CN108398184A - A kind of construction noise detecting system - Google Patents

A kind of construction noise detecting system Download PDF

Info

Publication number
CN108398184A
CN108398184A CN201810168630.8A CN201810168630A CN108398184A CN 108398184 A CN108398184 A CN 108398184A CN 201810168630 A CN201810168630 A CN 201810168630A CN 108398184 A CN108398184 A CN 108398184A
Authority
CN
China
Prior art keywords
construction
module
noise
detecting system
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810168630.8A
Other languages
Chinese (zh)
Inventor
弓春霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Collect Electric Power Engineering Co Ltd
Original Assignee
Beijing Collect Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Collect Electric Power Engineering Co Ltd filed Critical Beijing Collect Electric Power Engineering Co Ltd
Priority to CN201810168630.8A priority Critical patent/CN108398184A/en
Publication of CN108398184A publication Critical patent/CN108398184A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01HMEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
    • G01H17/00Measuring mechanical vibrations or ultrasonic, sonic or infrasonic waves, not provided for in the preceding groups
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Abstract

The present invention relates to a kind of construction noise detecting systems, including sensor array, noise measuring equipment and remote monitoring center, the microphone array includes multiple microphones positioned at construction site different location, the noise measuring equipment includes the power module in shell and the setting shell, signal acquisition and conversion module, signal processing and control module, data transmission unit and data memory module, multiple microphones are communicated to connect with the signal acquisition and conversion module respectively, the signal processing and control module respectively with the power module, signal acquisition and conversion module, data transmission unit and data memory module are connected, the remote monitoring center is communicated to connect by data transmission unit and the noise measuring equipment.The beneficial effects of the present invention are, construction noise detecting system by operation it is distinguishable go out construction noise and ambient noise, that is, whether exceeded, to be used to specify corresponding noise reduction management measure if analyzing current construction noise.

Description

A kind of construction noise detecting system
Technical field
The present invention relates to a kind of construction noise detecting systems.
Background technology
Noise monitoring is the monitoring activity carried out for the sound and its sound source of interference people study, work and life.Its Working contents are:Each Function area noise monitoring in city, road traffic noise monitoring, regional environmental noise monitoring and noise source Monitoring etc..
Currently, in the work progress of construction site, in order to improve construction personnel's operating environment, create good apply Work condition is to accelerate construction progress, ensure that construction quality, holding meet the working environment of the site operation of sanitary standard very It is important, therefore various Construction Technology specifications both domestic and external all define specific standard to operating environment in construction.Currently, Detection for operating environment in building engineering construction, universal detecting instrument can only detect the individual event factor in environment, and need It wants testing staff to carry out live reading and carries out periodic detection, this aspect keeps detection Comparision arduous and cumbersome, another party Face cannot be guaranteed that the environmental factor of non-detection period meets the requirements, while cannot be real-time to the noise of each position of construction site The size for the noise grasped and generated according to different location is timely handled, and does not distinguish construction noise and background Noise.
Invention content
In view of the above-mentioned problems in the prior art, the main purpose of the present invention is to provide a kind of easy to use, remote Journey detects and the construction noise detecting system of distinguishable construction noise and ambient noise indices.
The technical scheme is that such:
A kind of construction noise detecting system, including sensor array, noise measuring equipment and remote monitoring center, it is described Microphone array includes multiple microphones positioned at construction site different location, the noise measuring equipment include shell with And power module, signal acquisition and conversion module in the setting shell, signal processing and control module, data transmission unit And data memory module, multiple microphones are communicated to connect with the signal acquisition and conversion module respectively, the signal Processing is stored with the power module, signal acquisition and conversion module, data transmission unit and data respectively with control module Module is connected, and the remote monitoring center is communicated to connect by data transmission unit and the noise measuring equipment.
The front end face of the shell is provided with display screen, the display screen and the signal processing and control module communication link It connects.
4G module antennas are provided on the shell, the 4G module antennas are communicated with the signal processing with control module Connection.
Alarm is provided on the shell, the alarm is communicated to connect with the signal processing and control module.
The shell is made of aluminium alloy, and housing rear end face top both sides are respectively arranged with fixing device.
The fixing device includes fixed plate, and the fixed plate lower end is fixedly connected with the housing rear end face, and described Dead plate upper end is provided with mounting hole.
Further include mobile terminal, the mobile terminal is communicated by the data transmission unit with the noise measuring equipment Connection.
The mobile terminal is PC terminals or mobile phone.
Further include solar charging device, the solar charging device is connected with the power module, is used for described Power module provides electric energy.
The present invention has the following advantages and beneficial effect:The construction site noise detection system of the present invention, by construction Live noise is monitored, and multiple spot is deployed to ensure effective monitoring and control of illegal activities construction site, acquires sound source audio, and signal is carried out into backstage (noise measuring equipment) Processing realizes the identification to various construction noises, and data processed result is transmitted to by data transmission unit (4G modules) The server of remote monitoring center, is shown by mobile phone and network inquiry;In addition, the construction site noise detection system of the present invention By operation it is distinguishable go out construction noise and ambient noise, that is, whether exceeded, corresponding for formulating if analyzing current construction noise Noise reduction management measure.
Description of the drawings
Fig. 1 is the functional block diagram of construction noise detecting system provided in an embodiment of the present invention;
Fig. 2 is the front view structure signal of noise measuring equipment in construction noise detecting system provided in an embodiment of the present invention Figure.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.Therefore, below to the reality of the present invention provided in the accompanying drawings The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts Every other embodiment, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for description purposes only, and is not understood to indicate or imply relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, can also be electrical connection;It can be directly connected, it can also be indirect by intermediary It is connected, can is the connection inside two elements.For the ordinary skill in the art, it can manage as the case may be Solve the concrete meaning of above-mentioned term in the present invention.
The present invention is further illustrated with specific embodiment below with reference to accompanying drawings.
As depicted in figs. 1 and 2:The construction noise detecting system of the embodiment of the present invention, including sensor array 200, noise Detection device 100 and remote monitoring center 105, the microphone array 200 include being located at construction site different location Multiple microphones, the voice signal for obtaining construction site different location needs the position of reasonable Arrangement microphone, simultaneously Correctly choose the type of microphone according to site environment and parameter request, the noise measuring equipment 100 include shell 101 and Power module 106, signal acquisition and conversion module 102 in the shell 101, signal processing and control module 103, number are set According to transmission unit 104 and data memory module 105, multiple microphones respectively with the signal acquisition and conversion module 102 communication connections, the signal processing and control module 103 respectively with the power module 106, signal acquisition and conversion module 102, data transmission unit 104 and data memory module 105 are connected, and the remote monitoring center 300 passes through data transmission list Member 104 is communicated to connect with the noise measuring equipment 100, and the data transmission unit 104 can be 4G modules;The remote monitoring The server that center 300 may include monitoring host computer and be connected with the monitoring host computer;When work, noise measuring equipment, which is placed in, builds The construction site of construction is built, remote monitoring center is placed in monitoring room or operating room, and remote monitoring center can be to environmental factor Allow value range and voice to read function to be set, the publication of noise measuring equipment can be started or stopped and voice is read The manipulation commands such as number;Noise measuring equipment can execute the order of remote monitoring center and feed back to the information such as the data measured Remote monitoring center.
The front end face of the shell 101 is provided with display screen 107, the display screen 107 and the signal processing and control Module 103 communicates to connect, the display screen 107 can real-time display detection as a result, facilitate carried out for field personnel it is timely It checks and is handled accordingly.
4G module antennas 108, the 4G module antennas 108 and the signal processing and control are provided on the shell 101 Molding block 103 communicates to connect.
Alarm 109, the alarm 109 and the signal processing and control module 103 are provided on the shell 101 Communication connection, when the noise of detection is more than preset standard, alarm 109 is alarmed, and staff is facilitated to take Corresponding measure carries out timely processing.
The shell 101 is made of aluminium alloy, and 101 rear end face top both sides of the shell are respectively arranged with fixed dress It sets, and the shell carries out water proof and dust proof design, and then achievees the purpose that extend its service life.
The fixing device includes fixed plate 110, and 110 lower end of the fixed plate is fixed with 101 rear end face of the shell to be connected It connects, and 110 upper end of the fixed plate is provided with mounting hole 111.
The construction site noise detection system of the present invention further includes mobile terminal, and the mobile terminal is passed by the data Defeated unit is communicated to connect with the noise measuring equipment.
The mobile terminal is PC terminals or mobile phone.
The present invention construction site noise detection system further include solar charging device, the solar charging device with The power module is connected, for providing electric energy to the power module;By the solar charging device, can make full use of Solar energy provides electric energy to power module, achieves energy-saving and emission reduction purposes.
The construction site noise detection system of the present invention, by being monitored to construction site noise, multiple spot is deployed to ensure effective monitoring and control of illegal activities construction Scene acquires sound source audio, carries out signal processing into backstage (noise measuring equipment), realizes the knowledge to various construction noises Not, and by data processed result by data transmission unit (4G modules), it is transmitted to server, it is aobvious by mobile phone and network inquiry Show;In addition, the present invention construction site noise detection system by operation it is distinguishable go out construction noise and ambient noise, that is, analyze Whether exceeded go out current construction noise, for formulating corresponding management measure.
Finally it should be noted that:Above-described embodiments are merely to illustrate the technical scheme, rather than to it Limitation;Although the present invention is described in detail referring to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It can still modify to the technical solution recorded in previous embodiment, or to which part or all technical features into Row equivalent replacement;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side The range of case.

Claims (9)

1. a kind of construction noise detecting system, it is characterised in that:Including sensor array, noise measuring equipment and remote monitoring Center, the microphone array include multiple microphones positioned at construction site different location, the noise measuring equipment Including shell and the power module, signal acquisition and the conversion module that are arranged in the shell, signal processing and control module, number According to transmission unit and data memory module, multiple microphones respectively with the signal acquisition and conversion module communication link Connect, the signal processing and control module respectively with the power module, signal acquisition and conversion module, data transmission unit with And data memory module is connected, the remote monitoring center passes through data transmission unit and the noise measuring equipment communication link It connects.
2. construction noise detecting system according to claim 1, which is characterized in that the front end face of the shell is provided with aobvious Display screen, the display screen are communicated to connect with the signal processing and control module.
3. construction noise detecting system according to claim 1, which is characterized in that be provided with 4G modules day on the shell Line, the 4G module antennas are communicated to connect with the signal processing and control module.
4. construction noise detecting system according to claim 1, which is characterized in that it is provided with alarm on the shell, The alarm is communicated to connect with the signal processing and control module.
5. construction noise detecting system according to claim 1, which is characterized in that the shell is made of aluminium alloy, and Housing rear end face top both sides are respectively arranged with fixing device.
6. construction noise detecting system according to claim 5, which is characterized in that the fixing device includes fixed plate, The fixed plate lower end is fixedly connected with the housing rear end face, and the dead plate upper end is provided with mounting hole.
7. construction noise detecting system according to claim 1, which is characterized in that further include mobile terminal, the movement Terminal is communicated to connect by the data transmission unit and the noise measuring equipment.
8. construction noise detecting system according to claim 7, which is characterized in that the mobile terminal is PC terminals or hand Machine.
9. construction noise detecting system according to claim 1, which is characterized in that further include solar charging device, institute It states solar charging device with the power module to be connected, for providing electric energy to the power module.
CN201810168630.8A 2018-02-28 2018-02-28 A kind of construction noise detecting system Pending CN108398184A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810168630.8A CN108398184A (en) 2018-02-28 2018-02-28 A kind of construction noise detecting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810168630.8A CN108398184A (en) 2018-02-28 2018-02-28 A kind of construction noise detecting system

Publications (1)

Publication Number Publication Date
CN108398184A true CN108398184A (en) 2018-08-14

Family

ID=63095601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810168630.8A Pending CN108398184A (en) 2018-02-28 2018-02-28 A kind of construction noise detecting system

Country Status (1)

Country Link
CN (1) CN108398184A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323758A (en) * 2018-11-19 2019-02-12 国网四川省电力公司电力科学研究院 It can self-alignment substation's factory outside noise continuous monitor system
CN110095182A (en) * 2019-05-28 2019-08-06 西南交通大学 Tunnel Noise detection device and method
CN114279489A (en) * 2021-11-15 2022-04-05 深圳供电局有限公司 Construction site safety monitoring device and system
CN117352006A (en) * 2023-12-05 2024-01-05 济南城市投资集团有限公司 Monitoring method and system for environmental noise of construction site

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201229662Y (en) * 2008-02-01 2009-04-29 欧阳俊 Remote solar automatic monitoring system for noise
CN102645271A (en) * 2012-02-24 2012-08-22 珠海高凌环境科技有限公司 Intelligent supervision and management system for environmental noise sources
CN202420664U (en) * 2011-12-29 2012-09-05 东北石油大学 Automatic ambient noise monitor
CN202869644U (en) * 2012-10-11 2013-04-10 上海市环境监测技术装备有限公司 Noise monitoring and automatic disadvising device
CN203732947U (en) * 2013-12-19 2014-07-23 上海中锦建设集团股份有限公司 Construction site environmental index monitoring system
KR101435183B1 (en) * 2014-06-20 2014-08-29 주식회사 일산이엔씨 Remote monitoring and control system based plc with supporting current ip network
CN104637272A (en) * 2013-11-10 2015-05-20 陕西杰创科技有限公司 Noise pollution monitoring system
CN204359428U (en) * 2014-11-28 2015-05-27 武汉境辉环保科技有限公司 Neighbourhood noise remote automatic monitoring device
CN205300749U (en) * 2015-12-28 2016-06-08 天津长城科安电子科技有限公司 Long -range automatic monitoring appearance of metropolitan environment noise
CN206469979U (en) * 2017-02-15 2017-09-05 北京克莱克森电力工程有限公司 A kind of job site noise monitor device
CN206540619U (en) * 2016-12-26 2017-10-03 中国农业大学 A kind of farm machinery noise monitoring system
CN206712850U (en) * 2017-05-17 2017-12-05 德航(天津)智能科技有限公司 A kind of intelligent noise monitoring system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201229662Y (en) * 2008-02-01 2009-04-29 欧阳俊 Remote solar automatic monitoring system for noise
CN202420664U (en) * 2011-12-29 2012-09-05 东北石油大学 Automatic ambient noise monitor
CN102645271A (en) * 2012-02-24 2012-08-22 珠海高凌环境科技有限公司 Intelligent supervision and management system for environmental noise sources
CN202869644U (en) * 2012-10-11 2013-04-10 上海市环境监测技术装备有限公司 Noise monitoring and automatic disadvising device
CN104637272A (en) * 2013-11-10 2015-05-20 陕西杰创科技有限公司 Noise pollution monitoring system
CN203732947U (en) * 2013-12-19 2014-07-23 上海中锦建设集团股份有限公司 Construction site environmental index monitoring system
KR101435183B1 (en) * 2014-06-20 2014-08-29 주식회사 일산이엔씨 Remote monitoring and control system based plc with supporting current ip network
CN204359428U (en) * 2014-11-28 2015-05-27 武汉境辉环保科技有限公司 Neighbourhood noise remote automatic monitoring device
CN205300749U (en) * 2015-12-28 2016-06-08 天津长城科安电子科技有限公司 Long -range automatic monitoring appearance of metropolitan environment noise
CN206540619U (en) * 2016-12-26 2017-10-03 中国农业大学 A kind of farm machinery noise monitoring system
CN206469979U (en) * 2017-02-15 2017-09-05 北京克莱克森电力工程有限公司 A kind of job site noise monitor device
CN206712850U (en) * 2017-05-17 2017-12-05 德航(天津)智能科技有限公司 A kind of intelligent noise monitoring system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323758A (en) * 2018-11-19 2019-02-12 国网四川省电力公司电力科学研究院 It can self-alignment substation's factory outside noise continuous monitor system
CN109323758B (en) * 2018-11-19 2021-10-22 国网四川省电力公司电力科学研究院 Self-calibrated substation boundary noise continuous monitoring system
CN110095182A (en) * 2019-05-28 2019-08-06 西南交通大学 Tunnel Noise detection device and method
CN114279489A (en) * 2021-11-15 2022-04-05 深圳供电局有限公司 Construction site safety monitoring device and system
CN117352006A (en) * 2023-12-05 2024-01-05 济南城市投资集团有限公司 Monitoring method and system for environmental noise of construction site
CN117352006B (en) * 2023-12-05 2024-01-30 济南城市投资集团有限公司 Monitoring method and system for environmental noise of construction site

Similar Documents

Publication Publication Date Title
CN108398184A (en) A kind of construction noise detecting system
CN202127875U (en) Intelligent helmet for downwell use of coal mine
CN204465736U (en) A kind of power transmission line intelligent long distance control system based on Internet of Things
CN102228319A (en) Multisensor-integrated intelligent helmet
CN104581087A (en) Intelligent remote monitoring system of power transmission line on basis of internet of things
CN112491950B (en) Multi-source information perception and emergency linkage method, positioning linkage system and electronic equipment based on smart city
CN201703993U (en) Audible and visual alarm for crane elevating limiting
CN112911248A (en) Data acquisition and personnel and equipment positioning information platform suitable for mine
CN206469979U (en) A kind of job site noise monitor device
CN213842399U (en) Billboard monitoring system
CN112512006A (en) Outdoor communication monitoring device based on LORA technology and application method thereof
CN203232519U (en) Antitheft system for distribution transformer
JP7357266B2 (en) Radio field strength monitoring system
CN205319800U (en) Power scheduling operation safety control system
CN104853164A (en) Antitheft type remote ammeter acquisition system
CN111935411A (en) Monitoring system and monitoring method based on sound positioning
CN212693111U (en) Wireless temperature measurement system
CN108318940A (en) A kind of enviromental monitoring equipment
CN209327581U (en) A kind of Indoor Video positioning device
CN210992755U (en) Multi-functional wisdom fire control controller of simply installing
CN207503431U (en) A kind of remote alarming system
CN101835303B (en) Remote real-time monitoring system of LED streetlight
CN2645148Y (en) Fire alarm networked warning system
CN207938019U (en) A kind of moving electric power inspection terminal and system
CN207503429U (en) A kind of slave computer alarm and remote alarming system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814

RJ01 Rejection of invention patent application after publication