CN108360729B - Detachable and adjustable assembly type support and hanger and assembly process thereof - Google Patents

Detachable and adjustable assembly type support and hanger and assembly process thereof Download PDF

Info

Publication number
CN108360729B
CN108360729B CN201810100119.4A CN201810100119A CN108360729B CN 108360729 B CN108360729 B CN 108360729B CN 201810100119 A CN201810100119 A CN 201810100119A CN 108360729 B CN108360729 B CN 108360729B
Authority
CN
China
Prior art keywords
piece
horizontal
rod piece
vertical
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810100119.4A
Other languages
Chinese (zh)
Other versions
CN108360729A (en
Inventor
李兴友
周华美
邱金友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201810100119.4A priority Critical patent/CN108360729B/en
Publication of CN108360729A publication Critical patent/CN108360729A/en
Application granted granted Critical
Publication of CN108360729B publication Critical patent/CN108360729B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Vehicle Body Suspensions (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention provides a detachable adjustable assembled support hanger which comprises a vertical rod piece, a horizontal bar piece and a connecting piece, wherein the vertical rod piece is detachably and vertically connected to two ends of the horizontal bar piece through the connecting piece, the connecting piece comprises a vertical connecting sleeve and a horizontal connecting assembly, the horizontal connecting assembly comprises a horizontal connecting rod detachably connected with the horizontal bar piece and a shaft sleeve vertically connected with the horizontal connecting rod, and the shaft sleeve is sleeved outside the vertical connecting sleeve and is in clearance fit with the vertical connecting sleeve. The invention solves the problems of large pre-punching workload of components, blind hole pitch setting, heavy rod pieces and connecting pieces and inflexible rod piece pitch assembly in the conventional assembly type support and hanger assembly process. The assembled support and hanger can be assembled quickly by simply cutting a specific rod piece and matching with the connection of a fastener on the installation site, so that the open fire operation on the installation site is reduced, and the installation efficiency is improved.

Description

Detachable and adjustable assembly type support and hanger and assembly process thereof
Technical Field
The invention relates to an assembly type support and hanger frame, in particular to a detachable and adjustable assembly type support and hanger frame and an assembly process thereof.
Background
With the development of the assembly type building technology, the assembly type supporting and hanging frame is widely applied to the assembly type building market. The assembly type support and hanger generally comprises members such as rod pieces, connecting pieces, bolts, anchor bolts and the like, wherein the members are factory products, and the members can be combined into different support and hanger forms at will. The assembly process of the assembly type support and hanger on the existing market mainly adopts a bolt connection process, namely, a rod piece and a connecting piece are connected together by pre-punching holes on the rod piece and the connecting piece and matching bolts and nuts, and the support and hanger in different forms are assembled in a combined mode.
The existing assembly process of the assembly type support and hanger has the problems of large pre-punching workload of components, blindness in hole distance setting, heavy rod pieces and connecting pieces and inflexible rod piece distance assembly.
Disclosure of Invention
In order to solve the technical problem, the invention provides a detachable and adjustable assembly type support and hanger and an assembly process thereof.
The invention is realized by the following steps:
the utility model provides a can dismantle an adjustable assembled gallows, includes perpendicular member, horizontal bar spare and connecting piece, perpendicular member passes through connecting piece detachably connect perpendicularly in the both ends of horizontal bar spare, the connecting piece includes perpendicular connecting sleeve, horizontal coupling assembling include detachably connect in the horizontal connecting bar of horizontal bar spare tip, and with the perpendicular axle sleeve of connecting of horizontal connecting bar, the axle sleeve cover is established outside the perpendicular connecting sleeve to with clearance fit.
More specifically:
the vertical connecting sleeve is formed by combining two semicircular sleeves, and a raised positioning ring is arranged below each semicircular sleeve.
The connecting piece is connected with the vertical rod piece and the horizontal bar piece through threads.
The vertical rod piece is a round rod piece provided with external threads, and the inner wall of the vertical connecting sleeve is provided with internal threads matched with the external threads of the vertical rod piece.
Horizontal bar spare includes that rectangle holds carrier and cast support piece, rectangle hold carrier for the level set up and with cast support piece is the T type and connects.
The inner wall of the tubular support is provided with an internal thread, and the outer wall of the horizontal connecting lever is provided with an external thread matched with the internal thread of the tubular support.
The invention also provides an assembly process of the assembly type support and hanger, which comprises the following steps:
(1) firstly, fixing a vertical rod piece, and cutting and adjusting the length of the vertical rod piece as required;
(2) two ends of the horizontal rod piece are respectively connected with the horizontal connecting rod, and the length of the horizontal rod piece is cut and adjusted according to needs;
(3) and fixing a vertical connecting sleeve on the vertical rod piece, adjusting the fixed height as required, and then sleeving the shaft sleeve into the vertical connecting sleeve to connect the horizontal bar piece and the vertical rod piece through a connecting piece, so that the assembly of the support and hanger frame is completed.
The invention has the following advantages: need not to punch in advance during the assembly, member and connecting piece are light, the member interval sets up in a flexible way, can realize in the erection site, cuts through the simple of specific member, and the required assembled gallows of cooperation fastener is assembled out in quick combination to the connection, reduces the on-the-spot naked light operation of installation, provides the installation effectiveness. More specifically:
1) the designed connecting piece can quickly position the mounting height of the support and hanger;
2) the horizontal rod piece with the length capable of being simply cut according to the field requirement is designed, and the problems of inaccuracy of hole positions of pre-drilled holes or field drilling are solved.
Drawings
The invention will be further described with reference to the following examples with reference to the accompanying drawings.
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an exploded view of the present invention.
Fig. 3 is a schematic structural view of the connector.
Fig. 4 is a schematic structural view of the horizontal bar member.
Detailed Description
Referring to fig. 1 to 4, the assembly type support and hanger of the present embodiment includes a vertical rod 1, a connecting member 2 and a horizontal rod 3, wherein the connecting member 2 includes a vertical connecting sleeve 21 and a horizontal connecting member 22, the vertical connecting sleeve 21 is formed by combining two semicircular sleeves, and a protruding positioning ring 212 is disposed below the semicircular sleeves. Horizontal coupling assembling 22 includes horizontal connecting rod 221, and with horizontal connecting rod 221 is perpendicular the axle sleeve 222 of connecting, axle sleeve 222 cover is established outside perpendicular connecting sleeve 21 to with clearance fit.
The vertical rod piece 1 is a round rod piece provided with an external thread, and the inner wall of the vertical connecting sleeve 21 is provided with an internal thread matched with the external thread of the vertical rod piece.
The horizontal bar 3 comprises a rectangular bearing part 31 and a tubular support part 32, wherein the rectangular bearing part 31 is horizontally arranged and is connected with the tubular support part 32 in a T shape. The inner wall of the tubular support 32 is provided with an internal thread, and the outer wall of the horizontal connecting rod 221 is provided with an external thread matched with the internal thread of the tubular support.
In an assembly construction site, determining the lengths of the vertical rod piece 1 and the horizontal rod piece 3 according to the size of a support and hanger needed on site, and cutting the vertical rod piece 1 and the horizontal rod piece 3 according to the needed size; then, the vertical rod piece 1 is installed at the position where a support and hanger needs to be installed on site, then the horizontal rod piece 3 and the horizontal connecting rod 221 are connected in advance, and the positioning position where the horizontal rod piece 3 is connected is determined on the vertical rod piece 1; finally, the vertical connecting sleeve 21 is clamped at the designated position of the vertical rod member 1, the shaft sleeve 222 connected with the horizontal rod member 3 is sleeved on the vertical connecting sleeve 21, and the support and hanger assembly is completed.
More specifically, in the implementation field of the assembly process of the assembly type support and hanger, a vertical round rod piece 1 is fixed firstly, and the length of the vertical round rod piece 1 can be cut as required; secondly, two ends of the T-shaped horizontal rod 3 are respectively connected with the horizontal connecting rod 221, the length of the T-shaped horizontal rod 3 can be cut as required, and the shaft sleeve and the rectangular bearing piece 31 are finally in a vertical state; thirdly, clamping the vertical connecting sleeve 21 at a designated position of the vertical rod member 1, wherein the height of the designated position can be adjusted as required, then sheathing the shaft sleeve 222 into the vertical connecting sleeve 21, and realizing threaded connection and fixation by the clearance fit of the internal thread of the vertical connecting sleeve 21 and the external thread of the vertical round rod member 1. And finishing the assembly of the support and hanger.
After the invention is adopted, the required support and hanger can be assembled through simple three-step operation only by simply cutting according to the requirement on the implementation site.
Although specific embodiments of the invention have been described above, it will be understood by those skilled in the art that the specific embodiments described are illustrative only and are not limiting upon the scope of the invention, and that equivalent modifications and variations can be made by those skilled in the art without departing from the spirit of the invention, which is to be limited only by the appended claims.

Claims (5)

1. The utility model provides a can dismantle an adjustable assembled gallows which characterized in that: the connecting device comprises a vertical rod piece, a horizontal bar piece and a connecting piece, wherein the vertical rod piece is detachably and vertically connected to two ends of the horizontal bar piece through the connecting piece;
the vertical connecting sleeve is formed by combining two semicircular sleeves, and a raised positioning ring is arranged below each semicircular sleeve;
the vertical rod piece is a round rod piece provided with external threads, and the inner wall of the vertical connecting sleeve is provided with internal threads matched with the external threads of the vertical rod piece.
2. The removably adjustable mounting hanger of claim 1, wherein: the connecting piece with perpendicular member, horizontal bar spare is through threaded connection respectively.
3. The removably adjustable mounting hanger of claim 1, wherein: horizontal bar spare includes that rectangle holds carrier and cast support piece, rectangle hold carrier for the level set up and with cast support piece is the T type and connects.
4. The removably adjustable mounting hanger of claim 3, wherein: the inner wall of the tubular support is provided with an internal thread, and the outer wall of the horizontal connecting lever is provided with an external thread matched with the internal thread of the tubular support.
5. The assembling process of an assembled support and hanger as claimed in any one of claims 1 to 4, wherein: the method comprises the following steps:
(1) firstly, fixing a vertical rod piece, and cutting and adjusting the length of the vertical rod piece as required;
(2) connecting two ends of a horizontal rod piece with horizontal connecting rods respectively, so that the horizontal connecting components are fixed at two ends of the horizontal rod piece, and cutting and adjusting the length of the horizontal rod piece according to requirements;
(3) and fixing a vertical connecting sleeve on the vertical rod piece, adjusting the fixed height as required, and then sleeving the shaft sleeve into the vertical connecting sleeve to connect the horizontal bar piece and the vertical rod piece through a connecting piece, so that the assembly of the support and hanger frame is completed.
CN201810100119.4A 2018-02-01 2018-02-01 Detachable and adjustable assembly type support and hanger and assembly process thereof Expired - Fee Related CN108360729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810100119.4A CN108360729B (en) 2018-02-01 2018-02-01 Detachable and adjustable assembly type support and hanger and assembly process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810100119.4A CN108360729B (en) 2018-02-01 2018-02-01 Detachable and adjustable assembly type support and hanger and assembly process thereof

Publications (2)

Publication Number Publication Date
CN108360729A CN108360729A (en) 2018-08-03
CN108360729B true CN108360729B (en) 2020-05-05

Family

ID=63007775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810100119.4A Expired - Fee Related CN108360729B (en) 2018-02-01 2018-02-01 Detachable and adjustable assembly type support and hanger and assembly process thereof

Country Status (1)

Country Link
CN (1) CN108360729B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505244A (en) * 2018-11-27 2019-03-22 黄连芝 A kind of adjustable metal hanging brace

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9204047D0 (en) * 1992-02-26 1992-04-08 Bicc Plc Overhead optical transmission system
GB2378457A (en) * 2001-08-10 2003-02-12 J M T Man Services Ltd Support for a floor, ceiling or wall
CN203428849U (en) * 2013-08-05 2014-02-12 烟台中集来福士海洋工程有限公司 Detachable hoisting support
CN103742726B (en) * 2013-12-31 2015-12-16 成都市工业设备安装公司 A kind of mounting structure of gallus-type airduct and installation method thereof
CN205558247U (en) * 2016-01-31 2016-09-07 梁一星 Scaffold puts up connecting device for civil engineering
CN205592493U (en) * 2016-05-03 2016-09-21 昆明迈克西门科技有限公司 An assembled gallows
CN206001121U (en) * 2016-08-26 2017-03-08 广东腾龙建设有限公司 A kind of mounting structure of fire protection pipeline assembled suspension and support
CN206458899U (en) * 2017-01-06 2017-09-01 河南大森机电股份有限公司 A kind of subway combined type suspension and support
CN206667707U (en) * 2017-04-20 2017-11-24 李洪东 A kind of construction scaffold of installation easy to disassemble

Also Published As

Publication number Publication date
CN108360729A (en) 2018-08-03

Similar Documents

Publication Publication Date Title
US10054143B2 (en) Connector device for use in connecting elements of bracing systems and the like
CN210122814U (en) Laminated slab support frame
CN108360729B (en) Detachable and adjustable assembly type support and hanger and assembly process thereof
CN210374024U (en) Intelligent air conditioner easy to assemble
KR200445812Y1 (en) Improved supporting structure of pipe
CN211305066U (en) Pipe wall hole burring device
CN108443587B (en) Assembly type hanging bracket and assembly process thereof
CN111197369A (en) A connection structure and glass curtain wall that is used for inside and outside frame strip of centre gripping curtain wall glass
CN204059918U (en) scaffold and wall connecting piece
CN208604914U (en) A kind of novel light tubing overlap joint fixing component
CN210713428U (en) A connection structure and glass curtain wall that is used for inside and outside frame strip of centre gripping curtain wall glass
CN210713879U (en) Steel column verticality adjusting device
CN210827850U (en) Quick detachable temporary building fixed knot constructs
CN210106756U (en) Pipeline sleeve mounting and fixing device
CN108591787B (en) Assembled anti-shaking hanging bracket
CN206658039U (en) A kind of lighting proof strip device being easily installed
CN213626727U (en) Ceiling pull rod installation fixing device
CN219825670U (en) Detachable building external wall insulation board fastening member
CN210013910U (en) Component capable of stably mounting bracket on hollow wall or light wall
CN210289127U (en) Laminated plate support frame
CN221171716U (en) Holding pole and wall hanging installation device of 5G communication base station
CN219865763U (en) Staple bolt structure for quick installation and connection of intubation tube
CN220014131U (en) Large plate aluminum plate mounting member convenient to fix
CN217020031U (en) Cylindrical steel template convenient to produce
CN221143520U (en) Foot-operated net convenient to connect on scaffold steel pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200505

Termination date: 20210201

CF01 Termination of patent right due to non-payment of annual fee