CN108360473A - The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating - Google Patents
The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating Download PDFInfo
- Publication number
- CN108360473A CN108360473A CN201810131029.1A CN201810131029A CN108360473A CN 108360473 A CN108360473 A CN 108360473A CN 201810131029 A CN201810131029 A CN 201810131029A CN 108360473 A CN108360473 A CN 108360473A
- Authority
- CN
- China
- Prior art keywords
- bank
- choose
- chosen
- sides
- energy dissipating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The present invention is that bank construction method is chosen in a kind of three-dimensional scatter energy dissipating, can increase the aerial aeration effect of water body, increase the overboard region area of overflow, is reduced into water discharge per unit width, and effect of energy dissipation is improved, and decrease washes away riverbed.The technical solution adopted by the present invention is:Step 1:The conventional wide continuous outlet point midway for choosing bank is lifted certain altitude upwards, and it is connected with straight line with choosing bank initial position midpoint and choose bank outlet port both sides endpoint, makes to choose bank interior central area and forms a upward sphenoid structure;Step 2:Choose bank initial position midpoint in the plane with choose bank outlet both sides endpoint linearly connect, it is in triangular shape to make the structure in the plane, this at two straight line choose projection on bank in anti-arc and form an arc, choose bank initial position midpoint and be connected by the camber line with bank terminal position both sides endpoint is chosen;Step 3:Bank both sides abutment wall will be chosen simultaneously to cancel.
Description
One, technical field:
The present invention relates to belong to flood-discharge energy-dissipating field in hydraulic and hydroelectric engineering, and in particular to bank construction is chosen in a kind of three-dimensional scatter energy dissipating
Method.
Two, background technology:
In hydraulic and hydroelectric engineering, is limited sometimes by terrain or for from the aspect of to construction investment, there is one kind to let out
Water buildings jet bucket axis is in nearly orthogonal with river center line(The two angle is 70 ° ~ 110 °)The case where(Such as Fig. 1 institutes
Show), good dispersion energy dissipating should be realized in such cases, and is needed to limit and chosen the flip shot distance of bank overflow to ensure not wash away
River opposite bank bank slope.
It is followed from the perspective of energy dissipating, in engineering and is dispensed into water to increase effective upstream face product as much as possible to realize
The principle of energy dispersive, there are commonly inclined cutouts of the narrow slit type of longitudinal stretching overflow and overflow extending transversely etc. effectively to disappear
It can work.However, slit-type energy dissipation be mainly by the narrow effect of the beam to jet bucket use flowing water body in it is longitudinal with stand to drawing
It stretches, this will certainly increase sater professionals to be unfavorable for the erosion control of opposite bank bank slope;Although and chamferring bank has certain lateral expansion
Effect is dissipated, but it is more faint to the influence for reducing the farthest drop point of overflow.
Three, invention content
Bank construction method is chosen in a kind of three-dimensional scatter energy dissipating of present invention offer, to prevent water area from not washing away river opposite bank bank slope.
To achieve the above object, the technical solution adopted by the present invention is:
The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating, it is characterised in that:The construction procedure is:
Step 1:The conventional wide continuous outlet point midway for choosing bank is lifted certain altitude upwards, and it is originated with bank is chosen
Position midpoint and choose bank outlet port both sides endpoint and be connected with straight line, make to choose bank interior central area formed one it is prominent upwards
The sphenoid structure risen;
Step 2:Choose bank initial position midpoint in the plane with choose bank outlet both sides endpoint linearly connect, to make the structure
Be in triangular shape in the plane, this at two straight line choose projection on bank in anti-arc and form an arc, choose bank initial position midpoint and choose bank
Terminal position both sides endpoint is connected by the camber line;
Step 3:Bank both sides abutment wall will be chosen simultaneously to cancel.
Sphenoid end height h=(1.1~2.0)h0, h0To choose the depth of water in bank, when river is wider, center can be made to choose flowing water
Amount appropriateness increases, and h can use smaller value at this time;Conversely, when positioned at Narrow Valleys, h can be taken higher value, to reduce overflow most
It is remote choose away from.
When river relative narrower, make arctan(h/L)≥(π/180)θ, wherein θ are that can be protected with what angle indicated
Card choose bank have farthest choose away from choose angle, take 40 °, L is the floor projection length for choosing bank ogee section.
Compared with prior art, the invention has the advantages that and effect:
The present invention makes water body realize the dispersion of diversification after the flip shot of flood releasing structure end is gone out, and can shorten overflow of growing
It chooses away from the erosion damage to weaken water body for river opposite bank bank slope, and largely interior in a limited space can realize water
The high degree of dispersion of body increases the overboard region area of overflow, reduces into water discharge per unit width to increase the aerial aeration effect of water body,
Effect of energy dissipation is improved, decrease washes away riverbed.
Four, it illustrates
Fig. 1 discharge structures and river nearly orthogonal typical layout;
Fig. 2 is that the present invention chooses bank structural schematic diagram;
Fig. 3 is the structural model figure of the present invention;
Fig. 4 is the vertical view of Fig. 2;
Fig. 5 is the side view of Fig. 2;
Fig. 6, which is that routine is wide, continuously chooses bank vertical view;
Fig. 7, which is that routine is wide, continuously chooses bank side view;
Fig. 8 " three-dimensional scatter energy dissipating " structure typical flow pattern one;
Fig. 9 " three-dimensional scatter energy dissipating " structure typical flow pattern two;
Figure 10 chooses bank overflow drop point canonical schema;A routinely chooses bank;B three-dimensional scatters choose bank.
Five, specific implementation mode
It is limited with reference to specific embodiment technical scheme of the present invention is further:
The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating(Referring to Fig. 2 and Fig. 7), the construction procedure is:
Step 1:The conventional wide continuous outlet point midway for choosing bank is lifted certain altitude upwards, and it is originated with bank is chosen
Position midpoint and choose bank outlet port both sides endpoint and be connected with straight line, make to choose bank interior central area formed one it is prominent upwards
The sphenoid structure risen;
Step 2:Choose bank initial position midpoint in the plane with choose bank outlet both sides endpoint linearly connect, to make the structure
Be in triangular shape in the plane, this at two straight line choose projection on bank in anti-arc and form an arc, choose bank initial position midpoint and choose bank
Terminal position both sides endpoint is connected by the camber line;
Step 3:Simultaneously to increase the horizontal proliferation effect for choosing bank, bank both sides abutment wall will be chosen and cancelled.
The present invention chooses bank separation beam corporeity, the transversely acting that flow of growing is applied by wedge structure so that go out
The trend of oriented two side diffusion of tongue of carrying water, it is lateral by intermediate wedge structure further as the reason chosen bank side wall and be cancelled
Notch flip shot that the part water body of effect occurs from side due to the cancellation of abutment wall and go out, to substantially increase flow
Horizontal proliferation so that the water length that enters that flow enters downstream river course is significantly increased, and greatly reduces water and flows into water discharge per unit width;
Simultaneously because the presence of intermediate wedge structure so that flow has different flip shot angles upwards vertical, to make overflow in centre
Closely, the remote inner concavity in both sides enters water form, and by numerical computations, it is as shown in Figure 8 and Figure 9 to choose bank typical flow pattern for this.
Influence the major parameter that overflow enters water form(Referring to Fig. 2-Fig. 5)Be sphenoid end height h, h size it is direct
Be related to overflow of growing laterally and longitudinal assignment of traffic ratio, the h the big, choose bank midline position water flow it is smaller and two
Side water flow is bigger, and upstream area depression is deeper for overflow drop point center, and vice versa(It is typical that difference chooses bank overflow drop point
Schematic diagram is shown in Figure 10);It can make both sides water flow excessive if h is excessive and enter water discharge per unit width to increase both sides.In order to make
Flow disperse as far as possible and realize well shorten overflow longitudinally choose away from purpose, general h=(1.1~2.0)h0, h0To choose bank
The interior depth of water, but orographic condition can also have an impact h, when river is wider, center can be made to choose streamflow and moderately increased, h can at this time
Take smaller value;Conversely, when positioned at Narrow Valleys, h can be taken higher value, farthest be chosen to reduce overflow away from concrete numerical value needs
It just can determine that according to river width.
In addition, when river relative narrower, arctan can be made(h/L)≥(π/180)θ, wherein θ are to be indicated with angle
Can ensure choose bank have farthest choose away from choose angle, generally take 40 °, so as to effectively shorten overflow it is farthest choose away from.
Claims (3)
1. the construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating, it is characterised in that:The construction procedure is:
Step 1:The conventional wide continuous outlet point midway for choosing bank is lifted certain altitude upwards, and it is originated with bank is chosen
Position midpoint and choose bank outlet port both sides endpoint and be connected with straight line, make to choose bank interior central area formed one it is prominent upwards
The sphenoid structure risen;
Step 2:Choose bank initial position midpoint in the plane with choose bank outlet both sides endpoint linearly connect, to make the structure
Be in triangular shape in the plane, this at two straight line choose projection on bank in anti-arc and form an arc, choose bank initial position midpoint and choose bank
Terminal position both sides endpoint is connected by the camber line;
Step 3:Bank both sides abutment wall will be chosen simultaneously to cancel.
2. the construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating according to claim 1, it is characterised in that:Sphenoid end
Height h=(1.1~2.0)h0, h0To choose the depth of water in bank, when river is wider, make center choose streamflow moderately increase, at this time h take compared with
Small value;Conversely, when positioned at Narrow Valleys, h is taken into higher value, to reduce overflow farthest choose away from.
3. the construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating according to claim 1, it is characterised in that:When river is opposite
When relatively narrow, make arctan(h/L)≥(π/180)θ, wherein θ be with angle indicate can ensure to choose bank have it is farthest choose away from
Choose angle, take 40 °, L chooses the floor projection length of bank ogee section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810131029.1A CN108360473A (en) | 2018-02-09 | 2018-02-09 | The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810131029.1A CN108360473A (en) | 2018-02-09 | 2018-02-09 | The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108360473A true CN108360473A (en) | 2018-08-03 |
Family
ID=63005410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810131029.1A Pending CN108360473A (en) | 2018-02-09 | 2018-02-09 | The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360473A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110747830A (en) * | 2019-10-22 | 2020-02-04 | 四川大学 | Reverse tongue-shaped flip bucket |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08189024A (en) * | 1995-01-09 | 1996-07-23 | Nippon Concrete Ind Co Ltd | Method for constructing apron of dam |
CN202440803U (en) * | 2012-02-13 | 2012-09-19 | 中国水电顾问集团成都勘测设计研究院 | Air-entraining structure for flood releasing building |
CN103276703B (en) * | 2013-06-14 | 2015-03-11 | 西北农林科技大学 | Folded-line shape diversion pier of spillway |
CN205035778U (en) * | 2015-09-14 | 2016-02-17 | 珠江水利委员会珠江水利科学研究院 | Flip trajectory bucket worker |
CN205077460U (en) * | 2015-09-09 | 2016-03-09 | 珠江水利委员会珠江水利科学研究院 | A class bank is chosen to differential type |
CN106930249A (en) * | 2017-04-17 | 2017-07-07 | 四川大学 | A kind of taper volute chamber rotational flow silo flood discharging tunnel system |
-
2018
- 2018-02-09 CN CN201810131029.1A patent/CN108360473A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08189024A (en) * | 1995-01-09 | 1996-07-23 | Nippon Concrete Ind Co Ltd | Method for constructing apron of dam |
CN202440803U (en) * | 2012-02-13 | 2012-09-19 | 中国水电顾问集团成都勘测设计研究院 | Air-entraining structure for flood releasing building |
CN103276703B (en) * | 2013-06-14 | 2015-03-11 | 西北农林科技大学 | Folded-line shape diversion pier of spillway |
CN205077460U (en) * | 2015-09-09 | 2016-03-09 | 珠江水利委员会珠江水利科学研究院 | A class bank is chosen to differential type |
CN205035778U (en) * | 2015-09-14 | 2016-02-17 | 珠江水利委员会珠江水利科学研究院 | Flip trajectory bucket worker |
CN106930249A (en) * | 2017-04-17 | 2017-07-07 | 四川大学 | A kind of taper volute chamber rotational flow silo flood discharging tunnel system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110747830A (en) * | 2019-10-22 | 2020-02-04 | 四川大学 | Reverse tongue-shaped flip bucket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104775393A (en) | Deformed inverse step rectifying energy dissipation method and stilling basin | |
CN106436659A (en) | Special-shaped step energy dissipater | |
CN106498909B (en) | For spillway on bank or the defrlector bucket of flood discharge hole outlet | |
CN108360473A (en) | The construction method of bank is chosen in a kind of three-dimensional scatter energy dissipating | |
CN111501682A (en) | Flood discharge orifice multilayer asymmetric arrangement method suitable for high arch dam | |
CN114059501B (en) | Method for estimating flow distribution after water entering after surface deep hole water tongue air collision | |
CN101864754B (en) | Inclined flip bucket for spillway or flood discharge hole outlet | |
CN108005039A (en) | It is a kind of to be arranged at the energy dissipating construction for letting out groove | |
CN103669301A (en) | High-low ridge stilling pool achieving double-layer disperse energy dissipation | |
CN206971181U (en) | A kind of multichannel bank stiling basin of dispersible energy dissipating | |
CN106894399B (en) | Structure and method for adjusting flood discharge water flow distribution | |
CN104563067A (en) | Method for eliminating deviation of water jet of water tongue shock wave of slot sill and auto-correcting deviation slot sill | |
CN108517842A (en) | Asymmetric aeration method suitable for curving spillway | |
CN208009378U (en) | A kind of longitudinal direction formula High-low Bucket Energy Dissipation Building straggly | |
CN111979989B (en) | Tweezer-shaped water tongue transverse collision energy dissipater | |
CN205077460U (en) | A class bank is chosen to differential type | |
CN114718028A (en) | Double-layer dispersed energy dissipation device for water flow energy dissipation | |
CN213389967U (en) | Energy dissipation dam for river and lake water body | |
CN209412796U (en) | A kind of energy dissipation by hydraulic jump structure extending to stilling pond suitable for flaring gate pier | |
CN210597232U (en) | Flip bucket based auxiliary energy dissipation building block | |
CN112796284A (en) | Choose face mixed flow energy dissipation type | |
CN206408597U (en) | The tail pier and gate pier component of spillway | |
CN110747830A (en) | Reverse tongue-shaped flip bucket | |
CN203603126U (en) | Double-layer dispersion energy dissipation high-and-low sill stilling pool | |
CN219100252U (en) | Combined type drainage ditch force dissipating structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |
|
RJ01 | Rejection of invention patent application after publication |