CN108386168A CN201810174997.0A CN201810174997A CN108386168A CN 108386168 A CN108386168 A CN 108386168A CN 201810174997 A CN201810174997 A CN 201810174997A CN 108386168 A CN108386168 A CN 108386168A
Authority
CN
China
Prior art keywords
energy
gathering pulse
gathering
controller
pulse generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810174997.0A
Other languages
Chinese (zh)
Other versions
CN108386168B (en
Inventor
聂泳培
李铁建
陈壮志
蒋玉林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Juneng Electric Technology Co ltd
Original Assignee
Hunan Feitian Photoelectric Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Feitian Photoelectric Technology Co ltd filed Critical Hunan Feitian Photoelectric Technology Co ltd
Priority to CN201810174997.0A priority Critical patent/CN108386168B/en
Publication of CN108386168A publication Critical patent/CN108386168A/en
Application granted granted Critical
Publication of CN108386168B publication Critical patent/CN108386168B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

The invention discloses equipment for exploiting thick oil by utilizing energy-gathering pulses in the field of thick oil exploitation and a using method thereof. The thickened oil is softened by energy-gathering pulses and then mined, so that the mining efficiency is greatly improved, the energy consumption is only one tenth or even less than that of the traditional energy consumption, the cost is low, and the environmental pollution is small.

Description

A kind of equipment and its application method carrying out thickened oil recovery using energy-gathering pulse
Technical field
The invention belongs to thickened oil recovery fields, and in particular to it is a kind of using energy-gathering pulse carry out thickened oil recovery equipment and its Application method.
Background technology
Viscous crude refers under formation condition, and viscosity is more than 50 millipascal seconds, or degassed crude viscosity is l000 under reservoir temperature The high viscosity heavy crude of~10000 millipascal seconds.In the oil exploitation in oil field, viscous crude has special high viscosity and Gao Ning Solid point characteristic all encounters some technical barriers in the various aspects of development and application.For production technique, colloid, asphalitine Mobility of the crude oil in reservoir and pit shaft is caused to be deteriorated with long chain paraffin, it is desirable that implement the tertiary oil recovery technique side of high investment Method.Height glues, the conveying of High viscosity crude must use more powerful pumping equipment, and in order to reach rational pump displacement, It is required that transport system heat or being diluted processing to crude oil.According to relevant information, the storage of China's viscous crude Amount occupies the 7th in the world, hitherto it is found that having 9 large and medium-sized oil basins and large number of heavy crude reservoir block.The world Various countries are all that first exploitation is easier to exploitation, lighter crude oil in the evolution of petroleum industry.The state of foreign oil large storage capacity Family, because its is resourceful and heavy crude producing is of high cost, risk is big, not yet puts on the agenda heavy crude producing.Once getting thick Oil well is usually used the method for shut-in well, lies over, without exploiting except part is exploited to meet industrial production outer.
With gradually decreasing compared with light crude resource, it has to start to exploit the mink cell focus of some more difficult exploitations, therefore The share of mink cell focus gradually increases in world oil yield.In recent years, China also accelerates the exploitation of viscous crude, at present viscous crude Yield accounted for 1/10th or so of national oil annual output.Improving the thinking of heavy crude reservoir yield at present mainly reduces Viscosity of thickened oil improves Reservoir Permeability, increases producing pressure differential.Main mature technology be heat extraction by steam injection, combustion in situ, hot water+ Chemical huffpuff is taken sand cooling and is adopted etc..The problem of these methods are primarily present is exactly that recovery ratio is relatively low, and it is huge more to there is energy consumption cost Greatly, the problems such as environmentally friendly.No matter which kind of mode is taken, the problem of greatest problem that thickened oil recovery faces is exactly cost of winning.Especially In the case where current international oil price variation is larger, this problem is the main bugbear of current thickened oil recovery.
Invention content
The object of the invention is being provided in a kind of equipment and its application method carrying out thickened oil recovery using energy-gathering pulse, with solution Technological deficiency certainly existing in the prior art.
To achieve the above object, the present invention provides a kind of equipment carrying out thickened oil recovery using energy-gathering pulse, including well Upper device and downhole hardware, device includes controller, power supply and energy-gathering pulse generator on well, and downhole hardware includes cumulative arteries and veins Punching release electrode, power supply are connect with controller and energy-gathering pulse generator respectively, and energy-gathering pulse generator is discharged with energy-gathering pulse Electrode is connected by cable, and controller is connect by optical fiber with energy-gathering pulse generator to control the generation of energy-gathering pulse generator The shock wave released for energy-gathering pulse release electrode.
Preferably, downhole hardware further includes energy-storing device, and energy-storing device is located at energy-gathering pulse generator and energy-gathering pulse release electricity Savings are carried out with the energy generated to energy-gathering pulse generator between pole and are sent to energy-gathering pulse by the energy after saving is completed Release electrode is discharged, and energy-storing device is also connect by optical fiber with controller.
Preferably, energy-gathering pulse generator is Marx generators.
Preferably, Marx generators are inductance isolated form Marx generators.
Preferably, power supply is AC/DC power supplys, and the output power of AC/DC power supplys is 60KW, output voltage 30KV.
Above equipment is relied on, carrying out viscous crude the present invention also provides a kind of equipment using energy-gathering pulse thickened oil recovery opens The method adopted, includes the following steps:
S1:Controller, power supply and energy-gathering pulse generator are arranged in position on well, and cable and energy-gathering pulse will be passed through The energy-gathering pulse release electrode of generator connection is put into thick oil underground well;
S2:Power supply is opened, controlling energy-gathering pulse generator by controller opens, and persistently exports energy-gathering pulse;
S3:After viscous crude is thinning, energy-gathering pulse generator is controlled by controller and is closed.
Preferably, when controlling the unlatching of energy-gathering pulse generator by controller in S2, energy-storing device is also controlled by controller It opens, makes energy-gathering pulse energy stores in energy-storing device.
Preferably, when energy-gathering pulse energy stores full in energy-storing device, energy-gathering pulse generator is closed by controller, and lead to It crosses controller control energy-storing device and transfers its energy to energy-gathering pulse release electrode progress energy release.
The invention has the advantages that:
1, the equipment for carrying out thickened oil recovery using energy-gathering pulse of the invention, after viscous crude is softened by energy-gathering pulse again into Row exploitation substantially increases production efficiency, and with exploitation, low energy consumption, at low cost, the small feature of environmental pollution.
2, the present invention increases energy-storing device between energy-gathering pulse generator and energy-gathering pulse release electrode, can be by cumulative Release is concentrated after the energy accumulating that impulse generator generates, and is greatly improved the effect of viscous crude softening.
Below with reference to accompanying drawings, the present invention is described in further detail.
Description of the drawings
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of device structure block diagram using energy-gathering pulse thickened oil recovery of the preferred embodiment of the present invention;
Fig. 2 is the relational graph of inductance and the number of turns.
In figure, 1, power supply;2, controller;3, energy-gathering pulse generator;4, energy-gathering pulse discharges electrode;5, energy-storing device.
Specific implementation mode
The embodiment of the present invention is described in detail below in conjunction with attached drawing, but the present invention can be defined by the claims Implement with the multitude of different ways of covering.
To achieve the above object, the present invention provides a kind of equipment carrying out thickened oil recovery using energy-gathering pulse, referring to figure Device and downhole hardware on 1, including well, device includes controller 2, power supply 1 and energy-gathering pulse generator 3, underground dress on well It sets and discharges electrode 4 including energy-gathering pulse, power supply 1 is connect with controller 2 and energy-gathering pulse generator 3 respectively, and energy-gathering pulse occurs Device 3 is connect with energy-gathering pulse release electrode 4 by cable, and controller 2 is connect with energy-gathering pulse generator 3 to control by optical fiber Energy-gathering pulse generator 3 processed generates the shock wave released for energy-gathering pulse release electrode 4.
Device includes power supply 1, controller 2 and energy-gathering pulse generator 3 on well, and the high energy high pressure that power supply 1 generates passes through electricity Cable is transmitted in energy-gathering pulse equipment, and discharging electrode 4 by energy-gathering pulse after 3 cumulative of energy-gathering pulse generator is discharged. Under High Voltage electric field action, the energy-gathering pulse in viscous crude discharges 4 launching electronics of electrode, the liquid point near animating electrode Son.The electronics being ionized out in the electronics and liquid of electrode emission ionizes out more electronics by highfield acceleration between electrode. The region that fluid molecule is ionized forms plasma channel.With the extension of ionized space, discharge channel is formed between electrode, Liquid is breakdown.After discharge channel generates, due to discharge resistance very little, the discharge current of tens kilo-amperes will be generated.Discharge current Channel circumference liquid is heated, liquid vaporization and rapid expansion outward are made.The air cavity expanded rapidly generates powerful in aqueous medium Shock wave.Shock wave is acted in a manner of momentum or surge and is around situated between with the difference of discharge current and discharge time Matter.Being equivalent to oil reservoir impact using fluid pulse makes oil reservoir become loosely to improve oil recovery ratio.Energy-gathering pulse The shock wave of generation can generate thousands of times of acceleration of gravity, and around discharge channel, discharge current evokes the wink of Gausses up to ten thousand Varying magnetic field, changing magnetic field establish electric field and upper kilo-ampere electric current in viscous crude in conductor fluid, high-intensity magnetic field generates oil reservoir medium Strong polarization.Energy-gathering pulse generates plasma (plasma pulse), acts on viscous crude strand.Plasma pulse skill Art chooses basic hydrocarbon molecules, breaks strand, makes itself to become smaller to by fine pore, viscous crude permeability It is improved.Controller 2 can be adjusted the shape of energy-gathering pulse, wavelength and amplitude, can be adapted for Viscosity of Heavy Crude Oil not Same various situations.
Preferably, downhole hardware further includes energy-storing device 5, and energy-storing device 5 is located at energy-gathering pulse generator 3 and is discharged with energy-gathering pulse Savings are carried out with the energy generated to energy-gathering pulse generator 3 between electrode 4 and are sent to cumulative by the energy after saving is completed Pulse release electrode 4 is discharged, and energy-storing device 5 is also connect by optical fiber with controller 2.
Since viscous crude is located at the deeper below place of bottom, the energy that energy-gathering pulse generator 3 generates, which has, greatly to be consumed On cable between connection energy-gathering pulse generator 3 and energy-gathering pulse release electrode 4, reaches energy-gathering pulse and discharge electrode 4 On energy may decrease to the effect that viscous crude softens.Therefore electrode 4 is discharged in energy-gathering pulse generator 3 and energy-gathering pulse Between installed energy-storing device 5 additional, make energy first assemble in energy-storing device 5, then by energy-gathering pulse discharge electrode 4 released It puts.To improve viscous crude softening rate, production efficiency is promoted.Energy-storing device 5 carries out control control by controller on well 2, can be in real time Observe energy storage state, and energy release time and number are determined with the flow condition according to viscous crude
Preferably, energy-gathering pulse generator 3 is Marx generators.
Preferably, Marx generators are inductance isolated form Marx generators.
Inductance isolated form Marx generators can greatly reduce the charging time, when can more reduce to repetitive operation The requirement of Marx generators fever.The charging voltages of inductance isolated form Marx generators need according to the maximum voltage value of cable come It determines, to prevent cable from breaking down.And when considering certain surplus, series is set as 3-10 grades, therefore every grade of capacitance is 4.8uF.Therefore, isolation inductance, main capacitance and the switch of inductance isolated form Marx generators are required for carrying out special designing.
The calculating of inductance is isolated:According to inductance reckoner, the inductance of single layer helix tube:
Wherein N is the number of turns, and D is the diameter of helix tube, and Φ is the value changed with A/D, and wherein A is the length of helix tube.This In, D=154mm, A=240mm.It can so be found by table:Φ=4.91, numerical value in substitution, can obtain inductance and the number of turns Relationship, as shown in Figure 2.It is 15 circles to take N.Meanwhile a diameter of d of conducting wire is enabled, then the first correction term of inductance:
Wherein:Meanwhile second correction term be:
It is J be with the relevant value of the number of turns, the number of turns N be 15, J=-0.2857.
In calculating, if it is 15 to take the number of turns N, and diameter of wire d is 1.0mm, can obtain inductance:
The selection of main capacitance:
According to above-mentioned calculating, main capacitance operating voltage 10kV, capacitance 4.8uF, it is contemplated that underground size and work shape State chooses oil immersed type impulse capacitor, and capacitor is cylinder, according to underground size, the cross-sectional area of capacitor is selected, in axis Extend to direction, by multiple parallel ways to meet condenser capacity demand.The volume of associated capacitor for specific customization and At.
The design of switch:
It is the key that ensure that Marx generators can work normally for the design switched in Marx generators, design two Kind switch electrode, the entire Marx first order and the second level, using I type electrodes, the third level is to the tenth grade using II grades of electrodes.I types Electrode, which is field, enhances electrode, enhances electrode using field by preceding two-stage, it is ensured that the preferential conducting of two-stage before Marx, and residue 10 Grade uses II type homogeneous electrodes, it is possible to prevente effectively from preferential conducting occurs, to prevent Marx from effectively establishing electric discharge.And for The determination of main gap needs to estimate disruptive field intensity, and the breakdown relational expression of air or nitrogen is under quiescent voltage:
P is the inner gas pressure (0.1MPa) of switch, d in formulaeffIt is the enhanced intensity factor for electrode effective distance (cm), f. For plate electrode:deff/ d=1.0, f=1.0.Wherein d is two interelectrode distances (cm), then, breakdown voltage Ubr=Eb × d (kV) can be obtained.
Preferably, power supply 1 is AC/DC power supplys, and the output power of AC/DC power supplys is 60KW, output voltage 30KV.
According to the demand of downhole production, the output power of power supply 1 is 60KW, output voltage 30KV.
Above equipment is relied on, carrying out viscous crude the present invention also provides a kind of equipment using energy-gathering pulse thickened oil recovery opens The method adopted, includes the following steps:
S1:Controller 2, power supply 1 and energy-gathering pulse generator 3 are arranged in position on well, and cable and cumulative will be passed through The energy-gathering pulse release electrode 4 that impulse generator 3 connects is put into thick oil underground well.
S2:Power supply 1 is opened, controlling energy-gathering pulse generator 3 by controller 2 opens, and persistently exports energy-gathering pulse.
S3:After viscous crude is thinning, energy-gathering pulse generator 3 is controlled by controller 2 and is closed.
Preferably, when controlling 3 unlatching of energy-gathering pulse generator by controller 2 in S2, also pass through controller 2 and control energy storage Device 5 is opened, and makes energy-gathering pulse energy stores in energy-storing device 5.
Preferably, when energy-gathering pulse energy stores full in energy-storing device 5, energy-gathering pulse generator 3 is closed by controller 2, And energy-storing device 5 is controlled by controller 2 and transfers its energy to the energy-gathering pulse release progress energy release of electrode 4.
To verify equipment effect, the present embodiment devises a kind of being opened using energy-gathering pulse progress viscous crude for suitable ground experiment The experimental provision adopted.The voltage 50kv of energy-gathering pulse generating means, energy 300-500J;The output power of power supply 1 is 20KW, defeated It is 30KV to go out voltage.The data measured by experimental provision are as shown in the table:
When temperature and plant capacity rise, related experiment result gradually improves, and the viscous crude after softening can meet open Adopt demand.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of equipment carrying out thickened oil recovery using energy-gathering pulse, including device and downhole hardware on well, which is characterized in that institute It includes energy-gathering pulse that state device on well, which include controller (2), power supply (1) and energy-gathering pulse generator (3), the downhole hardware, Electrode (4) is discharged, the power supply (1) connect with controller (2) and energy-gathering pulse generator (3) respectively, the energy-gathering pulse hair Raw device (3) is connect with energy-gathering pulse release electrode (4) by cable, and the controller (2) is gathered by optical fiber with described Energy impulse generator (3) connection is generated with controlling energy-gathering pulse generator (3) for energy-gathering pulse release electrode (4) releasing Shock wave.
2. a kind of equipment carrying out thickened oil recovery using energy-gathering pulse according to claim 1, which is characterized in that the well Lower device further includes energy-storing device (5), and the energy-storing device (5) is connected to the energy-gathering pulse generator (3) and the energy-gathering pulse Savings are carried out with the energy generated to energy-gathering pulse generator (3) between release electrode (4) and are passed the energy after saving is completed It send to energy-gathering pulse release electrode (4) and is discharged, the energy-storing device (5) also connect with the controller (2).
3. a kind of equipment carrying out thickened oil recovery using energy-gathering pulse according to claim 2, which is characterized in that the storage Energy device (5) is connect with the controller (2) by optical fiber.
4. a kind of equipment carrying out thickened oil recovery using energy-gathering pulse according to claim 1, which is characterized in that described poly- Energy impulse generator (3) is Marx generators.
5. a kind of equipment carrying out thickened oil recovery using energy-gathering pulse according to claim 4, which is characterized in that described Marx generators are inductance isolated form Marx generators.
6. according to a kind of any equipment carrying out thickened oil recovery using energy-gathering pulse of claim 1-5, which is characterized in that The power supply (1) is AC/DC power supplys, and the output power of the AC/DC power supplys is 60KW, output voltage 30KV.
7. a kind of method that equipment using the thickened oil recovery described in claim 6 carries out thickened oil recovery, which is characterized in that including Following steps:
S1:Controller (2), power supply (1) and energy-gathering pulse generator (3) are arranged in position on well, and cable and institute will be passed through The energy-gathering pulse release electrode (4) for stating energy-gathering pulse generator (3) connection is put into thick oil underground well;
S2:Power supply (1) is opened, controlling energy-gathering pulse generator (3) by controller (2) opens, and persistently exports energy-gathering pulse;
S3:After viscous crude is thinning, energy-gathering pulse generator (3) is controlled by controller (2) and is closed.
8. the method according to claim 7 for carrying out thickened oil recovery, which is characterized in that pass through controller (2) in the S2 When controlling energy-gathering pulse generator (3) unlatching, the energy-storing device (5) is also controlled by controller (2) and is opened, energy-gathering pulse is enable Amount is stored in the energy-storing device (5).
9. the method according to claim 8 for carrying out thickened oil recovery, which is characterized in that when cumulative in the energy-storing device (5) When pulse energy stores full, the energy-gathering pulse generator (3) is closed by the controller (2), and pass through the controller (2) It controls the energy-storing device (5) and transfers its energy to energy-gathering pulse release electrode (4) progress energy release.
CN201810174997.0A 2018-03-02 2018-03-02 Device for heavy oil exploitation by utilizing energy-gathering pulse and application method thereof Active CN108386168B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810174997.0A CN108386168B (en) 2018-03-02 2018-03-02 Device for heavy oil exploitation by utilizing energy-gathering pulse and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810174997.0A CN108386168B (en) 2018-03-02 2018-03-02 Device for heavy oil exploitation by utilizing energy-gathering pulse and application method thereof

Publications (2)

Publication Number Publication Date
CN108386168A true CN108386168A (en) 2018-08-10
CN108386168B CN108386168B (en) 2023-10-31

Family

ID=63070199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810174997.0A Active CN108386168B (en) 2018-03-02 2018-03-02 Device for heavy oil exploitation by utilizing energy-gathering pulse and application method thereof

Country Status (1)

Country Link
CN (1) CN108386168B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2213860C2 (en) * 2001-10-22 2003-10-10 Закрытое акционерное общество Акционерная компания "Ионно-плазменные технологии" Method of pulse and ion-plasma stimulation of oil formation
US20080036301A1 (en) * 2005-06-08 2008-02-14 Mcdonald Kenneth Fox Photon Initiated Marxed Modulators
CN104271880A (en) * 2011-05-24 2015-01-07 快帽系统公司 Power system for high temperature applications with rechargeable energy storage
CN104467772A (en) * 2014-11-17 2015-03-25 西安交通大学 Pulse transformer type trigger
CN104756608A (en) * 2012-07-27 2015-07-01 诺瓦斯能源集团有限公司 A system and method for stimulating wells, deposits and boreholes using the plasma source
CN205811974U (en) * 2016-07-18 2016-12-14 西安电子工程研究所 A kind of from trigger-type compact Marx generator
CN106437656A (en) * 2016-12-12 2017-02-22 中国地质大学(北京) Oil and gas reservoir permeation-increasing and plugging-releasing device based on liquid-electric effect
CN106917615A (en) * 2015-12-28 2017-07-04 中国石油天然气股份有限公司 Heavy oil reservoir exploitation method and device
CN207960585U (en) * 2018-03-02 2018-10-12 湖南飞天光电科技有限公司 A kind of equipment carrying out thickened oil recovery using energy-gathering pulse

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2213860C2 (en) * 2001-10-22 2003-10-10 Закрытое акционерное общество Акционерная компания "Ионно-плазменные технологии" Method of pulse and ion-plasma stimulation of oil formation
US20080036301A1 (en) * 2005-06-08 2008-02-14 Mcdonald Kenneth Fox Photon Initiated Marxed Modulators
CN104271880A (en) * 2011-05-24 2015-01-07 快帽系统公司 Power system for high temperature applications with rechargeable energy storage
CN104756608A (en) * 2012-07-27 2015-07-01 诺瓦斯能源集团有限公司 A system and method for stimulating wells, deposits and boreholes using the plasma source
CN104467772A (en) * 2014-11-17 2015-03-25 西安交通大学 Pulse transformer type trigger
CN106917615A (en) * 2015-12-28 2017-07-04 中国石油天然气股份有限公司 Heavy oil reservoir exploitation method and device
CN205811974U (en) * 2016-07-18 2016-12-14 西安电子工程研究所 A kind of from trigger-type compact Marx generator
CN106437656A (en) * 2016-12-12 2017-02-22 中国地质大学(北京) Oil and gas reservoir permeation-increasing and plugging-releasing device based on liquid-electric effect
CN207960585U (en) * 2018-03-02 2018-10-12 湖南飞天光电科技有限公司 A kind of equipment carrying out thickened oil recovery using energy-gathering pulse

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
戴树高等: "高粘度稠油开采技术的国内外现状", vol. 22, no. 11, pages 21 - 25 *
梁金禄等: "稠油破乳技术研究进展", vol. 29, no. 08, pages 1 - 6 *
毛吉灿等: "电感隔离型固态MARX脉冲功率源的研究", 农业装备与车辆工程, vol. 56, no. 1, pages 46 - 49 *

Also Published As

Publication number Publication date
CN108386168B (en) 2023-10-31

Similar Documents

Publication Publication Date Title
CN108222838B (en) Rock breaking experimental device of electric pulse rock breaking drill bit
US10858913B2 (en) Permeability enhancement method for coalbed methane wells by using electric pulse detonation fracturing technology
He et al. Practice and development suggestions of hydraulic fracturing technology in the Gulong shale oil reservoirs of Songliao Basin, NE China
US20200240245A1 (en) Blockage removal and permeability enhancement method for coalbed methane wells by using electric pulses
CN102678044B (en) Well drilling rod and pulse plasma drilling machine system
CN202596572U (en) Well drilling rod and pulse plasma drilling machine system
CN103244089B (en) Microwave-assisted solvent extraction method for thick oil
CN105134157B (en) A kind of rock stratum steam fracturing device applied to shale gas exploitation
CN205876286U (en) Stifled seam raising output instrument of making is separated to electromagnetism high frequency impulse
RU2012130055A (en) METHOD FOR DEVELOPING DEPOSITS AND THE MOST COMPLETE EXTRACTION OF HIGH-VISCOUS AND SHALE OILS, BITUMENS, GAS-CONDENSATES, SHALE GASES AND OIL-GAS GASES
CN204552720U (en) A kind of compact reservoir microcrack expansion and reservoir firing equipment
CN207988947U (en) Electric pulse rock breaking drill bit and experimental device thereof
CN105952426A (en) Oil well plug removal and output increase device based on hydro-electric pulse shock waves
CN104047585A (en) Pulse fracturing device and method
CN107165607A (en) The transformation device and its method of work of a kind of shale frequency spectrum resonance reservoir
CN107120083A (en) A kind of control method of shale underground frequency spectrum resonance
CN206816239U (en) A kind of transformation device of shale frequency spectrum resonance reservoir
CN207960585U (en) A kind of equipment carrying out thickened oil recovery using energy-gathering pulse
CN105041282A (en) Horizontal well staged fracturing and steam huff-puff method for medium-low permeability heavy oil reservoir
CN201778798U (en) High-energy electrohydraulic explosion stratum treatment system
CN108386168A (en) Equipment for exploiting thick oil by utilizing energy-gathered pulses and using method thereof
CN104653155A (en) Exploratory well electric pump oil testing and production testing drainage device and system
CN110097254A (en) The dynamic evaluation method of multielement hot fluid oil reservoirs potentiality
CN210948624U (en) Pulse electro-osmosis oil production operation device
CN204663490U (en) A kind of anti-wax viscosity reduction apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201013

Address after: Room 103, building 1, No. 771 Linglongshan Road, Linglong street, Lin'an District, Hangzhou City, Zhejiang Province

Applicant after: Zhejiang dumei Electric Technology Co.,Ltd.

Address before: 410000 Hunan city Changsha high tech Zone Yuelu West Road 588 core city science park 1 1802

Applicant before: HUNAN FEITIAN PHOTOELECTRIC TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220507

Address after: 311599 room 402, building 2, electronic equipment Industrial Park, No. 368, baiyunyuan East Road, FengChuan street, Tonglu County, Hangzhou City, Zhejiang Province

Applicant after: Zhejiang Juneng Electric Technology Co.,Ltd.

Address before: 311300 room 103, building 1, no.771, Linglongshan Road, Linglong street, Lin'an District, Hangzhou City, Zhejiang Province

Applicant before: Zhejiang dumei Electric Technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant