CN108385899B - Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof - Google Patents

Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof Download PDF

Info

Publication number
CN108385899B
CN108385899B CN201810191902.6A CN201810191902A CN108385899B CN 108385899 B CN108385899 B CN 108385899B CN 201810191902 A CN201810191902 A CN 201810191902A CN 108385899 B CN108385899 B CN 108385899B
Authority
CN
China
Prior art keywords
grc
column
antique
mounting
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810191902.6A
Other languages
Chinese (zh)
Other versions
CN108385899A (en
Inventor
胡伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Taixing Decoration Engineering Co ltd
Original Assignee
Sichuan Taixing Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Taixing Decoration Engineering Co ltd filed Critical Sichuan Taixing Decoration Engineering Co ltd
Priority to CN201810191902.6A priority Critical patent/CN108385899B/en
Publication of CN108385899A publication Critical patent/CN108385899A/en
Application granted granted Critical
Publication of CN108385899B publication Critical patent/CN108385899B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses an indoor antique GRC combined column and antique color-painted beam decoration system, which solves the problem that the indoor antique GRC combined column and the antique color-painted beam decoration system at the present stage are too long in construction period. Its technical scheme main points are indoor GRC combination column modelled after an antique and various drawing roof beam decoration system modelled after an antique, including two GRC combination columns and various drawing roof beams modelled after an antique, when the concrete column core in the preparation GRC combination column, prefabricated GRC post cover and various drawing roof beam modelled after an antique simultaneously to realize the installation of GRC combination column and various drawing roof beam modelled after an antique through installation piece and mounting groove, reduced whole indoor GRC combination column modelled after an antique and various drawing roof beam decoration system's installation cycle modelled after an antique installation.

Description

Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof
Technical Field
The invention belongs to the field of decorative buildings, and particularly relates to an indoor antique GRC combined column and antique color painting beam decorative system and a construction method thereof.
Background
With the development of economic society, higher requirements are put forward for the decoration of public buildings, and the requirements of functions of the public buildings are met while good decoration effects and good comfort levels are achieved. The indoor antique GRC combined column and the antique color-painted beam decoration system can embody the characteristics of Chinese civilian nationalities, are solemn and elegant, are very suitable for being applied to the decoration of the inner and outer parts of an important public building, the most important characteristic of the antique building is the carved beam painting span, the colored-painted beam and the antique GRC combined column are all important members in the antique building decoration, and therefore the combination of the colored-painted beam and the antique GRC combined column can improve the decoration effect of the whole antique building.
However, the indoor antique GRC combined column and the antique color-painted beam decoration system in the current stage are complicated in structure and long in construction period.
Disclosure of Invention
The first purpose of the invention is to provide an indoor antique GRC combination column and antique color-painted beam decoration system, which greatly shortens the construction period of the indoor antique GRC combination column and antique color-painted beam decoration system by arranging a prefabricated GRC column sleeve and an antique color-painted beam.
The technical purpose of the invention is realized by the following technical scheme:
an indoor antique GRC combined column and antique color-painted beam decoration system comprises two GRC combined columns and antique color-painted beams arranged at the tops of the two adjacent GRC combined columns; the antique color-drawing beam comprises a prefabricated structural beam and a color-drawing beam decorative plate arranged on the bottom surface of the prefabricated structural beam, mounting blocks are arranged at two ends of the prefabricated structural beam, and first through holes penetrating through the upper end surface and the lower end surface of the mounting blocks are formed in the mounting blocks; the GRC combined column comprises a concrete column core and a GRC column sleeve sleeved outside the concrete column core, wherein the top of the GRC combined column is provided with a mounting groove for embedding a mounting block and a mounting notch for horizontally extending a prefabricated structural beam, and a plurality of first reinforcing steel bars extending into the first through holes are pre-buried in the top of the GRC combined column; the antique color painting beam is also filled with a cement filling block for bonding and fixing the first steel bar at the first through hole of the mounting block.
Through adopting above-mentioned technical scheme, in the installation piece embedding GRC combination post of prefabricated construction roof beam in the various drawing roof beam modelled after an antique, realize GRC combination post to the support of the various drawing roof beam modelled after an antique to through first reinforcing bar, the first through-hole that supplies first reinforcing bar to pass and the setting of cement filling block, strengthened the connection between various drawing roof beam modelled after an antique and the GRC combination post, guaranteed joint strength between them.
Meanwhile, the construction period of the whole indoor antique GRC combined column and the antique color-painted beam decoration system is shortened by separately manufacturing and assembling the GRC combined column and the antique color-painted beam, the GRC combined column is disassembled into the concrete column core and the GRC column sleeve, and the GRC column sleeve can be sleeved on the outer side of the concrete column core when the concrete column core is completely coagulated, so that the construction period of the whole indoor antique GRC combined column and the antique color-painted beam decoration system is further shortened.
As a further improvement of the invention, a plurality of second steel bars are uniformly arranged at the bottom of the mounting block along the circumferential direction of the first through hole, a hollow mounting pipe for the second steel bars to be inserted is pre-embedded at the bottom of the mounting groove of the GRC combined column, and a third cement bonding layer is arranged between the inner wall of the mounting pipe and the second steel bars.
Through adopting above-mentioned technical scheme, the setting of second reinforcing bar, installation pipe and third cement tie coat for the installation piece of prefabricated construction roof beam and the mounting groove cooperation of GRC combination post are inseparabler, have further promoted the mounting structure intensity between GRC combination post and the ancient painted colour roof beam.
As a further improvement of the invention, the GRC combined column is also provided with a bell mouth for guiding cement binder into the installation pipe along the installation pipe at the bottom of the installation groove.
Through adopting above-mentioned technical scheme, the setting of horn mouth can make things convenient for in the leading-in installation pipe of cement binder, promotes the joint strength of installation inside pipe wall and second reinforcing bar, further promotes the mounting structure intensity between GRC combination post and the various drawing roof beam modelled after an antique.
As a further improvement of the invention, a plurality of third steel bars which penetrate through the first through holes and are fixedly welded with the first steel bars are embedded at two ends of the embedded structural beam, and the cement filling blocks bond and fix the parts of the third steel bars, which are positioned in the first through holes.
Through adopting above-mentioned technical scheme, the third reinforcing bar not only with first reinforcing bar welded fastening, it is fixed by the cement filling block bonding moreover, further promote the mounting structure intensity between GRC combination post and the ancient painted roof beam in ancient style.
As a further improvement of the invention, a plurality of mounting studs with internal threads are embedded in the outer surface of the concrete column core, the GRC column sleeve is provided with a second through hole which is opposite to the mounting studs and a mounting plate which is embedded in the second through hole in advance, the mounting plate is provided with a mounting through hole which is opposite to the mounting studs, the GRC column sleeve is also provided with a mounting bolt which passes through the mounting through hole and is in threaded connection with the mounting studs, and a first cement bonding layer is also arranged between the concrete column core and the GRC column sleeve.
Through adopting above-mentioned technical scheme, realized being connected between concrete column core and the GRC column jacket, and connected mode is comparatively simple and convenient. Simultaneously, through setting up first cement tie coat, further promoted the cooperation intensity between concrete column core and the GRC column jacket, reduced the probability that GRC column jacket drops from concrete column core.
As a further improvement of the invention, a cement pouring pipe fitting for introducing a cement binder between the concrete column core and the GRC column sleeve is pre-embedded in the concrete column core, and the cement pouring pipe fitting comprises a cement pouring main pipe which is vertically arranged and communicated with the ground of the installation groove and a cement pouring branch pipe which is communicated with the cement pouring main pipe and the outer surface of the dry-mixed concrete column core.
Through adopting above-mentioned technical scheme, can pour the pipe fitting through the cement and lead-in concrete column core and GRC post jacket with the cement binder between, conveniently form first cement tie coat, simplify the installation between concrete column core and the GRC post jacket.
As a further improvement of the invention, the GRC column jacket is further provided with a decorative cover plate covering the second through hole, and the second through hole is further filled with a second cement bonding layer for bonding and fixing the decorative cover plate.
Through adopting above-mentioned technical scheme, dress trim cover closes the second through-hole, has promoted the decoration aesthetic feeling of whole GRC combination post, has eliminated the influence of second through-hole to whole GRC combination post outward appearance aesthetic feeling.
As a further improvement of the invention, the ground for installing the GRC combined column is provided with a limiting groove for installing the GRC column sleeve, and a rubber supporting ring for supporting the GRC column sleeve is arranged in the limiting groove.
By adopting the technical scheme, the limiting groove can assist in positioning the GRC column sleeve, so that the GRC column sleeve is conveniently arranged on the outer side of the concrete column core; simultaneously the setting of rubber support ring can avoid cement to reveal through GRC column casing bottom when pouring first cement tie coat, and the rubber support ring can cushion GRC column casing, weakens the ground and supports towards the dashing that GRC column casing produced.
The second purpose of the invention is to provide a construction method of the indoor antique GRC combined column and the antique color painting beam decoration system.
The technical purpose of the invention is realized by the following technical scheme:
an indoor archaizing GRC combined column and archaizing color painting beam decoration system construction method comprises the following steps: s100, manufacturing the concrete column core on the ground, and prefabricating the GRC column sleeve and the antique color painting beam; s200, sleeving a GRC column sleeve on the outer side of a concrete column core by using a crane, adjusting the angle of the GRC column sleeve to enable an installation stud to be opposite to an installation through hole of an installation plate in the GRC column sleeve, and connecting and fixing the installation plate and the installation stud by using an installation bolt; s300, filling a cement binder between the concrete column core and the GRC column sleeve through a cement pouring pipe fitting, and continuing the next operation after the cement binder is solidified and fixed; s400, hoisting a prefabricated structural beam of the antique color painting beam by using a crane, embedding an installation block into an installation groove at the top of the GRC combined column, enabling a first steel bar in the installation groove to penetrate through a first through hole of the installation block, enabling a second steel bar on the installation block to be inserted into the installation pipe of the GRC combined column, enabling a third steel bar in the prefabricated structural beam to be abutted against the first steel bar, and welding the first steel bar and the third steel bar to fix the first steel bar and the third steel bar; s500, filling cement binder into the first through hole, bonding the first steel bar and the second steel bar to form a cement filling block, and continuing the next operation after the cement binder is solidified; s600, installing the color painting beam decorating plate on the bottom surface of the prefabricated structural beam.
In conclusion, the invention has the following beneficial effects:
1. the invention discloses an indoor antique GRC combined column and antique color-painted beam decoration system, which comprises two GRC combined columns and antique color-painted beams, wherein when a concrete column core in the GRC combined column is manufactured, a GRC column sleeve and the antique color-painted beam are prefabricated at the same time, and the installation of the GRC combined column and the antique color-painted beam is realized through an installation block and an installation groove, so that the installation period of the whole indoor antique GRC combined column and antique color-painted beam decoration system is shortened;
2. the first steel bar inserted into the first through hole is arranged at the top of the GRC combined column, the second steel bar inserted into the installation pipe of the GRC combined column is arranged at the bottom of the installation block, and the third steel bar welded and fixed with the first steel bar is pre-embedded in the prefabricated structural beam.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of an antique color-painted beam according to the present invention;
FIG. 3 is a schematic cross-sectional view of an archaized color-painted beam according to the present invention;
FIG. 4 is an enlarged view taken at A in FIG. 3;
FIG. 5 is a schematic structural view of a GRC composite column according to the present invention;
FIG. 6 is a schematic cross-sectional view of a GRC composite column of the present invention;
FIG. 7 is an enlarged view at B in FIG. 6;
FIG. 8 is an enlarged view at C of FIG. 6;
fig. 9 is an enlarged view at D in fig. 6.
In the figure: 100. a GRC composite column; 110. a concrete column core; 111. mounting grooves; 112. a first reinforcing bar; 113. installing a pipe; 114. a bell mouth; 115. mounting a stud; 120. a GRC column sleeve; 121. mounting a plate; 122. installing a bolt; 123. a decorative cover plate; 124. a second cement bond coat; 130. installing a notch; 140. a first cement bond coat; 150. pouring the pipe fittings by using cement; 151. pouring main pipe with cement; 152. pouring branch pipes by using cement; 200. archaizing color painting beams; 210. prefabricating a structural beam; 211. fixing grooves; 212. fixing the stud; 220. a color-painted beam decorative plate; 221. mounting a bracket; 222. fixing the bolt; 230. mounting blocks; 231. a first through hole; 232. a second reinforcing bar; 233. a third reinforcing bar; 300. a limiting groove; 310. a rubber support ring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, an indoor antique GRC combination column and antique color-painted beam decoration system includes two GRC combination columns 100 fixed on the ground and an antique color-painted beam 200 installed on the top of two adjacent GRC combination columns 100.
Referring to fig. 2, 3 and 4, the antique painted beam 200 includes a prefabricated structural beam 210 and a painted beam decorative plate 220 detachably mounted on the bottom of the prefabricated structural beam 210. The top of the color-painted beam decorative plate 220 is provided with an installation bracket 221, the bottom of the prefabricated structural beam 210 is provided with a fixing groove 211 for embedding the installation bracket 221, and a plurality of fixing studs 212 are embedded in the bottom of the fixing groove 211 of the prefabricated structural beam 210 along the length direction of the fixing groove 211. The antique painted beam 200 is further provided with a fixing bolt 222 matched with the fixing stud 212, and the painted beam decorating plate 220 is fixed at the bottom of the prefabricated structural beam 210 through the matching of the fixing bolt 222 and the fixing stud 212.
The two ends of the structural precast beam are provided with mounting blocks 230, in this embodiment, the mounting blocks 230 are cylindrical, and the outer diameter of the horizontal section of the mounting blocks 230 is greater than the width of the structural precast beam. The center of the mounting block 230 is provided with a first through hole 231 penetrating the upper and lower end surfaces of the mounting block 230. A plurality of second steel bars 232 are uniformly arranged at the bottom of the mounting block 230 along the circumferential direction of the first through hole 231, and the length of the second steel bars 232 is not less than 25 mm.
A plurality of third steel bars 233 penetrating through the first through hole 231 along the length direction of the embedded structural beam are also embedded in both ends of the embedded structural beam. In this embodiment, both ends of the embedded structural beam are provided with six third steel bars 233, and every two third steel bars 233 are located at the same horizontal height.
Referring to fig. 5, each of the two GRC composite columns 100 includes a concrete core 110 and a GRC jacket 120 covering the concrete core 110. Wherein, the GRC composite column 100 is provided with an installation groove 111 for embedding an installation block 230 at the top center of the concrete column core 110, and the GRC composite column 100 is further provided with an installation notch 130 for the prefabricated structural beam 210 to horizontally extend out.
The concrete column core 110 is embedded with a plurality of first steel bars 112 extending into the first through holes 231 at the bottom of the installation groove 111. Wherein, the first reinforcing bar 112 and the third reinforcing bar 233 are welded and fixed. In the present embodiment, six first reinforcing bars 112 are embedded in the concrete column core 110, and the six first reinforcing bars 112 are arranged in two rows and three columns.
Referring to fig. 5, 6 and 7, the concrete column core 110 is embedded with a hollow installation tube 113 into which a second reinforcing bar 232 (see fig. 2) is inserted at the bottom of the installation groove 111, and a bell mouth 114 for introducing cement binder into the installation tube 113 is further provided at the bottom of the installation groove 111 along the installation tube 113. Wherein, a third cement bonding layer is arranged between the inner wall of the installation pipe 113 and the second steel bar 232.
The antique painted beam 200 is further filled with a cement filling block at the first through hole 231 of the mounting block 230 for simultaneously bonding and fixing the first reinforcing bar 112 and the third reinforcing bar 233.
Referring to fig. 6 and 8, a plurality of mounting studs 115 with internal threads are embedded in the outer surface of the concrete column core 110, the GRC column jacket 120 is provided with second through holes facing the mounting studs 115 and mounting plates 121 pre-embedded in the second through holes, the mounting plates 121 are provided with mounting through holes facing the mounting studs 115, and the GRC column jacket 120 is further provided with mounting bolts 122 penetrating through the mounting through holes and in threaded connection with the mounting studs 115. A first cement bond layer 140 is also provided between the concrete column core 110 and the GRC column jacket 120.
The GRC column jacket 120 is further provided with a decorative cover plate 123 covering the second through hole, and the second through hole is further filled with a second cement bonding layer 124 for bonding and fixing the decorative cover plate 123.
Referring to fig. 6, a cement casting pipe 150 for introducing a cement binder between the concrete column core 110 and the GRC column jacket 120 is embedded in the concrete column core 110, and the cement casting pipe 150 includes a cement casting main pipe 151 vertically disposed and communicated with the bottom surface of the installation groove 111, and a cement casting branch pipe 152 communicated with the cement casting main pipe 151 and the outer surface of the dry concrete column core 110.
Referring to fig. 5 and 9, the ground for installing the GRC composite column 100 is provided with a limiting groove 300 for installing the GRC column jacket 120, and a rubber support ring 310 for supporting the GRC column jacket 120 is arranged in the limiting groove 300.
With reference to fig. 1 to 9, the construction method of the indoor antique GRC combination column and antique color-painted beam 200 decoration system is as follows:
s100, arranging a limiting groove 300 at a position where the GRC combined column 100 needs to be manufactured, manufacturing the concrete column core 110 at the center of the limiting groove 300, prefabricating the GRC column sleeve 120 and the antique color-painted beam 200, and continuing to perform the next operation after the concrete column core 110, the GRC column sleeve 120 and the antique color-painted beam 200 are manufactured;
s200, installing a rubber support ring 310 for supporting the GRC column jacket 120 in the limiting groove 300, wherein the thickness of the rubber support ring 310 is smaller than the depth of the limiting groove 300, then using a crane to sleeve the GRC column jacket 120 on the outer side of the concrete column core 110, adjusting the angle of the GRC column jacket 120 to enable the mounting stud 115 to be opposite to the mounting through hole of the mounting plate 121 in the GRC column jacket 120, using a mounting bolt 122 to connect and fix the mounting plate 121 and the mounting stud 115, coating a cement adhesive on the second through hole, and using a decorative cover plate 123 to close the second through hole;
s300, filling a cement binder between the concrete column core 110 and the GRC column sleeve 120 through the cement pouring pipe fitting 150, and continuing the next operation after the cement binder is solidified for the first cement binding layer 140;
s400, hoisting the prefabricated structural beam 210 of the antique color painting beam 200 by using a crane, embedding the installation block 230 into the installation groove 111 at the top of the GRC combined column 100, enabling the first steel bar 112 in the installation groove 111 to penetrate through the first through hole 231 of the installation block 230, enabling the second steel bar 232 on the installation block 230 to be inserted into the installation pipe 113 of the GRC combined column 100, enabling the third steel bar 233 in the prefabricated structural beam 210 to be abutted against the first steel bar 112, and welding the first steel bar 112 and the third steel bar 233 to fix the two;
s500, filling cement binder into the first through hole 231, and bonding the first reinforcing steel bar 112 and the second reinforcing steel bar 232 to form a cement filling block in a fixed mode, and continuing to perform the next operation after the cement binder is solidified;
s600, embedding the mounting bracket 221 of the color-painted beam decorative plate 220 into the fixing groove 211 of the prefabricated structural beam 210, and fixing the color-painted beam decorative plate 220 at the bottom of the prefabricated structural beam 210 by using the fixing bolt 222.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.

Claims (6)

1. An indoor antique GRC combined column and antique color painting beam decoration system is characterized by comprising two GRC combined columns (100) and antique color painting beams (200) arranged at the tops of the two adjacent GRC combined columns (100);
the antique colored drawing beam (200) comprises a prefabricated structural beam (210) and a colored drawing beam decorative plate (220) arranged on the bottom surface of the prefabricated structural beam (210), mounting blocks (230) are arranged at two ends of the prefabricated structural beam (210), and first through holes (231) penetrating through the upper end surface and the lower end surface of the mounting blocks (230) are formed in the mounting blocks (230);
the GRC combined column (100) comprises a concrete column core (110) and a GRC column sleeve (120) sleeved outside the concrete column core (110), the top of the GRC combined column (100) is provided with a mounting groove (111) for embedding a mounting block (230) and a mounting notch (130) for horizontally extending a prefabricated structural beam (210), and a plurality of first steel bars (112) extending into a first through hole (231) are pre-embedded in the top of the GRC combined column (100);
the antique color painting beam (200) is also filled with a cement filling block for bonding and fixing the first steel bar (112) at a first through hole (231) of the mounting block (230);
a plurality of second steel bars (232) are uniformly distributed at the bottom of the mounting block (230) along the circumferential direction of the first through hole (231), a hollow mounting pipe (113) for the second steel bars (232) to be inserted into is pre-embedded at the bottom of the mounting groove (111) of the GRC combined column (100), and a third cement bonding layer is arranged between the inner wall of the mounting pipe (113) and the second steel bars (232);
a plurality of third steel bars (233) which penetrate through the first through holes (231) and are fixedly welded with the first steel bars (112) are also embedded at the two ends of the embedded structural beam, and the cement filling blocks bond and fix the parts, located in the first through holes (231), of the third steel bars (233);
the outer surface of the concrete column core (110) is pre-embedded with a plurality of mounting studs (115) with internal threads, the GRC column sleeve (120) is provided with second through holes right opposite to the mounting studs (115) and a mounting plate (121) pre-embedded in the second through holes, the mounting plate (121) is provided with the mounting through holes right opposite to the mounting studs (115), the GRC column sleeve (120) is further provided with mounting bolts (122) penetrating through the mounting through holes and in threaded connection with the mounting studs (115), and a first cement bonding layer (140) is further arranged between the concrete column core (110) and the GRC column sleeve (120).
2. The indoor archaized GRC combined column and archaized painted beam decoration system as claimed in claim 1, wherein the GRC combined column (100) is further provided with a bell mouth (114) at the bottom of the installation groove (111) along the installation pipe (113) for guiding cement binder into the installation pipe (113).
3. The indoor archaized GRC combined column and archaized painted beam decoration system according to claim 1, wherein the concrete column core (110) is pre-embedded with a cement pouring pipe (150) for introducing a cement binder between the concrete column core (110) and the GRC column sleeve (120), and the cement pouring pipe (150) comprises a cement pouring main pipe (151) which is vertically arranged and communicated with the ground of the installation groove (111) and a cement pouring branch pipe (152) which is communicated with the cement pouring main pipe (151) and the outer surface of the dry-mixed concrete column core (110).
4. The indoor archaized GRC combined column and archaized painted beam decoration system according to claim 3, wherein the GRC column sleeve (120) is further provided with a decoration cover plate (123) covering a second through hole, and the second through hole is further filled with a second cement bonding layer (124) for bonding and fixing the decoration cover plate (123).
5. The indoor archaized GRC combination column and archaized painted beam decoration system according to claim 4, wherein a ground for installing the GRC combination column (100) is provided with a limiting groove (300) for installing the GRC column sleeve (120), and a rubber support ring (310) for supporting the GRC column sleeve (120) is arranged in the limiting groove (300).
6. The utility model provides an indoor GRC combination post modelled after an antique and ancient painted roof beam decoration system's worker method which characterized in that: the method comprises the following steps:
s100, making a concrete column core (110) of the claim 3 on the ground, and prefabricating a GRC column jacket (120) and an antique painted beam (200) of the claim 3;
s200, sleeving a GRC column sleeve (120) on the outer side of a concrete column core (110) by using a crane, adjusting the angle of the GRC column sleeve (120), enabling an installation stud (115) to be opposite to an installation through hole of an installation plate (121) in the GRC column sleeve (120), and connecting and fixing the installation plate (121) and the installation stud (115) by using an installation bolt (122);
s300, filling a cement binder between the concrete column core (110) and the GRC column sleeve (120) through a cement pouring pipe fitting (150), and continuing the next operation after the cement binder is solidified and fixed;
s400, hoisting a prefabricated structural beam (210) of the archaized colored drawing beam (200) by using a crane, embedding an installation block (230) into an installation groove (111) at the top of the GRC combined column (100), enabling a first steel bar (112) in the installation groove (111) to penetrate through a first through hole (231) of the installation block (230), enabling a second steel bar (232) on the installation block (230) to be inserted into an installation pipe (113) of the GRC combined column (100), enabling a third steel bar (233) in the prefabricated structural beam (210) to be abutted against the first steel bar (112), and welding the first steel bar (112) and the third steel bar (233) to fix the prefabricated structural beam and the GRC combined column;
s500, filling cement binder into the first through hole (231), and continuously performing the next operation after the cement binder is solidified, wherein the cement binder is a cement filling block which is formed by bonding and fixing the first steel bar (112) and the second steel bar (232);
s600, installing the color painting beam decorating plate (220) on the bottom surface of the prefabricated structural beam (210).
CN201810191902.6A 2018-03-08 2018-03-08 Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof Expired - Fee Related CN108385899B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810191902.6A CN108385899B (en) 2018-03-08 2018-03-08 Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810191902.6A CN108385899B (en) 2018-03-08 2018-03-08 Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof

Publications (2)

Publication Number Publication Date
CN108385899A CN108385899A (en) 2018-08-10
CN108385899B true CN108385899B (en) 2020-04-10

Family

ID=63067306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810191902.6A Expired - Fee Related CN108385899B (en) 2018-03-08 2018-03-08 Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof

Country Status (1)

Country Link
CN (1) CN108385899B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184199A (en) * 1995-12-28 1997-07-15 Shimizu Corp Recyclable building frame, and constructing and dismantling method therefor
JP2002088782A (en) * 2000-09-14 2002-03-27 Nippon Steel Corp Joining structure for column and beam of underground frame of building
CN2848997Y (en) * 2005-11-16 2006-12-20 润弘精密工程事业股份有限公司 Thinshell girder structure
CN102704636A (en) * 2012-06-15 2012-10-03 北京港源建筑装饰工程有限公司 Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN202672356U (en) * 2012-07-03 2013-01-16 山东科技大学 Rabbet connection node of precast reinforced concrete beam and beam-column joint
CN104389396A (en) * 2014-11-20 2015-03-04 沈阳建筑大学 Pseudo-classic architecture eaves lower decoration and heat-insulation system
CN104674997A (en) * 2015-02-13 2015-06-03 上海市园林设计院有限公司 Supporting structure of archaized wood structure building roof and construction method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184199A (en) * 1995-12-28 1997-07-15 Shimizu Corp Recyclable building frame, and constructing and dismantling method therefor
JP2002088782A (en) * 2000-09-14 2002-03-27 Nippon Steel Corp Joining structure for column and beam of underground frame of building
CN2848997Y (en) * 2005-11-16 2006-12-20 润弘精密工程事业股份有限公司 Thinshell girder structure
CN102704636A (en) * 2012-06-15 2012-10-03 北京港源建筑装饰工程有限公司 Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN202672356U (en) * 2012-07-03 2013-01-16 山东科技大学 Rabbet connection node of precast reinforced concrete beam and beam-column joint
CN104389396A (en) * 2014-11-20 2015-03-04 沈阳建筑大学 Pseudo-classic architecture eaves lower decoration and heat-insulation system
CN104674997A (en) * 2015-02-13 2015-06-03 上海市园林设计院有限公司 Supporting structure of archaized wood structure building roof and construction method thereof

Also Published As

Publication number Publication date
CN108385899A (en) 2018-08-10

Similar Documents

Publication Publication Date Title
CN107143135B (en) Structure-integrated heat-insulation decorative external template and external wall construction method thereof
CN102953484B (en) Curtain wall with glass and aluminum honeycomb plate bilayer structure and construction method thereof
CN101629440A (en) Integrally prefabricated composite external wall panel and manufacturing method thereof
CN105908889A (en) Construction method for prefabrication and reverse installation of cornice concrete decoration members of archaistic building
CN102535738A (en) Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house
CN102287034B (en) Special-shaped rail and construction method thereof
CN108385899B (en) Indoor antique GRC combined column and antique color painting beam decoration system and construction method thereof
CN106894504A (en) A kind of light-duty assembling type steel structure house and its method of construction
CN112049232B (en) Arc-shaped structure and construction method thereof
CN214942026U (en) Pipe well prefabricated plate
CN205776930U (en) Injection lightweight concrete light steel wall
CN106320662A (en) Construction method for decorating superwide concrete lines on outer wall of building
CN107965122A (en) A kind of novel decorative lines of metal composite EPS
CN210530058U (en) Assembly type frame cladding plate technical system
KR200491057Y1 (en) GAEJA balustrade assembly
CN210032346U (en) Special-shaped composite supporting device
CN209817222U (en) Connection node of coincide floor and wall body
CN107246152A (en) A kind of method that steel structure frame is assembled with combined light floor modules
CN102704636B (en) Indoor antique glass fiber reinforced cement (GRC) combined column and antique colored drawing beam decoration system and construction method thereof
CN217175377U (en) Concrete column pouring and decorating integrated structure
CN211622370U (en) Heat preservation and decoration integrated board for green building
CN108265882B (en) Steel plate-stone composite beam for large-span space and construction method thereof
CN217379284U (en) Assembled steel-concrete structure connecting column and connecting joint of assembled steel-concrete structure connecting column and wall
CN102691458A (en) Large-scale archaistic metal combined moon gate and construction method thereof
CN219471280U (en) High-span door head glass brick wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200410