CN108362945A - A kind of bushing shell for transformer distal end power failure experimental rig and method - Google Patents

A kind of bushing shell for transformer distal end power failure experimental rig and method Download PDF

Info

Publication number
CN108362945A
CN108362945A CN201810350892.6A CN201810350892A CN108362945A CN 108362945 A CN108362945 A CN 108362945A CN 201810350892 A CN201810350892 A CN 201810350892A CN 108362945 A CN108362945 A CN 108362945A
Authority
CN
China
Prior art keywords
terminals
power failure
transformer
disconnecting link
bushing shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810350892.6A
Other languages
Chinese (zh)
Inventor
邓威
张宁
陈昱
熊力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201810350892.6A priority Critical patent/CN108362945A/en
Publication of CN108362945A publication Critical patent/CN108362945A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/16Measuring impedance of element or network through which a current is passing from another source, e.g. cable, power line
    • G01R27/18Measuring resistance to earth, i.e. line to ground
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/12Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
    • G01R31/14Circuits therefor, e.g. for generating test voltages, sensing circuits

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)

Abstract

The present invention relates to the technical fields of substation's test method, more specifically, it is related to a kind of bushing shell for transformer distal end power failure experimental rig and method, including end shield adapter, cable and in-site collecting device, the cable connection is between end shield adapter and in-site collecting device;The end shield adapter is equipped with terminals and ground terminal; the in-site collecting device includes the first terminals being connect respectively with terminals, ground terminal by cable, the second terminals; first terminals are connected with anti-open-circuit protector; first terminals can be connect with megameter, dielectric loss measuring instrument, and second terminals are connected with current transformer.The present invention can realize that not tearing end shield adapter open carries out power failure experiment, the experiment of a sleeve of main transformer can be completed in ground change wiring, realize esd ground operation, elimination is ascended a height operating risk, it saves operation of ascending a height, remove the time for restoring end shield adapter, working efficiency is improved, the person, equipment Risk are reduced.

Description

A kind of bushing shell for transformer distal end power failure experimental rig and method
Technical field
The present invention relates to the technical fields of substation's test method, stop more particularly, to a kind of bushing shell for transformer distal end Electric test device and method.
Background technology
Bushing shell for transformer, which installs on-line monitoring system additional, can effectively find casing insulation defect, be answered extensively in electric system With.Casing on-line monitoring system is usually made of end shield adapter, cable, in-site collecting device etc., is filled as bottom shielding of bushing is grounded It is built-in ground connection to set structure, then need to install end shield adapter additional at bottom shielding of bushing earthing or grounding means, then by cable by end shield Earth current signal is sent to in-site collecting device and is handled.And according to testing regulations, bushing shell for transformer need to periodically be stopped Electric test includes mainly major insulation and casing the dielectric dissipation factor tan δ of end shield and capacitance, end shield insulation against ground electricity over the ground Resistance experiment.
For having installed the bushing shell for transformer of on-line monitoring end shield adapter additional, to eliminate end shield adapter rear end to adopting on the spot The influence of long range common cable stray capacitance and external disturbance to power failure preventive trial data, traditional experiment between acquisition means Method need to remove end shield adapter and rear end cable, at end shield earthing or grounding means(Proximal end)It is directly tested, off-test is extensive After multiple end shield adapter, and at in-site collecting device(Distally)Check that end shield is grounded recovery situation.However, because of end shield adapter Installation, operating procedure are complicated, and 500kV bottom shielding of bushing imperfect earth, capacitor core caused by misoperation has occurred and has made moist Defect, to increase bottom shielding of bushing lost territory, the equipment Risk that makes moist.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of power failure experiments of installation bushing shell for transformer distal end Device and method carries out bushing shell for transformer insulation resistance, dielectric dissipation factor tan δ and capacitance examination at in-site collecting device It tests.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of bushing shell for transformer distal end power failure experimental rig, including end shield adapter, cable and in-site collecting device, institute are provided Cable connection is stated between end shield adapter and in-site collecting device;The end shield adapter is equipped with terminals and ground terminal, institute It includes the first terminals being connect respectively with terminals, ground terminal by cable, the second terminals to state in-site collecting device, described First terminals are connected with anti-open-circuit protector, and the first terminals can be connect with megameter, dielectric loss measuring instrument, and described second connects Line end is connected with current transformer.
The bushing shell for transformer distal end power failure experimental rig of the present invention disconnects the company of the first terminals and anti-open-circuit protector It connects, disconnects the connection of the second terminals and current transformer, test transformer casing is tested in the first terminals connection megameter Insulation against ground resistance and test transformer casing insulation resistance test test transformer in the first terminals connection dielectric loss measuring instrument Casing tan δ and capacitance experiment.The present invention can realize that not tearing end shield adapter open carries out power failure experiment, and wiring is changed on ground The experiment of a sleeve of main transformer can be completed, realizes esd ground operation, eliminates operating risk of ascending a height, operation of ascending a height is saved, removes Restore the time of end shield adapter, improve working efficiency, reduces the person, equipment Risk.
Further, the cable includes single-core cable and the power failure test wire with function of shielding, the power failure examination It tests line to be connected between terminals and the first terminals, the single-core cable is connected between ground terminal and the second terminals.Stop The setting of electric test line can eliminate the influence of electric jamming.
Further, the power failure test wire include the core-wire layer being sequentially arranged from inside to outside, equipotential layer, shielded layer with And restrictive coating, it is equipped with the first insulating layer between the core-wire layer and equipotential layer, is equipped between the equipotential layer and shielded layer Second insulating layer.
Further, one end of the power failure test wire is equipped with interface plug, and the interface plug includes connecting with terminals The first foot connect and the crus secunda in hanging masked state and third foot.First foot is adapted to by power failure test wire with end shield The terminals of device connect, and crus secunda, third foot are in hanging masked state.
Further, the first disconnecting link, the Current Mutual Inductance are connected between the anti-open-circuit protector and the first terminals The second disconnecting link is connected between device and the second terminals.First terminals connect realization by the first disconnecting link with anti-open-circuit protector The protection of circuit, the second terminals connect the acquisition for realizing current signal, the first disconnecting link with current transformer by the second disconnecting link Setting with the second disconnecting link is mutual convenient for controlling the connection between the first terminals and anti-open-circuit protector, the second terminals and electric current Connection between sensor.
Further, first disconnecting link is single-pole single-throw switch (SPST), and second disconnecting link is double-pole single throw.
Further, first terminals include the signal wire interface connected by conducting wire and high pressure line interface.The Two movable contacts of two disconnecting links are connect with the signal wire interface of the second terminals, the first terminals respectively, and the dynamic of the first disconnecting link touches Point is connect with the high pressure line interface of the first terminals.
Further, first terminals, the second terminals, the first disconnecting link, the second disconnecting link are set to secondary connection plate On.First terminals, the second terminals are set in secondary connection plate, the first disconnecting link, the second disconnecting link operating side be set to and secondary connect It is easy to operate outside line plate, and can guarantee the safety of operation.
The present invention also provides a kind of bushing shell for transformer distal end power failure test methods, which is characterized in that including:
The test method of bushing shell for transformer insulation against ground resistance:The first disconnecting link, the second disconnecting link are disconnected, by the first terminals to end Screen adapter applies voltage and is tested, in the access megameter test of the first terminals;
The test method of bushing shell for transformer insulation resistance:The first disconnecting link, the second disconnecting link are disconnected, megameter is accessed in the first terminals Test;
The test method of bushing shell for transformer dielectric dissipation factor tan δ and capacitance:The first disconnecting link, the second disconnecting link are disconnected, The signal wire interface access dielectric loss measuring instrument test of one terminals.
The bushing shell for transformer distal end power failure test method of the present invention, can realize that not tearing end shield adapter open carries out power failure examination It tests, can complete the experiment of a sleeve of main transformer in ground change wiring, realize esd ground operation, eliminate operating risk of ascending a height, It saves operation of ascending a height, remove the time for restoring end shield adapter, improve working efficiency, reduce the person, equipment Risk.
Preferably, test transformer casing dielectric dissipation factor tan δ and when capacitance, based on reversal connection collimation method first The high pressure line interface access dielectric loss measuring instrument test of terminals.The first terminals signal wire interface access dielectric loss measuring instrument into The positive connection experiment of row carries out reversal connection collimation method experiment, to obtain in the high pressure line interface access dielectric loss measuring instrument of the first terminals Accurate test transformer casing dielectric dissipation factor tan δ and capacitance.
Compared with prior art, the beneficial effects of the invention are as follows:
The bushing shell for transformer distal end power failure experimental rig and method of the present invention, can realize that not tearing end shield adapter open carries out power failure examination It tests, can complete the experiment of a sleeve of main transformer in ground change wiring, realize esd ground operation, eliminate operating risk of ascending a height, It saves operation of ascending a height, remove the time for restoring end shield adapter, improve working efficiency, reduce the person, equipment Risk.
Description of the drawings
Fig. 1 is the structural schematic diagram of the bushing shell for transformer distal end power failure experimental rig of the present invention.
Fig. 2 is the structural schematic diagram of the in-site collecting device of bushing shell for transformer distal end power failure experimental rig.
Fig. 3 is the structural schematic diagram of the power failure test wire of bushing shell for transformer distal end power failure experimental rig.
Specific implementation mode
The present invention is further illustrated With reference to embodiment.Wherein, attached drawing only for illustration, What is indicated is only schematic diagram rather than pictorial diagram, should not be understood as the limitation to this patent;Reality in order to better illustrate the present invention Example is applied, the certain components of attached drawing have omission, zoom in or out, and do not represent the size of actual product;To those skilled in the art For, the omitting of some known structures and their instructions in the attached drawings are understandable.
The same or similar label correspond to the same or similar components in the attached drawing of the embodiment of the present invention;In retouching for the present invention In stating, it is to be understood that if it is based on attached drawing to have the orientation or positional relationship of the instructions such as term "upper", "lower", "left", "right" Shown in orientation or positional relationship, be merely for convenience of description of the present invention and simplification of the description, do not indicate or imply the indicated Device or element must have a particular orientation, with specific azimuth configuration and operation, therefore position relationship described in attached drawing Term only for illustration, should not be understood as the limitation to this patent, for the ordinary skill in the art, can To understand the concrete meaning of above-mentioned term as the case may be.
Embodiment one
It is suitable for the first embodiment of the bushing shell for transformer distal end power failure experimental rig of the present invention, including end shield as shown in Figure 1 to Figure 3 Orchestration 1, cable and in-site collecting device 2, cable connection is between end shield adapter 1 and in-site collecting device 2;End shield is adapted to Device 1 is equipped with terminals 11 and ground terminal 12, and in-site collecting device 2 includes being connected respectively by cable and terminals 11, ground terminal 12 The first terminals 21, the second terminals 22 connect, the first terminals 21 are connected with anti-open-circuit protector 3,21 energy of the first terminals Enough to be connect with megameter, dielectric loss measuring instrument, the second terminals are connected with current transformer 4.
Specifically, as shown in Figure 1, cable includes single-core cable 5 and the power failure test wire 6 with function of shielding, have a power failure Test wire 6 is connected between terminals 11 and the first terminals 21, and single-core cable 5 is connected to ground terminal 12 and the second terminals 22 Between.Wherein, as shown in figure 3, power failure test wire 6 includes the core-wire layer 61 being sequentially arranged from inside to outside, equipotential layer 62, shielding Layer 63 and restrictive coating 64 are equipped with the first insulating layer 65, equipotential layer 62 and shielded layer between core-wire layer 61 and equipotential layer 62 Second insulating layer 66 is equipped between 63, the setting of shielded layer 63 can eliminate the influence of electric jamming.As shown in Fig. 2, the examination that has a power failure The one end for testing line 6 is equipped with interface plug 7, and interface plug 7 includes the first foot 71 being connect with terminals and shielded in hanging The crus secunda 72 and third foot 73 of state, the first foot 71 are connect by power failure test wire 6 with the terminals 11 of end shield adapter 1, Crus secunda 72, third foot 73 are in hanging masked state.
As shown in Figure 1 and Figure 2, the first disconnecting link 8, Current Mutual Inductance are connected between anti-open-circuit protector 3 and the first terminals 21 The second disconnecting link 9 is connected between device 4 and the second terminals 22, the first terminals 21 pass through the first disconnecting link 8 and anti-open-circuit protector 3 Connection realizes that the protection of circuit, the second terminals 22 are connect by the second disconnecting link 9 with current transformer 4 and realize adopting for current signal Collection, the setting of the first disconnecting link 8 and the second disconnecting link 9 convenient between the first terminals 21 of control and anti-open-circuit protector 3 connection, the Connection between two terminals 22 and current transformer 4.Wherein, the first disconnecting link 8 is single-pole single-throw switch (SPST), and the second disconnecting link 9 is double Monopole single throw switch, the first terminals 21 include the signal wire interface 23 connected by conducting wire and high pressure line interface 24.Second knife Two movable contacts of lock 9 are connect with the signal wire interface 23 of the second terminals 22, the first terminals 21 respectively, the first disconnecting link 8 Movable contact is connect with the high pressure line interface 24 of the first terminals 21.
In addition, the first terminals 21, the second terminals 22, the first disconnecting link 8, the second disconnecting link 9 are set to secondary connection plate 10 On, the first terminals 21, the second terminals 22 be set to secondary connection plate 10 in, the first disconnecting link 8, the second disconnecting link 9 operating side set It is easy to operate in outside secondary connection plate 10, and can guarantee the safety of operation.
Embodiment two
The present embodiment is the embodiment of bushing shell for transformer distal end power failure test method, including:
The test method of bushing shell for transformer insulation against ground resistance:The first disconnecting link 8, the second disconnecting link 9 are disconnected, the first terminals 21 are passed through Apply voltage to end shield adapter 1 to test, in the access megameter test of the first terminals 21;
The test method of bushing shell for transformer insulation resistance:The first disconnecting link 8, the second disconnecting link 9 are disconnected, million are accessed in the first terminals 21 Europe table test;
The test method of bushing shell for transformer dielectric dissipation factor tan δ and capacitance:The first disconnecting link 8, the second disconnecting link 9 are disconnected, The signal wire interface 23 of first terminals 21 accesses dielectric loss measuring instrument test.
Preferably, test transformer casing dielectric dissipation factor tan δ and when capacitance, based on reversal connection collimation method first The high pressure line interface 24 of terminals 21 accesses dielectric loss measuring instrument test.Dielectric loss is accessed in the signal wire interface 23 of the first terminals 21 Tester carries out positive connection experiment, and accessing dielectric loss measuring instrument in the high pressure line interface 24 of the first terminals 21 carries out reversal connection collimation method Experiment, to obtain accurate test transformer casing dielectric dissipation factor tan δ and capacitance.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention Protection domain within.

Claims (10)

1. a kind of bushing shell for transformer distal end power failure experimental rig, which is characterized in that including end shield adapter(1), cable and just Ground harvester(2), the cable connection is in end shield adapter(1)With in-site collecting device(2)Between;The end shield adapter (1)Equipped with terminals(11)And ground terminal(12), the in-site collecting device(2)Including respectively by cable and terminals, connect First terminals of ground terminal connection(21), the second terminals(22), first terminals(21)It is connected with anti-open-circuit protector (3), the first terminals(21)It can be connect with megameter, dielectric loss measuring instrument, second terminals(22)It is mutual to be connected with electric current Sensor(4).
2. power failure experimental rig in bushing shell for transformer distal end according to claim 1, which is characterized in that the cable includes single Core cable(5)And the power failure test wire with function of shielding(6), the power failure test wire(6)It is connected to terminals(11)With First terminals(21)Between, the single-core cable(5)It is connected to ground terminal(12)With the second terminals(22)Between.
3. power failure experimental rig in bushing shell for transformer distal end according to claim 2, which is characterized in that the power failure test wire (6)Including the core-wire layer being sequentially arranged from inside to outside(61), equipotential layer(62), shielded layer(63)And restrictive coating(64), institute State core-wire layer(61)And equipotential layer(62)Between be equipped with the first insulating layer(65), the equipotential layer(62)And shielded layer(63) Between be equipped with second insulating layer(66).
4. power failure experimental rig in bushing shell for transformer distal end according to claim 3, which is characterized in that the power failure test wire (6)One end be equipped with interface plug(7), the interface plug includes the first foot being connect with terminals(71)And in hanging The crus secunda of masked state(72)With third foot(73).
5. power failure experimental rig in bushing shell for transformer distal end according to any one of claims 1 to 4, which is characterized in that described Anti- open-circuit protector(3)With the first terminals(21)Between be connected with the first disconnecting link(8), the current transformer(4)With second Terminals(22)Between be connected with the second disconnecting link(9).
6. power failure experimental rig in bushing shell for transformer distal end according to claim 5, which is characterized in that first disconnecting link (8)For single-pole single-throw switch (SPST), second disconnecting link(9)For double-pole single throw.
7. power failure experimental rig in bushing shell for transformer distal end according to claim 6, which is characterized in that first terminals (21)It include the signal wire interface connected by conducting wire(23)And high pressure line interface(24).
8. power failure experimental rig in bushing shell for transformer distal end according to claim 5, which is characterized in that first terminals (21), the second terminals(22), the first disconnecting link(8), the second disconnecting link(9)It is set to secondary connection plate(10)On.
9. a kind of bushing shell for transformer distal end power failure test method, which is characterized in that including:
The test method of bushing shell for transformer insulation against ground resistance:Disconnect the first disconnecting link(8), the second disconnecting link(9), pass through the first wiring End is to end shield adapter(1)Apply voltage to be tested, in the first terminals(21)Access megameter test;
The test method of bushing shell for transformer insulation resistance:Disconnect the first disconnecting link(8), the second disconnecting link(9), in the first terminals(21) Access megameter test;
The test method of bushing shell for transformer dielectric dissipation factor tan δ and capacitance:Disconnect the first disconnecting link(8), the second disconnecting link (9), in the first terminals(21)Signal wire interface(23)Access dielectric loss measuring instrument test.
10. power failure test method in bushing shell for transformer distal end according to claim 9, which is characterized in that test transformer set Pipe dielectric dissipation factor tan δ and when capacitance, based on reversal connection collimation method in the first terminals(21)High pressure line interface(24)It connects Enter dielectric loss measuring instrument test.
CN201810350892.6A 2018-04-18 2018-04-18 A kind of bushing shell for transformer distal end power failure experimental rig and method Pending CN108362945A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810350892.6A CN108362945A (en) 2018-04-18 2018-04-18 A kind of bushing shell for transformer distal end power failure experimental rig and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810350892.6A CN108362945A (en) 2018-04-18 2018-04-18 A kind of bushing shell for transformer distal end power failure experimental rig and method

Publications (1)

Publication Number Publication Date
CN108362945A true CN108362945A (en) 2018-08-03

Family

ID=63008648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810350892.6A Pending CN108362945A (en) 2018-04-18 2018-04-18 A kind of bushing shell for transformer distal end power failure experimental rig and method

Country Status (1)

Country Link
CN (1) CN108362945A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101354418A (en) * 2008-09-22 2009-01-28 河南省电力公司商丘供电公司 Power transformer test method without disconnecting wire
CN201945639U (en) * 2010-12-23 2011-08-24 保定供电公司 Power uninterrupted test box for capacitive equipment
CN203216999U (en) * 2013-04-19 2013-09-25 保定市力兴电子设备有限公司 Capacitive equipment dielectric loss live line measurement sampling device
CN103336186A (en) * 2012-12-18 2013-10-02 辽宁省电力有限公司检修分公司 Method for testing transformer equipment without disassembling lead
CN105510645A (en) * 2015-11-30 2016-04-20 杭州西湖电子研究所 Wiring method for automatic detection of three-phase integrated-type power transformer
CN205941610U (en) * 2016-07-26 2017-02-08 广东电网有限责任公司佛山供电局 Main transformer bushing tap adapter
CN208140801U (en) * 2018-04-18 2018-11-23 广东电网有限责任公司 A kind of bushing shell for transformer distal end power failure experimental rig

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101354418A (en) * 2008-09-22 2009-01-28 河南省电力公司商丘供电公司 Power transformer test method without disconnecting wire
CN201945639U (en) * 2010-12-23 2011-08-24 保定供电公司 Power uninterrupted test box for capacitive equipment
CN103336186A (en) * 2012-12-18 2013-10-02 辽宁省电力有限公司检修分公司 Method for testing transformer equipment without disassembling lead
CN203216999U (en) * 2013-04-19 2013-09-25 保定市力兴电子设备有限公司 Capacitive equipment dielectric loss live line measurement sampling device
CN105510645A (en) * 2015-11-30 2016-04-20 杭州西湖电子研究所 Wiring method for automatic detection of three-phase integrated-type power transformer
CN205941610U (en) * 2016-07-26 2017-02-08 广东电网有限责任公司佛山供电局 Main transformer bushing tap adapter
CN208140801U (en) * 2018-04-18 2018-11-23 广东电网有限责任公司 A kind of bushing shell for transformer distal end power failure experimental rig

Similar Documents

Publication Publication Date Title
CN204044296U (en) A kind of partial discharge detecting system
CN106443144A (en) Distributed transient overvoltage monitoring system for EHV (extra-high voltage) GIS
CN106526288A (en) Transmission line voltage and current monitoring system and method
CN203658430U (en) Capacitive equipment insulation online monitoring and electrification test integrated sampling protection device
CN106249054B (en) Capacitance type voltage transformer and integrated detection sensor thereof
CN103713244B (en) A kind of live detection method for distribution cable shelf depreciation
CN208140801U (en) A kind of bushing shell for transformer distal end power failure experimental rig
CN103823103A (en) Overvoltage on-line monitoring device and method
CN110501619A (en) A kind of high frequency response partial pressure measuring apparatus
CN105372457B (en) A kind of capacitance type equipment live detection end shield sampler
CN203561722U (en) Two-frequency signal detection position indicator for electricity overhead line
CN206379635U (en) A kind of 10kV overhead transmission lines short circuit and earth fault experiment high-tension switch cabinet
CN202720281U (en) On-line monitoring device for capacitive equipment of transformer substation
CN108362945A (en) A kind of bushing shell for transformer distal end power failure experimental rig and method
CN110426616A (en) A kind of GIS partial discharge detection device and method based on flange plate bolt
CN206040566U (en) Auxiliary ground device
RU2640315C1 (en) Adjustable capacitive sensor of high voltage
CN216082927U (en) Resistance measuring device suitable for circuit breaker or isolating switch under high electric field intensity
JP3349275B2 (en) Elephant for cable head
CN113433435A (en) Steep wave measurement trigger device based on electric signal
CN108548982A (en) A kind of test method of capacitance current, apparatus and system
CN209513975U (en) A kind of authentic partial discharge monitoring device of switchgear
US4591941A (en) Double insulated protected system providing electrical safety and instrumentation quality power grounding
CN207832951U (en) A kind of capacitance type potential transformer insulation line monitoring device
CN201945639U (en) Power uninterrupted test box for capacitive equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180803