Prior art keywords
earth
cutterhead
motor
face
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810197394.2A
Other languages
Chinese (zh)
Other versions
CN108361042B (en
Inventor
宋伟涛
李鹏飞
陈柯屹
杜修力
龚秋明
路德春
林庆涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201810197394.2A priority Critical patent/CN108361042B/en
Publication of CN108361042A publication Critical patent/CN108361042A/en
Application granted granted Critical
Publication of CN108361042B publication Critical patent/CN108361042B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Abstract

The invention discloses a kind of test methods of simulation shallow embedding Shield Tunneling face passive failure, after the completion of banketing in model casing, the initial reading of the displacement meter in front of Miniature water Monitoring on Earth Pressure element and the excavation face on the cutterhead of model shielding machine in the soil body, the displacement meter monitoring element in earth's surface is recorded.By hole of the model shielding machine on model casing, prepare to excavate.When model shielding machine is excavated to precalculated position, jacking motor, cutter motor and soil output motor are simultaneously closed off.Start excavation face passive failure experiment.Start cutter motor, open simultaneously jacking motor, do not open soil output motor, records the value of each monitoring element, including the Water And Earth Pressures value on cutterhead, the shift value in the soil body of excavation face front, the displacement of the earth's surface soil body in real time.It is then shut off cutter motor and jacking motor, surveys the numerical value of each monitoring element.With the process of true shield machine excavation face passive failure more closely, making model test result more science, accurate.

Description

A kind of test method of simulation shallow embedding Shield Tunneling face passive failure
Technical field
The present invention relates to Tunnel Engineering model test fields, and in particular to a kind of simulation shallow embedding Shield Tunneling face is passive The test method of destruction.
Background technology
In recent years, with the quickening of China's urban construction process, ground space has tended to be saturated, and traffic jam issue is serious Constrain expanding economy.To alleviate traffic above-ground pressure, metro construction is come into being.With the other methods pair such as drilling and blasting method Than shield method is smaller with upper traffic impact over the ground;Mechanization degree is high, speed of application is fast;Bad climate is to shield construction The advantages that small is influenced, is widely used in the construction of urban subway tunnel.
Due to the limitation of surface structures and ambient enviroment, the technology of shield is required higher and higher, wherein excavation face supporting The reasonable selection of power is a key technology in shield-tunneling construction.Balancing earth-pressure shielding machine is to utilize the knife cutting soil body, the soil body It flows into the subsequent soil pressure cabin of cutterhead, and makes in soil pressure cabin there is appropriate pressure to be balanced with excavation face Water And Earth Pressures, to reduce shield Structure promotes the disturbance of layer soil body over the ground, when being unearthed by the outside casting of soil output of soil pressure cabin lower part.Soil output is leaned on Rotating speed control is unearthed amount, to keep in soil pressure cabin being full of soil always and will not be excessively full.Shallow embedding shield tunnel is applied In working hour, if fltting speed is too fast, the Water And Earth Pressures in soil pressure cabin gradually increase, on more than excavation face when Water And Earth Pressures, Phenomena such as just will appear surface uplift.Therefore, research shallow embedding Shield Tunneling face passive failure relevant issues have reality Meaning.
Currently, the research method about the face passive failure of shallow embedding Shield Tunneling mainly has:Theory analysis, model test And numerical simulation.Compared to other two methods, model test can it is more true, comprehensively reflect Soil mass state, more Intuitive observation earth's surface deformation.The country has the experiment that many simulation tunnel excavation faces are actively destroyed, but about shallow embedding shield The model test of tunnel passive failure is fewer and fewer.Therefore, it is passive to be badly in need of a kind of simulation shallow embedding Shield Tunneling of offer face The test method of destruction.
Invention content
It is an object of the invention to the deficiencies of above-mentioned technology, it is proposed that passively break in a kind of simulation shallow embedding Shield Tunneling face Bad test method realizes the research to the face passive failure of shallow embedding Shield Tunneling.By rotary head, open jacking electricity Machine, the mode for closing soil output simulate the overall process of shallow embedding Shield Tunneling face passive failure, simultaneously, it is contemplated that shield Influence of the structure digging process to excavation face stability.It can be used for simulating the shallow embedding shield in the stratum such as sand, clay, sandy gravel soils The process of tunnel excavation face passive failure.
The technical solution adopted by the present invention to solve the technical problems is:A kind of simulation shallow embedding Shield Tunneling face is passive The test method of destruction realizes that the pilot system of the test method includes Miniature water Monitoring on Earth Pressure element (3), excavation face front The displacement meter (5) on displacement meter (4) and earth's surface in the soil body;Miniature water Monitoring on Earth Pressure element (3) is arranged in model shielding machine (1) on cutterhead (2).
Each Miniature water Monitoring on Earth Pressure element (3) is embedding by way of being punched on the cutterhead of model shielding machine (1) (2) Enter the inside of the panel (6) on cutterhead (2), surface and cutterhead (2) panel (6) of each Miniature water Monitoring on Earth Pressure element (3) It flushes.Miniature water Monitoring on Earth Pressure element (3) is mounted on the center of cutterhead (2) and the face apart from cutterhead (2) center of circle distant places 0.85R On plate (6), R is to excavate radius.
Displacement meter (4) in front of excavation face in the soil body is used for monitoring displacement in the ground of inside soil body in front of excavation face.It excavates The embedded lateral section of the displacement meter (4) in necromancer body is model shielding machine (1) excavation face front ± 0.25D, ± 0.75D in front On the face of the positions 1.25D, longitudinal section is on model shielding machine (1) center line and two positions lateral extent 0.5D, 1D and 1.5D Face on, height section be model shielding machine (1) shield shell on and the face of the top positions distance 0.5D and 1D on.
Displacement meter (5) in earth's surface, is laid in the surface on stratum.The position of displacement meter (5) in earth's surface is:Cross section is The section of model shielding machine excavation face front ± 0.25D, 0.5D and 0.75D;Vertical section be model shielding machine central axes on and in The section of axis both sides 0.5R and 1R.The purpose for laying the displacement meter (5) in earth's surface is to monitor the displacement of earth's surface.In order to more preferable Earth's surface deformation is observed on ground, with smalt in earth's surface grid division.
This method includes the following steps:
After the completion of banketing in S1 model casings (7), a period of time is stood, is recorded on the cutterhead (2) of model shielding machine (1) Displacement meter (4) in front of Miniature water Monitoring on Earth Pressure element (3) and excavation face in the soil body, the monitoring member of the displacement meter (5) in earth's surface The initial reading of part.
Holes (8) of the S2 by model shielding machine (1) on model casing (7) prepares to excavate.The top of shield machine is opened simultaneously Stepper motor (9), cutter motor (10) and soil output motor (11), model shielding machine (1) start to tunnel.
When S3 model shielding machines (1) are excavated to precalculated position, jacking motor (9), cutter motor (10) and spiral shell are simultaneously closed off Screw out earthenware motor (11).It stands, when the reading of all monitoring elements is stable in allowable range within half an hour, at this time Read the displacement of Water And Earth Pressures size on cutterhead, excavation face front land movement value, earth's surface.
S4 starts excavation face passive failure experiment.Start cutter motor (10), opens simultaneously jacking motor (9), do not open spiral shell Earthenware motor (11) is screwed out, records the Water And Earth Pressures value in the value of each monitoring element, including cutterhead (2) in real time, before excavation face Shift value in necromancer body, the displacement of the earth's surface soil body.
S5 after the test, closes cutter motor (10) and jacking motor (9), and each monitoring element is surveyed after standing a period of time Numerical value.
Model shielding machine (1) can complete the driving and cutterhead (2) rotation, the unearthed basic training of soil output (13) of shield Energy.The rotation of the rotation and soil output (13) of the driving, cutterhead (2) of model shielding machine (1), passes through jacking motor (9), knife Coil motor (10) and soil output motor (11) control respectively, and being capable of independent operating.
Beneficial effects of the present invention are shown:
(1) present invention the rotation of the cutterhead of model shielding machine, tunnel forward, do not allow soil output to be unearthed by way of mould The process of the passive failure in quasi- shallow embedding Shield Tunneling face, more connects with the process of true shield machine excavation face passive failure Closely, make model test result more science, accurate.
(2) it nuzzles in advance in the soil body compared to the simple retaining-plate of traditional experiment, then pushes soil body excavation simulation face forward The mode of passive failure, the present invention consider the digging process of model shielding machine early period, with true shallow embedding Shield Tunneling face Passive failure is influenced to be consistent by tunneling process early period.
Description of the drawings
The artwork of sensor on Fig. 1 cutterheads.
Displacement meter artwork in the soil body in front of Fig. 2 excavation faces.(a) plan view, (b) I-I cross-section diagrams, (c) II-II sections Figure.
Fig. 3 surface displacement meter artworks.
Model shielding machine in Fig. 4 examples and model casing schematic diagram.
The flow chart of Fig. 5 shallow embedding Shield Tunneling face passive failure test procedures.
In figure:1, model shielding machine;2, cutterhead;3, Miniature water Monitoring on Earth Pressure element;4, in front of excavation face in the soil body Displacement meter;5, the displacement meter in earth's surface;6, panel;7, model casing;8, hole;9, jacking motor;10, cutter motor;11, spiral Go out earthenware motor.
Specific implementation mode
In order to which the present invention is well understood, the present invention is further retouched below with reference to the accompanying drawings and specific embodiments It states, but should not be limited the scope of the invention with this.
As shown in figure 4, the model shielding machine (1) in example, with the element that true shield machine has, cutterhead (2), soil pressure cabin (12) and soil output (13).The length of a diameter of 280mm of cutter head of shield machine, shield machine are 2120mm.
Model shielding machine (1) can complete the driving of shield and the true shields such as cutterhead (2) rotates, soil output (13) is unearthed The basic function that structure machine has.The rotation of the rotation and soil output (13) of the driving, cutterhead (2) of model shielding machine (1) is led to It crosses jacking motor (9), cutter motor (10) and soil output motor (11) to control respectively, and can be with independent operating.
Model casing (7) as shown in Figure 4, size are:Excavate the wide 1m in direction, long 2m, high 1.05m.Front and back babinet has a diameter For the circular hole of 30cm, as the entrance of model shielding machine (1) driving, babinet is welded by the steel plate of 10mm thickness, can meet mould The rigidity requirement of type experiment.
A kind of test method of simulation shallow embedding Shield Tunneling face passive failure, composition include:Monitoring scheme and examination Test step.
Monitoring scheme includes:Miniature water Monitoring on Earth Pressure element on the cutterhead (2) of model shielding machine (1), before excavation face Grating scale displacement meter (4) in necromancer body, the displacement meter (5) in earth's surface are LVDT high precision displacement meters.
As shown in Figure 1, Miniature water Monitoring on Earth Pressure element (3) size is smaller, respectively diameter 10mm and 8mm.Cutterhead A diameter of 280mm, Miniature water Monitoring on Earth Pressure element (3) are mounted on cutterhead (2) center of circle and the cutterhead (2) apart from center of circle 238mm On panel (6).Miniature water Monitoring on Earth Pressure element (3) on the cutterhead (2) of model shielding machine (1) is by model shielding machine (1) mode punched on cutterhead (2) is embedded in the inside of the panel (6) on cutterhead (2), the face on their surface and cutterhead (2) Plate (6) flushes, and Miniature water Monitoring on Earth Pressure element (3) is put into hole, will not be dropped out.
As shown in Fig. 2, plan view, I-I sectional view and II-II of the grating scale displacement meter of inside soil body cut open in front of excavation face Face figure.The embedded lateral section of inside soil body grating scale displacement meter (4) is in front of model shielding machine (1) excavation face in front of excavation face ± 70mm, the positions ± 210mm and 350mm face on, longitudinal section be model shielding machine (1) center line on and two lateral extents On the face of the position 140mm, 280mm and 420mm, height section be model shielding machine (1) shield shell on and top distance 140mm and On the face of the positions 280mm.The purpose for laying grating scale displacement meter (4) is the excavation face front soil body during monitoring passive failure Vertical displacement.
As shown in figure 3, the installation position figure of the LVDT displacement meters of earth's surface.The LVDT displacement meters position of earth's surface is:Cross section For the section of model shielding machine excavation face front ± 70mm, 140mm and 210mm;Vertical section be model shielding machine central axes on and The section of central axes both sides 140mm and 280mm.The purpose for laying LVDT high precision displacement meters is to monitor the displacement of earth's surface.For Preferably observation earth's surface deformation can use smalt in earth's surface grid division.
As shown in figure 5, a kind of experiment process figure of simulation shallow embedding Shield Tunneling face passive failure, in conjunction with specific reality Example, test procedure are as follows:
1. after the completion of banketing in model casing (7), standing for 24 hours, recording miniature on the cutterhead (2) of model shielding machine (1) Water And Earth Pressures monitoring element (3), the grating scale displacement meter (4) in front of excavation face in the soil body, the LVDT high precision displacements in earth's surface The initial reading of the sensors such as meter.
2. model shielding machine (1) is abutted model casing (7) hole (8), prepare to excavate.The cutterhead electricity of shield machine is opened simultaneously Machine (10), soil output motor (11) and jacking motor (9), model shielding machine (1) start digging excavation.Cutter motor (10) Rotating speed be 4r/min, the rotating speed of soil output motor (11) is 6r/min, and the forward speed of jacking motor (9) is 10mm/ min。
3. when after model shielding machine (1) excavation 1h to 30cm, jacking motor (9), cutter motor (10) and spiral shell are simultaneously closed off Screw out earthenware motor (11).2 hours are stood, when the reading of each monitoring element is stable in allowable range within half an hour, The monitoring data such as the Water And Earth Pressures value on cutterhead (2), the shift value in front of excavation face, surface displacement amount are read at this time.
4. starting excavation face passive failure experiment.Start cutter motor (10) to dally with the speed of 3r/min, open simultaneously Jacking motor (9) is tunneled with the speed of 1mm/min, does not open soil output motor (11);Each monitoring element is recorded in real time Value, including the Water And Earth Pressures value on cutterhead (2), the displacement of the shift value and the earth's surface soil body of the excavation face front soil body.
5. after the test, closing cutter motor (10) and jacking motor (9), the numerical value that 1h surveys each monitoring element is stood.
The example of the present invention is illustrated above, but the present invention is not limited thereto, it can also be without departing from this hair It is suitably changed in the range of bright main points.
Embodiment and effect:
Examples detailed above of the present invention, by installing miniature earth pressure gauge and miniature osmometer, excavation on model shielding machine cutterhead The method that the pre-buried grating scale displacement meter in side, earth's surface bury LVDT displacement meters in front completes a kind of simulation shallow embedding shield tunnel and opens The monitoring scheme of the test method of digging face passive failure;By the rotation of model shielding machine cutterhead, model shielding machine driving, do not allow spiral shell The unearthed test method of earthenware is screwed out, the process of true shield tunneling face passive failure is simulated.It is hereby achieved that model shield Damage of soil body region and surface uplift range in front of limit support power, excavation face in machine excavation face.The present invention can be used for simulating Have under water and anhydrous condition, the process of shallow embedding Shield Tunneling face passive failure in the stratum such as sand, clay, sand pebble soil.

Claims (3)

1. a kind of test method of simulation shallow embedding Shield Tunneling face passive failure, realizes the pilot system packet of the test method Miniature water Monitoring on Earth Pressure element (3) is included, the displacement meter (5) on displacement meter (4) and earth's surface in the soil body of excavation face front;It is miniature Water And Earth Pressures monitoring element (3) is arranged on the cutterhead (2) of model shielding machine (1);
Each Miniature water Monitoring on Earth Pressure element (3) is embedded in knife by way of being punched on the cutterhead of model shielding machine (1) (2) The surface of the inside of panel (6) on disk (2), each Miniature water Monitoring on Earth Pressure element (3) is flushed with cutterhead (2) panel (6); Miniature water Monitoring on Earth Pressure element (3) is mounted on the center of cutterhead (2) and the panel (6) apart from cutterhead (2) center of circle distant places 0.85R On, R is to excavate radius;
Displacement meter (4) in front of excavation face in the soil body is used for monitoring displacement in the ground of inside soil body in front of excavation face;Before excavation face The embedded lateral section of displacement meter (4) in necromancer body be model shielding machine (1) excavation face front ± 0.25D, ± 0.75D with On the face of the positions 1.25D, longitudinal section is on model shielding machine (1) center line and two positions lateral extent 0.5D, 1D and 1.5D On face, height section is on model shielding machine (1) shield shell and on the face of the top positions distance 0.5D and 1D, and D is digging diameter;
Displacement meter (5) in earth's surface, is laid in the surface on stratum;The position of displacement meter (5) in earth's surface is:Cross section is model The section of shield machine excavation face front ± 0.25D, 0.5D and 0.75D;Vertical section is on model shielding machine central axes and central axes The section of both sides 0.5R and 1R;The purpose for laying the displacement meter (5) in earth's surface is to monitor the displacement of earth's surface;In order to preferably see Earth's surface deformation is examined, with smalt in earth's surface grid division;
It is characterized in that:This method includes the following steps:
After the completion of banketing in S1 model casings (7), a period of time is stood, is recorded miniature on the cutterhead (2) of model shielding machine (1) Displacement meter (4) in front of Water And Earth Pressures monitoring element (3) and excavation face in the soil body, displacement meter (5) monitoring element in earth's surface Initial reading;
Holes (8) of the S2 by model shielding machine (1) on model casing (7) prepares to excavate;The jacking electricity of shield machine is opened simultaneously Machine (9), cutter motor (10) and soil output motor (11), model shielding machine (1) start to tunnel;
When S3 model shielding machines (1) are excavated to precalculated position, simultaneously closes off jacking motor (9), cutter motor (10) and spiral and go out Earthenware motor (11);It stands, when the reading of all monitoring elements is stable in allowable range within half an hour, reads at this time The displacement of Water And Earth Pressures size, excavation face front land movement value, earth's surface on cutterhead;
S4 starts excavation face passive failure experiment;Start cutter motor (10), opens simultaneously jacking motor (9), do not open spiral and go out Earthenware motor (11) records the Water And Earth Pressures value in the value of each monitoring element, including cutterhead (2), excavation face front soil in real time Shift value in body, the displacement of the earth's surface soil body;
S5 after the test, closes cutter motor (10) and jacking motor (9), and the number of each monitoring element is surveyed after standing a period of time Value.
2. a kind of test method of simulation shallow embedding Shield Tunneling face passive failure according to claim 1, feature It is:Model shielding machine (1) can complete the driving and cutterhead (2) rotation, the unearthed basic function of soil output (13) of shield;Mould The rotation of the rotation and soil output (13) of the driving, cutterhead (2) of type shield machine (1) passes through jacking motor (9), cutterhead electricity Machine (10) and soil output motor (11) control respectively, and being capable of independent operating.
3. a kind of test method of simulation shallow embedding Shield Tunneling face passive failure according to claim 1, feature It is:Pass through the rotation of model shielding machine cutterhead, model shielding machine driving, the test method for not allowing soil output to be unearthed, simulation The process of true shield tunneling face passive failure;It can obtain limit support power in model shielding machine excavation face, before excavation face Necromancer body destroyed area and surface uplift range;Can be used for simulating has under water and anhydrous condition, sand, clay, sandy gravel soil The process of shallow embedding Shield Tunneling face passive failure in layer.
CN201810197394.2A 2018-03-11 2018-03-11 A kind of test method for simulating the face passive failure of shallow embedding Shield Tunneling Expired - Fee Related CN108361042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810197394.2A CN108361042B (en) 2018-03-11 2018-03-11 A kind of test method for simulating the face passive failure of shallow embedding Shield Tunneling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810197394.2A CN108361042B (en) 2018-03-11 2018-03-11 A kind of test method for simulating the face passive failure of shallow embedding Shield Tunneling

Publications (2)

Publication Number Publication Date
CN108361042A true CN108361042A (en) 2018-08-03
CN108361042B CN108361042B (en) 2019-10-29

Family

ID=63003874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810197394.2A Expired - Fee Related CN108361042B (en) 2018-03-11 2018-03-11 A kind of test method for simulating the face passive failure of shallow embedding Shield Tunneling

Country Status (1)

Country Link
CN (1) CN108361042B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109141949A (en) * 2018-08-08 2019-01-04 西南交通大学 A kind of experimental rig of simulation shield machine driving
CN113188995A (en) * 2021-04-27 2021-07-30 同济大学 Shield cutter head rotation and earth surface vibration effect excavation surface stability model test device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0688479A (en) * 1992-09-09 1994-03-29 Fujita Corp Automatic control device for drilling speed of shield machine
CN1619280A (en) * 2004-12-09 2005-05-25 上海隧道工程股份有限公司 Large shield tunnelling analogue test platform
CN101775989A (en) * 2010-02-05 2010-07-14 上海盾构设计试验研究中心有限公司 Comprehensive simulation test platform of large sunk shield entry-driving machine
DE202012104780U1 (en) * 2012-12-07 2013-02-27 Geodata Messtechnik Gmbh Tubing distance sensor for tunnel boring machine
CN103364218A (en) * 2013-08-05 2013-10-23 中国科学院武汉岩土力学研究所 Miniature TBM (Tunnel Boring Machine) excavation system for tunnel excavation in physical simulation test
CN106096162A (en) * 2016-06-21 2016-11-09 西南交通大学 A kind of method determining shield support pressure and mathematical model thereof and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0688479A (en) * 1992-09-09 1994-03-29 Fujita Corp Automatic control device for drilling speed of shield machine
CN1619280A (en) * 2004-12-09 2005-05-25 上海隧道工程股份有限公司 Large shield tunnelling analogue test platform
CN101775989A (en) * 2010-02-05 2010-07-14 上海盾构设计试验研究中心有限公司 Comprehensive simulation test platform of large sunk shield entry-driving machine
DE202012104780U1 (en) * 2012-12-07 2013-02-27 Geodata Messtechnik Gmbh Tubing distance sensor for tunnel boring machine
CN103364218A (en) * 2013-08-05 2013-10-23 中国科学院武汉岩土力学研究所 Miniature TBM (Tunnel Boring Machine) excavation system for tunnel excavation in physical simulation test
CN106096162A (en) * 2016-06-21 2016-11-09 西南交通大学 A kind of method determining shield support pressure and mathematical model thereof and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109141949A (en) * 2018-08-08 2019-01-04 西南交通大学 A kind of experimental rig of simulation shield machine driving
CN113188995A (en) * 2021-04-27 2021-07-30 同济大学 Shield cutter head rotation and earth surface vibration effect excavation surface stability model test device

Also Published As

Publication number Publication date
CN108361042B (en) 2019-10-29

Similar Documents

Publication Publication Date Title
CN108457657B (en) A kind of test method that simulation Shield Tunneling face is actively destroyed
CN105021418B (en) Suitable for the shield tunneling surface model and analogy method of geotechnical centrifugal model test
CN104965994A (en) Determining and estimating method for surface subsidence characteristic parameters caused by subway tunnel construction
CN107119731A (en) Foundation ditch group excavates the model test apparatus to close to buildings deformation effect
CN110284530B (en) Multifunctional combined assembled model test box device combining foundation pit and tunnel and application
CN108361042B (en) A kind of test method for simulating the face passive failure of shallow embedding Shield Tunneling
CN107130592A (en) A kind of long screw auger and impact drill two-shipper is combined pore-creating filling pile construction
CN205317774U (en) Testing system of stratum loss extension in simulation shield tunnel vertical section
CN108709977A (en) A kind of ground preloading influences the indoor model test device and test method of existing subway tunnel
CN103061774A (en) Shield tunnel construction environment simulation unit
CN105527404A (en) Test system and method for simulating ground loss extension in shield tunnel vertical section
CN111139837A (en) Method for simultaneously excavating multiple base pits at crossed subway in soft soil area
CN108362856B (en) Model experiment device for simulating long-term ground settlement of urban high-density area
Mao et al. Water leakage susceptible areas in loess multi-arch tunnel operation under the lateral recharge conditions
CN114386290A (en) Method for testing five-dimensional space effect caused by surface subsidence based on dual-mode shield construction
CN108506004B (en) Soil pressure transfer law device and method inside model shielding machine in active destructive process
CN208902713U (en) Ground preloading influences the indoor model test device of existing subway tunnel
CN105257318B (en) A kind of lining cutting localized seepage causes the method for security protection that tunnel structure is deformed
CN109826633A (en) Existing shield tunnel simulator and analogy method are worn under a kind of shield machine
CN108198505A (en) A kind of shield formula TBM tunnels beans gravel construction simulation device
CN112195927A (en) Deep foundation pit pile anchor support construction method adopting foundation pit deformation monitoring
CN108489746A (en) The device and method that earth pressure gauge monitoring model shield machine is laid in soil output
CN112112168A (en) Deep foundation pit pile anchor supporting system and construction method thereof
Viggiani et al. Geotechnical aspects of underground railway construction in the urban environment: the examples of Rome and Naples
CN207989032U (en) A kind of experimental rig for the simulation of earth pressure balanced shield, EPBS cutterhead mud lining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029

CF01 Termination of patent right due to non-payment of annual fee