CN108399465A - The OD distribution methods of area traffic control strategy are implemented in a kind of reply - Google Patents

The OD distribution methods of area traffic control strategy are implemented in a kind of reply Download PDF

Info

Publication number
CN108399465A
CN108399465A CN201710945343.9A CN201710945343A CN108399465A CN 108399465 A CN108399465 A CN 108399465A CN 201710945343 A CN201710945343 A CN 201710945343A CN 108399465 A CN108399465 A CN 108399465A
Authority
CN
China
Prior art keywords
trip
strategy
detour
reply
implemented
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710945343.9A
Other languages
Chinese (zh)
Other versions
CN108399465B (en
Inventor
王炜
吴忠君
胡晓健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201710945343.9A priority Critical patent/CN108399465B/en
Publication of CN108399465A publication Critical patent/CN108399465A/en
Application granted granted Critical
Publication of CN108399465B publication Critical patent/CN108399465B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/40

Abstract

The present invention discloses a kind of OD distribution methods of reply implementation area traffic control strategy, and step is:A determines the regional extent for implementing traffic administration strategy and its implements management strategy classification;B identifies be no longer pass through the region by quasi- implementation management strategy region before management strategy is not carried out and after implementing management strategy OD pairs, and calculates its evaluation of estimate before management strategy is not carried out;C drafts OD pairs in step B of detour optimal path according to the region and its property parameters of periphery road network, and calculates its corresponding evaluation of estimate;D, setting allows detour threshold value, and according to evaluation of estimate, judges whether detour path is received;Original OD is assigned in other trip modes if detour path is not received using advantage trip distance share rate function by E;F is superimposed the OD shares in each section respectively by trip mode, obtains the new OD allocation results in section.Such OD distribution methods can solve the problems, such as that relevant traffic amount is redistributed after implementing traffic administration strategy.

Description

The OD distribution methods of area traffic control strategy are implemented in a kind of reply
Technical field
The invention belongs to traffic assignation technical field, more particularly to OD points of area traffic control strategy are implemented in a kind of reply Method of completing the square.
Background technology
Intelligent transportation has the developing direction of future city road traffic as a popular research direction in recent years Great leading action is the developing direction of future transportation system.The construction of intelligent transportation system is to greatly develop intelligent transportation Important measure, and structure city virtual traffic platform one step of key.
Traffic Demand Forecasting is directly affected as traffic programme, the commander of an advance unit or vanguard of decision-making, the accuracy of prediction result The science of follow-up work.However, in recent years, with being widely used for traffic administration strategy, the traffic administration plan of regional area Implementation slightly is more and more obvious the influence for having traffic distribution, not yet finds that there are relevant solutions.
Invention content
The purpose of the present invention is to provide a kind of OD distribution methods of reply implementation area traffic control strategy, can solve Relevant traffic amount redistributes problem after certainly implementing traffic administration strategy.
In order to achieve the above objectives, solution of the invention is:
The OD distribution methods of area traffic control strategy are implemented in a kind of reply, include the following steps:
A determines the regional extent for implementing traffic administration strategy and its implements management strategy classification;
B, identification are no longer pass through before management strategy is not carried out by quasi- implementation management strategy region and after implementing management strategy Quasi- implement management region OD pairs, and calculate its evaluation of estimate before management strategy is not carried out;
C drafts OD pairs in step B of detour according to quasi- implementation management strategy region and its property parameters of periphery road network Optimal path, and calculate its corresponding evaluation of estimate;
D, setting allows detour threshold value, and according to the evaluation of estimate determined in step B and step C, whether judges detour path Received;
Original OD Traffic growth rates are arrived it by E if detour path is not received using advantage trip distance share rate function In his trip mode;
F is superimposed the OD shares in each section respectively by trip mode, obtains the new OD Traffic growth rate results in section.
In above-mentioned steps A, the region for implementing traffic administration strategy includes physical region made of being enclosed by several roads, And the special area of Dan Youyi road or node composition.
In above-mentioned steps A, management strategy classification is including but not limited to forbidden, restrict driving, congestion-pricing and setting public transport are special It uses.
In above-mentioned steps B, identification is not carried out before management strategy by quasi- implement management strategy region OD pairs, and use is following Method:By each section in existing road network, node property parameters based on, using optimal method, determine each OD pairs optimal Path, and the quasi- regional extent for implementing management strategy is combined, define whether each OD pairs of optimal path is implemented to manage plan by quasi- Slightly region.
The attribute in above-mentioned section, which includes section number of track-lines, road section length and vehicle, allows running velocity.
The attribute of above-mentioned node includes the steering management of intersection geometric properties and each Parking Entrance.
Above-mentioned optimal method includes but is not limited to short line, most saves time and minimum stroke expense.
In above-mentioned steps C, the optimization aim of the optimal path keeps one with the optimization aim of optimal path in step B It causes.
In above-mentioned steps D, detour threshold value is defined as characterizing the acceptable maximum detour rate of resident, the detour rate Implement the ratio of the evaluation of estimate and the evaluation of estimate of optimal path before implementation management strategy in the optimal detour path after management strategy.
In above-mentioned steps D, whether received using following methods judgement detour path:It detours if detour rate is less than or equal to Threshold value, then path of detouring are received;Otherwise, detour path is not received.
In above-mentioned steps E, advantage trip distance share rate function increases every time on the basis of Urban Residential Trip is investigated The investigation of trip distance and trip mode, and be fitted to obtain according to the data of investigation, the share rate function is to go out Row distance is the function of independent variable.
Above-mentioned steps E includes following steps:
Step E1 determines advantage trip distance share rate function ys of the trip mode i at trip distance xi=yi(x);
Step E2 is determined to substitute one or more trip modes of original trip;
Step E3 determines the distance L for substituting optimal paths of the trip mode j between origin and destination O, DOD(j);
Step E4 corrects each share rate for substituting trip mode between origin and destination O, D,
Wherein, LOD(j) distance of optimal paths of the trip mode j between origin and destination O, D, y are indicatedj(LOD(j)) it indicates Share rate under the distance of optimal paths of the trip mode j between origin and destination O, D, yj' indicate trip mode j origin and destination O, Amendment share rate under the distance of optimal path between D;
Step E5, by original OD Traffic growth rates to other trip modes,
VOD(j)=VOD(i)*yj
Wherein, VOD(i) volume of traffic from trip mode i starting point O to terminal D, V are indicatedOD(j) trip mode j is indicated From VOD(i) share in.
After adopting the above scheme, the present invention influences existing travel modal after being directed to implementation traffic administration strategy at present The problem of, emphasis is not implementing the case where management strategy region but optimal path pass through the region for origin and destination O, D, passes through Rational detour threshold value is set, existing OD amounts can be transferred to other paths by the way of detouring, or be based on advantage Distance trip share rate function shifts other and substitutes trip mode, to improving accuracy, the assessment traffic administration plan of traffic assignation Influence after slightly implementing etc. has active influence.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific implementation mode
Below with reference to attached drawing, technical scheme of the present invention is described in detail.
As shown in Figure 1, the present invention provides a kind of OD distribution methods of reply implementation area traffic control strategy, including it is as follows Step:
Step A determines the regional extent for implementing traffic administration strategy and its implements management strategy classification;
Wherein, the region of the implementation traffic administration strategy is not limited solely to object made of being enclosed by several roads Region is managed, also includes the special area that Dan Youyi road or a node form;The management strategy classification refers to existing The mode for urban traffic control, the method that has or may use in the future, including but not limited to forbidden, restricted driving, congestion Charge and setting public transportation lane;
Step B, identification are not carried out before management strategy behind quasi- implementation management strategy region and implementation management strategy no longer By quasi- implement management region OD pairs, and calculate its evaluation of estimate before management strategy is not carried out;
In the step B, the identification is not carried out before management strategy by quasi- implement management strategy region OD pairs, can Using following methods:By each section in existing road network, node property parameters based on, using optimal method, determine each OD To optimal path, and combine the quasi- regional extent for implementing management strategy, whether define each OD pairs of optimal path by quasi- real Apply management strategy region;Wherein, the attribute in section, which includes section number of track-lines, road section length and vehicle, allows running velocity, node Attribute include intersection geometric properties and each Parking Entrance steering management;Used optimal method includes but is not limited to Existing shortest path most saves time and minimum stroke expense;
Step C drafts in step B OD pairs according to quasi- implementation management strategy region and its property parameters of periphery road network Detour optimal path, and calculate its corresponding evaluation of estimate, wherein the optimization aim of optimal path and optimal path in step B Optimization aim is consistent;
Step D, setting allows detour threshold value, and according to the evaluation of estimate determined in step B and step C, judges detour path Whether received;
Wherein, the detour threshold value is for characterizing resident's acceptable maximum detour rate, and the detour rate can be with It is defined as implementing the evaluation of estimate in the optimal detour path after management strategy and the evaluation of estimate of optimal path before implementation management strategy Ratio;The detour threshold value is related with trip mode, the corresponding detour threshold value of the trip mode that mobility is higher, speed is faster It is bigger, it can be obtained by resident trip survey in engineering practice, it is proposed that the value between 1.2-2.0;
In the step D, it may be used whether following methods judgement detour path is received:If the detour rate is less than Equal to detour threshold value, then path of detouring can be received;Otherwise, do not receive detour path, can only be gone out using other substitute modes Row.
Step E, if detour path is not received, using advantage trip distance share rate function by original OD Traffic growth rates Onto other trip modes;
Wherein, the advantage trip distance share rate function can be on the basis of original Urban Residential Trip be investigated Increase the investigation of each trip distance and trip mode, and is fitted to obtain according to the data of investigation, the share rate letter Number is the function using trip distance as independent variable;
Specifically, step E includes following steps:
(E1) according to the setting method of aforementioned advantages trip distance share rate function, determine trip mode i in trip distance x Under advantage trip distance share rate function yi=yi(x);
(E2) determination can substitute one or more trip modes of original trip;
(E3) the distance L for substituting optimal paths of the trip mode j between origin and destination O, D is determinedOD(j);
(E4) each share rate for substituting trip mode between origin and destination O, D is corrected:
Wherein, LOD(j) distance of optimal paths of the trip mode j between origin and destination O, D, y are indicatedj(LOD(j)) it indicates Share rate under the distance of optimal paths of the trip mode j between origin and destination O, D, yj' indicate trip mode j origin and destination O, Amendment share rate under the distance of optimal path between D;
(E5) by original OD Traffic growth rates to other trip modes,
VOD(j)=VOD(i)*yj
Wherein, VOD(i) volume of traffic from trip mode i starting point O to terminal D, V are indicatedOD(j) trip mode j is indicated From VOD(i) share in;
Step F is superimposed the OD shares in each section respectively by trip mode, obtains the new OD Traffic growth rate knots in section Fruit.
Above example is merely illustrative of the invention's technical idea, and protection scope of the present invention cannot be limited with this, every According to technological thought proposed by the present invention, any change done on the basis of technical solution each falls within the scope of the present invention Within.

Claims (12)

1. the OD distribution methods of area traffic control strategy are implemented in a kind of reply, it is characterised in that include the following steps:
A determines the regional extent for implementing traffic administration strategy and its implements management strategy classification;
B is identified by quasi- implementation management strategy region before management strategy is not carried out and is no longer pass through after implementing management strategy and intended in fact Apply management region OD pairs, and calculate its evaluation of estimate before management strategy is not carried out;
It is optimal to draft OD pairs in step B of detour according to quasi- implementation management strategy region and its property parameters of periphery road network by C Path, and calculate its corresponding evaluation of estimate;
D, setting allows detour threshold value, and according to the evaluation of estimate determined in step B and step C, judges whether detour path is connect By;
E is gone out original OD Traffic growth rates to other using advantage trip distance share rate function if detour path is not received On line mode;
F is superimposed the OD shares in each section respectively by trip mode, obtains the new OD Traffic growth rate results in section.
2. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as described in claim 1, it is characterised in that:Institute It states in step A, the region for implementing traffic administration strategy includes physical region and Dan Youyi made of being enclosed by several roads The special area of road or node composition.
3. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as described in claim 1, it is characterised in that:Institute It states in step A, management strategy classification is including but not limited to forbidden, restrict driving, congestion-pricing and setting public transportation lane.
4. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as described in claim 1, it is characterised in that:Institute It states in step B, identification is not carried out before management strategy by quasi- implement management strategy region OD pairs, using following methods:With existing Have each section in road network, node property parameters based on, using optimal method, determine each OD pairs of optimal path, and tie The quasi- regional extent for implementing management strategy is closed, whether defines each OD pairs of optimal path by intending implementing management strategy region.
5. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as claimed in claim 4, it is characterised in that:Institute The attribute for stating section, which includes section number of track-lines, road section length and vehicle, allows running velocity.
6. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as claimed in claim 4, it is characterised in that:Institute The attribute for stating node includes the steering management of intersection geometric properties and each Parking Entrance.
7. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as claimed in claim 4, it is characterised in that:Institute Optimal method is stated to include but is not limited to short line, most save time and minimum stroke expense.
8. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as claimed in claim 4, it is characterised in that:Institute It states in step C, the optimization aim and the optimization aim of optimal path in step B of the optimal path are consistent.
9. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as described in claim 1, it is characterised in that:Institute It states in step D, detour threshold value is defined as implementing management plan for characterizing the acceptable maximum detour rate of resident, the detour rate The ratio of the evaluation of estimate in the optimal detour path after slightly and the evaluation of estimate of optimal path before implementation management strategy.
10. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as claimed in claim 9, it is characterised in that: In the step D, whether received using following methods judgement detour path:If detour rate is less than or equal to detour threshold value, Detour path is received;Otherwise, detour path is not received.
11. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as described in claim 1, it is characterised in that: In the step E, advantage trip distance share rate function increases each trip distance on the basis of Urban Residential Trip is investigated It with the investigation of trip mode, and is fitted to obtain according to the data of investigation, the share rate function is to be with trip distance The function of independent variable.
12. the OD distribution methods of area traffic control strategy are implemented in a kind of reply as described in claim 1, it is characterised in that institute It includes following steps to state step E:
Step E1 determines advantage trip distance share rate function ys of the trip mode i at trip distance xi=yi(x);
Step E2 is determined to substitute one or more trip modes of original trip;
Step E3 determines the distance L for substituting optimal paths of the trip mode j between origin and destination O, DOD(j);
Step E4 corrects each share rate for substituting trip mode between origin and destination O, D,
Wherein, LOD(j) distance of optimal paths of the trip mode j between origin and destination O, D, y are indicatedj(LOD(j)) trip is indicated Share rate under the distance of optimal paths of the mode j between origin and destination O, D, yj' indicate trip mode j origin and destination O, D it Between optimal path distance under amendment share rate;
Step E5, by original OD Traffic growth rates to other trip modes,
VOD(j)=VOD(i)*yj
Wherein, VOD(i) volume of traffic from trip mode i starting point O to terminal D, V are indicatedOD(j) indicate trip mode j from VOD (i) share in.
CN201710945343.9A 2017-10-12 2017-10-12 OD distribution method for implementing regional traffic management strategy Active CN108399465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710945343.9A CN108399465B (en) 2017-10-12 2017-10-12 OD distribution method for implementing regional traffic management strategy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710945343.9A CN108399465B (en) 2017-10-12 2017-10-12 OD distribution method for implementing regional traffic management strategy

Publications (2)

Publication Number Publication Date
CN108399465A true CN108399465A (en) 2018-08-14
CN108399465B CN108399465B (en) 2021-09-07

Family

ID=63094336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710945343.9A Active CN108399465B (en) 2017-10-12 2017-10-12 OD distribution method for implementing regional traffic management strategy

Country Status (1)

Country Link
CN (1) CN108399465B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109325617A (en) * 2018-09-04 2019-02-12 青岛海信网络科技股份有限公司 A kind of urban traffic status prediction technique and device
CN109544927A (en) * 2018-12-10 2019-03-29 中南大学 A kind of multitiered network collaboration restricted driving method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102136192A (en) * 2011-01-31 2011-07-27 上海美慧软件有限公司 Method for identifying trip mode based on mobile phone signal data
US20110267954A1 (en) * 2010-03-16 2011-11-03 The Regents Of The University Of California Method for routing-assisted traffic monitoring
CN103310120A (en) * 2013-07-10 2013-09-18 东南大学 Transport service level based method for determining section congestion charge rates
CN107038862A (en) * 2017-05-04 2017-08-11 东南大学 A kind of traffic assignation modification method under the conditions of tail number restricted driving

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110267954A1 (en) * 2010-03-16 2011-11-03 The Regents Of The University Of California Method for routing-assisted traffic monitoring
CN102136192A (en) * 2011-01-31 2011-07-27 上海美慧软件有限公司 Method for identifying trip mode based on mobile phone signal data
CN103310120A (en) * 2013-07-10 2013-09-18 东南大学 Transport service level based method for determining section congestion charge rates
CN107038862A (en) * 2017-05-04 2017-08-11 东南大学 A kind of traffic assignation modification method under the conditions of tail number restricted driving

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109325617A (en) * 2018-09-04 2019-02-12 青岛海信网络科技股份有限公司 A kind of urban traffic status prediction technique and device
CN109544927A (en) * 2018-12-10 2019-03-29 中南大学 A kind of multitiered network collaboration restricted driving method
CN109544927B (en) * 2018-12-10 2019-11-29 中南大学 A kind of multitiered network collaboration restricted driving method

Also Published As

Publication number Publication date
CN108399465B (en) 2021-09-07

Similar Documents

Publication Publication Date Title
DE102016223638B4 (en) DRIVING ASSISTANT DEVICE
Ashalatha et al. Critical gap through clearing behavior of drivers at unsignalised intersections
CN104821080B (en) Intelligent vehicle traveling speed and time predication method based on macro city traffic flow
CN105644559B (en) A kind of unmanned method and system based on virtual rail and Moving Block Technology in UMT
CN104897168B (en) The intelligent vehicle method for searching path and system assessed based on road hazard
CN108958242B (en) Lane change decision-making auxiliary method and system based on high-precision map
CN102288193A (en) Motor vehicle travel route determination method based on historical data
Hu et al. TPSQ: Trust-based platoon service query via vehicular communications
CN105139645A (en) Urban regional road network operation index assessment method based on floating car technology
DE102018221740A1 (en) Method, device and computer program for a vehicle
CN106197442A (en) Air navigation aid and equipment
WO2023010854A1 (en) Path tracking method and apparatus, vehicle, and storage medium
CN108399465A (en) The OD distribution methods of area traffic control strategy are implemented in a kind of reply
WO2023197408A1 (en) Method and apparatus for determining vehicle speed control model training sample
WO2021077818A1 (en) Method and system for predicting motion trajectory
JPWO2022054712A5 (en) Map server, map distribution method
TW201928904A (en) A way for dividing the traffic network by origin-destination tree(OD-Tree)
HU228199B1 (en) Method for determining traffic related information
DE102021211781A1 (en) VEHICLE OPERATION USING BEHAVIOR RULES CHECKS
Zhang et al. Dynamic lane grouping at isolated intersections: problem formulation and performance analysis
Elbery et al. Eco-routing: an ant colony based approach
CN108389404B (en) Road traffic jam treatment method
CN109729164A (en) Intelligent network joins Automobile Computing Platform Che Duanyu cloud operation grade distribution method
Qu et al. Capacity and delay estimation for roundabouts using conflict theory
CN104376726B (en) Traffic signal cooperative control sub-area division method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant