmission channel resource, corresponding uplink control channel money to be reserved for terminal
Source;
Receiving module 430, for receiving the response message or other controls that terminal is sent by uplink control channel resource
Information;Wherein, response message or other control information include at least:It is corresponding with down control channel in descending transmission channel resource
Response feedback information..
Wherein, as shown in figure 5, reserved module 420 includes:
First reserved submodule 421, for being controlled according to the starting of the downstream grants information in descending transmission channel resource
Channel Elements CCE reserves corresponding first uplink control channel resource for terminal.
Wherein, the first reserved submodule 421 includes:
First determination unit 4211 is used for basisIt determines and starting CCE
Corresponding first channel number;
First Prearranged elements 4212, for believing for the first upload control that terminal channel reservation number is the first channel number
Road resource;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel
The starting CCE of downstream grants information in resource,Indicate the uplink control channel money of the business control channel of high-rise configuration
The offset in source.
Wherein, the first reserved submodule 421 includes:
Second determination unit 4213 is used for basisIt determines and rises
Corresponding first channel numbers of beginning CCE;
Second Prearranged elements 4214, for believing for the first upload control that terminal channel reservation number is the first channel number
Road resource;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel
The starting CCE of downstream grants information in resource,ForFunction, the lower phases of different numerical value configuration
TogetherIt is correspondingDifference,Indicate the uplink control of the business control channel of high-rise configuration
The offset of channel resource processed.
Wherein, reserving module 420 further includes:
Second reserved submodule 422, for according to for transmitting downlink service data information in descending transmission channel resource
Beginning Physical Resource Block PRB reserves corresponding second uplink control channel resource for terminal.
Wherein, the second reserved submodule 422 includes:
Third determination unit 4221 is used for basisIt determines and starting PRB
Corresponding second channel number;
Third Prearranged elements 4222, for believing for the second upload control that terminal channel reservation number is second channel number
Road resource;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIndicate descending transmission channel money
The starting PRB of downlink service data information is transmitted in source,Indicate the upload control of the traffic data channel of high-rise configuration
The offset of channel resource.
Wherein, the second reserved submodule 422 includes:
4th determination unit 4223 is used for basisIt determines and rises
The second channel number that beginning PRB pair is answered;
4th Prearranged elements 4224, for believing for the second upload control that terminal channel reservation number is second channel number
Road resource;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIndicate descending transmission channel money
Starting PRB, the F (n of downlink service data information are transmitted in sourcePRB_start) it is nPRB_startFunction, under the configuration of different numerical value
nPRB_startCorresponding F (n when identicalPRB_start) different,Indicate the upload control of the traffic data channel of high-rise configuration
The offset of channel resource.
It is worth noting that the base station of the embodiment of the present invention, reserved for terminal by the descending transmission channel resource of scheduling
Corresponding uplink control channel resource, to realize the scheduling and instruction of uplink control channel resource;Further, pass through the uplink
Control channel resource receives the response message that terminal is fed back after receiving downlink information or other control information, is answered receiving
Stop repeating to send downlink information after answering information, meet the requirement of business low time delay high reliability, and further saves network and pass
Defeated resource.
Fourth embodiment
In order to preferably realize above-mentioned purpose, as shown in fig. 6, the fourth embodiment of the present invention additionally provides a kind of base station,
The base station includes:Processor 600;The memory 620 being connected with the processor 600 by bus interface, and by total
The transceiver 610 that line interface is connected with processor 600;The memory 620 is executing operation for storing the processor
When used program and data;By 610 transmission data information of the transceiver or pilot tone, also pass through the transceiver
610 receive uplink control channel;When the calling of processor 600 and the program and data stored in the memory 620 is executed, is had
Body,
Processor 600 is used to read the program in memory 620, is specifically used for executing following functions:It is used for terminal scheduling
In the descending transmission channel resource of transmission downlink information;According to descending transmission channel resource, corresponding uplink control is reserved for terminal
Channel resource processed.
Transceiver 610 is specifically used for executing following functions for sending and receiving data under the control of processor 600:
The response message or other control information that terminal is sent are received by uplink control channel resource;Wherein, response message or other
Control information includes at least:Response feedback information corresponding with down control channel in descending transmission channel resource..
Wherein, in figure 6, bus architecture may include the bus and bridge of any number of interconnection, specifically by processor 600
The various circuits for the memory that the one or more processors and memory 620 of representative represent link together.Bus architecture is also
Various other circuits of such as peripheral equipment, voltage-stablizer and management circuit or the like can be linked together, these are all
It is it is known in the art, therefore, it will not be further described herein.Bus interface provides interface.Transceiver 610 can
To be multiple element, that is, includes transmitter and transceiver, the list for being communicated over a transmission medium with various other devices is provided
Member.Processor 600 is responsible for bus architecture and common processing, and memory 620 can store processor 600 and execute operation
When used data.
Specifically, processor 600 is additionally operable to execute:According to the starting of the downstream grants information in descending transmission channel resource
Control channel unit CCE reserves corresponding first uplink control channel resource for terminal.
Specifically, processor 600 is additionally operable to execute:According toIt determines and rises
Corresponding first channel numbers of beginning CCE;
For the first uplink control channel resource that terminal channel reservation number is the first channel number;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel
The starting CCE of downstream grants information in resource,Indicate the uplink control channel money of the business control channel of high-rise configuration
The offset in source.
Specifically, processor 600 is additionally operable to execute:According toReally
Fixed the first channel number corresponding with starting CCE;
For the first uplink control channel resource that terminal channel reservation number is the first channel number;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel
The starting CCE of downstream grants information in resource,ForFunction, the lower phases of different numerical value configuration
TogetherIt is correspondingDifference,Indicate the uplink control of the business control channel of high-rise configuration
The offset of channel resource processed.
Specifically, processor 600 is additionally operable to execute:According to transmission downlink service data information in descending transmission channel resource
Starting Physical Resource Block PRB, reserve corresponding second uplink control channel resource for terminal.
Specifically, processor 600 is additionally operable to execute:According toIt determines and rises
The second channel number that beginning PRB pair is answered;
For the second uplink control channel resource that terminal channel reservation number is second channel number;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIndicate descending transmission channel money
The starting PRB of downlink service data information is transmitted in source,Indicate the upload control of the traffic data channel of high-rise configuration
The offset of channel resource.
Specifically, processor 600 is additionally operable to execute:According toReally
The fixed second channel answered with starting PRB pair is numbered;
For the second uplink control channel resource that terminal channel reservation number is second channel number;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIndicate descending transmission channel money
Starting PRB, the F (n of downlink service data information are transmitted in sourcePRB_start) it is nPRB_startFunction, under the configuration of different numerical value
nPRB_startCorresponding F (n when identicalPRB_start) different,Indicate the upload control of the traffic data channel of high-rise configuration
The offset of channel resource.
Corresponding uplink control channel money is reserved in this way, the descending transmission channel resource that the base station passes through scheduling is terminal
Source, to realize the scheduling and instruction of uplink transmission resource;Further, terminal is received by the uplink control channel resource connecing
The response message fed back after downlink information or other control information are received, stop repeating to send downlink after receiving response message
Information, meets the requirement of business low time delay high reliability, and further saves network transmission resource.
5th embodiment
The resource that first embodiment above describes the uplink control channel of the present invention to fourth embodiment from base station side is pre-
Stay method, below the present embodiment by conjunction with attached drawing to the resource determining method of the uplink control channel of its corresponding end side do into
One step introduction.
As shown in fig. 7, the resource determining method of the uplink control channel of the embodiment of the present invention, is applied to terminal, it is specific to wrap
Include following steps:
Step 701:Detect the descending transmission channel resource for being used for transmission downlink information of base station scheduling.
Wherein, downlink information includes:Downlink Control Information and downlink data information, corresponding descending transmission channel resource packet
It includes:Down control channel resources and downstream data channel resource.Terminal can by receive Downlink Control Information (such as DCI information),
Or it is the descending transmission channel resource scheduled in terminal to obtain base station by broadcast or other systems message.
Step 702:According to the descending transmission channel resource detected, corresponding uplink control channel resource is determined.
Here it is to say, according to the mapping relations of preset uplink control channel resource and descending transmission channel resource, terminal
Corresponding uplink control channel resource can be directly determined after detecting descending transmission channel resource.
Step 703:By uplink control channel resource a response message or other control information are sent to base station.
Wherein, response message or other control information include at least:With down control channel in descending transmission channel resource
Corresponding response feedback information.Response message is response feedback/non-response feedback (ACK/NACK), other control information are except answering
Answer the ascending control information except information.When terminal does not receive downlink information, ACK feedbacks are not sent to base station, base station will be after
Continuous repetition sends the downlink information, until after terminal receives downlink information, is sent by corresponding uplink control channel resource
ACK is fed back so that base station stops sending the downlink information under current transmission.Wherein, downlink information includes control information and data
Information, terminal can carry out ACK feedbacks respectively with regard to control information and data information respectively, not connect when terminal receives control information
When receiving data information, the ACK that control information is only sent by corresponding uplink control channel is fed back so that base station stops sending
It controls information and individually continues to repeat transmission data information, until the ACK for receiving data information is fed back, to reduce control
The overhead bit of information saves network transmission resource.
The resource determining method of the uplink control channel of the embodiment of the present invention, terminal are believed according to the downlink transfer that base station is dispatched
The scheduling information of road resource determines corresponding uplink transport channel resource, and further when receiving downlink information, by this
Row control channel resource feeds back response message or other control information so that base station stops repeating to send downlink information, meets industry
The requirement for low time delay high reliability of being engaged in, and further save network transmission resource.
Sixth embodiment
Above 5th embodiment to the present invention uplink control channel resource determining method simple introduction, below this reality
It will be described further in conjunction with attached drawing and concrete application scene by applying example.
Similarly, still by taking URLLC business transmitting scenes as an example, the corresponding response message biography of transmission Downlink Control Information is being determined
When defeated resource, as shown in figure 8, the resource determining method of the uplink control channel of the embodiment of the present invention, is applied to terminal, it is specific to wrap
Include following steps:
Step 801:Detect the descending transmission channel resource for being used for transmission Downlink Control Information of base station scheduling.
By detecting Downlink Control Information, broadcast or other systems message, know base station scheduling is used for transmission downlink control
The descending transmission channel resource of information processed.
Step 802:According to the starting control channel list of the downstream grants information in the descending transmission channel resource detected
First CCE determines corresponding first uplink control channel resource.
Under different transmitting scenes and multiplex mode, the side of uplink control channel resource is determined according to descending transmission channel resource
Formula is different.Wherein, TDM modes and FDM modes can be used in control information and data information.It below will be respectively with regard to different transmitting scenes
It is introduced with multiplex mode.
When control information and data information uses TDM or FDM modes, and the PRB indexes of URLLC business and other business
When (such as eMBB) is using unified PRB (Physical Resource Block, Physical Resource Block) indexes, i.e., entire frequency domain band
Width, even if there is different numerical value configurations (Numerology), PRB is by low frequency to high frequency Unified number.Under this scene, terminal is logical
It crosses following manner and determines uplink control channel resource:
According toDetermine the first channel number corresponding with starting CCE;
The channel resource that channel number is the first channel number is determined as to the first uplink control of transmitting uplink control information
Channel resource processed;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downlink and awards
The starting CCE of information is weighed,Indicate the offset of the uplink control channel resource of the business control channel of high-rise configuration.
Wherein,In addition to indicating in descending transmission channel resource other than the starting CCE of downstream grants information, may be used also
To be the minimum value in descending transmission channel resource in the CCE of downstream grants information.
When control information and data information uses TDM or FDM modes, but the PRB indexes of URLLC business are adopted with other business
When with the PRB indexes distinguished, uplink control channel resource is reserved in base station in the following manner:
According toDetermine that the first channel corresponding with starting CCE is compiled
Number;
The channel resource that channel number is the first channel number is determined as to the first uplink control of transmitting uplink control information
Channel resource processed;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downlink and awards
The starting CCE of information is weighed,ForFunction, under the configuration of different numerical valueWhen identical
It is correspondingDifference,Indicate the uplink control channel resource of the business control channel of high-rise configuration
Offset.
For different numerical value configuration CCE respectively number when, due to different numerical value configuration (Numerology) there may be
It repeats to number, therefore in uplink transport channel resource and descending transmission channel resource impact, needs to pass throughMapping function distinguishes identical CCE numbers, such as:The CCE that Numerology1 is used numbers as 1-100, wherein
Some resource is used for Numerology2, and number is 1-80.At this point, there are two types of schemes to solve potential conflict, the first is right
Different Numerology distribute differentOffset, second is identicalOffset passes through a mapping
Function is distinguished.Such as the function of Numerology2 is
WhereinThe sum numbered for the CCE of other Numerology.
Step 803:After the Downlink Control Information transmitted in detecting descending transmission channel resource, pass through the first uplink control
Channel resource processed sends the first response message or other control information to base station.
Wherein, response message or other control information include at least:With down control channel in descending transmission channel resource
Corresponding response feedback information.When terminal does not receive Downlink Control Information, ACK feedbacks are not sent to base station, when base station connects
When can not receive ACK feedbacks, it will continue to repeat to send the Downlink Control Information, until when terminal receives Downlink Control Information, hair
An ACK feedback information, base station is sent to stop sending Downlink Control Information after receiving ACK feedback information.In order to avoid because of network
State it is poor and cause base station always repeat send Downlink Control Information the problem of, the maximum transmitted once transmitted can be pre-set
Number, it is anti-that such terminal sends a NACK when not receiving the Downlink Control Information and reaching maximum transmission times, to base station
Feedforward information so that base station stops the transmission of the Downlink Control Information, and is that the terminal is scheduled again.
Further, in the corresponding response message transfer resource of determining transmission downlink service data information, such as Fig. 9 institutes
Show, the resource determining method of the uplink control channel of the embodiment of the present invention, is applied to terminal, specifically includes following steps:
Step 901:Detect the descending transmission channel resource for being used for transmission downlink service data information of base station scheduling.
Terminal can be by way of detecting Downlink Control Information, broadcast message or other systems information, while knowing transmission
The descending transmission channel resource of Downlink Control Information and downlink service data information saves terminal power consumption to reduce detection number.
Step 902:It is provided according to the starting physics for the downlink data information transmitted in the descending transmission channel resource detected
Source block PRB determines corresponding second uplink control channel resource.
It is similar with step 802, under different transmitting scenes and multiplex mode, uplink control is determined according to descending transmission channel resource
The mode of channel resource processed is different.It is introduced in different transmitting scenes and multiplex mode separately below.
When control information and data information uses TDM or FDM modes, and the PRB indexes of URLLC business are adopted with other business
When with unified PRB indexes, uplink control channel resource is reserved in base station in the following manner:
According toDetermine that the second channel answered with starting PRB pair is numbered;
The channel resource that channel number is second channel number is determined as to transmit the second uplink control of upstream data information
Channel resource processed;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink business
The starting PRB of data information,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration
Amount.
Wherein, nPRB_startIn addition to indicating in descending transmission channel resource other than the starting PRB of downlink service data information, also
Can be the PRB that low-limit frequency index is corresponding in descending transmission channel resource.
When control information and data information uses TDM or FDM modes, but the PRB indexes of URLLC business are adopted with other business
When with the PRB indexes distinguished, uplink control channel resource is reserved in base station in the following manner:
According toDetermine that the second channel answered with starting PRB pair is compiled
Number;
The channel resource that channel number is second channel number is determined as to transmit the second uplink control of upstream data information
Channel processed;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink business
Starting PRB, the F (n of data informationPRB_start) it is nPRB_startFunction, the lower n of different numerical value configurationPRB_startIt is corresponding when identical
F(nPRB_start) different,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
For different numerical value (Numerology) PRB respectively number when, since different Numerology may have repetition
Number, therefore in uplink transport channel resource and when descending transmission channel resource impact, need to use F (nPRB_start) should set
Resource number of the function region split-phase with PRB index values.At this point, there are two types of schemes to solve potential conflict, the first is to difference
Numerology distributes differentOffset, second is identicalOffset passes through a mapping function area
Point.Such as the function of Numerology2 isWhereinThe sum numbered for the PRB of other Numerology.
Step 903:After the downlink service data information transmitted in detecting descending transmission channel resource, on second
Row control channel resource sends the second response message or other control information to base station.
Wherein, response message or other control information further include:With downstream data channel pair in descending transmission channel resource
The response feedback information answered.When terminal does not receive Downlink Control Information, continue to repeat to send the Downlink Control Information, until
When terminal receives downlink service data information, an ACK feedback information is sent, base station stops after receiving ACK feedback information
Send Downlink Control Information.The problem of similarly repeating to send in order to avoid base station caused by due to network state is poor, can be advance
The maximum transmission times once transmitted are set, when terminal does not receive downlink service data information and reaches maximum transmission times
When, a NACK feedback informations are sent, base station stops sending downlink service data information after receiving NACK feedback informations, and
Again the terminal is scheduled.
The resource determining method of the uplink control channel of the embodiment of the present invention, terminal are believed according to the downlink transfer that base station is dispatched
The scheduling information of road resource determines corresponding uplink transport channel resource, and further when receiving downlink information, by this
Row control channel resource feeds back response message or other control information so that base station stops repeating to send downlink information, meets industry
The requirement for low time delay high reliability of being engaged in, and further save network transmission resource.
7th embodiment
Above 5th embodiment and sixth embodiment describe the resource determination side of the uplink control channel under different scenes
Method is described further corresponding terminal below in conjunction with attached drawing.
As shown in Figure 10, the terminal 1000 of the embodiment of the present invention, can realize and be detected in the 5th embodiment and sixth embodiment
The descending transmission channel resource for being used for transmission downlink information of base station scheduling;According to the descending transmission channel resource detected, really
Fixed corresponding uplink control channel resource;By uplink control channel resource a response message or other control letters are sent to base station
The details of breath method, and reach identical effect, which specifically includes following functions module:
Detection module 1010, the descending transmission channel resource for being used for transmission downlink information for detecting base station scheduling;
Processing module 1020, for according to the descending transmission channel resource detected, determining corresponding uplink control channel
Resource;
Sending module 1030, for sending a response message or other control letters to base station by uplink control channel resource
Breath;Wherein, response message or other control information include at least:It is corresponding with down control channel in descending transmission channel resource
Response feedback information.
Wherein, as shown in figure 11, processing module 1020 includes:
First processing submodule 1021, for according to the downstream grants information in the descending transmission channel resource detected
Control channel unit CCE is originated, determines corresponding first uplink control channel resource.
Wherein, the first processing submodule 1021 further includes:
First computing unit 10211 is used for basisIt determines and starting CCE
Corresponding first channel number;
First processing units 10212, for the channel resource that channel number is the first channel number to be determined as transmission
First uplink control channel resource of row control information;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downlink and awards
The starting CCE of information is weighed,Indicate the offset of the uplink control channel resource of the business control channel of high-rise configuration.
Wherein, the first processing submodule 1021 includes:
Second computing unit 10213 is used for basisDetermine with
Originate corresponding first channel numbers of CCE;
Second processing unit 10214, for the channel resource that channel number is the first channel number to be determined as transmission
First uplink control channel resource of row control information;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downlink and awards
The starting CCE of information is weighed,ForFunction, under the configuration of different numerical valueWhen identical
It is correspondingDifference,Indicate the uplink control channel resource of the business control channel of high-rise configuration
Offset.
Wherein, sending module 1030 includes:
First sending submodule 1031, the Downlink Control Information for being transmitted in detecting descending transmission channel resource
Afterwards, the first response message or other control information are sent to base station by the first uplink control channel resource.
Wherein, processing module 1020 further includes:
Second processing submodule 1022, for according to the downlink data letter transmitted in the descending transmission channel resource detected
The starting Physical Resource Block PRB of breath, determines corresponding second uplink control channel resource.
Wherein, second processing submodule 1022 includes:
Third computing unit 10221 is used for basisIt determines and starting PRB
Corresponding second channel number;
Third processing unit 10222, for the channel resource that channel number is second channel number to be determined as transmission
Second uplink control channel resource of row data information;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink business
The starting PRB of data information,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration
Amount.
Wherein, second processing submodule 1022 further includes:
4th computing unit 10223 is used for basisDetermine with
The second channel number that starting PRB pair is answered;
Fourth processing unit 10224, for the channel resource that channel number is second channel number to be determined as transmission
Second uplink control channel of row data information;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink business
Starting PRB, the F (n of data informationPRB_start) it is nPRB_startFunction, the lower n of different numerical value configurationPRB_startIt is corresponding when identical
F(nPRB_start) different,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
Wherein, sending module 1030 further includes:
Second sending submodule 1032, the downlink service data letter for being transmitted in detecting descending transmission channel resource
After breath, the second response message or other control information are sent to base station by the second uplink control channel resource.
It is worth noting that the terminal of the embodiment of the present invention, according to the scheduling of the descending transmission channel resource of base station scheduling
Information determines corresponding uplink transport channel resource, and is further provided by the uplink control channel when receiving downlink information
Feed back response message or other control information in source so that base station stops repeating to send downlink information, and meeting business low time delay height can
By the requirement of property, and further save network transmission resource.
8th embodiment
Figure 12 is the structural schematic diagram of the terminal of another embodiment of the present invention.Specifically, the terminal 1200 in Figure 12 can
To be mobile phone, tablet computer, personal digital assistant (Personal Digital Assistant, PDA) or vehicle-mounted computer etc..
Terminal 1200 in Figure 12 includes power supply 1210, memory 1220, input unit 1230, display unit 1240, place
Manage device 1250, WIFI (Wireless Fidelity) module 1260, voicefrequency circuit 1270 and RF circuits 1280.
Wherein, input unit 1230 can be used for receiving information input by user, and generates and set with the user of terminal 1200
It sets and the related signal of function control inputs.Specifically, in the embodiment of the present invention, which may include touch-control
Panel 1231.Touch panel 1231, also referred to as touch screen collect user on it or neighbouring touch operation (such as user
Use the operation of any suitable object or attachment such as finger, stylus on touch panel 1231), and according to preset journey
Formula drives corresponding attachment device.Optionally, touch panel 1231 may include two portions of touch detecting apparatus and touch controller
Point.Wherein, the touch orientation of touch detecting apparatus detection user, and the signal that touch operation is brought is detected, it transmits a signal to
Touch controller;Touch controller receives touch information from touch detecting apparatus, and is converted into contact coordinate, then gives
The processor 1250, and order that processor 1250 is sent can be received and executed.Furthermore, it is possible to using resistance-type, capacitance
The multiple types such as formula, infrared ray and surface acoustic wave realize touch panel 1231.In addition to touch panel 1231, input unit 1230
Can also include other input equipments 1232, other input equipments 1232 can include but is not limited to physical keyboard, function key (ratio
Such as volume control button, switch key), it is trace ball, mouse, one or more in operating lever etc..
Wherein, display unit 1240 can be used for showing information input by user or be supplied to the information and terminal of user
Various menu interfaces.Display unit 1240 may include display panel 1241, optionally, LCD or organic light emission two may be used
The forms such as pole pipe (Organic Light-Emitting Diode, OLED) configure display panel 1241.
It should be noted that touch panel 1231 can cover display panel 1241, touch display screen is formed, when the touch display screen
It detects and sends processor 1250 on it or after neighbouring touch operation to determine the type of touch event, be followed by subsequent processing
Device 1250 provides corresponding visual output according to the type of touch event in touch display screen.
Touch display screen includes Application Program Interface viewing area and common control viewing area.The Application Program Interface viewing area
And arrangement mode of the common control viewing area does not limit, can be arranged above and below, left-right situs etc. can distinguish two it is aobvious
Show the arrangement mode in area.The Application Program Interface viewing area is displayed for the interface of application program.Each interface can be with
Including the interface elements such as icon and/or widget desktop controls of at least one application program.The Application Program Interface viewing area
Or the empty interface not comprising any content.This commonly uses control viewing area for showing the higher control of utilization rate, for example,
Application icons such as button, interface number, scroll bar, phone directory icon etc. are set.
Wherein processor 1250 is the control centre of terminal, utilizes each portion of various interfaces and connection whole mobile phone
Point, by running or execute the software program and/or module that are stored in first memory 1221, and calls and be stored in second
Data in memory 1222 execute the various functions and processing data of terminal, to carry out integral monitoring to terminal.It is optional
, processor 1250 may include one or more processing units.
In embodiments of the present invention, by calling store the first memory 1221 in software program and/or module and/
To the data in second memory 1222, processor 1250 is used for:Detect the downlink for being used for transmission downlink information of base station scheduling
Transmission channel resources;According to the descending transmission channel resource detected, corresponding uplink control channel resource is determined;Pass through uplink
Control channel resource sends a response message or other control information to base station;Wherein, response message or other control information extremely
Include less:Response feedback information corresponding with down control channel in descending transmission channel resource.
Specifically, processor 1250 is additionally operable to:According to the downstream grants information in the descending transmission channel resource detected
Starting control channel unit CCE, determine corresponding first uplink control channel resource.
Specifically, processor 1250 is additionally operable to:According toIt determines and originates
Corresponding first channel numbers of CCE;
The channel resource that channel number is the first channel number is determined as to the first uplink control of transmitting uplink control information
Channel resource processed;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downlink and awards
The starting CCE of information is weighed,Indicate the offset of the uplink control channel resource of the business control channel of high-rise configuration.
Specifically, processor 1250 is additionally operable to:According toIt determines
The first channel number corresponding with starting CCE;
The channel resource that channel number is the first channel number is determined as to the first uplink control of transmitting uplink control information
Channel resource processed;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downlink and awards
The starting CCE of information is weighed,ForFunction, under the configuration of different numerical valueIt is identical
When it is correspondingDifference,Indicate the uplink control channel money of the business control channel of high-rise configuration
The offset in source.
Specifically, processor 1250 is additionally operable to:The Downlink Control Information transmitted in detecting descending transmission channel resource
Afterwards, the first response message or other control information are sent to base station by the first uplink control channel resource.
Specifically, processor 1250 is additionally operable to:According to the downlink data transmitted in the descending transmission channel resource detected
The starting Physical Resource Block PRB of information, determines corresponding second uplink control channel resource.
Specifically, processor 1250 is additionally operable to:According toIt determines and originates
The second channel number that PRB pair is answered;
The channel resource that channel number is second channel number is determined as to transmit the second uplink control of upstream data information
Channel resource processed;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink business
The starting PRB of data information,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration
Amount.
Specifically, processor 1250 is additionally operable to:According toIt determines
The second channel answered with starting PRB pair is numbered;
The channel resource that channel number is second channel number is determined as to transmit the second uplink control of upstream data information
Channel processed;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink business
Starting PRB, the F (n of data informationPRR_start) it is nPRR_startFunction, the lower n of different numerical value configurationPRR_startIt is corresponding when identical
F(nPRB_start) different,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
Specifically, processor 1250 is additionally operable to:The downlink service data transmitted in detecting descending transmission channel resource
After information, the second response message or other control information are sent to base station by the second uplink control channel resource.
The terminal of the embodiment of the present invention determines corresponding according to the scheduling information of the descending transmission channel resource of base station scheduling
Uplink transport channel resource pass through the uplink control channel resource and feed back response letter and further when receiving downlink information
Breath or other control information so that base station stops repeating to send downlink information, meets the requirement of business low time delay high reliability, and
Further save network transmission resource.
Those of ordinary skill in the art may realize that lists described in conjunction with the examples disclosed in the embodiments of the present disclosure
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is implemented in hardware or software, depends on the specific application and design constraint of technical solution.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In embodiment provided herein, it should be understood that disclosed device and method can pass through others
Mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only
A kind of division of logic function, formula that in actual implementation, there may be another division manner, such as multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, device or unit
It connects, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, you can be located at a place, or may be distributed over multiple
In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme
's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also
It is that each unit physically exists alone, it can also be during two or more units be integrated in one unit.
It, can be with if the function is realized in the form of SFU software functional unit and when sold or used as an independent product
It is stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be expressed in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be
People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention.
And storage medium above-mentioned includes:USB flash disk, mobile hard disk, ROM, RAM, magnetic disc or CD etc. are various can to store program code
Medium.
In addition it should be pointed out that in apparatus and method of the present invention, it is clear that each component or each step are can to divide
It solves and/or reconfigures.These decompose and/or reconfigure the equivalent scheme that should be regarded as the present invention.Also, execute above-mentioned system
The step of column processing, can execute according to the sequence of explanation in chronological order naturally, but not need to be centainly suitable according to the time
Sequence executes, and certain steps can execute parallel or independently of one another.For those of ordinary skill in the art, it is to be understood that this
The whole either any steps or component of the method and apparatus of invention, can any computing device (including processor, storage
Medium etc.) either to be realized with hardware, firmware, software or combination thereof in the network of computing device, this is this field
What those of ordinary skill can be achieved in the case where having read the explanation of the present invention with their basic programming skill.
Therefore, the purpose of the present invention can also by run on any computing device a program or batch processing come
It realizes.The computing device can be well known fexible unit.Therefore, the purpose of the present invention can also include only by offer
The program product of the program code of the method or device is realized to realize.That is, such program product is also constituted
The present invention, and the storage medium for being stored with such program product also constitutes the present invention.Obviously, the storage medium can be
Any well known storage medium or any storage medium that developed in the future.It may also be noted that the present invention's
In device and method, it is clear that each component or each step can be decomposed and/or be reconfigured.These decomposition and/or again group
Close the equivalent scheme that should be regarded as the present invention.Also, the step of executing above-mentioned series of processes can be naturally according to the sequence of explanation
It executes in chronological order, but does not need to centainly execute sequentially in time.Certain steps can parallel or independently of one another
It executes.
Above-described is the preferred embodiment of the present invention, it should be pointed out that the ordinary person of the art is come
It says, can also make several improvements and retouch under the premise of not departing from principle of the present invention, these improvements and modifications also exist
In protection scope of the present invention.
Claims (32)
1. a kind of method for obligating resource of uplink control channel is applied to base station, which is characterized in that including:
The descending transmission channel resource of downlink information is used for transmission for terminal scheduling;
According to the descending transmission channel resource, corresponding uplink control channel resource is reserved for the terminal;
The response message or other control information that the terminal is sent are received by the uplink control channel resource;Wherein, institute
It states response message or other control information includes at least:With down control channel is corresponding in the descending transmission channel resource answers
Answer feedback information.
2. the method for obligating resource of uplink control channel according to claim 1, which is characterized in that described according under described
Row transmission channel resources are the step of terminal reserves corresponding uplink control channel resource, including:
It is the terminal according to the starting control channel unit CCE of the downstream grants information in the descending transmission channel resource
Reserve corresponding first uplink control channel resource.
3. the method for obligating resource of uplink control channel according to claim 2, which is characterized in that described according under described
The starting control channel unit CCE of downstream grants information in row transmission channel resources reserves corresponding first for the terminal
The step of uplink control channel resource, including:
According toDetermine the first channel number corresponding with the starting CCE;
For the first uplink control channel resource that terminal channel reservation number is the first channel number;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel resource
The starting CCE of middle downstream grants information,Indicate the uplink control channel resource of the business control channel of high-rise configuration
Offset.
4. the method for obligating resource of uplink control channel according to claim 2, which is characterized in that described according under described
The starting control channel unit CCE of downstream grants information in row transmission channel resources reserves corresponding first for the terminal
The step of uplink control channel resource, including:
According toDetermine that the first channel corresponding with the starting CCE is compiled
Number;
For the first uplink control channel resource that terminal channel reservation number is the first channel number;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel resource
The starting CCE of middle downstream grants information,ForFunction, it is identical under the configuration of different numerical valueIt is correspondingDifference,Indicate the uplink control of the business control channel of high-rise configuration
The offset of channel resource processed.
5. the method for obligating resource of uplink control channel according to claim 1, which is characterized in that described according under described
Row transmission channel resources are the step of terminal reserves corresponding uplink control channel resource, further include:
It is described according to the starting Physical Resource Block PRB for transmitting downlink service data information in the descending transmission channel resource
Terminal reserves corresponding second uplink control channel resource.
6. the method for obligating resource of uplink control channel according to claim 5, which is characterized in that described according under described
The starting Physical Resource Block PRB that downlink service data information is transmitted in row transmission channel resources, it is reserved corresponding for the terminal
The step of second uplink control channel resource, including:
According toDetermine that the second channel answered with the starting PRB pair is numbered;
For the second uplink control channel resource that terminal channel reservation number is second channel number;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIt indicates in descending transmission channel resource
The starting PRB of downlink service data information is transmitted,Indicate the uplink control channel of the traffic data channel of high-rise configuration
The offset of resource.
7. the method for obligating resource of uplink control channel according to claim 5, which is characterized in that described according under described
The starting Physical Resource Block PRB that downlink service data information is transmitted in row transmission channel resources, it is reserved corresponding for the terminal
The step of second uplink control channel resource, including:
According toDetermine that the second channel answered with the starting PRB pair is compiled
Number;
For the second uplink control channel resource that terminal channel reservation number is second channel number;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIt indicates in descending transmission channel resource
Transmit starting PRB, the F (n of downlink service data informationPRB_start) it is nPRR_startFunction, the lower n of different numerical value configurationPRB_start
Corresponding F (n when identicalPRB_start) different,Indicate the uplink control channel money of the traffic data channel of high-rise configuration
The offset in source.
8. a kind of resource determining method of uplink control channel is applied to terminal, which is characterized in that including:
Detect the descending transmission channel resource for being used for transmission downlink information of base station scheduling;
According to the descending transmission channel resource detected, corresponding uplink control channel resource is determined;
By the uplink control channel resource response message or other control information are sent to base station;Wherein, the response
Information or other control information include at least:Response feedback corresponding with down control channel in the descending transmission channel resource
Information.
9. the resource determining method of uplink control channel according to claim 8, which is characterized in that the basis detects
The descending transmission channel resource, the step of determining corresponding uplink control channel resource, including:
According to the starting control channel unit CCE of the downstream grants information in the descending transmission channel resource detected, really
Fixed corresponding first uplink control channel resource.
10. the resource determining method of uplink control channel according to claim 9, which is characterized in that described according to detection
To the descending transmission channel resource in downstream grants information starting control channel unit CCE, determine corresponding first
The step of uplink control channel resource, including:
According toDetermine the first channel number corresponding with the starting CCE;
The channel resource that channel number is the first channel number is determined as to the first upload control letter of transmitting uplink control information
Road resource;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downstream grants letter
The starting CCE of breath,Indicate the offset of the uplink control channel resource of the business control channel of high-rise configuration.
11. the resource determining method of uplink control channel according to claim 9, which is characterized in that described according to detection
To the descending transmission channel resource in downstream grants information starting control channel unit CCE, determine corresponding first
The step of uplink control channel resource, including:
According toDetermine that the first channel corresponding with the starting CCE is compiled
Number;
The channel resource that channel number is the first channel number is determined as to the first upload control letter of transmitting uplink control information
Road resource;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downstream grants letter
The starting CCE of breath,ForFunction, under the configuration of different numerical valueWhen identical pair
It answersDifference,Indicate the uplink control channel resource of the business control channel of high-rise configuration
Offset.
12. the resource determining method of uplink control channel according to claim 9, which is characterized in that described by described
The step of uplink control channel resource sends a response message or other control information to base station, including:
After the Downlink Control Information transmitted in detecting the descending transmission channel resource, believed by first upload control
Road resource sends the first response message or other control information to base station.
13. the resource determining method of uplink control channel according to claim 8, which is characterized in that described according to detection
The descending transmission channel resource arrived the step of determining corresponding uplink control channel resource, further includes:
According to the starting Physical Resource Block PRB for the downlink data information transmitted in the descending transmission channel resource detected,
Determine corresponding second uplink control channel resource.
14. the resource determining method of uplink control channel according to claim 13, which is characterized in that described according to detection
To the descending transmission channel resource in the starting Physical Resource Block PRB of downlink data information that transmits, determine corresponding
The step of two uplink control channel resources, including:
According toDetermine that the second channel answered with the starting PRB pair is numbered;
The channel resource that channel number is second channel number is determined as to transmit the second upload control letter of upstream data information
Road resource;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink service data
The starting PRB of information,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
15. the resource determining method of uplink control channel according to claim 13, which is characterized in that described according to detection
To the descending transmission channel resource in the starting Physical Resource Block PRB of downlink data information that transmits, determine corresponding
The step of two uplink control channel resources, including:
According toDetermine that the second channel answered with the starting PRB pair is compiled
Number;
The channel resource that channel number is second channel number is determined as to transmit the second upload control letter of upstream data information
Road;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startExpression receives downlink service data
Starting PRB, the F (n of informationPRB_start) it is nPRR_startFunction, the lower n of different numerical value configurationPRB_startCorresponding F when identical
(nPRB_start) different,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
16. the resource determining method of uplink control channel according to claim 13, which is characterized in that described by described
The step of uplink control channel resource sends a response message or other control information to base station, including:
After the downlink service data information transmitted in detecting the descending transmission channel resource, pass through the second uplink control
Channel resource processed sends the second response message or other control information to base station.
17. a kind of base station, which is characterized in that including:
Scheduler module, the descending transmission channel resource for being used for transmission downlink information for terminal scheduling;
Reserved module, for according to the descending transmission channel resource, corresponding uplink control channel money to be reserved for the terminal
Source;
Receiving module, for receiving the response message or other controls that the terminal is sent by the uplink control channel resource
Information;Wherein, the response message or other control information include at least:It is controlled with downlink in the descending transmission channel resource
The corresponding response feedback information of channel.
18. base station according to claim 17, which is characterized in that the reserved module includes:
First reserved submodule, for the starting control channel according to the downstream grants information in the descending transmission channel resource
Unit CCE reserves corresponding first uplink control channel resource for the terminal.
19. base station according to claim 18, which is characterized in that the first reserved submodule includes:
First determination unit is used for basisDetermination is corresponding with the starting CCE
The first channel number;
First Prearranged elements, for being provided for the first uplink control channel that terminal channel reservation number is the first channel number
Source;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel resource
The starting CCE of middle downstream grants information,Indicate the uplink control channel resource of the business control channel of high-rise configuration
Offset.
20. base station according to claim 18, which is characterized in that the first reserved submodule includes:
Second determination unit is used for basisIt determines and the starting CCE
Corresponding first channel number;
Second Prearranged elements, for being provided for the first uplink control channel that terminal channel reservation number is the first channel number
Source;
Wherein,Indicate the channel number of uplink control channel resource,Indicate descending transmission channel resource
The starting CCE of middle downstream grants information,ForFunction, it is identical under the configuration of different numerical valueIt is correspondingDifference,Indicate the uplink control of the business control channel of high-rise configuration
The offset of channel resource processed.
21. base station according to claim 17, which is characterized in that the reserved module further includes:
Second reserved submodule, for according to the starting material for transmitting downlink service data information in the descending transmission channel resource
Resource block PRB is managed, corresponding second uplink control channel resource is reserved for the terminal.
22. base station according to claim 21, which is characterized in that the second reserved submodule includes:
Third determination unit is used for basisDetermination is answered with the starting PRB pair
Second channel number;
Third Prearranged elements, for being provided for the second uplink control channel that terminal channel reservation number is second channel number
Source;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIt indicates in descending transmission channel resource
The starting PRB of downlink service data information is transmitted,Indicate the uplink control channel of the traffic data channel of high-rise configuration
The offset of resource.
23. base station according to claim 21, which is characterized in that the second reserved submodule includes:
4th determination unit is used for basisIt determines and the starting
The second channel number that PRB pair is answered;
4th Prearranged elements, for being provided for the second uplink control channel that terminal channel reservation number is second channel number
Source;
Wherein,Indicate the channel number of uplink control channel resource, nPRB_startIt indicates in descending transmission channel resource
Transmit starting PRB, the F (n of downlink service data informationPRB_start) it is nPRR_startFunction, the lower n of different numerical value configurationPRB_start
Corresponding F (n when identicalPRB_start) different,Indicate the uplink control channel money of the traffic data channel of high-rise configuration
The offset in source.
24. a kind of terminal, which is characterized in that including:
Detection module, the descending transmission channel resource for being used for transmission downlink information for detecting base station scheduling;
Processing module, for according to the descending transmission channel resource detected, determining corresponding uplink control channel resource;
Sending module, for sending a response message or other control information to base station by the uplink control channel resource;
Wherein, the response message or other control information include at least:With down control channel in the descending transmission channel resource
Corresponding response feedback information.
25. terminal according to claim 24, which is characterized in that the processing module includes:
First processing submodule, for the starting according to the downstream grants information in the descending transmission channel resource detected
Control channel unit CCE determines corresponding first uplink control channel resource.
26. terminal according to claim 25, which is characterized in that described first, which handles submodule, includes:
First computing unit is used for basisDetermination is corresponding with the starting CCE
The first channel number;
First processing units, for the channel resource that channel number is the first channel number to be determined as transmitting uplink control information
The first uplink control channel resource;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downstream grants letter
The starting CCE of breath,Indicate the offset of the uplink control channel resource of the business control channel of high-rise configuration.
27. terminal according to claim 25, which is characterized in that described first, which handles submodule, includes:
Second computing unit is used for basisIt determines and the starting
Corresponding first channel numbers of CCE;
Second processing unit, for the channel resource that channel number is the first channel number to be determined as transmitting uplink control information
The first uplink control channel resource;
Wherein,Indicate the channel number of uplink control channel resource,Expression receives downstream grants letter
The starting CCE of breath,ForFunction, under the configuration of different numerical valueWhen identical pair
It answersDifference,Indicate the uplink control channel resource of the business control channel of high-rise configuration
Offset.
28. terminal according to claim 25, which is characterized in that the sending module includes:
First sending submodule, for after the Downlink Control Information transmitted in detecting the descending transmission channel resource, leading to
It crosses first uplink control channel resource and sends the first response message or other control information to base station.
29. terminal according to claim 24, which is characterized in that the processing module further includes:
Second processing submodule, for according to the downlink data information transmitted in the descending transmission channel resource detected
Physical Resource Block PRB is originated, determines corresponding second uplink control channel resource.
30. terminal according to claim 29, which is characterized in that the second processing submodule includes:
Third computing unit is used for basisDetermination is answered with the starting PRB pair
Second channel number;
Third processing unit, for being determined as the channel resource that channel number is second channel number to transmit upstream data information
The second uplink control channel resource;
Wherein,Indicate the channel number of uplink control channel resource, nPRR_startExpression receives downlink service data
The starting PRB of information,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
31. terminal according to claim 29, which is characterized in that the second processing submodule further includes:
4th computing unit is used for basisIt determines and the starting
The second channel number that PRB pair is answered;
Fourth processing unit, for being determined as the channel resource that channel number is second channel number to transmit upstream data information
The second uplink control channel;
Wherein,Indicate the channel number of uplink control channel resource, nPRR_startExpression receives downlink service data
Starting PRB, the F (n of informationPRB_start) it is nPRB_startFunction, the lower n of different numerical value configurationPRB_startCorresponding F when identical
(nPRB_start) different,Indicate the offset of the uplink control channel resource of the traffic data channel of high-rise configuration.
32. terminal according to claim 29, which is characterized in that the sending module further includes:
Second sending submodule, the downlink service data information for being transmitted in detecting the descending transmission channel resource
Afterwards, the second response message or other control information are sent to base station by second uplink control channel resource.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710069558.9A CN108401270A (en) | 2017-02-08 | 2017-02-08 | The method for obligating resource of uplink control channel determines method, base station and terminal |
PCT/CN2018/074265 WO2018145583A1 (en) | 2017-02-08 | 2018-01-26 | Resource reservation method and determination method for uplink control channel, base station and terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710069558.9A CN108401270A (en) | 2017-02-08 | 2017-02-08 | The method for obligating resource of uplink control channel determines method, base station and terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108401270A true CN108401270A (en) | 2018-08-14 |
Family
ID=63094132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710069558.9A Pending CN108401270A (en) | 2017-02-08 | 2017-02-08 | The method for obligating resource of uplink control channel determines method, base station and terminal |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN108401270A (en) |
WO (1) | WO2018145583A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110312315A (en) * | 2019-04-19 | 2019-10-08 | 展讯通信(上海)有限公司 | A kind of information transferring method and device |
WO2021087915A1 (en) * | 2019-11-07 | 2021-05-14 | Oppo广东移动通信有限公司 | Information sending method, receiving method, apparatus, device, and storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101043709A (en) * | 2006-03-22 | 2007-09-26 | 华为技术有限公司 | Method for realizing uplink wireless channel resource distribution |
WO2009037853A1 (en) * | 2007-09-21 | 2009-03-26 | Panasonic Corporation | Radio communication base station device, radio communication terminal device, and response signal allocation method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102014505B (en) * | 2009-11-03 | 2013-09-11 | 电信科学技术研究院 | Method, equipment and system for resource allocation of upstream control channel |
CN103378951B (en) * | 2012-04-25 | 2017-10-27 | 电信科学技术研究院 | A kind of ascending control channel determines method and device |
JP6501903B2 (en) * | 2015-04-08 | 2019-04-17 | ホアウェイ・テクノロジーズ・カンパニー・リミテッド | Network node user device and method thereof |
-
2017
- 2017-02-08 CN CN201710069558.9A patent/CN108401270A/en active Pending
-
2018
- 2018-01-26 WO PCT/CN2018/074265 patent/WO2018145583A1/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101043709A (en) * | 2006-03-22 | 2007-09-26 | 华为技术有限公司 | Method for realizing uplink wireless channel resource distribution |
WO2009037853A1 (en) * | 2007-09-21 | 2009-03-26 | Panasonic Corporation | Radio communication base station device, radio communication terminal device, and response signal allocation method |
Non-Patent Citations (2)
Title |
---|
3GPP: "3rd Generation Partnership Project;Technical Specification Group Radio Access Network;Evolved Universal Terrestrial Radio Access (E-UTRA);Physical layer procedures(Release 14)", 《3GPP TS 36.213 V14.1.0》 * |
NTT DOCOMO: "Views on PUCCH for Rel-13 low complexity MTC", 《3GPP TSG RAN WG1 MEETING #81》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110312315A (en) * | 2019-04-19 | 2019-10-08 | 展讯通信(上海)有限公司 | A kind of information transferring method and device |
WO2021087915A1 (en) * | 2019-11-07 | 2021-05-14 | Oppo广东移动通信有限公司 | Information sending method, receiving method, apparatus, device, and storage medium |
Also Published As
Publication number | Publication date |
---|---|
WO2018145583A1 (en) | 2018-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113115443B (en) | Resource allocation indication method, base station and terminal | |
CN108243501B (en) | Scheduling method of transmission resources, network equipment and terminal equipment | |
CN108307517B (en) | Resource scheduling indication method, network equipment and terminal equipment | |
CN108696463B (en) | Downlink control channel detection method, terminal and base station | |
CN107889268A (en) | Method, terminal device and the network equipment of descending scheduling resource | |
CN113573256B (en) | Information feedback and resource scheduling method, terminal and network equipment | |
CN108667572A (en) | A kind of service data transmission method, base station and terminal | |
CN106953718A (en) | A kind of implementation method, device and the equipment of the retransmission process of code block | |
CN107889231A (en) | Exempt from method, the network equipment and the terminal device of transmission uplink information authorized | |
WO2018103577A1 (en) | Terminal scheduling method, terminal and base station | |
CN112788760B (en) | Method for determining hybrid automatic repeat request-acknowledgement HARQ-ACK feedback position and communication equipment | |
CN110505697A (en) | A kind of transmission method of hybrid automatic repeat-request, terminal and base station | |
CN108235436A (en) | Subscriber device and base station | |
CN109088707A (en) | Transmission method, detection method, device and the equipment of grading control channel | |
CN106102168A (en) | The control method of a kind of data transmission and relevant device | |
CN106301700A (en) | The information feedback method of a kind of upstream data and relevant device | |
US20220061039A1 (en) | Method for transmitting information, terminal and network device | |
WO2021013089A1 (en) | Information transmission method, user equipment and control node | |
US20200068566A1 (en) | Data transmission method, terminal and base station | |
CN110166181A (en) | A kind of transmission method of HARQ-ACK, terminal and base station | |
CN108401270A (en) | The method for obligating resource of uplink control channel determines method, base station and terminal | |
CN108633005B (en) | Resource allocation method and device, authorization-free service processing method and user equipment | |
CN109905215A (en) | Transmission method and equipment | |
CN108024349A (en) | Detection method, sending method, network side equipment and the terminal of down control channel | |
JP7307269B2 (en) | Information processing method, equipment and computer-readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180814 |
|
RJ01 | Rejection of invention patent application after publication |