CN108363789A - A kind of industry and commerce user power utilization table code data lack method for repairing and mending and device in short term - Google Patents

A kind of industry and commerce user power utilization table code data lack method for repairing and mending and device in short term Download PDF

Info

Publication number
CN108363789A
CN108363789A CN201810146112.6A CN201810146112A CN108363789A CN 108363789 A CN108363789 A CN 108363789A CN 201810146112 A CN201810146112 A CN 201810146112A CN 108363789 A CN108363789 A CN 108363789A
Authority
CN
China
Prior art keywords
period
complement
table code
candidate reference
code value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810146112.6A
Other languages
Chinese (zh)
Other versions
CN108363789B (en
Inventor
卢世祥
阙华坤
林国营
王赛
李畅
黄宇魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority to CN201810146112.6A priority Critical patent/CN108363789B/en
Publication of CN108363789A publication Critical patent/CN108363789A/en
Application granted granted Critical
Publication of CN108363789B publication Critical patent/CN108363789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2282Tablespace storage structures; Management thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/215Improving data quality; Data cleansing, e.g. de-duplication, removing invalid entries or correcting typographical errors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Primary Health Care (AREA)
  • Marketing (AREA)
  • Software Systems (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An embodiment of the present invention provides a kind of industry and commerce user power utilization table code data to lack method for repairing and mending and device in short term, wherein this method includes:Obtain user's meter waits for the complement period, and each candidate reference period corresponding with the complement period is waited for is determined according to preset time interval and the preset quantity of candidate reference period;It calculates separately and waits for the distance between complement period and each candidate reference period, determine that the candidate reference period corresponding with minimum range is to choose with reference to the period;Judging to choose with reference to the period, with after being not more than preset distance at a distance between the complement period, complement period progress data modification to be treated according to the table code data with reference to the period are chosen;Wherein, preset time interval is the time interval between two periods of arbitrary neighborhood in comprising all periods for waiting for complement period and candidate reference period.

Description

A kind of industry and commerce user power utilization table code data lack method for repairing and mending and device in short term
Technical field
The present invention relates to electric network data fields of measurement more particularly to a kind of industry and commerce user power utilization table code data to lack in short term Method for repairing and mending and device.
Background technology
Along with the arrival in Information technology epoch, big data has been more and more widely used in every field.And with China's intelligent grid construction is in full swing, and electric power big data should be needed and be given birth to, and as indispensable during power grid intelligence A part.
The final goal of intelligent grid construction is to become the covering entire production process of electric system, including power generation, transmission of electricity, change The panorama real-time system of multiple links such as electricity, distribution, electricity consumption and scheduling.And it is power grid to support the basis of intelligent grid reliability service Panorama real-time data acquisition, transimission and storage, and the magnanimity electric power data of accumulation are quickly analyzed.But acquired in data, it passes During defeated and storage, inevitably will appear shortage of data, shortage of data causes strong influence to data analysis, The practical value that missing data is related to analysis result is effectively treated.Therefore the analysis to electric power data is completed, how to be carried out Data modification is a significant and stubborn problem.
Data analysis precision is not only interfered in the presence of missing data, also influences effectively opening for statistical analysis personnel's follow-up work Exhibition.For industry and commerce user, when existing, when carrying out data modification with the short-term missing of ammeter code data, common method has coarse Set method, decision tree and Bayesian network etc..
However, the above method when carrying out data modification, can not utilize the part throttle characteristics of industry and commerce user, lead to it It is not high to the repairing quality of industry and commerce user's table code data.
Invention content
An embodiment of the present invention provides a kind of industry and commerce user power utilization table code data to lack method for repairing and mending and device in short term, fills The part throttle characteristics that industry and commerce user is utilized is divided to also achieve higher repair while providing fabulous data filling rate Mend the quality of data.
An embodiment of the present invention provides a kind of industry and commerce user power utilization table code data to lack method for repairing and mending in short term, including:
Obtain user's meter waits for the complement period, is determined according to preset time interval and the preset quantity of candidate reference period Corresponding each candidate reference period complement period is waited for described;
It is waited for the distance between complement period and each candidate reference period described in calculating separately, determining and minimum range The corresponding candidate reference period is to choose with reference to the period;
It is chosen described in judgement with reference to the period with described after being not more than preset distance at a distance between the complement period, according to It is described that the table code data with reference to the period is chosen to wait for that the complement period carries out data modification to described;
Wherein, the preset time interval for comprising the institute for waiting for complement period and the candidate reference period sometimes Duan Zhong, the time interval between two periods of arbitrary neighborhood.
Preferably, a kind of industry and commerce user power utilization table code data provided by the invention lack method for repairing and mending and further include in short term:
Described in determination after the quantity of complement period be at least two after, by it is all it is described when the complement period when long-press from It is small to being ranked up greatly, if there are waiting for that the duration of complement period is consistent described in several, then by several consistent institutes of duration It states to carve at the beginning of waiting for the complement period by each period and be ranked up from front to back.
Preferably, by it is described wait for the complement period centered on point, positioned at it is described wait for the complement period before the candidate reference The quantity of period waits for that the quantity of candidate reference period after the complement period is equal with positioned at described.
Preferably, described calculate separately described waits for the distance between complement period and each candidate reference period specifically For:
According to the table code value for waiting for start time complement period, the table code value for waiting for finish time complement period, each The table code value of a start time candidate reference period and the table code value of each finish time candidate reference period pass through Preset first formula waits for the distance between complement period and each candidate reference period described in calculating separately;
Wherein, preset first formula is:
Dist(t0,ti)=| (Vt0_e-Vt0_s)-(Vti_e-Vti_s)|/|Vt0_e-Vt0_s| * 100%
In formula, t0To wait for complement period, tiFor i-th of candidate reference period, Vt0_sTo wait for the table of start time complement period Code value, Vt0_eTo wait for the table code value of finish time complement period, Vti_sFor the table code value of i-th of start time candidate reference period, Vti_eFor the table code value of i-th of finish time candidate reference period.
Preferably, described chosen described in judgement is waited at a distance between the complement period with described no more than preset with reference to the period After distance, the table code data with reference to the period are chosen to wait for that the complement period carries out data modification and specifically includes to described according to described:
It is chosen described in judgement with reference to the period with described after being not more than preset distance at a distance between the complement period, is determined The each scarce several moment for waiting for the complement period, and determination is corresponding with each scarce several moment in described choose with reference to the period The complement moment;
According to the table code value for waiting for start time complement period, the table code value for waiting for finish time complement period, institute It states and chooses the table code value with reference to start time period, described choose the table code value with reference to finish time period and described choose reference The table code value at period at each complement moment waits for complement period at each scarce several moment by preset second formula to described Carry out corresponding data repairing;
Wherein, preset second formula is:
Vt0_s+j×m=Vt0_s+(Vti_s+j×m-Vti_s)×(Vt0_e-Vt0_s)÷(Vti_e-Vti_s)
In formula, t0To wait for complement period, tiThe period is referred to choose, m is data collection interval, Vt0_s+j×mTo wait mending Number period t0J-th of table code value for lacking the number moment, Vti_s+j×mPeriod t is referred to chooseiThe table code value at j-th of complement moment.
Preferably, the embodiment of the present invention additionally provides a kind of industry and commerce user power utilization table code data and lacks repairing dress in short term It sets, including:
Acquiring unit waits for the complement period, according to preset time interval and candidate reference period for obtain user's meter Preset quantity determine and wait for corresponding each candidate reference period complement period with described;
Computing unit, for calculate separately it is described wait for the distance between complement period and each candidate reference period, Determine that the candidate reference period corresponding with minimum range is to choose with reference to the period;
Unit is repaired, is waited at a distance between the complement period no more than pre- with described with reference to the period for being chosen described in judgement After setting distance, the table code data with reference to the period are chosen to wait for that the complement period carries out data modification to described according to described;
Wherein, the preset time interval for comprising the institute for waiting for complement period and the candidate reference period sometimes Duan Zhong, the time interval between two periods of arbitrary neighborhood.
Preferably, a kind of industry and commerce user power utilization table code data provided in an embodiment of the present invention lack repair apparatus in short term, Further include:
Sequencing unit, for after the quantity of complement period is at least two, described complement to be waited for by all described in determination The when long-press of period is ranked up from small to large, if there are waiting for that the duration of complement period is consistent described in several, then by duration It carves at the beginning of waiting for the complement period by each period described in several consistent and is ranked up from front to back.
Preferably, by it is described wait for the complement period centered on point, positioned at it is described wait for the complement period before the candidate reference The quantity of period waits for that the quantity of candidate reference period after the complement period is equal with positioned at described.
Preferably, the computing unit specifically includes:
Computation subunit, for calculate separately it is described wait between complement period and each candidate reference period away from From;
First determination subelement, for determining that the candidate reference period corresponding with minimum range is when choosing reference Section;
The computation subunit is additionally operable to wait for the table code value of start time complement period according to, described waits for the complement period The table code value of finish time, the table code value of each start time candidate reference period and each candidate reference period knot The table code value at beam moment by preset first formula calculate separately it is described wait for complement period and each candidate reference period it Between distance;
Wherein, preset first formula is:
Dist(t0, ti)=| (Vt0_e-Vt0_s)-(Vti_e-Vti_s)|/|Vt0_e-Vt0_s| * 100%
In formula, t0To wait for complement period, tiFor i-th of candidate reference period, Vt0_sTo wait for the table of start time complement period Code value, Vt0_eTo wait for the table code value of finish time complement period, Vti_sFor the table code value of i-th of start time candidate reference period, Vti_eFor the table code value of i-th of finish time candidate reference period.
Preferably, the repairing unit specifically includes:
Second determination subelement waits at a distance between the complement period not with reference to the period with described for being chosen described in judgement After preset distance, determine described in wait for each scarce several moment of complement period, and determine in described choose with reference to the period with The corresponding complement moment at each scarce several moment;
Repair subelement, for according to when the table code value of start time complement period, described to the end of the complement period The table code value at moment described chooses the table code value with reference to start time period, the table code chosen with reference to finish time period Value and described the table code value with reference to period at each complement moment is chosen to wait for the complement period to described by preset second formula Each scarce several moment carry out corresponding data repairing;
Wherein, preset second formula is:
Vt0_s+j×m=Vt0_s+(Vti_s+j×m-Vti_s)×(Vt0_e-Vt0_s)÷(Vti_e-Vti_s)
In formula, t0To wait for complement period, tiThe period is referred to choose, m is data collection interval, Vt0_s+j×mTo wait mending Number period t0J-th of table code value for lacking the number moment, Vti_s+j×mPeriod t is referred to chooseiThe table code value at j-th of complement moment.
As can be seen from the above technical solutions, the embodiment of the present invention has the following advantages:
An embodiment of the present invention provides a kind of industry and commerce user power utilization table code data to lack method for repairing and mending and device in short term, In, this method includes:Obtain user's meter waits for the complement period, according to the preset number of preset time interval and candidate reference period Amount determines each candidate reference period corresponding with the complement period is waited for;It calculates separately and waits for complement period and each candidate reference period The distance between, determine that the candidate reference period corresponding with minimum range is to choose with reference to the period;Judging to choose with reference to the period , no more than after preset distance, the complement period is treated according to the table code data with reference to the period are chosen with after the distance between complement period Carry out data modification;Wherein, preset time interval is to appoint in comprising all periods for waiting for complement period and candidate reference period The time interval anticipated between the two neighboring period.The present invention is having found user's meter there are in the case of shortage of data, abundant profit Has the characteristics of higher similarity between industry and commerce user daily load curve interior for a period of time, by using shortage of data The front and back several days table code data of period repair data loss period, are capable of providing fabulous data filling rate, and Has higher repairing data quality.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without having to pay creative labor, may be used also for those of ordinary skill in the art To obtain other attached drawings according to these attached drawings.
Fig. 1 is the implementation that a kind of industry and commerce user power utilization table code data provided by the invention lack method for repairing and mending in short term The flow diagram of example;
Fig. 2 is another reality that a kind of industry and commerce user power utilization table code data provided by the invention lack method for repairing and mending in short term Apply the flow diagram of example;
Fig. 3 is the implementation that a kind of industry and commerce user power utilization table code data provided by the invention lack repair apparatus in short term The structural schematic diagram of example.
Specific implementation mode
An embodiment of the present invention provides a kind of industry and commerce user power utilization table code data to lack method for repairing and mending and device in short term, fills The part throttle characteristics that industry and commerce user is utilized is divided to also achieve higher repair while providing fabulous data filling rate Mend the quality of data.
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that disclosed below Embodiment be only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field All other embodiment that those of ordinary skill is obtained without making creative work, belongs to protection of the present invention Range.
Referring to Fig. 1, a kind of industry and commerce user power utilization table code data provided by the invention lack the one of method for repairing and mending in short term A embodiment, including:
101, obtain user's meter waits for the complement period, according to the preset quantity of preset time interval and candidate reference period Determine each candidate reference period corresponding with the complement period is waited for;
102, it calculates separately and waits for the distance between complement period and each candidate reference period, determination is corresponding with minimum range The candidate reference period be choose with reference to the period;
103, judge to choose with reference to the period at a distance between the complement period no more than after preset distance, according to choosing Complement period progress data modification is treated with reference to the table code data of period.
Wherein, preset time interval is the arbitrary phase in comprising all periods for waiting for complement period and candidate reference period Time interval between adjacent two periods.
An embodiment of the present invention provides a kind of industry and commerce user power utilization table code data to lack method for repairing and mending and device in short term, In, this method includes:Obtain user's meter waits for the complement period, according to the preset number of preset time interval and candidate reference period Amount determines each candidate reference period corresponding with the complement period is waited for;It calculates separately and waits for complement period and each candidate reference period The distance between, determine that the candidate reference period corresponding with minimum range is to choose with reference to the period;Judging to choose with reference to the period , no more than after preset distance, the complement period is treated according to the table code data with reference to the period are chosen with after the distance between complement period Carry out data modification;Wherein, preset time interval is to appoint in comprising all periods for waiting for complement period and candidate reference period The time interval anticipated between the two neighboring period.The present invention is having found user's meter there are in the case of shortage of data, abundant profit Has the characteristics of higher similarity between industry and commerce user daily load curve interior for a period of time, by using shortage of data The front and back several days table code data of period repair data loss period, are capable of providing fabulous data filling rate, and Has higher repairing data quality.
It is one embodiment that a kind of industry and commerce user power utilization table code data lack method for repairing and mending in short term above, to carry out more Another embodiment that a kind of industry and commerce user power utilization table code data lack method for repairing and mending in short term is provided below in specific description, Referring to Fig. 2, a kind of industry and commerce user power utilization table code data provided by the invention lack another implementation of method for repairing and mending in short term Example.
It should be noted that is referred in this implementation waits for the complement period that (i.e. table code data loss period) refers to based on acquisition Some of time interval continuous time serieses carve at the beginning of the time series and there are table code data, but its in finish time He all lacks the table code data at moment.Individually wait for that the complement period can use triple (start time, finish time, a data Missing points) it indicates.
The candidate reference period:Refer to some periods, the data of complement period can be treated based on the data of any of which period It is repaired, but repair efficiency will be different.The single candidate reference period can with two tuples (start time, at the end of Carve) it indicates.
It chooses and refers to the period:Refer to according to certain rule, some period selected from the candidate reference period utilizes The data of the period are repaired, and effect can be best.
The present embodiment includes:
201, obtain user's meter waits for the complement period, according to the preset quantity of preset time interval and candidate reference period Determine each candidate reference period corresponding with the complement period is waited for;
It should be noted that wait for that the shortage of data points of complement period are usually provided with a threshold value, even data are adopted Collection time interval is 1 hour, if setting threshold value is 24, the threshold value is corresponding when indicating to shortage of data the complement period It is long to wait for that the complement period carries out complement no more than 24 hours (1 day).
In the present embodiment, preset time interval is to include all periods for waiting for complement period and candidate reference period In, the time interval between two periods of arbitrary neighborhood.And the point centered on waiting for the complement period, before waiting for the complement period The quantity of candidate reference period is equal with the quantity of candidate reference period after waiting for the complement period.
Such as to certain critical point ammeter (case 1) of Mr. Yu's Production of Ceramics enterprise, table code data collection interval is 1 small When.Since its same day load characteristic curve often has larger similitude with the daily load characteristic curve of front and back a few days, can set UL=24 is set, SL (preset distance)=15%, K (half of the preset quantity of candidate reference period)=7, ST is (between preset time Every)=1.Wherein K=7, ST=1 indicate that the candidate reference period is the front and back 7*1=7 days periods same period for waiting for the complement period.
For another example to certain critical point meter (case 2) of Mr. Yu's large sized commercial center, table code data collection interval is same It is 1 hour.Since its same day load characteristic curve often has larger similitude with the daily load characteristic curve of same period last week, UL=24, SL=15%, K=4, ST=7 can be set.Wherein K=4, ST=7 indicate that the candidate reference period is to wait for the complement period Preceding 28,21,14,7 days and the rear period same period on the 7th, 14,21,28.
Before step 201, determine after the quantity of complement period be at least two after, by the needed complement period when Long-press is ranked up from small to large, if there are several to wait for that the duration of complement period is consistent, then by consistent several of duration It carves at the beginning of waiting for the complement period by each period and is ranked up from front to back.
Such as the critical point ammeter of Production of Ceramics enterprise in case 1,1 day 0 October in 2017 was up on October 31st, 2017 Its shortage of data points wait for that the complement period is respectively tm1=(2017-10-05 10 less than 24 when 23:00:00,2017- 10-06 06:00:00,19), tm2=(2017-10-11 11:00:00,2017-10-11 16:00:00,4), tm3= (2017-10-13 12:00:00,2017-10-13 17:00:00,4), tm4=(2017-10-15 12:00:00,2017- 10-15 14:00:00,1), tm5=(2017-10-25 12:00:00,2017-10-26 03:00:00,14), according to data Missing points from as little as more, start time from front to back sequence sequence after result be tm4, tm2, tm3, tm5, tm1.Again by It is a to wait for that the complement period executes step 201 to 206.
202, basis waits for the table code value of start time complement period, waits for table code value, the Ge Gehou of finish time complement period Choosing passes through preset first formula with reference to the table code value and the table code value of each finish time candidate reference period of start time period It calculates separately and waits for the distance between complement period and each candidate reference period, when determining candidate reference corresponding with minimum range Section is to choose with reference to the period;Judge to choose with reference to the period at a distance between the complement period no more than after preset distance, root Complement period progress data modification is treated according to the table code data with reference to the period are chosen;
Wherein, preset first formula is:
Dist(t0, ti)=| (Vt0_e-Vt0_s)-(Vti_e-Vti_s)|/|Vt0_e-Vt0_s| * 100%
In formula, t0To wait for complement period, tiFor i-th of candidate reference period, Vt0_sTo wait for the table of start time complement period Code value, Vt0_eTo wait for the table code value of finish time complement period, Vti_sFor the table code value of i-th of start time candidate reference period, Vti_eFor the table code value of i-th of finish time candidate reference period.
It should be noted that ensure that the validity of data needs before calculating distance by the incomplete candidate of data It is rejected with reference to the period.Such as scarce several period t of the critical point ammeter of Production of Ceramics enterprise in case 1m4=(2017-10-15 12: 00:00,2017-10-15 14:00:00,1), because of K=7, ST=1, so tm4The candidate reference period be the period before and after 7 The period same period of day, i.e. tm4_1=(2017-10-08 12:00:00,2017-10-08 14:00:00), tm4_2=(2017-10- 09 12:00:00,2017-10-09 14:00:00) ..., tm4_7=(2017-10-14 12:00:00,2017-10-14 14: 00:00), tm4_8=(2017-10-16 12:00:00,2017-10-16 14:00:00) ..., tm4_14=(2017-10-22 12:00:00,2017-10-22 14:00:00), wherein tm4_4=(2017-10-11 12:00:00,2017-10-11 14: 00:And t 00)m4_6=(2017-10-13 12:00:00,2017-10-13 14:00:00) table code data are imperfect, picked Remove out the candidate reference period.Then it calculates again and waits for the distance between complement period and each candidate reference period.
Such as scarce several period t of the critical point ammeter of Production of Ceramics enterprise in case 1m4=(2017-10-15 12:00: 00,2017-10-15 14:00:00,1), start time table code and finish time table code be respectively 2001.46kWh and 2003.46kWh, each candidate reference period is calculated using formula 1 and waits for being respectively 8.8% at a distance from the complement period, 8.4% ..., 5% ..., 7.5%, wherein being 5% apart from minimum value, the corresponding candidate reference period is tm4_7=(2017- 10-14 12:00:00,2017-10-14 14:00:00), using the period as choosing with reference to the period.
203, judge to choose with reference to the period and wait for whether the distance between complement period is more than preset distance, if so, holding Row 204, if it is not, then executing 205;
204, it abandons executing data retrieval operations;
205, judging to choose with reference to the period that determination waits mending with after being not more than preset distance at a distance between the complement period Each scarce several moment of number periods, and choosing with reference to determining the complement moment corresponding with each scarce several moment in the period;
206, basis waits for the table code value of start time complement period, the table code value for waiting for finish time complement period, chooses ginseng The table code value of start time period is examined, the table code value with reference to finish time period is chosen and chooses with reference to period at each complement moment Table code value complement period at each scarce several moment treated by preset second formula carry out corresponding data repairings.
Wherein, preset second formula is:
Vt0_s+j×m=Vt0_s+(Vti_s+j×m-Vti_s)×(Vt0_e-Vt0_s)÷(Vti_e-Vti_s)
In formula, t0To wait for complement period, tiThe period is referred to choose, m is data collection interval, Vt0_s+j×mTo wait mending Number period t0J-th of table code value for lacking the number moment, Vti_s+j×mPeriod t is referred to chooseiThe table code value at j-th of complement moment.
Such as scarce several period t of the critical point ammeter of Production of Ceramics enterprise in case 1m4=(2017-10-15 12:00: 00,2017-10-15 14:00:00,1), start time table code and finish time table code be respectively 2001.46kWh and 2003.46kWh needs at the time of complement to be 2017-10-15 13:00:00;
And it chooses with reference to period tm4_7=(2017-10-14 12:00:00,2017-10-14 14:00:00) at the beginning of Quarter table code and finish time table code be respectively 1951.24kWh and 1953.34kWh, correspond to the moment same period for needing the complement moment For 2017-10-14 13:00:00, table code value is 1952.74kWh.Then need table code value at the time of complement:
V2017-10-15 13:00:00=2001.46+ (1952.74-1951.24) × (2003.46-2001.46) ÷ (1953.34-1951.24)=2002.89kWh.
The case where embodiment of the present invention lacks industry and commerce user power utilization table code data in short term, is providing fabulous number While according to filling rate, higher repairing data quality is also achieved.Table code shortage of data problem is handled based on the inventive technique, The table code quality of data can effectively be promoted so that existing data obtain more extensively, deeper into utilization, realize electric cost estimate Calculation, electricity demand forecasting, peak Pinggu utilize the finings applications such as proficiency assessment.
Be above to a kind of commercial user provided by the invention with ammeter code data lack in short term method for repairing and mending carry out it is detailed It describes in detail bright, will lack repair apparatus in short term with ammeter code data to a kind of commercial user provided by the invention below and illustrate, Referring to Fig. 3, a kind of commercial user provided by the invention lacks one embodiment of repair apparatus with ammeter code data in short term, packet It includes:
Acquiring unit 301 waits for the complement period, when according to preset time interval and candidate reference for obtain user's meter The preset quantity of section determines each candidate reference period corresponding with the complement period is waited for;
Computing unit 302 waits for the distance between complement period and each candidate reference period for calculating separately, determine with The minimum range corresponding candidate reference period is to choose with reference to the period;
Repair unit 303, for judge to choose with reference to the period with wait at a distance between the complement period no more than it is preset away from From rear, data modification is carried out according to choosing the table code data with reference to the period to treat the complement period;
Wherein, preset time interval is the arbitrary phase in comprising all periods for waiting for complement period and candidate reference period Time interval between adjacent two periods.
Further, a kind of industry and commerce user power utilization table code data provided in an embodiment of the present invention lack repairing dress in short term It sets, further includes:
Sequencing unit 300, for determining after the quantity of complement period is at least two, by the needed complement period When long-press be ranked up from small to large, if there are several to wait for that the duration of complement period is consistent, then by consistent several of duration It is a wait for the complement period by each period at the beginning of carve and be ranked up from front to back.
Further, the point centered on waiting for the complement period, the number of the candidate reference period before waiting for the complement period Amount is equal with the quantity of candidate reference period after waiting for the complement period.
Further computing unit 302 specifically includes:
Computation subunit 3021 waits for the distance between complement period and each candidate reference period for calculating separately;
First determination subelement 3022, for determining that the candidate reference period corresponding with minimum range is when choosing reference Section;
Computation subunit 3021 is additionally operable to basis and waits for the table code value of start time complement period, waits for finish time complement period Table code value, the table code value of each start time candidate reference period and the table code value of each finish time candidate reference period it is logical It crosses preset first formula and calculates separately and wait for the distance between complement period and each candidate reference period;
Wherein, preset first formula is:
Dist(t0, ti)=| (Vt0_e-Vt0_s)-(Vti_e-Vti_s)|/|Vt0_e-Vt0_s| * 100%
In formula, t0To wait for complement period, tiFor i-th of candidate reference period, Vt0_sTo wait for the table of start time complement period Code value, Vt0_eTo wait for the table code value of finish time complement period, Vti_sFor the table code value of i-th of start time candidate reference period, Vti_eFor the table code value of i-th of finish time candidate reference period.
Further, repairing unit 303 specifically includes:
Second determination subelement 3031, for judge to choose with reference to the period with wait for being not more than at a distance between the complement period After preset distance, each scarce several moment for waiting for the complement period are determined, and determined and each scarce several moment in choosing with reference to the period The corresponding complement moment;
Subelement 3032 is repaired, the table code value of start time complement period is waited for for basis, waits for finish time complement period Table code value, choose the table code value with reference to start time period, choose the table code value with reference to finish time period and choose reference The table code value at period at each complement moment treats complement period each scarce several moment progress corresponding datas by preset second formula Repairing;
Wherein, preset second formula is:
Vt0_s+j×m=Vt0_s+(Vti_s+j×m-Vti_s)×(Vt0_e-Vt0_s)÷(Vti_e-Vti_s)
In formula, t0To wait for complement period, tiThe period is referred to choose, m is data collection interval, Vt0_s+j×mTo wait mending Number period t0J-th of table code value for lacking the number moment, Vti_s+j×mPeriod t is referred to chooseiThe table code value at j-th of complement moment.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description, The specific work process of device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
In several embodiments provided herein, it should be understood that disclosed system, device and method can be with It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit It divides, only a kind of division of logic function, formula that in actual implementation, there may be another division manner, such as multiple units or component It can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point, it is shown or The mutual coupling, direct-coupling or communication connection discussed can be the indirect coupling by some interfaces, device or unit It closes or communicates to connect, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, you can be located at a place, or may be distributed over multiple In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also It is that each unit physically exists alone, it can also be during two or more units be integrated in one unit.Above-mentioned integrated list The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can be stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or the network equipment etc.) executes the complete of each embodiment the method for the present invention Portion or part steps.And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can store journey The medium of sequence code.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to before Stating embodiment, invention is explained in detail, it will be understood by those of ordinary skill in the art that:It still can be to preceding The technical solution recorded in each embodiment is stated to modify or equivalent replacement of some of the technical features;And these Modification or replacement, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of industry and commerce user power utilization table code data lack method for repairing and mending in short term, which is characterized in that including:
Obtain user's meter waits for the complement period, according to preset time interval and the determination of the preset quantity of candidate reference period and institute It states and waits for complement period corresponding each candidate reference period;
It is waited for the distance between complement period and each candidate reference period described in calculating separately, determination is corresponding with minimum range The candidate reference period be choose with reference to the period;
It is chosen described in judgement with reference to the period with described after being not more than preset distance at a distance between the complement period, according to described The table code data with reference to the period are chosen to wait for that the complement period carries out data modification to described;
Wherein, the preset time interval is to include all periods for waiting for complement period and the candidate reference period In, the time interval between two periods of arbitrary neighborhood.
2. industry and commerce user power utilization table code data according to claim 1 lack method for repairing and mending in short term, which is characterized in that also Including:
Described in determination after the quantity of complement period be at least two after, by it is all it is described when the complement period when long-press from it is small to It is ranked up greatly, if there are waiting for that the duration of complement period is consistent described in several, then will be waited for described in consistent several of duration The complement period by each period at the beginning of carve and be ranked up from front to back.
3. industry and commerce user power utilization table code data according to claim 1 lack method for repairing and mending in short term, which is characterized in that with The point centered on waiting for the complement period, positioned at it is described wait for the complement period before the candidate reference period quantity and be located at institute The quantity for stating the candidate reference period after waiting for the complement period is equal.
4. industry and commerce user power utilization table code data according to claim 3 lack method for repairing and mending in short term, which is characterized in that institute It states and waits for that the distance between complement period and each candidate reference period are specially described in calculating separately:
According to the table code value for waiting for start time complement period, table code value, the Ge Gesuo for waiting for finish time complement period State the table code value of start time candidate reference period and the table code value of each finish time candidate reference period pass through it is preset First formula waits for the distance between complement period and each candidate reference period described in calculating separately;
Wherein, preset first formula is:
Dist(t0,ti)=| (Vt0_e-Vt0_s)-(Vti_e-Vti_s)|/|Vt0_e-Vt0_s| * 100%
In formula, t0To wait for complement period, tiFor i-th of candidate reference period, Vt0_sTo wait for the table code of start time complement period Value, Vt0_eTo wait for the table code value of finish time complement period, Vti_sFor the table code value of i-th of start time candidate reference period, Vti_eFor the table code value of i-th of finish time candidate reference period.
5. industry and commerce user power utilization table code data according to claim 4 lack method for repairing and mending in short term, which is characterized in that institute It states and is chosen described in judgement with reference to the period with described after being not more than preset distance at a distance between the complement period, according to the choosing The middle table code data with reference to the period wait for that the complement period carries out data modification and specifically includes to described:
It is chosen described in judgement with reference to the period with described after being not more than preset distance at a distance between the complement period, described in determination It waits for each scarce several moment of complement period, and determines in described choose with reference to the period benefit corresponding with each scarce several moment The number moment;
According to the table code value for waiting for start time complement period, the table code value for waiting for finish time complement period, the choosing Middle table code value with reference to start time period described chosen the table code value with reference to finish time period and described is chosen with reference to the period The table code value at each complement moment waits for that complement period at each scarce several moment carry out by preset second formula to described Corresponding data is repaired;
Wherein, preset second formula is:
Vt0_s+j×m=Vt0_s+(Vti_s+j×m-Vti_s)×(Vt0_e-Vt0_s)÷(Vti_e-Vti_s)
In formula, t0To wait for complement period, tiThe period is referred to choose, m is data collection interval, Vt0_s+j×mFor when complement Section t0J-th of table code value for lacking the number moment, Vti_s+j×mPeriod t is referred to chooseiThe table code value at j-th of complement moment.
6. a kind of industry and commerce user power utilization table code data lack repair apparatus in short term, which is characterized in that including:
Acquiring unit waits for the complement period for obtain user's meter, pre- according to preset time interval and candidate reference period It sets quantity and determines and wait for corresponding each candidate reference period complement period with described;
Computing unit, for calculate separately it is described wait for the distance between complement period and each candidate reference period, determination The candidate reference period corresponding with minimum range is to choose with reference to the period;
Repair unit, for chosen described in judgement with reference to the period with it is described wait at a distance between the complement period no more than it is preset away from From rear, the table code data with reference to the period are chosen to wait for that the complement period carries out data modification to described according to described;
Wherein, the preset time interval is to include all periods for waiting for complement period and the candidate reference period In, the time interval between two periods of arbitrary neighborhood.
7. industry and commerce user power utilization table code data according to claim 6 lack repair apparatus in short term, which is characterized in that also Including:
Sequencing unit, for after the quantity of complement period is at least two, described the complement period to be waited for by all described in determination When long-press be ranked up from small to large, if there are waiting for that the duration of complement period is consistent described in several, then it is duration is consistent Several described in wait for the complement period by each period at the beginning of carve and be ranked up from front to back.
8. industry and commerce user power utilization table code data according to claim 6 lack repair apparatus in short term, which is characterized in that with The point centered on waiting for the complement period, positioned at it is described wait for the complement period before the candidate reference period quantity and be located at institute The quantity for stating the candidate reference period after waiting for the complement period is equal.
9. industry and commerce user power utilization table code data according to claim 8 lack repair apparatus in short term, which is characterized in that institute Computing unit is stated to specifically include:
Computation subunit described waits for the distance between complement period and each candidate reference period for calculating separately;
First determination subelement, for determining that the candidate reference period corresponding with minimum range is to choose with reference to the period;
The computation subunit is additionally operable to according to when the table code value of start time complement period, described to the end of the complement period The table code value at moment, the table code value of each start time candidate reference period and at the end of each candidate reference period The table code value at quarter calculates separately described wait between complement period and each candidate reference period by preset first formula Distance;
Wherein, preset first formula is:
Dist(t0,ti)=| (Vt0_e-Vt0_s)-(Vti_e-Vti_s)|/|Vt0_e-Vt0_s| * 100%
In formula, t0To wait for complement period, tiFor i-th of candidate reference period, Vt0_sTo wait for the table code of start time complement period Value, Vt0_eTo wait for the table code value of finish time complement period, Vti_sFor the table code value of i-th of start time candidate reference period, Vti_eFor the table code value of i-th of finish time candidate reference period.
10. industry and commerce user power utilization table code data according to claim 9 lack repair apparatus in short term, which is characterized in that The repairing unit specifically includes:
Second determination subelement waits for being not more than at a distance between the complement period with reference to the period for choosing described in judgement with described After preset distance, determine described in wait for each scarce several moment of complement period, and determine in described choose with reference to the period with it is each The corresponding complement moment at scarce several moment;
Subelement is repaired, for waiting for the table code value of start time complement period according to, described waiting for finish time complement period Table code value, it is described choose the table code value with reference to start time period, it is described choose with reference to finish time period table code value and It is described that the table code value with reference to period at each complement moment is chosen to wait for that the complement period is each to described by preset second formula Scarce several moment carry out corresponding data repairing;
Wherein, preset second formula is:
Vt0_s+j×m=Vt0_s+(Vti_s+j×m-Vti_s)×(Vt0_e-Vt0_s)÷(Vti_e-Vti_s)
In formula, t0To wait for complement period, tiThe period is referred to choose, m is data collection interval, Vt0_s+j×mFor when complement Section t0J-th of table code value for lacking the number moment, Vti_s+j×mPeriod t is referred to chooseiThe table code value at j-th of complement moment.
CN201810146112.6A 2018-02-12 2018-02-12 Short-term missing repairing method and device for electricity consumption meter data of industrial and commercial users Active CN108363789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810146112.6A CN108363789B (en) 2018-02-12 2018-02-12 Short-term missing repairing method and device for electricity consumption meter data of industrial and commercial users

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810146112.6A CN108363789B (en) 2018-02-12 2018-02-12 Short-term missing repairing method and device for electricity consumption meter data of industrial and commercial users

Publications (2)

Publication Number Publication Date
CN108363789A true CN108363789A (en) 2018-08-03
CN108363789B CN108363789B (en) 2021-09-17

Family

ID=63005770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810146112.6A Active CN108363789B (en) 2018-02-12 2018-02-12 Short-term missing repairing method and device for electricity consumption meter data of industrial and commercial users

Country Status (1)

Country Link
CN (1) CN108363789B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111127247A (en) * 2019-11-21 2020-05-08 深圳供电局有限公司 Electric quantity data acquisition method and device, computer equipment and storage medium
CN117632927A (en) * 2023-11-24 2024-03-01 九科信息技术(深圳)有限公司 Data processing method, device, equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150092251A1 (en) * 2011-09-27 2015-04-02 Samsung Electronics Co., Ltd. Image scanning apparatus and method
CN104992239A (en) * 2015-06-24 2015-10-21 国网山东省电力公司电力科学研究院 Correlation coefficient-based industry electricity consumption law forecasting method
CN105678046A (en) * 2014-11-18 2016-06-15 日本电气株式会社 Missing data repairing method and device in time-space sequence data
US20170300317A1 (en) * 2016-03-24 2017-10-19 Knight Point Systems, Inc. System and method for patching software in a target computer system device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150092251A1 (en) * 2011-09-27 2015-04-02 Samsung Electronics Co., Ltd. Image scanning apparatus and method
CN105678046A (en) * 2014-11-18 2016-06-15 日本电气株式会社 Missing data repairing method and device in time-space sequence data
CN104992239A (en) * 2015-06-24 2015-10-21 国网山东省电力公司电力科学研究院 Correlation coefficient-based industry electricity consumption law forecasting method
US20170300317A1 (en) * 2016-03-24 2017-10-19 Knight Point Systems, Inc. System and method for patching software in a target computer system device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111127247A (en) * 2019-11-21 2020-05-08 深圳供电局有限公司 Electric quantity data acquisition method and device, computer equipment and storage medium
CN111127247B (en) * 2019-11-21 2024-01-19 深圳供电局有限公司 Electric quantity data acquisition method, device, computer equipment and storage medium
CN117632927A (en) * 2023-11-24 2024-03-01 九科信息技术(深圳)有限公司 Data processing method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN108363789B (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN112001618B (en) Method for integrating and optimizing construction period assignment, order acceptance and production scheduling
CN109492774B (en) Deep learning-based cloud resource scheduling method
CN110059834A (en) Electric power O&M method, system and terminal device
CN110738413A (en) Multi-constraint scheduling calculation method and device for automatic aviation part machining production line
CN110781562A (en) Multi-objective optimization method and device for airplane pulsation final assembly operation process
CN103679388B (en) Production scheduling method and production scheduling system
CN108681815B (en) Power distribution system operation reliability evaluation method based on rapid sequencing and block matrix
CN109410054B (en) Block chain consensus method based on information sharing contribution value in autonomous domain mode
CN106502918B (en) A kind of scheduling memory method and device
CN108230147A (en) A kind of exchange settlement method, system and device for quantifying investment tactics
CN105388876B (en) Obtain the method and device of the batch-type chemical production technology degree of conformity based on teams and groups
CN110991901A (en) Task allocation method, computer storage medium and electronic device
CN108363789A (en) A kind of industry and commerce user power utilization table code data lack method for repairing and mending and device in short term
CN110928261A (en) Distributed estimation scheduling method and system for distributed heterogeneous flow shop
EP2608123B1 (en) System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system
CN107423914A (en) A kind of method for scheduling task and system based on cloud manufacture
CN105528521B (en) A kind of definite method on Reconfigurable Manufacturing System reconstruct opportunity
CN111798119A (en) Order accepting and scheduling integrated optimization method for prefabricated part flow shop
CN112332420B (en) Device and method for determining hierarchical load reduction in power system risk assessment
CN111724129A (en) Source network load storage multi-round discharge method, system, equipment and storage medium
CN110165657A (en) Consider substation's load characteristics clustering analysis method of user's industry attribute
CN109741047A (en) Charging system on a kind of line
CN113496322A (en) Inter-area power declaration matching method and system considering available transmission capacity
CN110765355A (en) Method and device for pushing financial market product transaction strategy courses
CN111047161A (en) Industrial park operation management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant