CN108360857A - A kind of movable type molding assembly workshop construction method - Google Patents
A kind of movable type molding assembly workshop construction method Download PDFInfo
- Publication number
- CN108360857A CN108360857A CN201810226916.7A CN201810226916A CN108360857A CN 108360857 A CN108360857 A CN 108360857A CN 201810226916 A CN201810226916 A CN 201810226916A CN 108360857 A CN108360857 A CN 108360857A
- Authority
- CN
- China
- Prior art keywords
- workshop
- frame
- unit
- built
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides a kind of mobile molding assembly workshop construction method, belong to workshop construction field, this movable type molding assembly workshop construction method, including:A. built-in groove is dug, it will be in built-in base setting to built-in groove;The fixed mounting on built-in base;B. delivery includes the workshop unit of four rigid-frame columns to precalculated position;C. make liftoff 30 40cm of workshop unit using jack, movable accessory is installed in the bottom of unit in workshop;D. jack is taken out, workshop unit is moved to the position of corresponding mounting base using movable accessory;E. movable accessory is removed, the rigid-frame column of workshop unit is fixed with mounting base by bolt and anchor pole;H. step b steps e is repeated several times, tie-rod is set between two neighboring workshop unit, multiple workshop units combine the skeleton structure to form mobile assembly shop;I. it is laid with plate body structure outside skeleton structure and forms mobile assembly shop.Modular mounting means is easy to disassemble and re-assemble.
Description
Technical field
The present invention relates to workshop construction fields, in particular to a kind of mobile molding assembly workshop construction method.
Background technology
Currently, workshop assembly realize the predetermined area, after assembling workshop in the predetermined area, just secure shop locations it
No longer change afterwards, therefore disposable assembly is so that entire sorting and fixation procedure all without the concern for subsequent upgrading or are torn open
Unload problem.
With greatly developing for capital construction facility, disposable assembly shop cost increases, and passes through the recycling energy in workshop
Enough effectively save costs, also comply with the requirement of sustainable development.
Current workshop assembly is mainly proof strength, in order to reach preset intensity, while installation process for simplicity,
Most of coupling part, which is all made of, to be welded to connect, and is welded to connect and is caused dismounting difficulty, even if dismounting is also expendable strong
Row dismounting so that the part after dismounting can not utilize again.
Invention content
The present invention provides a kind of mobile molding assembly workshop construction methods, it is intended to solve mobile dress in the prior art
With the above problem existing for the construction method of assembly room.
The invention is realized in this way:
A kind of movable type molding assembly workshop construction method, including:
A. built-in groove is dug, it will be in built-in base setting to the built-in groove;The fixed mounting on the built-in base;
B. delivery includes the workshop unit of four rigid-frame columns to precalculated position;
C. make the liftoff 30-40cm of workshop unit using jack, movable accessory is installed in the bottom of the workshop unit;
D. the jack is taken out, the workshop unit is moved to the corresponding mounting base using the movable accessory
Position;
E. the movable accessory is removed, the rigid-frame column and the mounting base of the workshop unit pass through bolt and anchor pole
It is fixed;
H. the step b- steps e is repeated several times, tie-rod, multiple workshops are set between the two neighboring workshop unit
Unit combines the skeleton structure to form mobile assembly shop;
I. it is laid with plate body structure outside the skeleton structure and forms the mobile assembly shop.
In an embodiment of the present invention, there are workshop unit assembling steps before the step a:
Roof truss, two rigid-frame columns and one are arranged on the top of two rigid-frame columns in upright two rigid-frame columns
A roof truss forms frame unit, separately sets a frame unit, two frame units are set up in parallel, in two frame lists
The tie-rod is set between member, and two frame units constitute the workshop unit.
In an embodiment of the present invention, there is the step of setting purlin before the step i:
The purlin of the installation for being laid with the plate body structure on the roof truss of the skeleton structure.
In an embodiment of the present invention, there is the step of setting wind-resistant column before the step i:
Two symmetrical wind-resistant columns are set between two rigid-frame columns of the end of the movable type assembly shop.
In an embodiment of the present invention, further include in the step i:
The door and window gap for installing door and window is additionally provided between the plate body structure.
In an embodiment of the present invention, further include erection of doors and windows step after the step i:
Detachable door and window structure is assembled by combined door and window unit, is installed in the door and window gap described detachable
Door and window structure.
In an embodiment of the present invention, after the step h further include the steps that installation crane girder:
Bracket is provided on the rigid-frame column of the skeleton structure, the crane beam frame is located on the bracket, described
Crane girder is fixed by fixed frame and the bracket.
In an embodiment of the present invention, the step a further includes:
The moving track coordinated for the movable accessory is additionally provided in the built-in groove position.
In an embodiment of the present invention, further include between the step a and the step b:
Element soil is tamped into the built-in groove.
In an embodiment of the present invention, further include in the step h:
Column braces are set between two adjacent workshop units.
The beneficial effects of the invention are as follows:The mobile molding assembly workshop construction method provided through the invention, Ke Yishi
The modularization assembling of existing movable type assembly shop, the workshop unit first pieced together out one by one are assembled again.This is in preamble
Architecture basics on be just achieved, main purpose is to facilitate subsequent dismounting, and assembling flow path next time.It is tearing open
When unloading, a workshop unit can be dismantled as a whole, workshop unit whole Transporting to next position carries out another
Secondary assembling.
Description of the drawings
It, below will be to required use in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention
Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as
It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with root
Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is the structural schematic diagram of mobile assembly shop provided in an embodiment of the present invention;
Fig. 2 is the vertical view of skeleton structure provided in an embodiment of the present invention;
Fig. 3 is right view when wind-resistant column is not arranged for skeleton structure provided in an embodiment of the present invention;
Fig. 4 is the partial enlarged view of a-quadrant in Fig. 3;
Fig. 5 is the front view of skeleton structure provided in an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of column braces provided in an embodiment of the present invention;
Fig. 7 is the structural schematic diagram of first axle support provided in an embodiment of the present invention;
Fig. 8 is the structural schematic diagram of plate body structure provided in an embodiment of the present invention;
Fig. 9 is the partial enlarged view of B area in Fig. 8;
Figure 10 is the partial enlarged view in the regions C in Fig. 8;
Figure 11 is the structural schematic diagram of foundation structure provided in an embodiment of the present invention;
Figure 12 is the structural schematic diagram at the first visual angle of built-in base in Figure 11;
Figure 13 is the structural schematic diagram at the second visual angle of built-in base in Figure 11;
Figure 14 is the structural schematic diagram of anchor bolt under built-in base provided in an embodiment of the present invention;
Figure 15 is the structural schematic diagram of built-in groove provided in an embodiment of the present invention;
Figure 16 is the overall plan view of the foundation structure of mobile assembly shop provided in an embodiment of the present invention;
Figure 17 is the partial enlarged view in the regions D in Figure 16;
Figure 18 is the partial enlarged view in the regions E in Fig. 3;
Figure 19 is the structural schematic diagram at the first visual angle of movable accessory provided in an embodiment of the present invention;
Figure 20 is the structural schematic diagram at the second visual angle of movable accessory provided in an embodiment of the present invention;
Figure 21 is the structural schematic diagram provided in an embodiment of the present invention expanded and pull bar.
Icon:001- movable types assembly shop;010- plate body structures;030- skeleton structures;031- first sides;033-
Two side faces;100- rigid-frame columns;110- brackets;130- crane girders;150- wind-resistant columns;210- column braces;2101- first is tiltedly propped up
Support;The second bearing diagonals of 2103-;The first column braces of 211-;The second column braces of 213-;230- first axles support;231- first
Supporting rod;233- second support bars;235- fixed plates;The second axis of 250- supports;300- tie-rods;301- first axles;303- second
Axis;305- third axis;The 4th axis of 307-;The 310- bodies of rod;330- connectors;400- roof trusses;The first frame bodies of 410-;411- first connects
Fishplate bar;The second frame bodies of 430-;The second connecting plates of 431-;510- flower basket bolts;The first connecting pins 011-;013- second connection ends;
The first extension boards of 600-;The second extension boards of 700-;601- first is buckled to;701- second is buckled to;The first bearing surfaces of 7011-;7011-
Second bearing surface;800- plate ontologies;050- foundation structures;910- built-in bases;930- mounting bases;051- built-in grooves;The bottoms 0511-
Face;0513- sand dirt bands;911- anchor bolts;913- reinforcing bars;915- stirrups;The first switching doors of 071-;The 073- first via is along slope;
090- windows;The first positioning protrusion of 917-;101- locating slots;020- movable accessories;021- mounting plates;023- idler wheels;025-
Two positioning protrusion;027- expands plate;0271- expands hole;040-, which is expanded, pulls bar;The first inserted links of 041-;The second inserted links of 043-;
045- bearings.
Specific implementation mode
To keep the purpose, technical scheme and advantage of embodiment of the present invention clearer, implement below in conjunction with the present invention
The technical solution in embodiment of the present invention is clearly and completely described in attached drawing in mode, it is clear that described reality
The mode of applying is some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability
The every other embodiment that domain those of ordinary skill is obtained without creative efforts, belongs to the present invention
The range of protection.Therefore, the detailed description of the embodiments of the present invention to providing in the accompanying drawings is not intended to limit and wants below
The scope of the present invention of protection is sought, but is merely representative of the selected embodiment of the present invention.Based on the embodiment in the present invention,
The every other embodiment that those of ordinary skill in the art are obtained without creative efforts belongs to this
Invent the range of protection.
In the description of the present invention, it is to be understood that, the term of indicating position or position relationship is based on shown in attached drawing
Orientation or positional relationship, be merely for convenience of description of the present invention and simplification of the description, do not indicate or imply the indicated equipment
Or element must have a particular orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc.
Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;Can be that machinery connects
It connects, can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary in two elements
The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings
Condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature can be on or below second feature
Be in direct contact including the first and second features, can also include the first and second features not be in direct contact but by them it
Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above include fisrt feature second spy
Right over sign and oblique upper, or be merely representative of fisrt feature level height and be higher than second feature.Fisrt feature second feature it
Under, lower section and fisrt feature included below are immediately below second feature and obliquely downward, or be merely representative of fisrt feature level height
Less than second feature.
In order to explain mobile molding assembly workshop construction method, first mobile assembly shop 001 is described.
Mobile assembly shop 001 includes skeleton structure 030, plate body structure 010 and foundation structure 050.
It please refers to Fig.1, Fig. 2 and Fig. 3, skeleton structure 030 include rigid-frame column 100, support and tie-rod 300;Skeleton structure 030
With opposite first side 031 and second side 033;First side 031 is arranged at intervals with multiple rigid-frame columns 100, the second side
Face 033 is correspondingly arranged at intervals with multiple rigid-frame columns 100;The rigid frame of the rigid-frame column 100 and second side 033 of first side 031
Roof truss 400 is provided between column 100;
The side of roof truss 400 forms first axle 301 by the connection of tie-rod 300, and the other side forms the second axis by the connection of tie-rod 300
303, also have between first axle 301 and the second axis 303 and the third axis 305 and the 4th axis that are formed are connected by tie-rod 300
307, third axis 305 is close to first axle 301, and the 4th axis 307 is close to the second axis 303;
The rigid-frame column 100 of skeleton structure 030 is additionally provided with bracket 110 close to one end of roof truss 400, is arranged on bracket 110
There is crane girder 130;Support includes column braces 210, first axle support 230 and the second axis support 250;Column braces 210 are arranged
Between two adjacent rigid-frame columns 100, column braces 210 include the first bearing diagonal 2101 and the second bearing diagonal intersected
2103;
First axle support 230 is arranged between first axle 301 and third axis 305;Second axis support 250 is arranged in the second axis
303 and the 4th between axis 307;
Fig. 8, Fig. 9 and Figure 10 are please referred to, plate body structure 010 includes plate ontology 800, and plate ontology 800 has for close to bone
The mounting surface of frame structure 030, mounting surface have the first connecting pin 011 and second connection end 013, and the first connecting pin 011 is provided with
First extension board 600, second connection end 013 be provided with the second extension board 700, the first extension board 600 and the second extension board 700 to
Extend perpendicular to the direction of plate ontology 800;
First extension board 600 is provided with the first fitting part on one side far from the second extension board 700, and the second extension board 700 is remote
It is provided with the second fitting part on one side from the first extension board 600;
First fitting part is the first back-off 601, and the first back-off 601 has the first bearing surface towards 800 direction of plate ontology
7011;Second fitting part is the second back-off 701, and the second back-off 701 has the second bearing surface away from 800 direction of plate ontology
7011;
7011 energy of the second bearing surface of first bearing surface 7011 and another plate body structure 010 of one plate body structure 010
Enough contact;
6 and Figure 17 are please referred to Fig.1, foundation structure 050 includes built-in base 910 and mounting base 930, and built-in base 910 is embedded in
In soil layer, the lower section of built-in base 910 is provided with sand dirt band 0513;
1, Figure 12 and Figure 13 is please referred to Fig.1, mounting base 930 is fixed at built-in base 910 far from sand dirt band 0513
One end is provided with first positioning hole in mounting base 930, and the one end of rigid-frame column 100 far from roof truss 400 is provided with first positioning hole and matches
The second location hole of conjunction.
8 and Figure 12 are please referred to Fig.1, the intermediate position of mounting base 930 is provided with the first positioning protrusion 917, and rigid-frame column 100 is remote
One end from roof truss 400 is provided with the locating slot 101 that can coordinate with the first positioning protrusion 917;
First positioning protrusion 917 is set as the protrusion with curved surfaces, the inner wall of locating slot 101 and the first positioning protrusion
917 outer profile is suitable so that, can be with automatic adjusting position when mounting base 930 and rigid-frame column 100 align.
Mounting base 930 can fix shop locations after being fixed with rigid-frame column 100.
9 and Figure 20 are please referred to Fig.1, mobile assembly shop 001 further includes movable accessory 020, and movable accessory 020 includes peace
Loading board 021 and idler wheel 023, idler wheel 023 are mounted on the one side of mounting plate 021, one side setting of the mounting plate 021 far from idler wheel 023
There is the second positioning protrusion 025 that can coordinate with locating slot 101, being provided on mounting plate 021 can coordinate with second location hole
Third location hole;021 side of mounting plate, which is fixedly installed, expands plate 027, expands on plate 027 to be provided with and expands hole 0271.
After rigid-frame column 100 and mounting base 930 release cooperation, rigid-frame column 100 can be connect with movable accessory 020 so that
Workshop can pull movement.
Figure 21 is please referred to, mobile assembly shop 001 further includes expanding to pull bar 040, and the one end for expanding dragging bar 040 is set
Be equipped with can be provided with the first inserted link 041 of movable accessory 020 expanded hole 0271 and coordinated, the other end can with it is another
The second inserted link 043 of a movable accessory 020 expanded hole 0271 and coordinated, 041 outside of the first inserted link are provided with screw thread, the second inserted link
043 outside is provided with screw thread.
The centre for expanding dragging bar 040 is provided with for the fixed bearing 045 for pulling rope.
The setting that bar 040 is pulled by expansion makes multiple idler wheels 023 be directly linked, will not be because of applying during dragging
Power is uneven, and workshop direction is caused to deviate.The screw thread of first inserted link 041 and the second inserted link 043 makes the first inserted link 041 and second insert
Nut can be arranged in 043 end of bar, to fixed.
It ensure that the overall stability of mobile assembly shop 001, wherein sand dirt band by pre-buried foundation structure 050
0513 can with shock absorbing, while can ensure entire assembly shop gravity uniformly dispersing on foundation structure 050.Wherein
Basic connecting component of the mounting base 930 being arranged on foundation structure 050 as skeleton structure 030 so that mobile assembly shop
001 after the use of a cycle, can be coordinated by releasing skeleton structure 030 and the connection of mounting base 930 so that bone
Frame structure 030 can be dismantled without damagely, and preparation is installed next time, realizes the use of next cycle.
4 and Figure 15 are please referred to Fig.1, built-in base 910 is set in built-in groove 051, and built-in groove 051 is truncated rectangular pyramids shape slot, in advance
Burying slot 051 has bottom surface 0511, and sand dirt band 0513 is layed on bottom surface 0511, between 051 inner wall of built-in base 910 and built-in groove
Gap filling be always or usually as specified soil.
The setting of truncated rectangular pyramids shape slot makes the fixed performance that the surrounding in built-in groove 051 is arranged in built-in base 910 substantially suitable,
It avoids after there is either side loosening, fixing situation gradually deteriorates.Rammed earth can also improve the entirety of built-in base 910
Corrosion resistance improves service life.
Built-in base 910 is fixedly connected by anchor bolt 911 with sand dirt band 0513, and built-in base 910 has close to sand dirt band
0513 pedestal is provided with through-hole on pedestal, and anchor bolt 911 is fixed on across through-hole under sand dirt band 0513 and sand dirt band 0513
Soil layer in, the top of anchor bolt 911 is fixed by nut.Specifically manufacturing process should be:It realizes and presets anchor bolt 911, then
Banket, sand dirt band 0513 be perfused, reinforcing rib can also be arranged in part of the anchor bolt 911 in soil layer, to the position of anchor bolt 911 into
Row is fixed, and 911 change in location of anchor bolt when avoiding banketing and being perfused sand dirt band 0513 influences the contraposition of later stage and pedestal.
Built-in base 910 includes reinforcing bar 913 and stirrup 915, and more reinforcing bars 913 are vertically arranged, and stirrup 915 is coupled reinforcing bar 913.
Built-in base 910 is molded general frame by reinforcing bar 913 and stirrup 915, and steel frame construction ensure that the integral strength of built-in base 910,
Concrete can be paid close attention in the general frame of built-in base 910 realizes sizing.
Referring to Fig. 5, column braces 210 include the first column braces 211 and the second column braces 213, skeleton structure 030
With the bottom surface 0511 far from roofing, the first column braces 211 are arranged between bottom surface 0511 and crane girder 130, the second intercolumniation
Support 213 is arranged between crane girder 130 and roofing.
First column braces 211 and the second column braces 213 are separately positioned on close to one end of roof truss 400 and far from roof truss
400 one end makes skeleton structure 030 after installing crane girder 130, can share two-part load so that skeleton structure
030 load assignment is uniformly without concentrating on one point.
The position of bracket 110 is provided with tie-rod 300 between two neighboring rigid-frame column 100.Tie-rod 300 includes the body of rod 310
With connector 330, there is the body of rod 310 the first head and the second head being oppositely arranged, connector 330 to have tablet and riser,
Riser is fixed at the centre position of tablet one side, and tablet is vertically arranged with riser;First head is remote with a connector 330
From being fixedly connected on one side for riser;Second head being fixedly connected on one side far from riser with another connector 330.
Ensure the position of 100 end of two neighboring rigid-frame column by tie-rod 300, it can be easily by skeleton structure 030
General shape control in certain error, facilitate the installation of subsequent structural, while tie-rod 300 is used as a connector, together
Sample undertakes certain load, collapses after installing crane to avoid skeleton structure 030.
Referring to Fig. 7, the first bearing diagonal 2101 includes the first supporting section and the second supporting section, the first supporting section is located at second
The side of bearing diagonal 2103, the second supporting section are located at the other side of the second bearing diagonal 2103, the first supporting section and the second supporting section
Between connected by flower basket bolt 510.
First bearing diagonal 2101 and the second bearing diagonal 2103 can eliminate circumferential stress by the connection of flower basket bolt 510, protect
Demonstrate,prove the intensity of the first bearing diagonal 2101.The connection of first bearing diagonal 2101 and the second bearing diagonal 2103 and rigid-frame column 100 is all made of
Bolt is fixed, and has fixed plate 235, the end of the second bearing diagonal 2103 to be also equipped with admittedly in the end set of the first bearing diagonal 2101
Fixed board 235 is provided with the through-hole for installation bolt in fixed plate 235.
Fig. 3 and Fig. 4 are please referred to, roof truss 400 includes close to the first frame body 410 of first side 031 and close to second side
033 the second frame body 430, the first frame body 410 and the second frame body 430 are symmetrical arranged, and the first frame body 410 and the second frame body 430 can
Dismantling connection.
First frame body 410 and the second frame body 430 are detachably connected by bolt, in the first frame body 410 close to the second frame body
430 one side welding is provided with the first connecting plate 411, and the second frame body 430 is provided with the second company on one side close to the first frame body 410
It is both provided with through-hole on fishplate bar 431, the first connecting plate 411 and the second connecting plate 431, by making first across bolt in through-hole
Connecting plate 411 and the second connecting plate 431 are fixed, and to fix the first frame body 410 and the second frame body 430, spiral shell is removed in dismounting
Bolt.
Skeleton structure 030 has first end face and second end face, and two are provided between two rigid-frame columns 100 of first end face
Root wind-resistant column 150.
Wind-resistant column 150 improves face stability, while also providing matrix for the installation of the plate body structure of endface 010.
Referring to Fig. 6, first axle support 230 includes the first support bar 231 intersected and second support bar 233, first
Strut 231 includes the flower basket bolt 510 of two round bars of two coaxial round bars and connection, and second support bar 233 includes two same
The flower basket bolt 510 of two round bars of round bar and connection of axis.
The end of first support bar 231 and second support bar 233 passes through roof truss 400, and makes across the part of roof truss 400
It is fixed with nut, first axle support 230 is detachably connected with roof truss 400 by way of nut, to facilitate the dismounting in later stage.
Second axis support 250 includes the third supporting rod and the 4th supporting rod intersected, and third supporting rod includes two coaxial
Round bar and connection two round bars flower basket bolt 510, the 4th supporting rod include two coaxial round bars and connection two round bars
Flower basket bolt 510.
The end of third supporting rod and the 4th supporting rod passes through roof truss 400, and is using nut across the part of roof truss 400
Fixed, the second axis support 250 is detachably connected with roof truss 400 by way of nut, to facilitate the dismounting in later stage.
Specifically, being additionally provided with the support of third axis 305 between third axis 305 and the 4th axis 307, third axis 305 supports
The support 230 of structure and first axle and the support 250 of the second axis it is identical.
Skeleton structure 030 in this way ensure that the load-bearing property of entire mobile assembly shop 001, can realize steady
Fixed crane lost article found, movement.
Mobile assembly shop 001 is provided with the first switching door 071 at first end face, and the setting of the first switching door 071 exists
Between two wind-resistant columns 150;Mobile assembly shop 001 is provided with the second switching door at second end face, and the second switching door is set
It sets between two wind-resistant columns 150.
First switching door 071 and the second switching door are mainly used for the disengaging of transport vehicle, undertake raw material being transported into mobile dress
With workshop 001, and finished product is transported to the task of mobile assembly shop 001.
The bottom of first switching door 071 is extended to the outside of mobile assembly shop 001 has the first via along slope 073, the
The bottom of two switching doors is extended to 001 outside of mobile assembly shop the second curb slope.
Since mobile assembly shop 001 is in order to ensure internal volume drying, entirely movable type assembly shop 001 can be done
It is appropriate to raise.In order to facilitate the disengaging of transport vehicle, curb slope is set at the first switching door 071 and the second switching door.
First side 031 and second side 033 are provided with multiple windows 090, and plate body structure 010 covers first side 031
The position of window 090 is not set with second side 033.Window 090 ensure that the ventilation inside mobile assembly shop 001,
Window is set at window 090, the selectivity folding of window 090 may be implemented.
Embodiment
A kind of mobile molding assembly workshop construction method is present embodiments provided, this movable type molding assembly workshop is applied
Work method includes:
A. built-in groove 051 is dug, it will be in the setting to built-in groove 051 of built-in base 910;The fixed mounting on built-in base 910
930;
B. delivery includes the workshop unit of four rigid-frame columns 100 to precalculated position;
C. make the liftoff 30-40cm of workshop unit using jack, movable accessory 020 is installed in the bottom of unit in workshop;
D. jack is taken out, the institute that workshop unit is moved to corresponding mounting base 930 using movable accessory 020 is in place
It sets;
E. movable accessory 020 is removed, rigid-frame column 100 and the mounting base 930 of workshop unit are fixed by bolt and anchor pole;
H. step b- steps e is repeated several times, tie-rod 300, multiple workshop unit combinations are set between two neighboring workshop unit
Form the skeleton structure 030 of mobile assembly shop 001;
I. it is laid with plate body structure 010 outside skeleton structure 030 and forms mobile assembly shop 001.
The modularization assembling that mobile assembly shop 001 may be implemented by the operation of step a to step i, is first pieced together out
Workshop unit one by one is assembled again.This is just achieved on the architecture basics of preamble, and main purpose is
Facilitate subsequent dismounting, and assembling flow path next time.
In dismounting, a workshop unit can be dismantled as a whole, workshop unit whole Transporting is to next
Position carries out assembling again.
In the present embodiment, there are workshop unit assembling steps before step a:
Roof truss 400, two rigid-frame columns 100 and one are arranged on the top of two rigid-frame columns 100 in upright two rigid-frame columns 100
A roof truss 400 formed frame unit, separately set a frame unit, two frame units are set up in parallel, two frame units it
Between tie-rod 300 is set, two frame units constitute workshop units.
The aforementioned mobile molding assembly workshop construction method for not including this step, for dismounting movable type assembly shop 001
The mobile molding assembly workshop construction method assembled again afterwards.This step is first time assembling mobile assembly shop 001
Steps necessary, to form the workshop unit as built-up foundation.
In the present embodiment, there is the step of setting purlin before step i:It installs and uses on the roof truss 400 of skeleton structure 030
In the purlin for being laid with plate body structure 010.
Purlin provides the installation foundation of the plate body structure 010 on roof.
There is the step of setting wind-resistant column 150 before step i:Two rigid-frame columns of the end of mobile assembly shop 001
Two symmetrical wind-resistant columns 150 are set between 100.
The wind-resistant column 150 that front structure is mentioned can shift to an earlier date in two workshop units installed therein, can also be such as this
Described in embodiment, the benefit dress wind-resistant column 150 behind the mobile assembly shop 001 of composition.
Further include in step i:The door and window gap for installing door and window is additionally provided between plate body structure 010.
By reserving door and window gap it can facilitate the installation of follow-up door and window, without vacateing the position of door and window again below.
Further include erection of doors and windows step after step i:Detachable door and window structure is assembled by combined door and window unit,
Detachable door and window structure is installed in door and window gap.
There is multiple combined door and window units, the setting of combined door and window unit inside removable door window construction provided in this embodiment
In a fixed framework, and the combined door and window unit in framework can carry out freely combine it is different to achieve the effect that.
It further include the steps that installation crane girder 130 after step h:It is provided with bracket on the rigid-frame column 100 of skeleton structure 030
110, crane girder 130 is erected on bracket 110, and crane girder 130 is fixed by fixed frame and bracket 110.
It is provided with bracket 110 on the rigid-frame column 100 of skeleton structure 030, there is mounting structure, fixed frame on bracket 110
It is fixed with mounting structure, crane girder 130 is engaged between mounting structure and bracket 110.
Step a further includes:The moving track coordinated for movable accessory 020 is additionally provided in 051 position of built-in groove.
Moving track is the sulculus dug on bottom surface 0511, and the idler wheel 023 for movable accessory 020 is in sulculus by pre-
If track roll.
Further include between step a and step b:Element soil is tamped into built-in groove 051.
The fixing intensity for ensureing built-in base 910 by way of tamping element soil ensures the entirety of mobile assembly shop 001
Stablize.
Further include in step h:Column braces 210 are set between two adjacent workshop units.
Column braces 210 are to improve the integral strength of the skeleton structure 030 of mobile assembly shop 001.
The mobile molding assembly workshop construction method provided through the invention, may be implemented mobile assembly shop 001
Modularization assembling, the workshop unit first pieced together out one by one assembled again.This is just obtained on the architecture basics of preamble
With realization, main purpose is to facilitate subsequent dismounting, and assembling flow path next time.It, can be by one in dismounting
Workshop unit is dismantled as a whole, and workshop unit whole Transporting to next position carries out assembling again.
The foregoing is merely the preferred embodiment of the present invention, are not intended to restrict the invention, for this field
For technical staff, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by
Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of movable type molding assembly workshop construction method, which is characterized in that including:
A. built-in groove is dug, it will be in built-in base setting to the built-in groove;The fixed mounting on the built-in base;
B. delivery includes the workshop unit of four rigid-frame columns to precalculated position;
C. make the liftoff 30-40cm of workshop unit using jack, movable accessory is installed in the bottom of the workshop unit;
D. the jack is taken out, the workshop unit is moved to the institute of the corresponding mounting base using the movable accessory
In position;
E. the movable accessory is removed, the rigid-frame column of the workshop unit and the mounting base are solid by bolt and anchor pole
It is fixed;
H. the step b- steps e is repeated several times, tie-rod, multiple workshop units are set between the two neighboring workshop unit
Combination forms the skeleton structure of mobile assembly shop;
I. it is laid with plate body structure outside the skeleton structure and forms the mobile assembly shop.
2. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that before the step a
Also workshop unit assembling steps:
Roof truss, two rigid-frame columns and a room is arranged on the top of two rigid-frame columns in upright two rigid-frame columns
Frame formed frame unit, separately set a frame unit, two frame units are set up in parallel, two frame units it
Between the tie-rod is set, two frame units constitute the workshop units.
3. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that before the step i also
There is the step of setting purlin:
The purlin of the installation for being laid with the plate body structure on the roof truss of the skeleton structure.
4. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that before the step i
The step of wind-resistant column is also set:
Two symmetrical wind-resistant columns are set between two rigid-frame columns of the end of the movable type assembly shop.
5. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that the step i also
Including:
The door and window gap for installing door and window is additionally provided between the plate body structure.
6. movable type molding assembly workshop according to claim 5 construction method, which is characterized in that the step i it
After further include erection of doors and windows step:
Detachable door and window structure is assembled by combined door and window unit, the detachable door and window is installed in the door and window gap
Structure.
7. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that after the step h
It further include the steps that installation crane girder:
Bracket is provided on the rigid-frame column of the skeleton structure, the crane beam frame is located on the bracket, the crane
Beam is fixed by fixed frame and the bracket.
8. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that the step a is also wrapped
It includes:
The moving track coordinated for the movable accessory is additionally provided in the built-in groove position.
9. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that in the step a and
Further include between the step b:
Element soil is tamped into the built-in groove.
10. movable type molding assembly workshop according to claim 1 construction method, which is characterized in that in the step h
Further include:
Column braces are set between two adjacent workshop units.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810226916.7A CN108360857A (en) | 2018-03-19 | 2018-03-19 | A kind of movable type molding assembly workshop construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810226916.7A CN108360857A (en) | 2018-03-19 | 2018-03-19 | A kind of movable type molding assembly workshop construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108360857A true CN108360857A (en) | 2018-08-03 |
Family
ID=63000979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810226916.7A Pending CN108360857A (en) | 2018-03-19 | 2018-03-19 | A kind of movable type molding assembly workshop construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360857A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057419A (en) * | 2018-08-17 | 2018-12-21 | 北京市市政四建设工程有限责任公司 | Standard member, standard member group and subway work awning device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010121284A (en) * | 2008-11-17 | 2010-06-03 | Tekken Constr Co Ltd | Construction method of steel structure |
CN205296869U (en) * | 2015-12-01 | 2016-06-08 | 中国建筑第八工程局有限公司 | Spatial grid structure thrustor that slides |
CN205476582U (en) * | 2016-02-02 | 2016-08-17 | 中铁十九局集团轨道交通工程有限公司 | Bus rapid transit station boron steel frame integral translation device |
CN107476423A (en) * | 2017-08-01 | 2017-12-15 | 深圳海龙建筑科技有限公司 | The assembling method of steel building |
-
2018
- 2018-03-19 CN CN201810226916.7A patent/CN108360857A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010121284A (en) * | 2008-11-17 | 2010-06-03 | Tekken Constr Co Ltd | Construction method of steel structure |
CN205296869U (en) * | 2015-12-01 | 2016-06-08 | 中国建筑第八工程局有限公司 | Spatial grid structure thrustor that slides |
CN205476582U (en) * | 2016-02-02 | 2016-08-17 | 中铁十九局集团轨道交通工程有限公司 | Bus rapid transit station boron steel frame integral translation device |
CN107476423A (en) * | 2017-08-01 | 2017-12-15 | 深圳海龙建筑科技有限公司 | The assembling method of steel building |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057419A (en) * | 2018-08-17 | 2018-12-21 | 北京市市政四建设工程有限责任公司 | Standard member, standard member group and subway work awning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8713892B2 (en) | Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower | |
KR101391637B1 (en) | Constrution methoed for Prestressed Composite Truss girder using steel truss member | |
US20110126488A1 (en) | Upgradable lattice tower and components thereof | |
WO2009011516A2 (en) | Form with reinforcing bars, non-support form system and non-support construction method using the same | |
JP5050228B2 (en) | Ramen bridge construction method with cane member | |
CN208009978U (en) | A kind of assembled workshop | |
CN108360857A (en) | A kind of movable type molding assembly workshop construction method | |
CN102431924A (en) | Movable and adjustable multi-functional hoisting frame | |
CN212582721U (en) | Bearing platform of tower crane for vertical tower of top plate of foundation garage | |
CN208294163U (en) | A kind of movable type assembly shop | |
CN209778099U (en) | Lifting and mounting integrated device for steel truss between sections of arc-shaped roof | |
CN208845309U (en) | The support platform and wind power generating set of tower | |
JP5701490B2 (en) | Roof repair method and structure | |
CN106504674A (en) | Billboard | |
CN216780768U (en) | Combined beam column joint construction structure | |
JP7058892B1 (en) | Steel structure constructed around the existing columnar body and its construction method | |
CN108222569A (en) | A kind of movable type assembly shop | |
CN211472190U (en) | Box girder outer formwork component supporting structure based on disc buckle type support | |
RU2325499C2 (en) | Pole support section | |
CN210002826U (en) | detachable welding platform for steel column construction | |
CN108222568A (en) | A kind of assembled workshop | |
JP5688827B2 (en) | Reconstruction method of existing steel tower | |
CN115162823B (en) | Assembling method of pinnacle steel member | |
CN115637870B (en) | Method for transforming original inclined outer frame column into new vertical outer frame column | |
CN212562410U (en) | Detachable portable high-altitude operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |