CN108396967A - A kind of interior decoration construction method based on pure tealeaves building materials - Google Patents
A kind of interior decoration construction method based on pure tealeaves building materials Download PDFInfo
- Publication number
- CN108396967A CN108396967A CN201810206618.1A CN201810206618A CN108396967A CN 108396967 A CN108396967 A CN 108396967A CN 201810206618 A CN201810206618 A CN 201810206618A CN 108396967 A CN108396967 A CN 108396967A
- Authority
- CN
- China
- Prior art keywords
- tealeaves
- thermal insulation
- insulation support
- building material
- decorative building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of interior decoration construction method based on pure tealeaves building materials, including the maintenance of tealeaves decorative building material, the cleaning of indoor wall surface, the making of thermal insulation support, single head electrical bar, air-dispersing fan, temperature sensor and humidity sensor wherein are provided on thermal insulation support;Thermal insulation support is fixedly mounted on by structural member on metope later, the single head electrical bar, air-dispersing fan, solenoid valve, temperature sensor and humidity sensor are electrically connected with the controller;Then tealeaves decorative building material is attached on thermal insulation support successively, tealeaves decorative building material is after installation is complete, and indoor temperature needs to control at 20~28 °, and air humidity needs to control 50~70%.The present invention not only reduces the difficulty of tealeaves decorative building material installation, installation effectiveness is improved, and can grasp and control in time the temperature and humidity of tealeaves building materials, extends the service life of tealeaves building materials, advantage good with construction quality, that construction is convenient, easy to operate, speed of application is fast, easy to repair.
Description
Technical field
The invention belongs to interior decoration technologies, and in particular to a kind of interior decoration construction side based on pure tealeaves building materials
Method.
Background technology
It needs to paste ornament materials on wall segment when interior decoration, as needed to adhere to various not similar shapes on television background wall
The ornament materials of shape and color, to increase the beauty of television background wall.Currently, well known house decorative material mostly uses fiber
The materials such as plate, coating, marble, these materials mostly contain harmful chemical substance or radioactive element, as formaldehyde,
Benzene,toluene,xylene etc. can cause the acute or chronic poisoning for the personnel of moving in, and lead to the generation of various " house syndromes ", right
Health causes different degrees of harm.In order to overcome polluted deficiency, pertinent literature in existing house decorative material
In also there are some reports about brick tea decorative wall, the tealeaves house decorative material made using tealeaves is a kind of green ring
The new indoor building materials of guarantor, but in existing technology, there are no the records how constructed about tealeaves interior decoration building materials.
Therefore, development one kind is easy for construction, speed of application is fast, firmly install, decorative effect is beautiful and service life is long, can be effective
The interior decoration construction method based on pure tealeaves building materials for reducing difficulty of construction is desirability.
Invention content
In order to solve the problems, such as background technology, the purpose of the present invention is to provide a kind of easy for construction, construction speed
Degree is fast, firmly install, decorative effect is beautiful and service life is long, can effectively reduce the room based on pure tealeaves building materials of difficulty of construction
Interior trim construction method.
The object of the present invention is achieved like this, a kind of interior decoration construction method based on pure tealeaves building materials, including with
Lower step:
1. the maintenance of tealeaves decorative building material:It will be first put into using the prepared tealeaves decorative building material of pure tealeaves in maintenance room,
It is put into the 1st~15 day of maintenance room, maintains indoor temperature control at 25~30 DEG C, air humidity is controlled 70~80%, is being put
Behind enter to maintain room the 15th, indoor temperature control is maintained at 20~28 DEG C, air humidity is controlled 50~70%;
2. the cleaning of indoor wall surface:The impurity such as cobweb, the dust of Indoor environment surface of wall are first cleaned up, it is then right
The metope decorated is needed to carry out levelling;
3. the making of thermal insulation support:According to Decoration scheme, the thermal insulation support is monoblock tablet, is arranged on the thermal insulation support
Multiple single head electrical bars and multiple hydrofuge circular holes are equipped with air-dispersing fan on the hydrofuge circular hole, are placed on the thermal insulation support more
Capillary is provided with capillary aperture on capillary, and more capillaries are connected with a water inlet pipe, and electromagnetism is equipped on water inlet pipe
Valve is respectively arranged with temperature sensor and humidity sensor on the thermal insulation support;
4. the installation of thermal insulation support:Several mounting holes are first bored on metope, then by the position of mounting hole on thermal insulation support and metope
It after centering, then punches on thermal insulation support, is finally fixedly mounted on thermal insulation support on metope by structural member, arranged on the metope
There are controller, the single head electrical bar, air-dispersing fan, solenoid valve, temperature sensor and humidity sensor to be electrically connected with the controller;
5. the installation of tealeaves decorative building material:According to the design scheme of interior decoration, according to arrangement from top to bottom and from left to right
Mode will be placed on after the indoor tealeaves decorative building material of maintenance takes out and be attached on thermal insulation support successively, when attaching, adjacent two tealeaves
Gap between decorative building material is 2~3mm, and when attaching, and needs first to process location hole on the edge of tealeaves decorative building material,
Then tealeaves decorative building material is placed on thermal insulation support, finds after sticking position the draw-bore on thermal insulation support again accurately, uses pin later
Pin hole on location hole and thermal insulation support on tealeaves decorative building material is connected, after tealeaves decorative building material is completed, in pin
Tealeaves dedicated adhesive agent, the thickness of tealeaves dedicated adhesive agent coating are coated in nail surface and the junction of pin and tealeaves decorative building material
The flush of degree and thermal insulation support, you can complete the installation of tealeaves decorative building material;
6. the indoor maintenance of tealeaves decorative building material:After installation is complete, indoor temperature needs to control 20 tealeaves decorative building material
~28 °, air humidity needs to control 50~70%.
The advantageous effect of generation of the present invention is:It can select to fill without the tealeaves of planform according to the demand of resident family
Building materials are adornd, and are equipped with corresponding thermal insulation support to be the in-site installation for realizing tealeaves decorative building material, are realized to tea by thermal insulation support
The installation of acanthus building materials, one side tealeaves decorative building material are installed to realize with metope by thermal insulation support, and which reduce tealeaves dresses
The difficulty for adoring building materials installation, significantly improves the installation effectiveness of tealeaves decorative building material, phase is on the other hand arranged on thermal insulation support
The heat-insulation moisture-retention device answered extends tealeaves decoration in order to grasp and control in time the temperature and humidity of tealeaves decorative building material
The service life of building materials, in addition, being connected using pin between tealeaves decorative building material and thermal insulation support, dismounting installation is more convenient,
Maintenance and replacement for the tealeaves decorative building material in later stage is also more convenient, has construction using the decorated wall surface that the present invention makes
Advantage high-quality, that construction is convenient, easy to operate, speed of application is fast, easy to repair, use easy to spread.
Description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural schematic diagram of thermal insulation support;
Description of the drawings:1- metopes, 2- thermal insulation supports, 3- tealeaves decorative building materials, 4- pins, 5- capillaries, 6- weep holes, 7- grooves,
8- air-dispersings are fanned, 9- water inlet pipes, 10- solenoid valves, 11- temperature sensors, 12- controllers, 13- humidity sensors, 14- single head electric heating
Stick.
Specific implementation mode
With reference to embodiment and attached drawing explanation, the present invention is further illustrated, but not in any way to the present invention
Limit, based on present invention teach that made by it is any transform or replace, equal embodiment belongs to the scope of protection of the present invention.
Interior decoration construction method of the present invention based on pure tealeaves building materials, includes the following steps:
1. the maintenance of tealeaves decorative building material:The prepared tealeaves decorative building material of pure tealeaves 3 will be used first to be put into maintenance room,
It is put into the 1st~15 day of maintenance room, maintains indoor temperature control at 25~30 DEG C, air humidity is controlled 70~80%, is being put
Behind enter to maintain room the 15th, indoor temperature control is maintained at 20~28 DEG C, air humidity control, in advance will system 50~70%
Tealeaves decorative building material 3 be put into maintenance indoor storage, be to be able to offer tea adapted to after acanthus building materials 3 are installed it is indoor
Environmental condition avoids indoor tealeaves decorative building material 3 because of uncomfortable indoor environmental condition, mouldy, rotten phenomenon occurs, influence it
The effect in the service life and decoration that use;
2. the cleaning of indoor wall surface:The impurity such as cobweb, the dust of Indoor environment surface of wall are first cleaned up, it is then right
The metope decorated 1 is needed to carry out levelling;
3. the making of thermal insulation support 2:According to Decoration scheme, the thermal insulation support 2 be monoblock tablet, thermal insulation support 3 can wood
Material or bamboo material are made, and multiple single head electrical bars 14 and multiple hydrofuge circular holes 6, the row are arranged on the thermal insulation support 2
Air-dispersing fan 8 is installed, when indoor temperature is low, air-dispersing fan 8 can reduce indoor temperature, on the thermal insulation support 2 on 6 hole of wet circle
More capillaries 5 are placed with, capillary aperture is provided on capillary 5, more capillaries 5 are connected with a water inlet pipe 9, water inlet pipe
Solenoid valve 10 is installed on 9, can be humidified to tealeaves decorative building material 3 by water inlet pipe 9 and capillary 5, the thermal insulation support 2
On be respectively arranged with temperature sensor 11 and humidity sensor 13, be provided on the thermal insulation support 2 and place temperature sensor 11, wet
The groove 7 of sensor 13, single head electrical bar 14, water inlet pipe 9 and capillary 5 is spent, if thermal insulation support 2 uses wood materials and bamboo matter
After material is made, in order to ensure the safety used, one layer of heat-barrier material need to be covered in groove 7, temperature sensor 11 is examining
Indoor temperature is surveyed, humidity sensor 13 is suitable to be provided for tealeaves decorative building material 3 for detecting indoor air humidity
Conservation environment;
4. the installation of thermal insulation support 2:Several mounting holes are first bored on metope 1, then by the mounting hole on thermal insulation support 2 and metope 1
It after the centering of position, then punches on thermal insulation support 2, is finally fixedly mounted on thermal insulation support 2 on metope 1 by structural member, when installation,
Thermal insulation support is apart from 0.5~1mm of metope, and convenient for 8 exhaust of air-dispersing fan, controller 12, the single head electric heating are disposed on the metope 1
Stick 14, air-dispersing fan 8, solenoid valve 10, temperature sensor 11 and humidity sensor 13 are electrically connected with controller 12, pass through controller
To control temperature, the heat air that single head electrical bar 14 is sent out passes through the size of current of 12 control single head electrical bars 14
Air circulation heating tea leaves decorative building material 3 controls air-dispersing by controller 12 and fans 8 pairs of 3 hydrofuge of tealeaves decorative building material coolings, passes through
Controller controls solenoid valve 10 and is humidified to tealeaves decorative building material 3;
5. the installation of tealeaves decorative building material 3:According to the design scheme of interior decoration, according to arrangement from top to bottom and from left to right
Mode will be placed on after the indoor tealeaves decorative building material 3 of maintenance takes out and be attached to successively on thermal insulation support 2, when attaching, adjacent two tea
Gap between acanthus building materials 3 is 2~3mm, is 3 generation protected from environmental of tealeaves decorative building material in order to prevent there are gap
Contraction distortion, and when attaching, need first to process location hole on the edge of tealeaves decorative building material 3, then build tealeaves decoration
Material 3 is placed on thermal insulation support 2, is found after sticking position the draw-bore on thermal insulation support 2 again accurately, is later built tealeaves decoration with pin 4
The pin hole on location hole and thermal insulation support 2 on material 3 connects, it is preferable that the pin 4 is bamboo pin or wood dowel, is used
Bamboo pin or wood dowel can prevent from getting rusty, and avoid the tealeaves decorative building material 3 caused by pin gets rusty from falling off, tealeaves decorative building material 3
After being completed, tealeaves dedicated adhesive agent, tealeaves are coated on 4 surface of pin and pin 4 and the junction of tealeaves decorative building material 3
The flush of the thickness and thermal insulation support 2 of dedicated adhesive agent coating, you can complete the installation of tealeaves decorative building material 3, coat tealeaves
On the one hand dedicated adhesive agent can increase the bonding strength of tealeaves decorative building material 3 and thermal insulation support 2, avoid tealeaves decorative building material 3 de-
It falls, pin 4 can be covered by being on the other hand the agent of tealeaves dedicated adhesive, since color and the tealeaves decoration of tealeaves dedicated adhesive agent are built
The color of material 3 is close, can cover the installation trace of pin 4, further increases indoor aesthetic measure, and the tealeaves is special
The production method of adhesive is that first-class tealeaves is first crushed to 50~100 mesh, then adds water infusion to thick tea leaf powder
When, it receives dry juice and can be prepared by tealeaves dedicated adhesive agent to paste, it, can be in order to increase the aesthetic measure of tealeaves decorative building material
Ornamental strip is sticked in the gap location of adjacent tealeaves decorative building material 3;
6. the indoor maintenance of tealeaves decorative building material:After installation is complete, indoor temperature needs to control 20 tealeaves decorative building material 3
~28 °, air humidity needs to control 50~70%, if fruit is indoor temperature when being higher than 20~28 °, is controlled by controller 12
Air-dispersing fan 8 processed cools down, and when being less than 20~28 ° if it is indoor temperature, single head electrical bar 14 is controlled by controller 12
Increase indoor temperature, be higher than 50~70% if it is indoor air humidity, controller 12 can be passed through and control air-dispersing fan 8
Hydrofuge is carried out, is less than 50~70% if it is indoor air humidity, control solenoid valve 10 can be controlled by controller 12 and is beaten
It opens, after water inlet pipe 9 is connected with water source, the water mist sprayed by capillary 5 is humidified.
Claims (5)
1. a kind of interior decoration construction method based on pure tealeaves building materials, it is characterised in that, include the following steps:
1. the maintenance of tealeaves decorative building material:The prepared tealeaves decorative building material of pure tealeaves will be used(3)It is first put into maintenance room,
Be put into maintenance the 1st~15 day of room, maintaining indoor temperature control at 25~30 DEG C, air humidity control 70~80%,
After being put into the 15th of maintenance room, indoor temperature control is maintained at 20~28 DEG C, air humidity is controlled 50~70%;
2. the cleaning of indoor wall surface:The impurity such as cobweb, the dust of Indoor environment surface of wall are first cleaned up, it is then right
Need the metope decorated(1)It carries out levelling;
3. thermal insulation support(2)Making:According to Decoration scheme, the thermal insulation support(2)For monoblock tablet, the thermal insulation support
(2)The upper multiple single head electrical bars of arrangement(14)With multiple hydrofuge circular holes(6), the hydrofuge circle(6)Air-dispersing fan is installed on hole
(8), the thermal insulation support(2)On be placed with more capillaries(5), capillary(5)On be provided with capillary aperture, more capillaries
(5)With a water inlet pipe(9)It is connected, water inlet pipe(9)On solenoid valve is installed(10), the thermal insulation support(2)On be respectively arranged with
Temperature sensor(11)And humidity sensor(13);
4. thermal insulation support(2)Installation:First in metope(1)Upper several mounting holes of brill, then by thermal insulation support(2)With metope(1)On
Position of mounting hole centering after, then in thermal insulation support(2)Upper punching, finally by thermal insulation support(2)It is fixedly mounted on wall by structural member
Face(1)On, the metope(1)On be disposed with controller(12), the single head electrical bar(14), air-dispersing fan(8), solenoid valve
(10), temperature sensor(11)And humidity sensor(13)And controller(12)Electrical connection;
5. tealeaves decorative building material(3)Installation:According to the design scheme of interior decoration, according to row from top to bottom and from left to right
Row mode will be placed on the indoor tealeaves decorative building material of maintenance(3)Thermal insulation support is attached to after taking-up successively(2)On, when attaching, phase
Adjacent two tealeaves decorative building materials(3)Between gap be 2~3mm, and attach when, need first in tealeaves decorative building material(3)Side
Location hole is processed on edge, then by tealeaves decorative building material(3)It is placed on thermal insulation support(2)On, it is being kept the temperature again after finding sticking position accurately
Frame(2)Upper draw-bore, uses pin later(4)By tealeaves decorative building material(3)On location hole and thermal insulation support(2)On pin hole connection
Get up, tealeaves decorative building material(3)After being completed, in pin(4)Surface and pin(4)With tealeaves decorative building material(3)Company
Coat tealeaves dedicated adhesive agent, the thickness and thermal insulation support of tealeaves dedicated adhesive agent coating in the place of connecing(2)Flush, you can complete
Tealeaves decorative building material(3)Installation;
6. the indoor maintenance of tealeaves decorative building material:Tealeaves decorative building material(3)After installation is complete, indoor temperature needs to control
20~28 °, air humidity needs to control 50~70%.
2. a kind of interior decoration construction method based on pure tealeaves building materials according to claim 1, it is characterised in that:In step
Suddenly 3. in, the thermal insulation support(2)On be provided with placement temperature sensor(11), humidity sensor(13), single head electrical bar(14)、
Water inlet pipe(9)And capillary(5)Groove(7).
3. a kind of interior decoration construction method based on pure tealeaves building materials according to claim 1, it is characterised in that:In step
Suddenly 5. in, the production method of the tealeaves dedicated adhesive agent is that tealeaves is first crushed to 50~100 mesh, then adds tea leaf powder
Water infusion to it is thick when, receive dry juice and can be prepared by tealeaves dedicated adhesive agent to paste.
4. a kind of interior decoration construction method based on pure tealeaves building materials according to claim 1, it is characterised in that:In step
Suddenly 5. in, in adjacent tealeaves decorative building material(3)Gap location stick ornamental strip.
5. a kind of interior decoration construction method based on pure tealeaves building materials according to claim 1, it is characterised in that:In step
Suddenly 5. in, the pin(4)For bamboo pin or wood dowel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810206618.1A CN108396967B (en) | 2018-03-13 | 2018-03-13 | Indoor decoration construction method based on pure tea building materials |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810206618.1A CN108396967B (en) | 2018-03-13 | 2018-03-13 | Indoor decoration construction method based on pure tea building materials |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108396967A true CN108396967A (en) | 2018-08-14 |
CN108396967B CN108396967B (en) | 2020-10-13 |
Family
ID=63092516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810206618.1A Active CN108396967B (en) | 2018-03-13 | 2018-03-13 | Indoor decoration construction method based on pure tea building materials |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108396967B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004163051A (en) * | 2002-11-15 | 2004-06-10 | Minami Heating Plan:Kk | Wall heating structure |
DE102004028662A1 (en) * | 2004-06-12 | 2005-12-29 | Valentin Rosel | Building temperature heating and cooling heat exchanger system has external array of heat exchangers linked to heat pumps |
CN1800559A (en) * | 2005-12-30 | 2006-07-12 | 甘玉祥 | Camellia board decoration wall and its preparation method |
CN204551948U (en) * | 2015-04-21 | 2015-08-12 | 周清 | With the wall panel of humid control |
CN105756220A (en) * | 2016-04-01 | 2016-07-13 | 文登蓝岛建筑工程有限公司 | Interior wall and prefabricated building with air quality linkage control module and |
CN106705199A (en) * | 2015-11-16 | 2017-05-24 | 重庆市万盛区富生装饰行 | Intelligent humid and heat wall |
CN106948565A (en) * | 2017-02-27 | 2017-07-14 | 温州瑞家装饰工程有限公司 | A kind of environmental friendly indoor temperature controlling decorative board |
-
2018
- 2018-03-13 CN CN201810206618.1A patent/CN108396967B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004163051A (en) * | 2002-11-15 | 2004-06-10 | Minami Heating Plan:Kk | Wall heating structure |
DE102004028662A1 (en) * | 2004-06-12 | 2005-12-29 | Valentin Rosel | Building temperature heating and cooling heat exchanger system has external array of heat exchangers linked to heat pumps |
CN1800559A (en) * | 2005-12-30 | 2006-07-12 | 甘玉祥 | Camellia board decoration wall and its preparation method |
CN204551948U (en) * | 2015-04-21 | 2015-08-12 | 周清 | With the wall panel of humid control |
CN106705199A (en) * | 2015-11-16 | 2017-05-24 | 重庆市万盛区富生装饰行 | Intelligent humid and heat wall |
CN105756220A (en) * | 2016-04-01 | 2016-07-13 | 文登蓝岛建筑工程有限公司 | Interior wall and prefabricated building with air quality linkage control module and |
CN106948565A (en) * | 2017-02-27 | 2017-07-14 | 温州瑞家装饰工程有限公司 | A kind of environmental friendly indoor temperature controlling decorative board |
Also Published As
Publication number | Publication date |
---|---|
CN108396967B (en) | 2020-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101019493B (en) | High performance heliogreenhouse | |
CN201051810Y (en) | High performance day-light greenhouse | |
CN110863661A (en) | Attached concrete curing cloth with large vertical face structure | |
CN108396967A (en) | A kind of interior decoration construction method based on pure tealeaves building materials | |
CN102877615A (en) | Polyurethane thermal insulation ceiling | |
CN204907248U (en) | Two net big -arch shelters of three membranes | |
CN105926817B (en) | A kind of element type insulated fire curtain wall construction | |
CN209384558U (en) | A kind of dedicated aeroge decorative panel of assembling type outer wall | |
CN205259512U (en) | Decoration hanging plate for outer wall of building | |
CN104631712B (en) | Pitched roof high-elongation ridge vent coiled material and preparation method thereof | |
CN204234289U (en) | There is the waterproof material forming machine of slow cooling section | |
CN203603328U (en) | Light rapid installation thermal insulation curtain wall system | |
CN210126168U (en) | Concrete test block curing room | |
CN213868375U (en) | Light mortar veneer heat preservation decorates intergral template outer thermal insulation system | |
CN201865286U (en) | Fixing device of heat insulation veneer for building outer wall | |
CN105066302B (en) | A kind of no cover board vaporation-type solar air-conditioner system and its application method | |
CN204721990U (en) | The regulating system of a kind of dairy farm cowshed environment | |
CN112376770A (en) | Vertical air inlet and transverse air outlet unit type glass curtain wall system and construction method thereof | |
CN206397371U (en) | A kind of insulation solid wood composite door with partition-type structures | |
CN205843004U (en) | A kind of idle call modular metal radiation tail end device | |
CN216949217U (en) | Heat preservation and decoration integrated plate | |
CN213572489U (en) | Low temperature dope layer is prevented to outer wall | |
CN215858752U (en) | Real stone finish heat preservation decoration intergral template | |
CN117072901B (en) | Waterproof dampproofing LED underground lamp | |
CN215166817U (en) | Capillary dewing-proof structure on wall surface and house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |