CN108398184A - A kind of construction noise detecting system - Google Patents
A kind of construction noise detecting system Download PDFInfo
- Publication number
- CN108398184A CN108398184A CN201810168630.8A CN201810168630A CN108398184A CN 108398184 A CN108398184 A CN 108398184A CN 201810168630 A CN201810168630 A CN 201810168630A CN 108398184 A CN108398184 A CN 108398184A
- Authority
- CN
- China
- Prior art keywords
- construction
- module
- noise
- detecting system
- shell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01H—MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01H17/00—Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the preceding groups
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C17/00—Arrangements for transmitting signals characterised by the use of a wireless electrical link
- G08C17/02—Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
Abstract
The present invention relates to a kind of construction noise detecting systems, including sensor array, noise measuring equipment and remote monitoring center, the microphone array includes multiple microphones positioned at construction site different location, the noise measuring equipment includes the power module in shell and the setting shell, signal acquisition and conversion module, signal processing and control module, data transmission unit and data memory module, multiple microphones are communicated to connect with the signal acquisition and conversion module respectively, the signal processing and control module respectively with the power module, signal acquisition and conversion module, data transmission unit and data memory module are connected, the remote monitoring center is communicated to connect by data transmission unit and the noise measuring equipment.The beneficial effects of the present invention are, construction noise detecting system by operation it is distinguishable go out construction noise and ambient noise, that is, whether exceeded, to be used to specify corresponding noise reduction management measure if analyzing current construction noise.
Description
Technical field
The present invention relates to a kind of construction noise detecting systems.
Background technology
Noise monitoring is the monitoring activity carried out for the sound and its sound source of interference people study, work and life.Its
Working contents are:Each Function area noise monitoring in city, road traffic noise monitoring, regional environmental noise monitoring and noise source
Monitoring etc..
Currently, in the work progress of construction site, in order to improve construction personnel's operating environment, create good apply
Work condition is to accelerate construction progress, ensure that construction quality, holding meet the working environment of the site operation of sanitary standard very
It is important, therefore various Construction Technology specifications both domestic and external all define specific standard to operating environment in construction.Currently,
Detection for operating environment in building engineering construction, universal detecting instrument can only detect the individual event factor in environment, and need
It wants testing staff to carry out live reading and carries out periodic detection, this aspect keeps detection Comparision arduous and cumbersome, another party
Face cannot be guaranteed that the environmental factor of non-detection period meets the requirements, while cannot be real-time to the noise of each position of construction site
The size for the noise grasped and generated according to different location is timely handled, and does not distinguish construction noise and background
Noise.
Invention content
In view of the above-mentioned problems in the prior art, the main purpose of the present invention is to provide a kind of easy to use, remote
Journey detects and the construction noise detecting system of distinguishable construction noise and ambient noise indices.
The technical scheme is that such:
A kind of construction noise detecting system, including sensor array, noise measuring equipment and remote monitoring center, it is described
Microphone array includes multiple microphones positioned at construction site different location, the noise measuring equipment include shell with
And power module, signal acquisition and conversion module in the setting shell, signal processing and control module, data transmission unit
And data memory module, multiple microphones are communicated to connect with the signal acquisition and conversion module respectively, the signal
Processing is stored with the power module, signal acquisition and conversion module, data transmission unit and data respectively with control module
Module is connected, and the remote monitoring center is communicated to connect by data transmission unit and the noise measuring equipment.
The front end face of the shell is provided with display screen, the display screen and the signal processing and control module communication link
It connects.
4G module antennas are provided on the shell, the 4G module antennas are communicated with the signal processing with control module
Connection.
Alarm is provided on the shell, the alarm is communicated to connect with the signal processing and control module.
The shell is made of aluminium alloy, and housing rear end face top both sides are respectively arranged with fixing device.
The fixing device includes fixed plate, and the fixed plate lower end is fixedly connected with the housing rear end face, and described
Dead plate upper end is provided with mounting hole.
Further include mobile terminal, the mobile terminal is communicated by the data transmission unit with the noise measuring equipment
Connection.
The mobile terminal is PC terminals or mobile phone.
Further include solar charging device, the solar charging device is connected with the power module, is used for described
Power module provides electric energy.
The present invention has the following advantages and beneficial effect:The construction site noise detection system of the present invention, by construction
Live noise is monitored, and multiple spot is deployed to ensure effective monitoring and control of illegal activities construction site, acquires sound source audio, and signal is carried out into backstage (noise measuring equipment)
Processing realizes the identification to various construction noises, and data processed result is transmitted to by data transmission unit (4G modules)
The server of remote monitoring center, is shown by mobile phone and network inquiry;In addition, the construction site noise detection system of the present invention
By operation it is distinguishable go out construction noise and ambient noise, that is, whether exceeded, corresponding for formulating if analyzing current construction noise
Noise reduction management measure.
Description of the drawings
Fig. 1 is the functional block diagram of construction noise detecting system provided in an embodiment of the present invention;
Fig. 2 is the front view structure signal of noise measuring equipment in construction noise detecting system provided in an embodiment of the present invention
Figure.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.Therefore, below to the reality of the present invention provided in the accompanying drawings
The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of the selected implementation of the present invention
Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts
Every other embodiment, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to
Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" third " is used for description purposes only, and is not understood to indicate or imply relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ",
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be mechanical connection, can also be electrical connection;It can be directly connected, it can also be indirect by intermediary
It is connected, can is the connection inside two elements.For the ordinary skill in the art, it can manage as the case may be
Solve the concrete meaning of above-mentioned term in the present invention.
The present invention is further illustrated with specific embodiment below with reference to accompanying drawings.
As depicted in figs. 1 and 2:The construction noise detecting system of the embodiment of the present invention, including sensor array 200, noise
Detection device 100 and remote monitoring center 105, the microphone array 200 include being located at construction site different location
Multiple microphones, the voice signal for obtaining construction site different location needs the position of reasonable Arrangement microphone, simultaneously
Correctly choose the type of microphone according to site environment and parameter request, the noise measuring equipment 100 include shell 101 and
Power module 106, signal acquisition and conversion module 102 in the shell 101, signal processing and control module 103, number are set
According to transmission unit 104 and data memory module 105, multiple microphones respectively with the signal acquisition and conversion module
102 communication connections, the signal processing and control module 103 respectively with the power module 106, signal acquisition and conversion module
102, data transmission unit 104 and data memory module 105 are connected, and the remote monitoring center 300 passes through data transmission list
Member 104 is communicated to connect with the noise measuring equipment 100, and the data transmission unit 104 can be 4G modules;The remote monitoring
The server that center 300 may include monitoring host computer and be connected with the monitoring host computer;When work, noise measuring equipment, which is placed in, builds
The construction site of construction is built, remote monitoring center is placed in monitoring room or operating room, and remote monitoring center can be to environmental factor
Allow value range and voice to read function to be set, the publication of noise measuring equipment can be started or stopped and voice is read
The manipulation commands such as number;Noise measuring equipment can execute the order of remote monitoring center and feed back to the information such as the data measured
Remote monitoring center.
The front end face of the shell 101 is provided with display screen 107, the display screen 107 and the signal processing and control
Module 103 communicates to connect, the display screen 107 can real-time display detection as a result, facilitate carried out for field personnel it is timely
It checks and is handled accordingly.
4G module antennas 108, the 4G module antennas 108 and the signal processing and control are provided on the shell 101
Molding block 103 communicates to connect.
Alarm 109, the alarm 109 and the signal processing and control module 103 are provided on the shell 101
Communication connection, when the noise of detection is more than preset standard, alarm 109 is alarmed, and staff is facilitated to take
Corresponding measure carries out timely processing.
The shell 101 is made of aluminium alloy, and 101 rear end face top both sides of the shell are respectively arranged with fixed dress
It sets, and the shell carries out water proof and dust proof design, and then achievees the purpose that extend its service life.
The fixing device includes fixed plate 110, and 110 lower end of the fixed plate is fixed with 101 rear end face of the shell to be connected
It connects, and 110 upper end of the fixed plate is provided with mounting hole 111.
The construction site noise detection system of the present invention further includes mobile terminal, and the mobile terminal is passed by the data
Defeated unit is communicated to connect with the noise measuring equipment.
The mobile terminal is PC terminals or mobile phone.
The present invention construction site noise detection system further include solar charging device, the solar charging device with
The power module is connected, for providing electric energy to the power module;By the solar charging device, can make full use of
Solar energy provides electric energy to power module, achieves energy-saving and emission reduction purposes.
The construction site noise detection system of the present invention, by being monitored to construction site noise, multiple spot is deployed to ensure effective monitoring and control of illegal activities construction
Scene acquires sound source audio, carries out signal processing into backstage (noise measuring equipment), realizes the knowledge to various construction noises
Not, and by data processed result by data transmission unit (4G modules), it is transmitted to server, it is aobvious by mobile phone and network inquiry
Show;In addition, the present invention construction site noise detection system by operation it is distinguishable go out construction noise and ambient noise, that is, analyze
Whether exceeded go out current construction noise, for formulating corresponding management measure.
Finally it should be noted that:Above-described embodiments are merely to illustrate the technical scheme, rather than to it
Limitation;Although the present invention is described in detail referring to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:
It can still modify to the technical solution recorded in previous embodiment, or to which part or all technical features into
Row equivalent replacement;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side
The range of case.
Claims (9)
1. a kind of construction noise detecting system, it is characterised in that:Including sensor array, noise measuring equipment and remote monitoring
Center, the microphone array include multiple microphones positioned at construction site different location, the noise measuring equipment
Including shell and the power module, signal acquisition and the conversion module that are arranged in the shell, signal processing and control module, number
According to transmission unit and data memory module, multiple microphones respectively with the signal acquisition and conversion module communication link
Connect, the signal processing and control module respectively with the power module, signal acquisition and conversion module, data transmission unit with
And data memory module is connected, the remote monitoring center passes through data transmission unit and the noise measuring equipment communication link
It connects.
2. construction noise detecting system according to claim 1, which is characterized in that the front end face of the shell is provided with aobvious
Display screen, the display screen are communicated to connect with the signal processing and control module.
3. construction noise detecting system according to claim 1, which is characterized in that be provided with 4G modules day on the shell
Line, the 4G module antennas are communicated to connect with the signal processing and control module.
4. construction noise detecting system according to claim 1, which is characterized in that it is provided with alarm on the shell,
The alarm is communicated to connect with the signal processing and control module.
5. construction noise detecting system according to claim 1, which is characterized in that the shell is made of aluminium alloy, and
Housing rear end face top both sides are respectively arranged with fixing device.
6. construction noise detecting system according to claim 5, which is characterized in that the fixing device includes fixed plate,
The fixed plate lower end is fixedly connected with the housing rear end face, and the dead plate upper end is provided with mounting hole.
7. construction noise detecting system according to claim 1, which is characterized in that further include mobile terminal, the movement
Terminal is communicated to connect by the data transmission unit and the noise measuring equipment.
8. construction noise detecting system according to claim 7, which is characterized in that the mobile terminal is PC terminals or hand
Machine.
9. construction noise detecting system according to claim 1, which is characterized in that further include solar charging device, institute
It states solar charging device with the power module to be connected, for providing electric energy to the power module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810168630.8A CN108398184A (en) | 2018-02-28 | 2018-02-28 | A kind of construction noise detecting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810168630.8A CN108398184A (en) | 2018-02-28 | 2018-02-28 | A kind of construction noise detecting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108398184A true CN108398184A (en) | 2018-08-14 |
Family
ID=63095601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810168630.8A Pending CN108398184A (en) | 2018-02-28 | 2018-02-28 | A kind of construction noise detecting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108398184A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109323758A (en) * | 2018-11-19 | 2019-02-12 | 国网四川省电力公司电力科学研究院 | It can self-alignment substation's factory outside noise continuous monitor system |
CN110095182A (en) * | 2019-05-28 | 2019-08-06 | 西南交通大学 | Tunnel Noise detection device and method |
CN114279489A (en) * | 2021-11-15 | 2022-04-05 | 深圳供电局有限公司 | Construction site safety monitoring device and system |
CN117352006A (en) * | 2023-12-05 | 2024-01-05 | 济南城市投资集团有限公司 | Monitoring method and system for environmental noise of construction site |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201229662Y (en) * | 2008-02-01 | 2009-04-29 | 欧阳俊 | Remote solar automatic monitoring system for noise |
CN102645271A (en) * | 2012-02-24 | 2012-08-22 | 珠海高凌环境科技有限公司 | Intelligent supervision and management system for environmental noise sources |
CN202420664U (en) * | 2011-12-29 | 2012-09-05 | 东北石油大学 | Automatic ambient noise monitor |
CN202869644U (en) * | 2012-10-11 | 2013-04-10 | 上海市环境监测技术装备有限公司 | Noise monitoring and automatic disadvising device |
CN203732947U (en) * | 2013-12-19 | 2014-07-23 | 上海中锦建设集团股份有限公司 | Construction site environmental index monitoring system |
KR101435183B1 (en) * | 2014-06-20 | 2014-08-29 | 주식회사 일산이엔씨 | Remote monitoring and control system based plc with supporting current ip network |
CN104637272A (en) * | 2013-11-10 | 2015-05-20 | 陕西杰创科技有限公司 | Noise pollution monitoring system |
CN204359428U (en) * | 2014-11-28 | 2015-05-27 | 武汉境辉环保科技有限公司 | Neighbourhood noise remote automatic monitoring device |
CN205300749U (en) * | 2015-12-28 | 2016-06-08 | 天津长城科安电子科技有限公司 | Long -range automatic monitoring appearance of metropolitan environment noise |
CN206469979U (en) * | 2017-02-15 | 2017-09-05 | 北京克莱克森电力工程有限公司 | A kind of job site noise monitor device |
CN206540619U (en) * | 2016-12-26 | 2017-10-03 | 中国农业大学 | A kind of farm machinery noise monitoring system |
CN206712850U (en) * | 2017-05-17 | 2017-12-05 | 德航(天津)智能科技有限公司 | A kind of intelligent noise monitoring system |
-
2018
- 2018-02-28 CN CN201810168630.8A patent/CN108398184A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201229662Y (en) * | 2008-02-01 | 2009-04-29 | 欧阳俊 | Remote solar automatic monitoring system for noise |
CN202420664U (en) * | 2011-12-29 | 2012-09-05 | 东北石油大学 | Automatic ambient noise monitor |
CN102645271A (en) * | 2012-02-24 | 2012-08-22 | 珠海高凌环境科技有限公司 | Intelligent supervision and management system for environmental noise sources |
CN202869644U (en) * | 2012-10-11 | 2013-04-10 | 上海市环境监测技术装备有限公司 | Noise monitoring and automatic disadvising device |
CN104637272A (en) * | 2013-11-10 | 2015-05-20 | 陕西杰创科技有限公司 | Noise pollution monitoring system |
CN203732947U (en) * | 2013-12-19 | 2014-07-23 | 上海中锦建设集团股份有限公司 | Construction site environmental index monitoring system |
KR101435183B1 (en) * | 2014-06-20 | 2014-08-29 | 주식회사 일산이엔씨 | Remote monitoring and control system based plc with supporting current ip network |
CN204359428U (en) * | 2014-11-28 | 2015-05-27 | 武汉境辉环保科技有限公司 | Neighbourhood noise remote automatic monitoring device |
CN205300749U (en) * | 2015-12-28 | 2016-06-08 | 天津长城科安电子科技有限公司 | Long -range automatic monitoring appearance of metropolitan environment noise |
CN206540619U (en) * | 2016-12-26 | 2017-10-03 | 中国农业大学 | A kind of farm machinery noise monitoring system |
CN206469979U (en) * | 2017-02-15 | 2017-09-05 | 北京克莱克森电力工程有限公司 | A kind of job site noise monitor device |
CN206712850U (en) * | 2017-05-17 | 2017-12-05 | 德航(天津)智能科技有限公司 | A kind of intelligent noise monitoring system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109323758A (en) * | 2018-11-19 | 2019-02-12 | 国网四川省电力公司电力科学研究院 | It can self-alignment substation's factory outside noise continuous monitor system |
CN109323758B (en) * | 2018-11-19 | 2021-10-22 | 国网四川省电力公司电力科学研究院 | Self-calibrated substation boundary noise continuous monitoring system |
CN110095182A (en) * | 2019-05-28 | 2019-08-06 | 西南交通大学 | Tunnel Noise detection device and method |
CN114279489A (en) * | 2021-11-15 | 2022-04-05 | 深圳供电局有限公司 | Construction site safety monitoring device and system |
CN117352006A (en) * | 2023-12-05 | 2024-01-05 | 济南城市投资集团有限公司 | Monitoring method and system for environmental noise of construction site |
CN117352006B (en) * | 2023-12-05 | 2024-01-30 | 济南城市投资集团有限公司 | Monitoring method and system for environmental noise of construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108398184A (en) | A kind of construction noise detecting system | |
CN202127875U (en) | Intelligent helmet for downwell use of coal mine | |
CN204465736U (en) | A kind of power transmission line intelligent long distance control system based on Internet of Things | |
CN102228319A (en) | Multisensor-integrated intelligent helmet | |
CN104581087A (en) | Intelligent remote monitoring system of power transmission line on basis of internet of things | |
CN112491950B (en) | Multi-source information perception and emergency linkage method, positioning linkage system and electronic equipment based on smart city | |
CN201703993U (en) | Audible and visual alarm for crane elevating limiting | |
CN112911248A (en) | Data acquisition and personnel and equipment positioning information platform suitable for mine | |
CN206469979U (en) | A kind of job site noise monitor device | |
CN213842399U (en) | Billboard monitoring system | |
CN112512006A (en) | Outdoor communication monitoring device based on LORA technology and application method thereof | |
CN203232519U (en) | Antitheft system for distribution transformer | |
JP7357266B2 (en) | Radio field strength monitoring system | |
CN205319800U (en) | Power scheduling operation safety control system | |
CN104853164A (en) | Antitheft type remote ammeter acquisition system | |
CN111935411A (en) | Monitoring system and monitoring method based on sound positioning | |
CN212693111U (en) | Wireless temperature measurement system | |
CN108318940A (en) | A kind of enviromental monitoring equipment | |
CN209327581U (en) | A kind of Indoor Video positioning device | |
CN210992755U (en) | Multi-functional wisdom fire control controller of simply installing | |
CN207503431U (en) | A kind of remote alarming system | |
CN101835303B (en) | Remote real-time monitoring system of LED streetlight | |
CN2645148Y (en) | Fire alarm networked warning system | |
CN207938019U (en) | A kind of moving electric power inspection terminal and system | |
CN207503429U (en) | A kind of slave computer alarm and remote alarming system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180814 |
|
RJ01 | Rejection of invention patent application after publication |