CN108396999A - A kind of steel tower piling bar underground communication computer room - Google Patents

A kind of steel tower piling bar underground communication computer room Download PDF

Info

Publication number
CN108396999A
CN108396999A CN201810292443.0A CN201810292443A CN108396999A CN 108396999 A CN108396999 A CN 108396999A CN 201810292443 A CN201810292443 A CN 201810292443A CN 108396999 A CN108396999 A CN 108396999A
Authority
CN
China
Prior art keywords
computer room
steel tower
piling bar
underground communication
equipment compartment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810292443.0A
Other languages
Chinese (zh)
Other versions
CN108396999B (en
Inventor
王永光
王樱默
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changchun Huichunyuan Communicatons Co Ltd
Original Assignee
Changchun Huichunyuan Communicatons Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changchun Huichunyuan Communicatons Co Ltd filed Critical Changchun Huichunyuan Communicatons Co Ltd
Priority to CN201810292443.0A priority Critical patent/CN108396999B/en
Publication of CN108396999A publication Critical patent/CN108396999A/en
Application granted granted Critical
Publication of CN108396999B publication Critical patent/CN108396999B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/04Transformer houses; Substations or switchgear houses
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/04Ventilation with ducting systems, e.g. by double walls; with natural circulation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F2007/005Cyclic ventilation, e.g. alternating air supply volume or reversing flow direction

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Power Engineering (AREA)
  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of steel tower piling bar underground communication computer room, which includes that foundation, computer room part and beautification tower section, the bottom of computer room part are provided with bottom plate, and foundation is connected by prefabricated bolt with the computer room flange on bottom plate;Hollow equipment compartment is provided with above bottom plate, the top of equipment compartment is connect with conical pipe;Equipment compartment is internally provided with internal crane span structure, and equipment is equipped on internal crane span structure, and equipment takes hang, equipment compartment to be internally provided with intake stack, and outside is provided with air inlet;Equipment compartment top is provided with exhaust outlet;The top of computer room part is equipped with ventilation shaft, cable run and power supply pipeline;Foundation and computer room part are embedded in ground level or less;The top of computer room part is connect with beautification tower section, ventilation shaft passes through the inside of beautification tower section, and the top for beautifying tower section is set up defences rain cap, and band door is provided on side wall into manhole, for band door into Theft-proof iron door is provided on manhole, which uses Special anti-theft door lock.

Description

A kind of steel tower piling bar underground communication computer room
Technical field
The present invention relates to fields of communication technology, and in particular to a kind of steel tower piling bar underground communication computer room.
Background technology
Communications equipment room is that an essential key link, its side are linked to communication data center in communication construction, The other side is linked to one or several RRU.BBU communication base stations.Carry the key effect of the switching emission of signal in the communications.
By taking steel tower communications equipment room as an example, general common communications computer room is all the forms such as building or board house, integrated storehouse.It is this Common communications computer room occupancy resource is more, and it is big to build difficulty.By taking a common steel tower board house base station as an example;It is general to take up an area in 60- It between 150 square metres, takes up a large area, it is high to coordinate difficulty;It is affected to surrounding enviroment.
Steel tower communications equipment room in the prior art, which exists, to be taken up a large area, and consuming electric energy is more, and environment protecting is poor, anti-theft effect The shortcomings of poor.Soil is the important resource in China, occupy one meter with regard to one meter of greenery patches or good farmland less more.Electric energy is in the development of the national economy In be the essential energy, once, other industry has just been lacked once for more wastes.In addition, communications equipment room is set in the prior art Received shipment guild generates excessive heat, and temperature is excessively high to cause equipment damage, influence to run, and ventilation drop heat relies primarily on air-conditioning Equipment, the overconsumption of electricity will necessarily be caused by excessively relying on air-conditioning, and the power consumption 55% of base station derives from air-conditioning, national Base station air conditioner electricity consumption is added, and can be a prodigious number.Ordinary base station communications equipment room is prevented using color steel Robber's effect is bad, and equipment, battery theft case take place frequently, and steel tower communications equipment room wind resistance effect in the prior art is bad, because There is an urgent need in the art to a kind of novel computer rooms for this to solve problem above.
Invention content
It, can in order to overcome problems of the prior art, the present invention to provide a kind of steel tower piling bar underground communication computer room It largely economizes the land resource, reduces the condition for building base station, reduce the satisfy the need sight of people and vehicle of ground machine room upper and block, reduce peace Full hidden danger;Base station electricity consumption can be largely saved, the expenditure of base station air conditioner cost of equipment is reduced, is saved because air-conditioning safeguards generation Cost of labor;Base station equipment battery can be prevented stolen, reduce the police strength resource paid because equipment is stolen;The construction period It is short, at the construction field (site) one day can installation is complete, save the time, reduce the influence to surrounding enviroment.
To achieve the above object, steel tower piling bar underground communication computer room of the present invention includes foundation, computer room part With beautification tower section, the bottom of the computer room part is provided with bottom plate, and the foundation passes through prefabricated bolt and bottom plate On computer room flange be connected;Hollow equipment compartment is provided with above bottom plate, the top of equipment compartment is connect with conical pipe;Equipment Cabin is internally provided with internal crane span structure, is equipped with equipment on internal crane span structure, and equipment takes hang, equipment compartment be internally provided with into Wind pipeline, outside are provided with air inlet;Equipment compartment top is provided with exhaust outlet;The top of computer room part is equipped with ventilation shaft, light Cable pipeline and power supply pipeline;Foundation and computer room part are embedded in ground level or less;The top of computer room part and beautification tower Part connects, and ventilation shaft passes through the inside of beautification tower section, and the top for beautifying tower section is set up defences rain cap, and the side of tower section is beautified Band door is provided on wall into manhole, for band door into Theft-proof iron door is provided on manhole, which uses Special anti-theft door lock.
The air inlet is arranged at away from ground 1000mm.
The air inlet, which goes out, sets elbow, and the entrance of lower elbow sets filter screen, the intake stack of the inside of equipment compartment Entry design enters in computer room bottom, fresh air in bottom, ensures entire computer room inner air flow;It is additionally provided on intake stack logical Stomata.
Be provided with lower flange at the top of the conical pipe, the bottom for beautifying tower section is provided with upper flange, upper flange with It is bolted between lower flange.
It is provided with gusset between the top of the lower flange and conical pipe.
16 pieces of reinforcement ribs are provided on the peripheral surface of the conical pipe.
The inside of the beautification tower section is additionally provided with machine room door, which takes sealing means, is set on machine room door It is equipped with B grades of theftproof locks, the heat dissipation of computer room inner air independent loops.
The inside of the equipment compartment is additionally provided with interior cat ladder, and the base circle of equipment compartment installs energy-storage battery, and top is set Protected against explosion LED light.
The bolt hole of 20 a diameter of 60mm is correspondingly arranged on the upper flange and lower flange respectively;The basis It is provided with stirrup on partial periphery wall, main reinforcement is provided on the inner wall of stirrup, foundation is connected with computer room part by anchor bolt It connects.
The foundation includes basic bottom cavity, supporting rod and pedestal, and pedestal top both sides are respectively arranged with Supporting table, the basic bottom cavity include a horizontal wall and four vertical walls, and a horizontal wall and four vertical walls surround only There is open-topped basic bottom cavity;Platform is additionally provided with below horizontal wall;Supporting rod is perpendicular to horizontal wall and upwardly extends;Branch The bottom end of strut is fixed in horizontal wall, and the top of supporting rod is fixedly connected with supporting table;Supporting rod and adjacent vertical wall it Between be connected with elastic component;The pedestal is arranged in basic bottom cavity, and liquid is filled between basic bottom cavity and pedestal.
Steel tower piling bar underground communication computer room of the present invention compared with prior art, is ensureing the good operation of base station safety On the basis of, it solves the problems, such as follows;
1. a computer room solves the problems, such as land wastage first;General steel tower communications equipment room takes up an area 60-150 square metres, this hair It is 9 square metres that the bright steel tower piling bar underground communication computer room, which takes up an area, and aerial part is only 3 square metres, Economization on land More than 600%.It is minimum to save 51 square metres of greenery patches.Construction threshold is significantly reduced, reduces and soil, surrounding enviroment is wanted It asks, reduces influence of the ground machine room upper to periphery, and block to passing by traffic sight, improve pedestrains safety range.
2. a computer room solves the problems, such as air-conditioner power consumption;General common steel tower communications equipment room needs to install a 2P with overhead It adjusts, 1 year electricity consumption is about 17280KW, and every kilowatt of electricity charge are calculated by 0.89 yuan, about 15379 yuan, if using steel tower piling bar It economizes on electricity 15379 yuan at ground machine room lower list station.This computer room uses natural ventilating method, using the stack effect of single pole steel tower, in computer room Bottom is equipped with intake stack, after filtering, to air-supply in computer room, then is arranged heat by the exhaust outlet at the top of computer room unicom steel tower Go out.Make in computer room air always in circulation, fresh air constantly enters computer room in a steady stream.Ensure the normal operation of computer room.
3. a computer room solves the problems, such as that calculator room equipment is stolen, common steel tower communicates base room, mostly color steel room mechanism, equipment Battery is stolen to occur repeatedly.Using steel tower piling bar underground communication computer room of the present invention, it is stolen to can effectively prevent equipment Situation, this computer room are respectively provided with twice insurance lock on tower body and machine room door, entirely reach B grades of lock standards, are internally provided with Wireless monitoring equipment, can constantly situation in monitoring room, be effectively guaranteed calculator room equipment safe operation.
4. a computer room solves the problems, such as that steel tower communications equipment room wind resistance effect in the prior art is bad.
Description of the drawings
Fig. 1 is the structural schematic diagram of steel tower piling bar underground communication computer room of the present invention.
Fig. 2 is the sectional view in the directions A-A in Fig. 1.
Fig. 3 is the sectional view in the directions B-B in Fig. 1.
Fig. 4 is the sectional view in the directions C-C in Fig. 1.
Fig. 5 is the schematic diagram of the foundation of another embodiment.
Fig. 6 and Fig. 7 is steady arm horizontal force schematic diagram.
Specific implementation mode
The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention..
As shown in Figures 1 to 4, steel tower piling bar underground communication computer room of the present invention includes foundation 10, computer room portion 11 and beautification tower section 12, the bottom of the computer room part are divided to be provided with bottom plate 13, the foundation passes through prefabricated spiral shell Bolt is connected with the computer room flange on bottom plate;Hollow equipment compartment, the top of equipment compartment and conical pipe are provided with above bottom plate 16 connections;Equipment compartment is internally provided with internal crane span structure, and equipment is equipped on internal crane span structure, and equipment takes hang, equipment Cabin is internally provided with intake stack 20, and outside is provided with air inlet;Equipment compartment top is provided with exhaust outlet;Computer room is set at the top of part There are ventilation shaft 22, cable run and power supply pipeline;Foundation 10 and computer room part 11 are embedded in 24 or less ground level;Machine The top of room part is connect with beautification tower section, and ventilation shaft passes through the inside of beautification tower section, and the top for beautifying tower section is set Rainhat beautifies on the side wall of tower section being provided with band door into manhole 21, and for band door into Theft-proof iron door is provided on manhole, this is antitheft Iron gate uses Special anti-theft door lock.
The air inlet is arranged at away from ground 1000mm.
The air inlet, which goes out, sets elbow, and the entrance of lower elbow sets filter screen, the intake stack of the inside of equipment compartment Entry design enters in computer room bottom, fresh air in bottom, ensures entire computer room inner air flow;It is additionally provided on intake stack logical Stomata 17.
Lower flange 18 is provided at the top of the conical pipe, the bottom for beautifying tower section is provided with upper flange 25, upper method It is bolted between blue and lower flange.
It is provided with gusset 19 between the top of the lower flange and conical pipe.
16 pieces of reinforcement ribs 15 are provided on the peripheral surface of the conical pipe.
The inside of the beautification tower section is additionally provided with machine room door 23, which takes sealing means, on machine room door It is provided with B grades of theftproof locks, the heat dissipation of computer room inner air independent loops.
The inside of the equipment compartment is additionally provided with interior cat ladder 14, and the base circle of equipment compartment installs energy-storage battery, top If protected against explosion LED light.
The bolt hole 26 of 20 a diameter of 60mm is correspondingly arranged on the upper flange and lower flange respectively;The base It is provided with stirrup 27 on the periphery wall of plinth part, main reinforcement 28 is provided on the inner wall of stirrup, foundation passes through with computer room part Anchor bolt 29 connects.
In a preferred embodiment, foundation, computer room part and beautification tower section difference are as follows:
1, foundation, foundation are a diameter 2.8m, and the concrete precast block of height 1.5m, weight is on 25 tons of left sides The right side is connected equipped with 20 42 prefabricated bolts of Ф with computer room flange above, and main function is the base as ground machine room lower and steel tower Plinth plays firm and counterweight effect.
2, computer room part, computer room are process using Q345 material steel plates, steel plate thickness 16mm, and base plate thickness is 30mm, top use conical design, inside set 16 pieces of 16mm deep floors, and internal diameter 1000mm barrel shapes design connection in overhead uses method Orchid, 20 Φ 42mm high-strength bolts connections.Diameter 2.2m, height 3m, inner space reach 11 cubic metres, can accommodate three and be arranged It is standby, it is installed at triangle, not will produce interference from each other, be a utilization method compared with science in space availability ratio.If It is standby to take hang, it is respectively arranged on internal crane span structure, bottom can annular installation energy-storage battery.Top sets protected against explosion LED Lamp, computer room are internally provided with intake stack, are air inlets at outer identity distance ground 1000mm, set elbow, and entrance sets filter screen, internal Intake stack entry design enters in computer room bottom, fresh air in bottom, ensures that entire computer room inner air flow, exhaust outlet are located at machine Room top by tower top exhaust outlet by inside tower body, being discharged, and tower top is set up defences rain cap, using the stack effect of steel tower, by calorie source Source is constantly discharged, and does not have to other cool-down methods, can meet equipment operation needs.It is equipped with internal cat ladder in tower, safeguards installation Personnel pass in and out computer room from internal cat ladder, and ventilation shaft, cable run, the power supply pipeline of diameter 150mm are equipped at the top of computer room.
3, beautify tower section, beautification tower is equipped with inner ventilation pipeline, and top is set up defences rain cap, Rainproof moisture-proof, is entered by outside A small amount of rainwater inside tower is exported by diversion trench.Tower body is equipped with Theft-proof iron door, and Special anti-theft door lock, machine room door takes sealing in tower Mode, B grades of theftproof locks, the heat dissipation of computer room inner air independent loops.
The construction of steel tower piling bar underground communication computer room of the present invention mainly has following steps;
1. computer room and steel tower make;Computer room is welded using Q345 material roll of steel plate pressures, steel plate thickness 16mm, bottom plate Thickness is 30mm, and top uses conical design, inside sets 16 pieces of 16mm deep floors, and internal diameter 1000mm barrel shapes design connection in overhead is adopted With flange, 20 Ф 42mm high-strength bolts connections.Diameter 2.2m, height 3m, inner space reach 11 cubic metres, can accommodate three Complete equipment is installed at triangle, and equipment takes hang, is respectively arranged on internal crane span structure, and bottom can annular installation storage It can battery.Top sets protected against explosion LED light, and steel tower part takes crimped to be welded, with the mating installation of ground machine room lower.
2. basis makes;Basis is formed using C30 armored concrete is prefabricated, diameter 2800mm.Height 1500mm.Inside set 20 The pre-buried high-strength bolts of root Φ 42mm, with computer room flanged joint.The front and back bolt of installation does pitch preservative treatment.
3. computer room anti-corrosion water-proofing treatment;The outside of ground machine room lower connects with soil, and anti-corrosion is the key link of computer room, the machine Room is using 5 layers of anti-corrosion inside and outside epoxy resin, it is ensured that and it is watertight inside and outside computer room, and insulate with outer layer soil.
4. inside exhaust system is installed;Intake stack is installed, away from being air inlet at the 1000mm of ground on the outside of pipeline inside computer room Mouthful, elbow is set, entrance sets filter screen, pipe diameter 150mm, and internal intake stack entry design ensures new in computer room bottom Wind enters in bottom, ensures entire computer room inner air flow, and exhaust outlet, which is located at computer room top, to be passed through inside tower body, by tower top air draft Heat is endlessly discharged using the stack effect of steel tower for mouthful discharge, tower top rain cap of setting up defences.
5. in-site installation;A depth 5.5m is dug first, and the foundation pit of diameter 3m has dug foundation pit, is carried out to pit bottom soil layer Finishing, guarantee be not disturbed to hole bottom supporting course, and installation is complete for ground connection lightning protection net, so that it may with steel tower piling bar communications equipment room is direct It is lifted in place, surrounding backfills original soil rammed, and steel tower can be mounted directly, thus greatly shorten, in base station construction The duration at scene, it is only necessary to which a time, a communication tower main part can build completion.To the construction week of communication base station Phase can be one and quickly promote.It tries to gain time precious to one in the implementation of communication item for us.
Steel tower communications equipment room wind resistance effect in the prior art is bad.Object is excessively just then easy to break, due to steel tower in the prior art The steel tower and foundation of communications equipment room are all using rigid connection, and this connection type causes it to hold when in face of strong wind weather It is easily blown by strong wind, seriously affects its service life and maintenance cost.
In order to improve the wind resistance effect of steel tower communications equipment room, as shown in Figures 5 to 7, steel tower piling bar of the present invention The foundation of lower communications equipment room includes basic bottom cavity 2, supporting rod 5 and pedestal 4, and pedestal top both sides are respectively arranged with Supporting table 4a, the basic bottom cavity include that a horizontal wall 2a and four vertical walls 2b, a horizontal wall 2a and four are vertical Wall 2b surrounds only open-topped basic bottom cavity;Platform 2c is additionally provided with below horizontal wall;Supporting rod 5 is perpendicular to horizontal wall And it upwardly extends;The bottom end of supporting rod is fixed in horizontal wall, and the top of supporting rod is fixedly connected with supporting table;Supporting rod and phase It is connected with elastic component 6 between adjacent vertical wall;The pedestal is arranged in basic bottom cavity, is filled out between basic bottom cavity and pedestal Filled with liquid 3.
Liquid there is no particular/special requirement, such as water, mud etc. have basic fire protecting performance and non-toxic and tasteless liquid i.e. It can meet the requirements.After installing, due to the effect of buoyancy, liquid 3 assumes responsibility for pedestal 4 and (including is arranged above pedestal 4 Computer room part 11 and beautification tower section 12) 70% to 90% weight, 5 need of supporting rod undertake remaining 10% to 30% weight Amount.When in face of strong wind weather, as shown in fig. 6, since supporting rod 5 itself can generate small transversely deforming, this just changes Traditional rigid connection, becomes micro elastic connection, although deformation ratio shown in fig. 6 is larger, this is for side Just it describes, actual deflection is very small, and naked eyes are substantially sightless.This small transversely deforming counteracts wind-force Effect, improves the wind resistance effect of steel tower communications equipment room.And since elastic component 6 compensates for a part of bullet in the opposite direction Property deformation so that the small transversely deforming of supporting rod 5 maintains in appropriate range, will not cause the damage of supporting rod.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention belong to the scope of protection of present invention.

Claims (10)

1. a kind of steel tower piling bar underground communication computer room, which is characterized in that the steel tower piling bar underground communication computer room includes basis Partly, computer room part and beautification tower section, the bottom of the computer room part are provided with bottom plate, and the foundation passes through pre- Bolt processed is connected with the computer room flange on bottom plate;Hollow equipment compartment, the top of equipment compartment and cone are provided with above bottom plate Shape pipe connects;Equipment compartment is internally provided with internal crane span structure, and equipment is equipped on internal crane span structure, and equipment takes hang, if Standby cabin is internally provided with intake stack, and outside is provided with air inlet;Equipment compartment top is provided with exhaust outlet;Computer room is set at the top of part There are ventilation shaft, cable run and power supply pipeline;Foundation and computer room part are embedded in ground level or less;Computer room part Top connect with beautification tower section, and ventilation shaft passes through the inside of beautification tower section, and the top for beautifying tower section is set up defences rain cap, U.S. Change and be provided with band door on the side wall of tower section into manhole, band door is into Theft-proof iron door is provided on manhole, and the Theft-proof iron door is using special Use safe-guard door lock.
2. steel tower piling bar underground communication computer room as described in claim 1, which is characterized in that the air inlet is arranged away from ground At the 1000mm of face.
3. steel tower piling bar underground communication computer room as described in claim 1, which is characterized in that the air inlet goes out to set curved The entrance of head, lower elbow sets filter screen, and the entry design of the intake stack of the inside of equipment compartment is in computer room bottom, and fresh air is in bottom Into ensureing entire computer room inner air flow;Venthole is additionally provided on intake stack.
4. steel tower piling bar underground communication computer room as described in claim 1, which is characterized in that the top of the conical pipe is arranged There is lower flange, the bottom for beautifying tower section is provided with upper flange, is bolted between upper flange and lower flange.
5. steel tower piling bar underground communication computer room as claimed in claim 4, which is characterized in that the lower flange and conical pipe Gusset is provided between top.
6. steel tower piling bar underground communication computer room as described in claim 1, which is characterized in that on the peripheral surface of the conical pipe It is provided with 16 pieces of reinforcement ribs.
7. steel tower piling bar underground communication computer room as described in claim 1, which is characterized in that the inside of the beautification tower section It is additionally provided with machine room door, which takes sealing means, and B grades of theftproof locks are provided on machine room door, and computer room inner air is independent Circulation cooling.
8. steel tower piling bar underground communication computer room as described in claim 1, which is characterized in that the inside of the equipment compartment is also set It is equipped with interior cat ladder, the base circle of equipment compartment installs energy-storage battery, and top sets protected against explosion LED light.
9. steel tower piling bar underground communication computer room as claimed in claim 4, which is characterized in that on the upper flange and lower flange It is correspondingly arranged on the bolt hole of 20 a diameter of 60mm respectively;Stirrup, stirrup are provided on the periphery wall of the foundation Inner wall on be provided with main reinforcement, foundation passes through anchor bolts with computer room part.
10. such as claim 1-9 any one of them steel tower piling bar underground communication computer rooms, which is characterized in that the basic courses department It includes basic bottom cavity, supporting rod and pedestal to divide, and pedestal top both sides are respectively arranged with supporting table, the basic bottom cavity Including a horizontal wall and four vertical walls, a horizontal wall and four vertical walls surround only open-topped basic bottom cavity; Platform is additionally provided with below horizontal wall;Supporting rod is perpendicular to horizontal wall and upwardly extends;The bottom end of supporting rod is fixed on level On wall, the top of supporting rod is fixedly connected with supporting table;It is connected with elastic component between supporting rod and adjacent vertical wall;Described Pedestal is arranged in basic bottom cavity, and liquid is filled between basic bottom cavity and pedestal.
CN201810292443.0A 2018-04-03 2018-04-03 Iron tower steel pile underground communication machine room Active CN108396999B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810292443.0A CN108396999B (en) 2018-04-03 2018-04-03 Iron tower steel pile underground communication machine room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810292443.0A CN108396999B (en) 2018-04-03 2018-04-03 Iron tower steel pile underground communication machine room

Publications (2)

Publication Number Publication Date
CN108396999A true CN108396999A (en) 2018-08-14
CN108396999B CN108396999B (en) 2020-03-31

Family

ID=63099242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810292443.0A Active CN108396999B (en) 2018-04-03 2018-04-03 Iron tower steel pile underground communication machine room

Country Status (1)

Country Link
CN (1) CN108396999B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065146A (en) * 2020-09-07 2020-12-11 广州极诣科技有限公司 Auxiliary device and method for building and supporting communication base station

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147055A (en) * 2000-11-16 2002-05-22 Takenaka Komuten Co Ltd Floating body high-floor type base isolation structure using heavy muddy water
CN202431029U (en) * 2012-01-17 2012-09-12 江苏北洋通讯设备有限公司 Integrated beautification base station
CN202645063U (en) * 2012-03-31 2013-01-02 河北省景县宏远通讯有限公司 Miniature machine room for single-pipe tower
CN205025151U (en) * 2015-10-15 2016-02-10 长春市惠春源通信有限公司 Pipe tower piling bar integration computer lab
CN205370027U (en) * 2016-01-13 2016-07-06 云南九洲通信器材有限公司 Equilateral tee pipe tower room
CN106437274A (en) * 2016-08-26 2017-02-22 江苏铭远杆塔有限公司 Portable reusable communication tower base
CN106522601A (en) * 2016-09-13 2017-03-22 范广志 Integral environment-friendly fast-assembly base station
CN106996214A (en) * 2017-05-17 2017-08-01 滕荣荣 A kind of communication tower provided with prefabricated pile basis

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002147055A (en) * 2000-11-16 2002-05-22 Takenaka Komuten Co Ltd Floating body high-floor type base isolation structure using heavy muddy water
CN202431029U (en) * 2012-01-17 2012-09-12 江苏北洋通讯设备有限公司 Integrated beautification base station
CN202645063U (en) * 2012-03-31 2013-01-02 河北省景县宏远通讯有限公司 Miniature machine room for single-pipe tower
CN205025151U (en) * 2015-10-15 2016-02-10 长春市惠春源通信有限公司 Pipe tower piling bar integration computer lab
CN205370027U (en) * 2016-01-13 2016-07-06 云南九洲通信器材有限公司 Equilateral tee pipe tower room
CN106437274A (en) * 2016-08-26 2017-02-22 江苏铭远杆塔有限公司 Portable reusable communication tower base
CN106522601A (en) * 2016-09-13 2017-03-22 范广志 Integral environment-friendly fast-assembly base station
CN106996214A (en) * 2017-05-17 2017-08-01 滕荣荣 A kind of communication tower provided with prefabricated pile basis

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112065146A (en) * 2020-09-07 2020-12-11 广州极诣科技有限公司 Auxiliary device and method for building and supporting communication base station

Also Published As

Publication number Publication date
CN108396999B (en) 2020-03-31

Similar Documents

Publication Publication Date Title
CN107059919B (en) A kind of underground pipe gallery
CN202127186U (en) Semi-embedding prefabricated type substation
CN105281409A (en) Charging pile
CN208717954U (en) A kind of integrated pipe canal applied to city section water power route arrangement
CN103669955B (en) The data acquisition of a kind of applicable field installation and emergent public broadcasting upright column system
CN204014097U (en) Can on-line monitoring communication technology base station towards 4G
CN203729624U (en) Box body fixing belt antenna rising and falling integrated square cabin type base station
CN108396999A (en) A kind of steel tower piling bar underground communication computer room
CN110469358A (en) Main return remodeling method suitable for underground centralized return air system
CN103669980A (en) Ecological parking garage and installation steps thereof
CN204676787U (en) There is the accessible roof exhaust system of assembling stainless steel Ventilated cap
CN207469875U (en) Steel pipe pole rainwater, condensation water collection row's structure and high-voltage power transmission tower
CN201306018Y (en) Communication base station
CN206429001U (en) A kind of multipurpose outward flange single tube tower apparatus
CN105507646B (en) Communication base station
CN203491825U (en) Underground waterproof communication device cabin
CN111425030A (en) Design method capable of reducing design floor height of underground garage
CN207525813U (en) A kind of integrated prefabricated buried water intake pumping station
CN214696985U (en) Tower crane reserved hole protection structure
CN205077513U (en) Utility tunnel and underpass uncovered formula structure of building together
CN206581653U (en) A kind of novel steel skeleton cooling stack
CN205025151U (en) Pipe tower piling bar integration computer lab
CN207739745U (en) A kind of green plant enclosure wall of novel fabricated
CN203230202U (en) Energy-saving anti-theft machine room
CN207646606U (en) A kind of bridge cable protective device for municipal science of bridge building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant