CN1083518C - Quick leak-blocking technology by pouring and filling of polyurethane - Google Patents
Quick leak-blocking technology by pouring and filling of polyurethane Download PDFInfo
- Publication number
- CN1083518C CN1083518C CN 98123448 CN98123448A CN1083518C CN 1083518 C CN1083518 C CN 1083518C CN 98123448 CN98123448 CN 98123448 CN 98123448 A CN98123448 A CN 98123448A CN 1083518 C CN1083518 C CN 1083518C
- Authority
- CN
- China
- Prior art keywords
- polyurethane
- wall surface
- wall
- pouring
- hollow type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Sealing Material Composition (AREA)
Abstract
The present invention relates to a quick filling up leakage-stopping technology for the water penetration of a wall surface by injecting polyurethane. The present invention has the following steps that a hollow pouring body is arranged in a hole which is arranged at a water leakage point of a wall surface by a driller, and then, a hydrophilic polyurethane pouring agent is pressed into a wall by the pouring body through a high-pressure pump; the hydrophilic polyurethane pouring agent flows all around along tiny gaps caused by water penetration and is filled in each gap, and a foaming body is formed so as to reach the effect of preventing leakage. The present invention has the advantage of fast and simple construction, and is a new technology which completely breaks through the known construction technology.
Description
The present invention relates to the leak-stopping engineering of wall infiltration, furtherly, be meant a kind of technology of pouring and filling of polyurethane fast leak-stopping.
Taiwan is a fabric of island-in-sea type area, and amount of rainfall is abundant, a large amount of rainwater are especially arranged in plum rain season, so house architectural structure often must bear the erosion of moisture and rainwater.
In general, ground building causes wall surface infiltration reason, one is handled imperfection for the windowsill slot, one to rainy day, then rainwater infiltrates via windowsill, cause and leak, it is that main house body building structure is unsound that a kind of situation of leaking is arranged again, wall surface will produce the crack, this building is through after a while, and rainwater also can be scurried into gradually along this crack, progressively corrodes wall its crack is strengthened, if in time do not handle, what for to the structure that can therefore destroy entire wall and monolithic architecture thing.
And be positioned at the building of subterranean layer, on the one hand must bear the pressure that the underground soil is pushed,, make pressure that wall surface must bear greater than ground building again because a large amount of phreatic hydraulic pressure, therefore the easier wall surface generation crack that makes causes drainage.In case the underground water of tool acidity begins to infiltrate wall, will progressively corrode the reinforcing bar of burying underground in the wall, this point can all be filemot phenomenon by the water that flows out and can learn.Thus, bar construction begins to wreck in the building, if do not repair at once, will have a strong impact on whole solitary building braced structures time one for a long time, produces major crisis.
Solve the conventional method of this seepy question, only after finding leakage point, spread, fill up outside wall surface often with the cementing agent brush, stopping leaks continues to ooze out wall again, building is then brushed the shop synchronously, is filled up in the exterior wall place on the ground, so sealing rainwater in passive mode infiltrates, can not solve the infiltration that has been present in the wall in fact, the time one is of a specified duration, and wall still has and storEd the worry that continues corrosion in interior water.
Just more be difficult to resolve certainly and be positioned at leaking of subterranean layer, because it can't be two-way anti-blocking from wall face, thus, only smear the practice of cementing agent or guiding current with single face (being wall inside), to handle leakage point, will cause the interior ponding of wall to increase by outside continuation of wall, but do not lead the situation that pipeline relieves on the contrary off, so, cause the disappearance that is difficult to remedy with easier destruction entire wall structure.
The inventor is actively studied improvement based on the experience of being engaged in this class engineering construction for many years, through repeatedly experiment and improvement, has founded a new leak-blocking technology.
The purpose of this invention is to provide a kind of quick leak-blocking technology by pouring and filling of polyurethane, it soon short stopping ooze, and really in any micro gap of filling in wall, reach by the effect of thoroughly filling up fast leak-stopping in the wall.
The technology of a kind of pouring and filling of polyurethane fast leak-stopping of the present invention, its processing step is as follows:
Step 1: check and set out the wall surface leakage point;
Step poly-two:, be drilled with the hole of a desired depth to this wall surface ecto-entad with auger according to the leakage point of setting;
Step 3: hollow type bottling body installing is entered this hole, through hole bottom, but the predetermined broken part of reservation hollow type bottling body is in the outer end of this wall hole;
Step 4:, cooperate high-pressure pump and conduit to combine with the hollow type bottling body that is installed in hole with hydrophilic polyurethane filling agent;
Step 5: the pressure that high-pressure pump produced is pressed into hydrophilic polyurethane filling agent in the hollow type bottling body, makes hydrophilic polyurethane filling agent in wall through the hollow type bottling body, is following the micro gap channelling everywhere that is caused because of infiltration;
Step 6: the water in hydrophilic polyurethane filling agent and the wall surface contacts, after a scheduled time, promptly produce expansion, hard and close, airtight foaming body;
Step 7: after treating that hydrophilic polyurethane filling agent foaming is finished, the predetermined broken part that can will expose wall hollow type bottling body fractures;
Step 8: modify the leveling wall surface with the leveling of flat-faced wheel machine, epoxy resin and scraper at last, so get final product the wall of a permanent seepage prevention, leak-stopping.
During leakage point on setting wall surface, for the pressure of considering the polyurethane filling agent must be that each leakage point setpoint distance be the best for about 15~30 centimeters under the wall situation about can bear.
The filling agent of polyurethane described in the technology is to adjust host and accelerator by one to mix together with 2: 1 ratio, adjusts host and be expansion type polyurethane composition for best, and accelerator is with hydrophilic catalyzer, and for example multi-hydroxy polyether be the best.
Advantage of the present invention, a kind of quick leak-blocking technology by pouring and filling of polyurethane of the present invention is to reach the boundary that known construction technology can't be accomplished with the technology of innovating fully, thoroughly the antiseepage leak-stopping.The leakproof technology of only oozing of the present invention, be that with known construction technology maximum different this technology can initiative finds out each naked eyes in wall and can't distinguish the micro gap of looking, and needn't dig cutter, destroy under the structure of wall, really fill up each road micro gap, carry out blocking infiltration, crack fully with positive method, guarantee that wall construction no longer continues the corrosion of being seeped water by thoroughly filling up in the wall, and it is rapid and simple to construct, and is a kind of new technology that breaks through known construction technology fully.
Following drawings and Examples will help further to illustrate technical scheme of the present invention.
Fig. 1 is a process chart of the present invention.
Fig. 2 is one of construction schematic diagram of the present invention.
Fig. 3 is two of a construction schematic diagram of the present invention.
Fig. 4 is the schematic perspective view of hollow type bottling body of the present invention.
Fig. 5 is a polyurethane filling agent foaming schematic diagram of the present invention.
The symbol description of figure
10-wall surface 60-hollow type bottling body
20-leakage point 61-injection head
40-high-pressure pump 62-room
41-conduit 63-injection port
The 50-hole
See also shown in Figure 1, a kind of quick leak-blocking technology by pouring and filling of polyurethane of the present invention, implementation step is:
Step 1: find out the leakage point 20 that water oozes out prior to the wall surface 10 that leaks, certainly perhaps the leakage point 20 of whole sidewalls may surpass more than one, but for the leakage point 20 that prevents institute's searching, setting at a distance of too closely or too far away, cause wall surface 10 can't bear operation pressure, therefore each leakage point that is set 20 is all suitable at a distance of 15~30 centimeters.
Step 2: searched out on the leakage point of setting 20 in each, be drilled with the hole 50 of a desired depth to wall surface 10 places with auger, the width of each hole 50 must be slightly larger than hollow type bottling body 60 diameters of required application among the present invention at this moment, as shown in Figures 2 and 3.
Step 3: establish a hollow type bottling body 60 as shown in Figure 4, it mainly is to be a hollow tube shape, front end forms injection head 61, back segment then forms the room 62 of a broad, present open injection port 63 in afterbody, these hollow type bottling body 60 installings are entered wall surface 10 inside, and through to hole 50 bottoms, but hold outside this wall hole the predetermined broken part of reservation hollow type bottling body.
Step 4:, cooperate high-pressure pump 40 and conduit 41 to combine with the open injection port 63 of the hollow type bottling body 60 that is installed in hole 50 with hydrophilic polyurethane filling agent.This polyurethane filling agent is to be to adjust host with the polyurathamc, hydrophily catalyzer multi-hydroxy polyether is an accelerator, two doses are fully stirred with 2: 1 ratio allotment approximately, the polyurethane filling agent that stirring is finished has hydrophilic characteristic, be not subjected to the influence of wet environment in the slot fully, and more can therefore stickingly be in each corner of slot, this polyurethane filling agent and have and meet the water foam characteristics, promptly produce expansion, hard after through a scheduled time and close, airtight foaming body, and filling is in the space at its place.As shown in Figure 5, the polyurethane filling agent after this foaming is formed with the honeycomb conjunctive tissue, and each foaming body becomes hexagonal closely to connect each other in conjunction with shape, forms best defence line together, prevents moisture to pass through, and is the sealing material an of the best.
Step 5: purchase a high-pressure pump 40 in the job site, export a pressure (pressure that this high-pressure pump 40 is exported, it sets thrust must be greater than the pressure that had in the wall 10) hydrophilic polyurethane filling agent is pressed into hollow type bottling body 60, open injection port 63 through hollow type bottling body 60, inner room 62, the injection head 61 of front end pours in the wall, following the micro gap channelling everywhere that is caused because of infiltration, and diffuse to whole piece micro gap interchannel, make be positioned at wall surface 10 inside with naked eyes can't identification micro gap, can both be filled up fully by the polyurethane filling agent really.
Step 6: after the filling up of completing steps five, hydrophilic polyurethane filling agent contact with the water of wall surface 10 after a scheduled time, promptly produce expansion, hard and close, airtight foaming body, formed micro gap after so making wall surface 10 interior scripts invaded by infiltration is full of fully and is filled up.
Step 7: after treating that hydrophilic polyurethane filling agent foaming is finished, the predetermined broken part that can will expose the hollow type bottling body 60 of wall surface 10 fractures.
Step 8: remove with epoxy resin and scraper at last and modify entire wall face 10, the polyurethane filling agent that overflows is trimmed, the appearance of reduction wall surface 10 floridity so can permanently be stopped the situation of leaking, and be finished whole fast leak-stopping construction works.
Claims (3)
1. quick leak-blocking technology by pouring and filling of polyurethane, its processing step is as follows:
Step 1: check and set out leakage point (20) on the wall surface (10);
Step 2: the leakage point (20) according to setting is drilled with a hole (50) with auger to this wall surface (10) ecto-entad;
Step 3: hollow type bottling body installing is entered this hole (50), through hole (50) bottom, but the predetermined broken part of reservation hollow type bottling body is in the outer end of this wall hole;
Step 4:, cooperate high-pressure pump (40) and high pressure resistant conduit (41) to combine with the hollow type bottling body (60) that is installed in hole (50) with hydrophilic polyurethane filling agent;
Step 5: the pressure that is produced by high-pressure pump (40) is pressed into hydrophilic polyurethane filling agent in the hollow type bottling body (60), make hydrophilic polyurethane filling agent in wall through hollow type bottling body (60), following the small slot channelling everywhere that is caused because of infiltration;
Step 6: promptly produce expansion, hard after the water in hydrophilic polyurethane filling agent and the wall surface (10) contacts and close, airtight foaming body;
Step 7: after treating that hydrophilic polyurethane filling agent foaming is finished, the predetermined broken part that can will expose the outer hollow type bottling body of wall surface (10) (60) fractures;
Step 8: modify leveling wall surface (10) with the leveling of flat-faced wheel machine, epoxy resin and scraper at last, so get final product the wall of a permanent seepage prevention, leak-stopping.
2, quick leak-blocking technology by pouring and filling of polyurethane according to claim 1 is characterized in that, during leakage point (20) on described setting wall surface (10), the setpoint distance of each leakage point (20) is the 15-30 centimetre.
3. quick leak-blocking technology by pouring and filling of polyurethane according to claim 1, it is characterized in that, described polyurethane filling agent is to adjust host and accelerator by one to mix together with 2: 1 ratio, and adjusting host is expansion type polyurethane, and accelerator is hydrophilic catalyzer multi-hydroxy polyether.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98123448 CN1083518C (en) | 1998-10-20 | 1998-10-20 | Quick leak-blocking technology by pouring and filling of polyurethane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98123448 CN1083518C (en) | 1998-10-20 | 1998-10-20 | Quick leak-blocking technology by pouring and filling of polyurethane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1251402A CN1251402A (en) | 2000-04-26 |
CN1083518C true CN1083518C (en) | 2002-04-24 |
Family
ID=5228197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 98123448 Expired - Fee Related CN1083518C (en) | 1998-10-20 | 1998-10-20 | Quick leak-blocking technology by pouring and filling of polyurethane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1083518C (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104343246B (en) * | 2014-09-30 | 2017-07-07 | 陶孝兰 | A kind of method of waterproofing and leakage-stopping |
CN105586982B (en) * | 2014-11-14 | 2017-08-25 | 江西昌河航空工业有限公司 | A kind of pre-buried steel framework of lathe and the processing method in basic faying face gap |
CN108118724A (en) * | 2016-11-29 | 2018-06-05 | 中国二十冶集团有限公司 | T-bolt anchor box leak blocking method |
-
1998
- 1998-10-20 CN CN 98123448 patent/CN1083518C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1251402A (en) | 2000-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2004288174B2 (en) | Method for preparing in-ground tunnel structures | |
US4086309A (en) | Method for sealing cracks and cavities in different kinds of building constructions, such as building constructions in rock, concrete, brickwork and timber | |
KR102191009B1 (en) | Acting leakage prevention control method and underground leakage prevention system of subway station sturucture leakage disease | |
US6862862B2 (en) | Pressure injection of flexible polymer grout into slate roofs | |
CN111472818A (en) | Grouting construction method for water seepage of tunnel | |
CN1083518C (en) | Quick leak-blocking technology by pouring and filling of polyurethane | |
KR100920963B1 (en) | Water leakage maintenance structure and method of joint using high efficiency grout materials | |
CN110607921B (en) | Automatic repairing leakage stoppage treatment method and waterproof leakage stoppage structure | |
CN112593726A (en) | Anti-frost heaving leaking stoppage and reinforcement method for cold region | |
CN114961789B (en) | Slope road tunneling sectional grouting method in aquifer | |
CN114606903B (en) | Seepage-proofing reinforcing method for masonry dam | |
CN113153364B (en) | Water inflow treatment method suitable for inclined shaft under steep water-rich rock stratum | |
KR102078174B1 (en) | Flexible unit for repairing cracked part of concrete structure and maintenance method of cracked part using the flexible unit | |
JP2647445B2 (en) | Repair method for cracks and joints of concrete structures | |
CN114607170A (en) | Seam leakage stopping and reinforcing method for roof | |
KR100454605B1 (en) | High-density and pressurization repair method about new/old concrete joint part | |
KR102037163B1 (en) | Water Leakage Repair Method and Construction Equipment of Concrete Structures | |
CN113738152A (en) | Leakage maintenance construction method for water-return beam | |
KR101739747B1 (en) | Repair Method for Floor Leak of Building Basement | |
KR20210105091A (en) | How to repair the leaky part of the roof floor | |
KR102631054B1 (en) | floor space waterproofing construction method | |
CN215104389U (en) | Durable concrete crack repairing structure system | |
CN1042158C (en) | Injecting method for steel rod concrete prefabricated pile end | |
JP2887170B2 (en) | Combined backfill injection water stop method | |
CN115419294A (en) | Minimally invasive inner waterproof layer reconstruction process method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20020424 Termination date: 20141020 |
|
EXPY | Termination of patent right or utility model |