CN108381850A - A kind of production technology of change spur gear of elevator door - Google Patents

A kind of production technology of change spur gear of elevator door Download PDF

Info

Publication number
CN108381850A
CN108381850A CN201810052390.5A CN201810052390A CN108381850A CN 108381850 A CN108381850 A CN 108381850A CN 201810052390 A CN201810052390 A CN 201810052390A CN 108381850 A CN108381850 A CN 108381850A
Authority
CN
China
Prior art keywords
wheel hub
spur gear
elevator door
parts
production technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810052390.5A
Other languages
Chinese (zh)
Other versions
CN108381850B (en
Inventor
蔡武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingyang Renhe Elevator Fittings Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810052390.5A priority Critical patent/CN108381850B/en
Publication of CN108381850A publication Critical patent/CN108381850A/en
Application granted granted Critical
Publication of CN108381850B publication Critical patent/CN108381850B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C45/14336Coating a portion of the article, e.g. the edge of the article
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J11/00Features of adhesives not provided for in group C09J9/00, e.g. additives
    • C09J11/02Non-macromolecular additives
    • C09J11/04Non-macromolecular additives inorganic
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J11/00Features of adhesives not provided for in group C09J9/00, e.g. additives
    • C09J11/02Non-macromolecular additives
    • C09J11/06Non-macromolecular additives organic
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J4/00Adhesives based on organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond ; adhesives, based on monomers of macromolecular compounds of groups C09J183/00 - C09J183/16
    • C09J4/06Organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond in combination with a macromolecular compound other than an unsaturated polymer of groups C09J159/00 - C09J187/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C2045/1486Details, accessories and auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C2045/1486Details, accessories and auxiliary operations
    • B29C2045/14868Pretreatment of the insert, e.g. etching, cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/32Wheels, pinions, pulleys, castors or rollers, Rims

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Lubricants (AREA)
  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The present invention discloses a kind of production technology of change spur gear of elevator door, using Shooting Technique, metal wheel hub is first prepared, to metal wheel hub cleaning by degreasing, pre-blast processing, then special adhesive is sprayed on the glue spraying face of wheel hub, dry, preheating, polyurethane material is molded on metal wheel hub again and forms tyre bead, it is followed by aging, bearing and central shaft is added, change spur gear of elevator door is finally made;The adhesive is using polyurethane resin as base-material, plasticizer, diluent, filler, coupling agent, stabilizer, anti-wear agent and antioxidant is added, in addition β (3,4 7-oxa-bicyclo[4.1.0) ethyl trimethoxy silane, bis- (trimethylsilane) esters of maleic acid, isooctyl thioglycolate antimonic salt, 5 hydroxyl 1 (4 hydroxyl, 3 methoxyphenyl) 30 diketone, zinc chromate and magnesia are also added into;Wheel hub and polyurethane tyre bead in the change spur gear of elevator door have larger adhesion strength, in the environment of compression at 200 kilograms after operation 2000 hours, still can also normal use, greatly meet the needs of people's production and living.

Description

A kind of production technology of change spur gear of elevator door
Technical field
The present invention relates to elevator technology field, more particularly to a kind of production technology of change spur gear of elevator door.
Background technology
Currently, increasing with skyscraper, the use of elevator is more and more extensive, and elevator door is guided, carried with change gear Elevator door moves;Traditional change gear includes metal wheel hub and the bearing on the inside of wheel hub, there is a strata outside metal wheel hub Urethane tyre bead, currently, the production technology for preparing polyurethane roller is mainly two kinds of Shooting Technique and pouring technology, wherein being molded work Skill is because its required mechanical equipment is at low cost, and injection molding process is simple, and production efficiency height is more favored by producer;But traditional injection moulding work The bonding force difference for the tyre bead and wheel hub that skill is prepared, cannot meet using needs, or even tyre bead abjection occurs and change gear is caused to damage Bad phenomenon so that elevator is not normally functioning, and leverages the life of high-rise buildings.
Invention content
In view of the deficiencies of the prior art, the present invention intends to provide a kind of production technology of change spur gear of elevator door, The tyre bead and wheel hub for the change gear that the production technology is prepared using Shooting Technique and the production technology have preferable cohesive force, energy Meet normal use.
To achieve the above object, the present invention provides following technical solutions:A kind of production technology of change spur gear of elevator door, including Following step:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking with quartz sand or iron sand grain Processing;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature 10- 2-4 hours in 40 DEG C of environment, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then by wheel hub It is put into injection mold, and keeps the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tire in injection mold Loop-shaped is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
2 parts of β-(3,4- 7-oxa-bicyclo[4.1.0s) ethyl trimethoxy silane;
Bis- 2 parts of (trimethylsilane) esters of maleic acid;
1 part of isooctyl thioglycolate antimonic salt;
2 parts of ten diketone of 5- hydroxyls -1- (4- hydroxy 3-methoxybenzenes base) -3-;
1 part of zinc chromate;
2 parts of magnesia.
The plasticizer is o-phthalic acid dibutyl ester.
The diluent is pentyl acetate.
The filler is the mixture of white carbon, talcum powder and calcium carbonate, mass ratio 2:1:2.
The coupling agent is 3- mercapto hydroxypropyl methyl triethoxysilanes.
The anti-wear agent is octadecyltriethoxy silane.
The stabilizer is calcium stearate, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol Mixture, mass ratio 1:2:1.
The antioxidant is (3,5- di-tert-butyl-4-hydroxyl benzyls) benzene of 1,3,5- trimethyls -2,4,6- three and thio two The mixture of propionic acid dilauryl, mass ratio 3:1.
Cleaning in the step 2, which comprises the concrete steps that, first uses lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone The mixed liquor of formation carries out cleaning by degreasing to the glue spraying face of wheel hub, is then cleaned one time with clear water again.
In the mixed liquor that the lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone are formed, the mass ratio of the two It is 5:1.
Beneficial effects of the present invention:It is low that change spur gear of elevator door production cost is prepared using Shooting Technique, production efficiency is high, is suitble to Produce in enormous quantities;By first preparing metal wheel hub, to metal wheel hub cleaning by degreasing, pre-blast processing, then by special bonding Agent is sprayed on the glue spraying face of wheel hub, dry, preheating, then polyurethane material is molded on metal wheel hub and forms tyre bead, then ripe Change, bearing and central shaft is added, change spur gear of elevator door is finally made;Wheel hub in change spur gear of elevator door obtained in this way and polyurethane tire Circle have larger adhesion strength, at 200 kilograms be pressurized in the environment of operation 2000 hours after, still can also normal use, pole Big meets people's life, requirements of one's work.
Specific implementation mode
Embodiment 1:A kind of production technology of change spur gear of elevator door, includes the following steps:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking with quartz sand or iron sand grain Processing;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature 10- 2-4 hours in 40 DEG C of environment, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then by wheel hub It is put into injection mold, and keeps the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tire in injection mold Loop-shaped is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
2 parts of β-(3,4- 7-oxa-bicyclo[4.1.0s) ethyl trimethoxy silane;
Bis- 2 parts of (trimethylsilane) esters of maleic acid;
1 part of isooctyl thioglycolate antimonic salt;
2 parts of ten diketone of 5- hydroxyls -1- (4- hydroxy 3-methoxybenzenes base) -3-;
1 part of zinc chromate;
2 parts of magnesia.
The plasticizer is o-phthalic acid dibutyl ester.
The diluent is pentyl acetate.
The filler is the mixture of white carbon, talcum powder and calcium carbonate, mass ratio 2:1:2.
The coupling agent is 3- mercapto hydroxypropyl methyl triethoxysilanes.
The anti-wear agent is octadecyltriethoxy silane.
The stabilizer is calcium stearate, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol Mixture, mass ratio 1:2:1.
The antioxidant is (3,5- di-tert-butyl-4-hydroxyl benzyls) benzene of 1,3,5- trimethyls -2,4,6- three and thio two The mixture of propionic acid dilauryl, mass ratio 3:1.
Cleaning in the step 2, which comprises the concrete steps that, first uses lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone The mixed liquor of formation carries out cleaning by degreasing to the glue spraying face of wheel hub, is then cleaned one time with clear water again.
In the mixed liquor that the lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone are formed, the mass ratio of the two It is 5:1.
Comparative example 1:A kind of production technology of change spur gear of elevator door, includes the following steps:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking with quartz sand or iron sand grain Processing;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature 10- 2-4 hours in 40 DEG C of environment, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then by wheel hub It is put into injection mold, and keeps the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tire in injection mold Loop-shaped is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
Bis- 2 parts of (trimethylsilane) esters of maleic acid;
2 parts of ten diketone of 5- hydroxyls -1- (4- hydroxy 3-methoxybenzenes base) -3-;
1 part of zinc chromate;
2 parts of magnesia.
The plasticizer is o-phthalic acid dibutyl ester.
The diluent is pentyl acetate.
The filler is the mixture of white carbon, talcum powder and calcium carbonate, mass ratio 2:1:2.
The coupling agent is 3- mercapto hydroxypropyl methyl triethoxysilanes.
The anti-wear agent is octadecyltriethoxy silane.
The stabilizer is calcium stearate, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol Mixture, mass ratio 1:2:1.
The antioxidant is (3,5- di-tert-butyl-4-hydroxyl benzyls) benzene of 1,3,5- trimethyls -2,4,6- three and thio two The mixture of propionic acid dilauryl, mass ratio 3:1.
Cleaning in the step 2, which comprises the concrete steps that, first uses lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone The mixed liquor of formation carries out cleaning by degreasing to the glue spraying face of wheel hub, is then cleaned one time with clear water again.
In the mixed liquor that the lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone are formed, the mass ratio of the two It is 5:1.
Comparative example 2:A kind of production technology of change spur gear of elevator door, includes the following steps:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking with quartz sand or iron sand grain Processing;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature 10- 2-4 hours in 40 DEG C of environment, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then by wheel hub It is put into injection mold, and keeps the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tire in injection mold Loop-shaped is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
2 parts of β-(3,4- 7-oxa-bicyclo[4.1.0s) ethyl trimethoxy silane;
1 part of isooctyl thioglycolate antimonic salt;
2 parts of ten diketone of 5- hydroxyls -1- (4- hydroxy 3-methoxybenzenes base) -3-;
2 parts of magnesia.
The plasticizer is o-phthalic acid dibutyl ester.
The diluent is pentyl acetate.
The filler is the mixture of white carbon, talcum powder and calcium carbonate, mass ratio 2:1:2.
The coupling agent is 3- mercapto hydroxypropyl methyl triethoxysilanes.
The anti-wear agent is octadecyltriethoxy silane.
The stabilizer is calcium stearate, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol Mixture, mass ratio 1:2:1.
The antioxidant is (3,5- di-tert-butyl-4-hydroxyl benzyls) benzene of 1,3,5- trimethyls -2,4,6- three and thio two The mixture of propionic acid dilauryl, mass ratio 3:1.
Cleaning in the step 2, which comprises the concrete steps that, first uses lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone The mixed liquor of formation carries out cleaning by degreasing to the glue spraying face of wheel hub, is then cleaned one time with clear water again.
In the mixed liquor that the lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone are formed, the mass ratio of the two It is 5:1.
Comparative example 3:A kind of production technology of change spur gear of elevator door, includes the following steps:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking with quartz sand or iron sand grain Processing;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature 10- 2-4 hours in 40 DEG C of environment, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then by wheel hub It is put into injection mold, and keeps the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tire in injection mold Loop-shaped is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
2 parts of β-(3,4- 7-oxa-bicyclo[4.1.0s) ethyl trimethoxy silane;
Bis- 2 parts of (trimethylsilane) esters of maleic acid;
1 part of isooctyl thioglycolate antimonic salt;
1 part of zinc chromate.
The plasticizer is o-phthalic acid dibutyl ester.
The diluent is pentyl acetate.
The filler is the mixture of white carbon, talcum powder and calcium carbonate, mass ratio 2:1:2.
The coupling agent is 3- mercapto hydroxypropyl methyl triethoxysilanes.
The anti-wear agent is octadecyltriethoxy silane.
The stabilizer is calcium stearate, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol Mixture, mass ratio 1:2:1.
The antioxidant is (3,5- di-tert-butyl-4-hydroxyl benzyls) benzene of 1,3,5- trimethyls -2,4,6- three and thio two The mixture of propionic acid dilauryl, mass ratio 3:1.
Cleaning in the step 2, which comprises the concrete steps that, first uses lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone The mixed liquor of formation carries out cleaning by degreasing to the glue spraying face of wheel hub, is then cleaned one time with clear water again.
In the mixed liquor that the lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone are formed, the mass ratio of the two It is 5:1.
Comparative example 4:A kind of production technology of change spur gear of elevator door, includes the following steps:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking with quartz sand or iron sand grain Processing;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature 10- 2-4 hours in 40 DEG C of environment, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then by wheel hub It is put into injection mold, and keeps the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tire in injection mold Loop-shaped is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
2 parts of β-(3,4- 7-oxa-bicyclo[4.1.0s) ethyl trimethoxy silane;
Bis- 2 parts of (trimethylsilane) esters of maleic acid;
1 part of isooctyl thioglycolate antimonic salt;
2 parts of ten diketone of 5- hydroxyls -1- (4- hydroxy 3-methoxybenzenes base) -3-;
1 part of zinc chromate;
2 parts of magnesia.
The plasticizer is o-phthalic acid dibutyl ester.
The diluent is pentyl acetate.
The filler is the mixture of white carbon, talcum powder and calcium carbonate, mass ratio 2:1:2.
The coupling agent is 3- mercapto hydroxypropyl methyl triethoxysilanes.
The anti-wear agent is octadecyltriethoxy silane.
The stabilizer is calcium stearate, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol Mixture, mass ratio 1:2:1.
The antioxidant is (3,5- di-tert-butyl-4-hydroxyl benzyls) benzene of 1,3,5- trimethyls -2,4,6- three and thio two The mixture of propionic acid dilauryl, mass ratio 3:1.
Cleaning in the step 2, which is comprised the concrete steps that, cleans the glue spraying face of wheel hub 2 times with clear water.
Comparative example 5:The change spur gear of elevator door bought from the Li Da elevator components factory of Ningjin.
It is manufactured according to standard GB 7588-2003 elevators and safety standard is installed to made from embodiment 1 and comparative example 1-5 Sample is detected, and detects the adhesive property between the wheel hub of change spur gear of elevator door and polyurethane tyre bead.
It will implement 1 and comparative example 1-5 change spur gear of elevator door is made in rotating speed be rotating speed to be 50 ms/min, 200 kilograms of compressions It is run 2000 hours under environment, is detected according still further to standard GB 7588-2003 after having run, detects the wheel of change spur gear of elevator door Adhesive property between hub and polyurethane tyre bead.
The production technology of the change spur gear of elevator door of the present invention prepares metal wheel hub first, in accordance with national standard, prepares metal wheel The material of hub is aluminium alloy or 45# steel, then carries out cleaning by degreasing to the glue spraying face of manufactured metal wheel hub, and degreaser is selected The mass ratio of the mixed liquor that lauryl sodium sulfate and 5- cyclohexylbenzene -1,3- diketone are formed, the two is 5:1, it matches in this way The degreaser of formation can be good at carrying out cleaning by degreasing to metal wheel hub surface, it helps adhesive is more firmly bonded in On metal wheel hub;After degreaser cleaning by degreasing, cleaned one time with clear water, then with quartz sand or iron sand grain to metal wheel Hub surface carries out pre-blast feather plucking processing, removes metal surface burr, keeps metal surface more smooth;The processing of pre-blast feather plucking Afterwards, adhesive is sprayed on the glue spraying face of wheel hub, which is special, is difficult to buy on the market, which has very Good adhesive action is conducive to make have good adhesion strength between metal wheel hub and polyurethane tyre bead;After having sprayed adhesive, It is 2-4 hours dry, then the wheel hub after drying is placed and is preheated 4-12 hours in an oven, preheating temperature is 120-150 DEG C, is connect It wheel hub being put into specific injection mold and position, the glue spraying face that the Jiao Kou of injection mold is directed at wheel hub is allowed to be convenient for glue spraying, Gu It molds after fixed, then is injected liquid polyurethane material in injection mold glue mouth by casting machine screw rod with low-pressure injection molding machine, liquid is poly- The adhesive of the glue spraying layer of the shape that urethane material converges in injection mold into tyre bead, polyurethane material and metal wheel hub is abundant Contact is reacted 55-75 seconds;Then wheel hub is put into baking oven and carries out maturation process, curing temperature is 70-110 DEG C, time 8- 16 hours;After curing, then bearing and central shaft be packed on the inside of wheel hub, finished product;Elevator made from the production technology Wheel hub and polyurethane tyre bead in door change gear have larger adhesion strength, and operation 2000 is small in the environment of compression at 200 kilograms Shi Hou, still can also normal use, greatly meet people life, requirements of one's work.
As the innovative point of the present invention, using special adhesive, which adds using polyurethane resin as base-material Plasticizer, diluent, filler, coupling agent, stabilizer, anti-wear agent and antioxidant are also added into β-(3,4- epoxy hexamethylenes in addition Alkane) ethyl trimethoxy silane, bis- (trimethylsilane) esters of maleic acid, isooctyl thioglycolate antimonic salt, 5- hydroxyls -1- (4- hydroxyls - 3- methoxyphenyls) ten diketone of -3-, zinc chromate and magnesia, under the collective effect of this 6 kinds of substances, it ensure that the adhesive energy Metal wheel hub and polyurethane tyre bead are bonded together well, adhesion strength between the two is larger, disclosure satisfy that the people's The demand of life and work;Calcium stearate, stearoyl benzoyl methane and the bis- (beta-aminos of 1,4-butanediol have been selected on stabilizer Butenoic acid) ester this 3 kinds of substances, in the collective effect of 3 kinds of substances, thermal stability is fine, ensure that each component substance in adhesive Its effect can normally be played, it is ensured that adhesive has very strong viscosity;Antioxidant has selected 1,3,5- trimethyls -2,4,6- three (3,5- di-tert-butyl-4-hydroxyl benzyl) benzene and dilauryl thiodipropionate both substances, both substances can play Good antioxidation, slows down degree of aging.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of production technology of change spur gear of elevator door, it is characterised in that:Include the following steps:
Step 1:Prepare metal wheel hub, the material selection aluminium alloy or 45# steel of metal wheel hub;
Step 2:The glue spraying face of metal wheel hub is cleaned, then carries out pre-blast feather plucking processing with quartz sand or iron sand grain;
Step 3:Adhesive is sprayed on the glue spraying face of wheel hub, then wheel hub is placed in humidity and is less than 60%, temperature is 10-40 DEG C Environment in 2-4 hours, the wheel hub after being dried;
Step 4:Wheel hub in step 3 is put in the preheating carried out at a temperature of 120-150 DEG C 4-12 hours, then wheel hub is put into In injection mold, and keep the Jiao Kou of injection mold corresponding with the glue spraying face of wheel hub;
Step 5:Liquid polyurethane material is injected in injection mold, polyurethane material is made to be flowed into tyre bead shape in injection mold Shape is simultaneously bonded on metal wheel hub;
Step 6:Wheel hub is put into 8-16 hours in 70-110 DEG C of baking oven and carries out maturation process;
Step 7:Bearing and central shaft are packed on the inside of wheel hub, change spur gear of elevator door finished product is obtained;
Described adhesive includes following parts by weight composition:
Polyurethane resin:75 parts;
Plasticizer:3 parts;
Diluent:5 parts;
Filler:3 parts;
Coupling agent:2 parts;
Anti-wear agent:1 part;
Stabilizer:1.2 part;
Antioxidant:1 part;
2 parts of β-(3,4- 7-oxa-bicyclo[4.1.0s) ethyl trimethoxy silane;
Bis- 2 parts of (trimethylsilane) esters of maleic acid;
1 part of isooctyl thioglycolate antimonic salt;
2 parts of ten diketone of 5- hydroxyls -1- (4- hydroxy 3-methoxybenzenes base) -3-;
1 part of zinc chromate;
2 parts of magnesia.
2. a kind of production technology of change spur gear of elevator door according to claim 1, it is characterised in that:The plasticizer is adjacent benzene Dioctyl phthalate dibutyl ester.
3. a kind of production technology of change spur gear of elevator door according to claim 2, it is characterised in that:The diluent is acetic acid Pentyl ester.
4. a kind of production technology of change spur gear of elevator door according to claim 3, it is characterised in that:The filler is hard charcoal The mixture of black, talcum powder and calcium carbonate, mass ratio 2:1:2.
5. a kind of production technology of change spur gear of elevator door according to claim 4, it is characterised in that:The coupling agent is 3- mercaptos Hydroxypropyl methyl triethoxysilane.
6. a kind of production technology of change spur gear of elevator door according to claim 5, it is characterised in that:The anti-wear agent is 18 Alkyl triethoxysilane.
7. a kind of production technology of change spur gear of elevator door according to claim 6, it is characterised in that:The stabilizer is tristearin The mixture of sour calcium, stearoyl benzoyl methane and bis- (beta-amino butenoic acid) esters of 1,4-butanediol, mass ratio 1:2:1.
8. a kind of production technology of change spur gear of elevator door according to claim 7, it is characterised in that:The antioxidant is 1,3, 5- trimethyls -2,4, the mixture of 6- tri- (3,5- di-tert-butyl-4-hydroxyl benzyl) benzene and dilauryl thiodipropionate, matter Amount is than being 3:1.
9. a kind of production technology of change spur gear of elevator door according to claim 8, it is characterised in that:It is clear in the step 2 Wash the glue spraying for comprising the concrete steps that and first using lauryl sodium sulfate and the mixed liquor of 5- cyclohexylbenzene -1,3- diketone formation to wheel hub Face carries out cleaning by degreasing, is then cleaned one time with clear water again.
10. a kind of production technology of change spur gear of elevator door according to claim 9, it is characterised in that:The dodecyl sulphur In the mixed liquor that sour sodium and 5- cyclohexylbenzene -1,3- diketone are formed, the mass ratio of the two is 5:1.
CN201810052390.5A 2018-01-19 2018-01-19 Production process of elevator door change gear Active CN108381850B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810052390.5A CN108381850B (en) 2018-01-19 2018-01-19 Production process of elevator door change gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810052390.5A CN108381850B (en) 2018-01-19 2018-01-19 Production process of elevator door change gear

Publications (2)

Publication Number Publication Date
CN108381850A true CN108381850A (en) 2018-08-10
CN108381850B CN108381850B (en) 2020-09-18

Family

ID=63077335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810052390.5A Active CN108381850B (en) 2018-01-19 2018-01-19 Production process of elevator door change gear

Country Status (1)

Country Link
CN (1) CN108381850B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114458685A (en) * 2022-01-20 2022-05-10 依合斯工程塑胶(上海)有限公司 Low-degumming-rate door change gear and degumming process thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044500A (en) * 2016-06-28 2016-10-26 依合斯工程塑胶(上海)有限公司 Lift door pulley and production method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106044500A (en) * 2016-06-28 2016-10-26 依合斯工程塑胶(上海)有限公司 Lift door pulley and production method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114458685A (en) * 2022-01-20 2022-05-10 依合斯工程塑胶(上海)有限公司 Low-degumming-rate door change gear and degumming process thereof

Also Published As

Publication number Publication date
CN108381850B (en) 2020-09-18

Similar Documents

Publication Publication Date Title
CN110256974A (en) A kind of silane modified polyether seal glue and the preparation method and application thereof
CN103396620A (en) PVC (Polyvinyl Chloride) plastic-wood foaming material
CN103722125A (en) Method for casting automobile axle housing by V method
CN108381850A (en) A kind of production technology of change spur gear of elevator door
CN101811172A (en) Preparation method of high temperature resistant dope for lost foam
CN103801653A (en) Rapid manufacturing method of resin casting mold
CN103100665B (en) Sodium silicate sand mould drying and hardening process
CN110527475B (en) Sprayable anti-sagging silane modified polyether sealant and preparation method thereof
CN112756559A (en) Sand core made of special precoated sand
CN110015863B (en) Modifier for water glass for casting sand mold of electric melting brick and modified water glass prepared by modifier
CN204059735U (en) The strong muscle glass cermaic plate of hot pressing
CN105368129A (en) High-abrasion-resistance waterborne UV (ultraviolet)-curable carpentry coating and preparation method
CN110370694A (en) A kind of production technology of seamless rubber ball
CN110216052A (en) A kind of floor enamelling process
CN110038998A (en) A kind of disappearance die manufacturing process
CN114957887A (en) Preparation method of super-wear-resistant floor with excellent performance
CN108586959A (en) A kind of sealing joint strip and preparation method thereof for building decoration door and window
CN118290701B (en) Impact-resistant semi-prefabricated polyurethane runway and preparation method thereof
CN113441676A (en) Formula and preparation method of molding sand for cast iron
CN104130674A (en) Vehicle primer
CN1554525A (en) Method for producing crystal art funniture
CN108715714B (en) Preparation method of corrosion-resistant paint
CN108840567A (en) Double-deck Argyll Robertson pupil/sign Argyll-Robertson stream grain glaze and preparation method thereof
CN112659311B (en) Manufacturing method of 3D wood grain die of silicon spar platform basin
CN108485453A (en) A kind of leaching mould plate, the manufacturing process and its manufacturing equipment of the leaching mould plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190919

Address after: 325000 No. 301 Wanxiang Road, Furniture Park, Wanquan Light Industry Base, Pingyang County, Wenzhou City, Zhejiang Province

Applicant after: PINGYANG RENHE ELEVATOR FITTINGS CO., LTD.

Address before: 325000 2 Xingyang Road furniture garden, Wanquan light industrial base, Pingyang, Wenzhou, Zhejiang

Applicant before: Cai Wu

GR01 Patent grant
GR01 Patent grant