CN108385905A - 一种泡沫混凝土屋面打点找坡的施工方法 - Google Patents

一种泡沫混凝土屋面打点找坡的施工方法 Download PDF

Info

Publication number
CN108385905A
CN108385905A CN201810145312.XA CN201810145312A CN108385905A CN 108385905 A CN108385905 A CN 108385905A CN 201810145312 A CN201810145312 A CN 201810145312A CN 108385905 A CN108385905 A CN 108385905A
Authority
CN
China
Prior art keywords
long side
roofing
laser
slope
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810145312.XA
Other languages
English (en)
Other versions
CN108385905B (zh
Inventor
周骏宇
余美佑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN MINHUA WATERPROOF MATERIAL ENGINEERING Co Ltd
Original Assignee
FUJIAN MINHUA WATERPROOF MATERIAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN MINHUA WATERPROOF MATERIAL ENGINEERING Co Ltd filed Critical FUJIAN MINHUA WATERPROOF MATERIAL ENGINEERING Co Ltd
Priority to CN201810145312.XA priority Critical patent/CN108385905B/zh
Publication of CN108385905A publication Critical patent/CN108385905A/zh
Application granted granted Critical
Publication of CN108385905B publication Critical patent/CN108385905B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D15/00Apparatus or tools for roof working
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明提供一种泡沫混凝土屋面打点找坡的施工方法,包括:1、屋面结构层根据短边L的中心连成中线;2、在中线上均匀选取复数个激光发射点;3、从第一个激光发射点向垂直于中线且往长边的方向水平发射激光;4、使用标尺垂直于水平面并立在长边上,观察激光照射到标尺的刻度点高度h,计算出长边刻度点并记录;5、使用砖块分别堆积使其顶面至激光高度H和长边刻度点处;6、重复3至5,测量下一个H和长边刻度点;直至所有数据都测量完毕;7、以砖块堆积顶面为高用细线连接相邻两长边刻度点;8、重复3至7,完成屋面的另一长边L2的测量;9、浇筑泡沫混凝土,以砖块顶面和细线为标准用刮板进行找坡。本发明的找坡避免了屋面不平整问题。

Description

一种泡沫混凝土屋面打点找坡的施工方法
技术领域
本发明涉及建筑施工技术领域,尤其涉及一种泡沫混凝土屋面打点找坡的施工方法。
背景技术
如图1图2所示,目前传统的泡沫混凝土屋面找坡都是按照给定的泡沫混凝土平均厚度、屋面跨度和找坡坡度来进行计算,若泡沫混凝土平均厚度为a,短边L1(即短边处屋面跨度L1,简称短边L1),找坡坡度为θ,计算得中线L0处泡沫混凝土厚度为a+Ltanθ/4(L为短边L1的长度),长边L2处泡沫混凝土厚度为a-Ltanθ/4(L为短边L1的长度)。
传统技术的缺点在于:屋面结构层的屋面理想状态下是完全平整的,但是现实中屋面还是存在中间下凹等导致屋面不平整的情况。该方法完全忽略现实工程中屋面结构层的屋面不平整的问题,尤其是短边L1也非常长,屋面中间下凹,在传统的计算找坡法下基本无坡度可言,在屋面不平整的情况下,屋面上的每个小区域的厚度之间都存在细微的差距,不能将这个屋面当作一个大整体来计算,所以以传统的方式计算出的中线处泡沫混凝土厚度a+Ltanθ/4和长边处泡沫混凝土厚度a-Ltanθ/4就会使得找坡的精确度差。
发明内容
本发明要解决的技术问题,在于提供一种泡沫混凝土屋面打点找坡的施工方法,避免了屋面不平整问题,并且采用相邻点拉线的方式,精确度高,施工方便。
本发明的问题是这样实现的:
一种泡沫混凝土屋面打点找坡的施工方法,包括如下步骤:
步骤1、把已经完工的屋面结构层根据屋面相对的两短边L1的中心连成一中线L0,该中线L0将屋面的上表面分成两部分;
步骤2、在中线L0上均匀选取复数个激光发射点O;
步骤3、从第一个激光发射点O向垂直于中线L0且往屋面的任意一长边L2的方向水平发射出激光,并设定所述激光的高度为H;
步骤4、使用标尺垂直于水平面,并立在长边L2上,观察激光照射到标尺的刻度点高度h,计算出长边刻度点h-Ltanθ/2并记录,其中,θ为找坡坡度,L为短边L1的长度;
步骤5、使用砖块分别堆积使其顶面至H和h-Ltanθ/2处,用于标记测量过的高度H和h-Ltanθ/2;
步骤6、重复步骤3至步骤5,继续在下一个激光发射点发射,并测量下一个激光的高度H和长边刻度点h-Ltanθ/2;直至完成一长边L2上所有激光的高度H和长边刻度点h-Ltanθ/2都测量完毕;
步骤7、待所有激光的高度H和长边刻度点h-Ltanθ/2都测量完后,以每个砖块堆积顶面为高用细线连接相邻两个长边刻度点;
步骤8、重复步骤3至步骤7,完成屋面的另一长边L2的数据测量;
步骤9、浇筑泡沫混凝土,以砖块顶面和细线为标准用刮板进行找坡;从而完成屋面上由中线L0区分开的两部分的找坡工作。
进一步地,复数个所述激光发射点等间距设置,相邻的两激光发射点的距离在1m-2m之间。
本发明的优点在于:本发明采用激光法找坡,确定了泡沫混凝土最高水平面,在最高水平面的基础上进行找坡,避免了屋面不平整问题,并且采用相邻点拉线的方式,精确度高,施工方便。
附图说明
下面参照附图结合实施例对本发明作进一步的说明。
图1为传统找坡方法中屋面的俯视图。
图2为传统找坡方法中屋面的侧视图。
图3为本发明屋面结构层中屋面的俯视图(含激光)。
图4为本发明屋面结构层中屋面的俯视图(含细线)。
图5为本发明屋面结构层中屋面的侧视图。
图6为本发明一种泡沫混凝土屋面打点找坡的施工方法的执行流程图。
图中标号说明:
1-屋面、2-激光、3-标尺、4-细线。
具体实施方式
为使得本发明更明显易懂,现以一优选实施例,并配合附图作详细说明如下。
如图3至图6所示,本发明的一种泡沫混凝土屋面打点找坡的施工方法,包括如下步骤:
步骤1、把已经完工的屋面结构层根据屋面1相对的两短边L1的中心连成一中线L0,该中线L0将屋面1的上表面分成两部分;
步骤2、在中线L0上均匀选取复数个激光发射点O;复数个所述激光发射点O等间距设置,相邻的两激光发射点O的距离在1m-2m之间;
步骤3、从第一个激光发射点O向垂直于中线L0且往屋面1的任意一长边L2的方向水平发射出激光2,并设定所述激光2的高度为H;
步骤4、使用标尺3垂直于水平面,并立在长边L2上,观察激光2照射到标尺3的刻度点高度h,计算出长边刻度点h-Ltanθ/2并记录,其中,θ为找坡坡度,L为短边L1的长度;
步骤5、使用砖块分别堆积使其顶面至H和h-Ltanθ/2处,用于标记测量过的高度H和h-Ltanθ/2;
步骤6、重复步骤3至步骤5,继续在下一个激光发射点发射,并测量下一个激光2的高度H和长边刻度点h-Ltanθ/2;直至完成一长边L2上所有激光2的高度H和长边刻度点h-Ltanθ/2都测量完毕;
步骤7、待所有激光2的高度H和长边刻度点h-Ltanθ/2都测量完后,以每个砖块堆积顶面为高用细线4连接相邻两个长边刻度点;
步骤8、重复步骤3至步骤7,完成屋面1的另一长边L2的数据测量;
步骤9、浇筑泡沫混凝土,以砖块顶面和细线4为标准用刮板进行找坡;从而完成屋面1上由中线L0区分开的两部分的找坡工作。
本发明的优点如下:
本发明采用激光法找坡,确定了泡沫混凝土最高水平面,在最高水平面的基础上进行找坡,避免了屋面不平整问题,并且采用相邻点拉线的方式,精确度高,施工方便。
虽然以上描述了本发明的具体实施方式,但是熟悉本技术领域的技术人员应当理解,我们所描述的具体的实施例只是说明性的,而不是用于对本发明的范围的限定,熟悉本领域的技术人员在依照本发明的精神所作的等效的修饰以及变化,都应当涵盖在本发明的权利要求所保护的范围内。

Claims (2)

1.一种泡沫混凝土屋面打点找坡的施工方法,其特征在于:包括如下步骤:
步骤1、把已经完工的屋面结构层根据屋面相对的两短边L1的中心连成一中线L0,该中线L0将屋面的上表面分成两部分;
步骤2、在中线L0上均匀选取复数个激光发射点O;
步骤3、从第一个激光发射点O向垂直于中线L0且往屋面的任意一长边L2的方向水平发射出激光,并设定所述激光的高度为H;
步骤4、使用标尺垂直于水平面,并立在长边L2上,观察激光照射到标尺的刻度点高度h,计算出长边刻度点h-Ltanθ/2并记录,其中,θ为找坡坡度,L为短边L1的长度;
步骤5、使用砖块分别堆积使其顶面至H和h-Ltanθ/2处,用于标记测量过的高度H和h-Ltanθ/2;
步骤6、重复步骤3至步骤5,继续在下一个激光发射点发射,并测量下一个激光的高度H和长边刻度点h-Ltanθ/2;直至完成一长边L2上所有激光的高度H和长边刻度点h-Ltanθ/2都测量完毕;
步骤7、待所有激光的高度H和长边刻度点h-Ltanθ/2都测量完后,以每个砖块堆积顶面为高用细线连接相邻两个长边刻度点;
步骤8、重复步骤3至步骤7,完成屋面的另一长边L2的数据测量;
步骤9、浇筑泡沫混凝土,以砖块顶面和细线为标准用刮板进行找坡;从而完成屋面上由中线L0区分开的两部分的找坡工作。
2.如权利要求1所述的一种泡沫混凝土屋面打点找坡的施工方法,其特征在于:复数个所述激光发射点等间距设置,相邻的两激光发射点的距离在1m-2m之间。
CN201810145312.XA 2018-02-12 2018-02-12 一种泡沫混凝土屋面打点找坡的施工方法 Active CN108385905B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810145312.XA CN108385905B (zh) 2018-02-12 2018-02-12 一种泡沫混凝土屋面打点找坡的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810145312.XA CN108385905B (zh) 2018-02-12 2018-02-12 一种泡沫混凝土屋面打点找坡的施工方法

Publications (2)

Publication Number Publication Date
CN108385905A true CN108385905A (zh) 2018-08-10
CN108385905B CN108385905B (zh) 2020-08-18

Family

ID=63068885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810145312.XA Active CN108385905B (zh) 2018-02-12 2018-02-12 一种泡沫混凝土屋面打点找坡的施工方法

Country Status (1)

Country Link
CN (1) CN108385905B (zh)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006017833U1 (de) * 2006-11-21 2007-02-15 Harald Zahn Gmbh System zur Festlegung der Fixierungspunkte von Befestigungselementen für die mechanische Befestigung von Dämmmaterial und Abdichtbahnen auf Flachdächern
CN101413326A (zh) * 2008-11-12 2009-04-22 张建国 一种平屋面结构及其施工方法
CN101565997A (zh) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 大面积不规则地面砖施工方法
CN103556830A (zh) * 2013-11-13 2014-02-05 江西建工第一建筑有限责任公司 一种可控型现浇泡沫混凝土屋面施工方法
CN204043660U (zh) * 2014-07-22 2014-12-24 国家电网公司 地面坡度测量仪
CN104234430A (zh) * 2014-06-19 2014-12-24 中国建筑第四工程局有限公司 一种混凝土地坪一次性成型的施工方法
CN105986676A (zh) * 2016-07-07 2016-10-05 中国建筑第二工程局有限公司 一种大跨度混凝土楼板平整度控制系统及使用方法
CN205712808U (zh) * 2016-06-28 2016-11-23 青建国际集团有限公司 一种屋面找坡装置
CN106836814A (zh) * 2016-12-30 2017-06-13 上海建工七建集团有限公司 结构放坡等厚楼面标高的控制方法
CN107012992A (zh) * 2017-06-13 2017-08-04 福建闽华防水材料工程有限公司 一种泡沫混凝土屋面保温防水一体化系统的施工方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006017833U1 (de) * 2006-11-21 2007-02-15 Harald Zahn Gmbh System zur Festlegung der Fixierungspunkte von Befestigungselementen für die mechanische Befestigung von Dämmmaterial und Abdichtbahnen auf Flachdächern
CN101413326A (zh) * 2008-11-12 2009-04-22 张建国 一种平屋面结构及其施工方法
CN101565997A (zh) * 2009-05-25 2009-10-28 青岛恒生源集团建设有限公司 大面积不规则地面砖施工方法
CN103556830A (zh) * 2013-11-13 2014-02-05 江西建工第一建筑有限责任公司 一种可控型现浇泡沫混凝土屋面施工方法
CN104234430A (zh) * 2014-06-19 2014-12-24 中国建筑第四工程局有限公司 一种混凝土地坪一次性成型的施工方法
CN204043660U (zh) * 2014-07-22 2014-12-24 国家电网公司 地面坡度测量仪
CN205712808U (zh) * 2016-06-28 2016-11-23 青建国际集团有限公司 一种屋面找坡装置
CN105986676A (zh) * 2016-07-07 2016-10-05 中国建筑第二工程局有限公司 一种大跨度混凝土楼板平整度控制系统及使用方法
CN106836814A (zh) * 2016-12-30 2017-06-13 上海建工七建集团有限公司 结构放坡等厚楼面标高的控制方法
CN107012992A (zh) * 2017-06-13 2017-08-04 福建闽华防水材料工程有限公司 一种泡沫混凝土屋面保温防水一体化系统的施工方法

Also Published As

Publication number Publication date
CN108385905B (zh) 2020-08-18

Similar Documents

Publication Publication Date Title
WO2021218114A1 (zh) 一种用于预制混凝土叠合板表面粗糙度检测的方法
CN106836806B (zh) 用bim技术构筑异形混凝土结构及其过程中精度控制方法和装置
Moseley Prehistoric principles of labor organization in the Moche Valley, Peru
Millon The Teotihuacan mapping project
CN105986676B (zh) 一种大跨度混凝土楼板平整度控制系统及使用方法
CN101761155A (zh) 陶粒轻质墙板的施工方法
CN107476567A (zh) 一种控制坡屋面坡度及厚度的施工方法及导轨装置
CN102094532A (zh) 一种建筑施工水平构件尺寸的测量控制方法
CN106013645A (zh) 一种采用多台自动调平激光投线仪配合墙面贴灰饼的方法
CN207363251U (zh) 一种用于控制坡屋面坡度及厚度的导轨装置
US2395438A (en) Means for laying brick
CN108385905A (zh) 一种泡沫混凝土屋面打点找坡的施工方法
Marie-Victoire et al. Concrete cultural heritage in France: inventory and state of conservation
Horner et al. Characteristic items-a new approach to pricing and controlling construction projects
CN115897882A (zh) 一种现浇大截面多曲线屋面施工方法
CN207775678U (zh) 一种用于扇形方钉石路面铺装的模板
CN107354872B (zh) 一种变截面鱼腹式现浇箱梁混凝土错台防治结构及施工方法
Santagati et al. HBIM for the surveying, analysis and restoration of the Saint John THE Theologian Cathedral IN Nicosia (Cyprus)
Biers Water from Stymphalos?
CN207582743U (zh) 轻薄型预制块
Nannei et al. Integrated survey techniques: preliminary studies for the conservation of Villa Galvagnina
Lim et al. Detection of Restoration Work by Applying the Ransac Algorithm to the Point Cloud Data from Laser Scanning: Case Study at Ostia
Häcki et al. A laboratory of vaults from the twelfth to the sixteenth centuries
Jerome et al. DIGITAL DOCUMENTATION OF FRANK LLOYD WRIGHT’S MASTERPIECE, FALLINGWATER
NAPLES STRUCTURAL ANALYSIS AND BEHAVIOUR OF COMPLEX MONUMENTAL BUILDINGS IN SEISMIC AREAS: THE ST. DOMENICO MAGGIORE

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 350000 the 2 floor, 202 room, 416 section of the regulatory building of Fuzhou bonded port processing trade zone, Fuzhou, Fujian.

Applicant after: Fujian min Hua Building Materials Science and Technology Development Co., Ltd.

Address before: 350000 the 2 floor, 202 room, 416 section of the regulatory building of Fuzhou bonded port processing trade zone, Fuzhou, Fujian.

Applicant before: FUJIAN MINHUA WATERPROOF MATERIAL ENGINEERING CO., LTD.

GR01 Patent grant
GR01 Patent grant