CN108349694A - Monitoring system - Google Patents
Monitoring system Download PDFInfo
- Publication number
- CN108349694A CN108349694A CN201580084519.5A CN201580084519A CN108349694A CN 108349694 A CN108349694 A CN 108349694A CN 201580084519 A CN201580084519 A CN 201580084519A CN 108349694 A CN108349694 A CN 108349694A
- Authority
- CN
- China
- Prior art keywords
- external information
- group
- unit
- lift appliance
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
Abstract
Group selector (14) selects elevator group according to the external information that external information reception unit (12) receives.Device selector (15) selects lift appliance in multiple lift appliances from included in the elevator group that group selector (14) is selected.The lift appliance that detection operation instruction unit (16) makes device selector (15) select is detected action.Controlled operation instruction unit (17) makes the multiple lift appliances being included in elevator group identical with the lift appliance for the swing for being detected long strip article carry out controlled operation.
Description
Technical field
The present invention relates to monitoring systems.
Background technology
The control system of elevator is recorded in patent document 1.In control system described in Patent Document 1, such as
It receives urgent earthquake speed to give the correct time, car not in service is made to be moved to resonance floor.Resonance floor is stopped at making car
Afterwards, whether judgement long strip article is swung.
Existing technical literature
Patent document
Patent document 1:Japanese Unexamined Patent Publication 2014-105068 bulletins
Invention content
Problems to be solved by the invention
It gives the correct time in the building of application control system described in Patent Document 1, such as having issued urgent earthquake speed, one
Part car cannot use.When multiple buildings set on some region apply the control system, cause multiple
The operational efficiency of elevator declines in building.
The present invention is precisely in order to solving the problems, such as described above and completing.The object of the present invention is to provide a kind of prisons
Viewing system can prevent the operational efficiency of elevator from unnecessarily declining in multiple buildings, and can be detected to grow
Object makes lift appliance carry out controlled operation in the case of swinging.
The means used to solve the problem
The monitoring system of the present invention has:External information receiving unit receives external information;Storage unit, storage
Separately include the information of multiple elevator groups of multiple lift appliances;Group selecting unit, according to external information receiving unit
The external information received selects at least one elevator group from multiple elevator groups that storage unit stores information;Device
Selecting unit selects in multiple lift appliances from included in the elevator group that group selecting unit is selected at least one
Lift appliance;Detection operation indicating unit makes the lift appliance that device selecting unit is selected carry out for detecting strip material
The detection operation of the swing of body;And controlled operation indicating unit, in the lift appliance selected by device selecting unit
When detecting the swing of long strip article, make to be included in eleva-tor bank identical with the lift appliance for the swing for being detected long strip article
Multiple lift appliances in group carry out controlled operation.
The monitoring system of the present invention has:External information receiving unit receives external information;Storage unit, storage
The information of multiple lift appliances;Group setup unit, according to the external information that external information receiving unit receives, combination is deposited
Storage unit stores multiple lift appliances of information and sets at least one elevator group;Device selecting unit, from included in group
At least one lift appliance is selected in multiple lift appliances in the elevator group of group's setup unit setting;Detection operation instruction is single
Member makes the detection operation for the swing that the lift appliance that device selecting unit is selected carries out for detecting long strip article;And
Controlled operation indicating unit, when detecting the swing of long strip article in the lift appliance selected by device selecting unit,
The multiple lift appliances being included in elevator group identical with the lift appliance for the swing for being detected long strip article are made to carry out
Controlled operation.
Invention effect
The monitoring system of the present invention has:Group selecting unit, the outside received according to external information receiving unit
Information selects elevator group;Device selecting unit, it is multiple from included in the elevator group that group selecting unit is selected
Lift appliance is selected in lift appliance;Detection operation indicating unit makes the lift appliance that device selecting unit is selected carry out
Detection operation;And controlled operation indicating unit, make to be included in the lift appliance phase with the swing for being detected long strip article
Multiple lift appliances in same elevator group carry out controlled operation.Monitoring system according to the present invention, can be in multiple buildings
It prevents the operational efficiency of elevator from unnecessarily declining in object, and can make in the case where being detected the swing of long strip article
Lift appliance carries out controlled operation.
Description of the drawings
Fig. 1 is the figure of the configuration example for the monitoring system for showing embodiments of the present invention 1.
Fig. 2 is the figure for the configuration example for showing lift appliance.
Fig. 3 is the flow chart for the action example for showing that the monitoring system of embodiments of the present invention 1 carries out.
Fig. 4 is the intensity for the long period seismic shock for showing to generate when specific earthquake has occurred and the figure of property.
Fig. 5 is the figure of an example for the weather information for showing to be sent out by the meteorological Room.
Fig. 6 is the figure of the configuration example for the monitoring system for showing embodiments of the present invention 2.
Fig. 7 is the flow chart for the action example for showing that the monitoring system of embodiments of the present invention 2 carries out.
Fig. 8 is the figure for the hardware configuration for showing monitoring arrangement.
Specific implementation mode
It is described with reference to the present invention.Repeat description suitably simplifies or omits.In various figures, identical label
Indicate identical part or comparable part.
Embodiment 1
Fig. 1 is the figure of the configuration example for the monitoring system for showing embodiments of the present invention 1.Monitoring system tool shown in FIG. 1
There are monitoring arrangement 1 and multiple lift appliances 2.Monitoring arrangement 1 is connect using network 3 with multiple lift appliances 2.1 energy of monitoring arrangement
Enough and lift appliance 2 carries out two-way communication.Network 3 is, for example, special circuit.Network 3 can also be the Internet lines.Network 3
Special circuit and the Internet lines both sides can be used.
For example, the lift appliance 2 being arranged in Japanese various regions is connect using network 3 with monitoring arrangement 1.Can also be only to set
The lift appliance 2 in a part of region of Japan is set to connect with monitoring arrangement 1.For example, being provided only on the lift appliance 2 of eastern Japan
It is connect with monitoring arrangement 1.Also, the lift appliance 2 that can also be the country being arranged other than Japan utilizes network 3 and monitoring
Device 1 connects.For example, lift appliance 2 of the setting in Chinese various regions (CHINA) is connect with monitoring arrangement 1.In this case,
Monitoring arrangement 1 can be arranged in China, and the country other than China can also be arranged.Can also be to be arranged in Japanese various regions
Lift appliance 2 and being arranged is connect in lift appliance 2 all over China with monitoring arrangement 1.
Fig. 2 is the figure for the configuration example for showing lift appliance 2.Lift appliance 2 has car 4 and counterweight 5.Car 4 and counterweight 5
Hoistway is hung on by main rope 6.Traction machine 7 drives car 4.Car 4 is driven by traction machine 7 and is moved up and down in hoistway.It drags
Draw machine 7 to be controlled by control device 8.
Controlling cable 9 is connected between car 4 and control device 8.The equipment set on car 4 is carried out via controlling cable 9
The transmitting and receiving of signal between control device 8.Equipment set on car 4 is controlled by control device 8.It is controlled by control device 8
The equipment of system includes for example for the motor of driving gate and car operating panel.
Control device 8 for example controls the normal operation for making car 4 respond registered call successively.Also, control device 8
Control detection operation and controlled operation.The details of detection operation and controlled operation repeats after holding.
Lift appliance 2 has detection device 10.Detection device 10 detects the pendulum of the long strip article used in lift appliance 2
It is dynamic.Various long strip articles are used in lift appliance 2.As the example of the long strip article used in lift appliance 2, can enumerate
The ropes class such as main rope 6 and auxiliary ropes (not shown).As other examples of the long strip article used in lift appliance 2,
The cables such as controlling cable 9 can be enumerated.In the present embodiment, to detection device 10 detect main rope 6 swing example into
Row is described in detail.
Detection device 10 is for example with photophore and light-receiving device.Photophore sends out light to light-receiving device.If main rope 6 does not have
Swing is generated, then light-receiving device receives the light from photophore.When main rope 6 generates the swing of the amplitude with specified value or more
When, the illumination from photophore to main rope 6.The amount for the light from photophore that light-receiving device receives as a result, declines.It being capable of basis
The light quantity that light-receiving device receives, there is a situation where swing for detection main rope 6.
The method that detection device 10 detects the swing of main rope 6 is not limited to above-mentioned example.Also, detection device 10 can also
The swing of main rope 6 is detected according to multiple grades.Detection device 10 can also detect the swing at multiple positions of main rope 6.
Detection device 10 can also detect the swing of other long strip articles such as controlling cable 9.It can also be detected by detection device 10 a variety of
The swing of long strip article.In addition, it is not necessary that the lift appliance 2 that can be communicated with monitoring arrangement 1 is all with detection device
10。
Communication device 11 is device for communication with the outside.Via the progress lift appliance 2 of communication device 11 and outside
The transmitting and receiving of the signal in portion.For example, lift appliance 2 is communicated using communication device 11 with monitoring arrangement 1.
Monitoring arrangement 1 for example with external information reception unit 12, storage part 13, group selector 14, device selector 15,
Detection operation instruction unit 16, controlled operation instruction unit 17 and communication unit 18.
External information reception unit 12 receives external information.External information reception unit 12 receives outer from meteorological Ting Deng official missions
Portion's information.External information reception unit 12 can also receive external information from non-government institution.
When an earthquake occurs, be equipped with lift appliance 2 building for example sometimes according to primary intrinsic vibration velocity for a long time
Slowly persistently shake.It is this shake due to acceleration it is smaller, thus common earthquake sensing device sensing less than.It is shaken in building
When dynamic, the long strip article used in lift appliance 2 is swung.For example, shaking in the intrinsic vibration velocity of main rope 6 and the intrinsic of building
When speed is consistent, main rope 6 resonates.When the swing of main rope 6 increases, main rope 6 is likely to contact or hooking is to set on well
The equipment in road.Therefore, external information reception unit 12 for example receives information related with earthquake as external information.External information connects
Receipts portion 12 can also receive the predicted value for the earthquake degree for indicating multiple regions or the earthquake information of measured value as external information.
When high wind are blown when typhoon is close etc., the building equipped with lift appliance 2 is for example consolidated according to primary sometimes
There is vibration velocity slowly persistently to shake for a long time.Therefore, external information reception unit 12, which receives, for example makees with meteorological related information
For external information.External information reception unit 12 can also receive the predicted value for the wind speed for indicating multiple regions or the gas of measured value
Image information is as external information.
The external information that external information reception unit 12 receives is not limited to earthquake information and weather information.External information reception unit
12 can also receive other information as external information.
Storage part 13 stores the information of elevator group.The information of multiple elevator groups is stored in storage part 13.It is depositing
Include multiple lift appliances 2 in each elevator group of the storage of storage portion 13 information.For example, storing the eleva-tor bank of information in storage part 13
In group, including all or part lift appliance 2 that communication unit 18 can be communicated.For example, it is also possible to by communication unit 18
It is worth above whole lift appliances 2 in the lift appliance 2 that can be communicated on the basis of the lifting travel of car 4, included in depositing
Storage portion 13 stores at least any one elevator group of the elevator group of information.Table 1 shows the information stored in storage part 13
Example.
[table 1]
Table 1 indicates the example according to the region setting elevator group for being provided with lift appliance 2.For example, according to electricity is provided with
Each urban district raised path between farm fields village of ladder device 2 sets elevator group.For example, being included in the elevator of group group number 2 set on the lift appliance 2 in the cities B
In group.
The setting method of elevator group is not limited to above-mentioned example.For example, it is also possible to by set on the elevator in multiple urban district raised path between farm fields village
Device 2 is set as an elevator group.For example, it is also possible to set elevator group according to the plot equipped with building.For example, also may be used
To set elevator group according to the natural period of the building equipped with lift appliance 2.
Group selector 14 selects one or more eleva-tor bank from multiple elevator groups that storage part 13 stores information
Group.Group selector 14 carries out the selection of elevator group according to the external information that external information reception unit 12 receives.
Device selector 15 is selected in multiple lift appliances 2 from included in the elevator group that group selector 14 is selected
Select one or more lift appliance 2.In the case where group selector 14 has selected multiple elevator groups, device selector 15
To each elevator group that group selector 14 is selected, one or more lift appliance 2 is selected.As an example, consideration group
Group's selector 14 has selected the case where elevator group of group group number 1,2.Device selector 15 includes from the elevator group of group group number 1
Lift appliance 2 in, select such as device number 00000010 lift appliance 2.Also, device selector 15 is from group group number 2
In the lift appliance 2 that elevator group includes, the lift appliance 2 and device number 00001101 of such as device number 00001100 are selected
Lift appliance 2.
The lift appliance 2 that detection operation instruction unit 16 makes device selector 15 select is detected action.Detection operation
It is the action of the swing for detecting the long strip article used in lift appliance 2.Via communication unit 18 carry out monitoring arrangement 1 with
The transmitting and receiving of external signal.For example, monitoring arrangement 1 is communicated by communication unit 18 with each lift appliance 2.Detection operation
Instruction unit 16 makes communication unit 18 send the signal for being detected action.In the following, by the signal for being detected action
Referred to as " detection operation signal ".The lift appliance 2 selected from communication unit 18 to device selector 15 sends detection operation signal.
In lift appliance 2, when communication device 11 receives detection operation signal from monitoring arrangement 1, control device 8 is opened
Beginning detection operation.Also, control device 8 is in the swing for detecting long strip article by detection device 10 by being detected action
When, so that communication device 11 is sent the signal for the swing for indicating to detect long strip article.In the following, will indicate that detection device 10 detects
The signal of the swing of long strip article is also referred to as " swing detection signal ".Swing detection is sent from communication device 11 to monitoring arrangement 1
Signal.
Controlled operation instruction unit 17 makes to be included in elevator identical with the lift appliance 2 of swing for being detected long strip article
Multiple lift appliances 2 in group carry out controlled operation.Controlled operation is such that in the long strip article used in lift appliance 2 not
With the operating of the swing resonance of building.Controlled operation instruction unit 17 is examined in the lift appliance 2 selected by device selector 15
When measuring the swing of long strip article, communication unit 18 is made to send the signal for carrying out controlled operation.In the following, will be used to carry out control
The signal of operating is also referred to as " controlled operation signal ".From communication unit 18 to included in the electricity with the swing for being detected long strip article
Multiple lift appliances 2 in 2 identical elevator group of ladder device send control CRANK PULSES.Controlled operation signal can also be sent
To the whole lift appliances 2 for including in above-mentioned elevator group.Controlled operation signal can also be sent in above-mentioned elevator group and wrap
A part of lift appliance 2 contained.
In the following, illustrating the example for the action that this monitoring system carries out referring also to Fig. 3.Fig. 3 is the embodiment party for showing the present invention
The flow chart for the action example that the monitoring system of formula 1 carries out.
When usual, the lift appliance 2 being connect with monitoring arrangement 1 runs well.Normal operation is controlled by control device 8
System.
In monitoring arrangement 1, group selector 14 judges whether beginning condition is true (S101).Beginning condition is for making
Lift appliance 2 starts the condition of detection operation.Group selector 14 is in the swing for detecting for example to be easy to happen long strip article
When situation, it is determined as that beginning condition is set up.
For example, external information reception unit 12 receives the earthquake letter of the measured value of the earthquake degree comprising various regions when an earthquake occurs
Breath.If there is on the basis of the measured value of earthquake degree value more than region, then group selector 14 be determined as beginning condition set up.And
And external information reception unit 12 receives urgent rapid earthquake information report as earthquake information.Include the shake of various regions in urgent rapid earthquake information report
The predicted value of degree.Group selector 14 can also be judged to starting on the basis of there are the predicted value of earthquake degree when more than value region
Condition is set up.The a reference value being compared with the measured value of earthquake degree or predicted value is pre-stored in storage part 13.
For example, external information reception unit 12 receives the weather information of the measured value of the wind speed comprising various regions.If there is wind
Speed measured value on the basis of value more than region, then group selector 14 be determined as beginning condition set up.Also, external information connects
The receptions such as when typhoon is close of receipts portion 12 include the weather information of the predicted value of the wind speed of various regions.Group selector 14 can also be
There are be determined as that beginning condition sets up when more than value on the basis of the predicted value of wind speed region.Measured value with wind speed or prediction
The a reference value that value is compared is pre-stored in storage part 13.
Group selector 14 is when being determined as that beginning condition is set up, from the multiple eleva-tor banks for being stored with information in storage part 13
One or more elevator group (S102) is selected in group.For example, the selection of group selector 14 includes the actual measurement being arranged in earthquake degree
The elevator group of the lift appliance 2 in region on the basis of value or predicted value more than value.In this case, if accordingly
Region is one, then group selector 14 selects an elevator group.If corresponding region is multiple, group selector 14
Select multiple elevator groups.Group selector 14 can also select to include to be arranged on the basis of the measured value of earthquake degree or predicted value
The elevator group of lift appliance 2 in region more than value and include the elevator being arranged in the region adjacent with the region
The elevator group of device 2.
Group selector 14 can also select to include to be arranged on the basis of the measured value of wind speed or predicted value more than value
The elevator group of lift appliance 2 in region.Group selector 14 can also select comprising be arranged wind speed measured value or
The elevator group of lift appliance 2 in region on the basis of predicted value more than value and comprising being arranged adjacent with the region
The elevator group of lift appliance 2 in region.
When group selector 14 selects elevator group, device selector 15 is from selecting included in group selector 14
One or more lift appliance 2 (S103) is selected in multiple lift appliances 2 in elevator group.That is, device selector 15 is right
Each elevator group that group selector 14 is selected, selection are detected the lift appliance 2 of action.
The lift appliance 2 selected by device selector 15 can also be predetermined.For example, it can be select in group
In the case that portion 14 has selected the elevator group of group group number 1, the elevator of 15 certain selection device number 00000010 of device selector
Device 2.The lift appliance 2 selected by device selector 15 can not also be predetermined.For example, it can be device selectors
15 also consider the external information that external information reception unit 12 receives to carry out the selection of lift appliance 2.
When device selector 15 selects lift appliance 2, detection operation instruction unit 16 makes device selector 15 select
Each lift appliance 2 is detected action.Specifically, detection is sent to each lift appliance 2 selected by device selector 15 to move
Make signal (S104).In each lift appliance 2 selected by device selector 15, communication device 11 receives detection operation letter
Number.As a result, in each lift appliance 2 selected by device selector 15 detection operation.Detection operation is illustrated below
An example.
When communication device 11 receives detection operation signal, control device 8 makes car 4 move and stop at resonance building
Layer.There is the long strip article used in lift appliance 2 the length of the free part of displacement to be become according to the position of car 4
The long strip article of change.In such long strip article, the intrinsic vibration velocity of the free part of displacement according to the position of car 4 and
Variation.Resonance floor refers to that the possibility of the shaking resonance of the long strip articles such as main rope 6 and building when car 4 stops is larger
Floor.The floor that resonates is preset.
Control device 8 makes detection device 10 be acted when making car 4 stop at resonance floor.As a result, in strip material
When body occurs to have the swing of the amplitude of specified value or more, the swing of long strip article is detected by detection device 10.In addition, detection
Device 10 can also be acted before car 4 stops at resonance floor.The pendulum of long strip article is detected in detection device 10
When dynamic, control device 8 makes communication device 11 that swing detection signal occur.In monitoring arrangement 1, communication unit 18 receives swing detection
Signal.
In monitoring arrangement 1, when communication unit 18 sends detection operation signal in S104, by controlled operation instruction unit 17
Whether judgement communication unit 18 receives swing detection signal (S105).If communication unit 18 does not receive swing detection signal,
Monitoring arrangement 1 makes each lift appliance 2 continue to run well (S106).Monitoring arrangement 1 can also be such that communication unit 18 sends out as needed
Send the signal for running well.
When communication unit 18 receives swing detection signal, controlled operation instruction unit 17 makes to be included in and is detected strip
Multiple lift appliances 2 in the 2 identical elevator group of lift appliance of the swing of object carry out controlled operation.Specifically, according to
The swing detection signal received determines the lift appliance 2 for the swing for being detected long strip article.Then, to included in this
Multiple lift appliances 2 in 2 identical elevator group of lift appliance send control CRANK PULSES (S107).Included in it is tested
It measures in multiple lift appliances 2 in the 2 identical elevator group of lift appliance of the swing of long strip article, communication device 11 receives
Controlled operation signal.Start controlled operation in multiple lift appliances 2 as a result,.An example of controlled operation is illustrated below.
When communication device 11 receives controlled operation signal, control device 8 makes car 4 move and stop at off-resonance building
Layer.Off-resonance floor refers to the possibility for the swing resonance for stopping the long strip articles such as main rope 6 and building even if car 4
Smaller floor.Off-resonance floor is preset.
When communication device 11 receives controlled operation signal, control device 8 can also make car 4 move or determine always
Phase moves.As described above, position of the intrinsic vibration velocity of the free part of displacement of the long strip articles such as main rope 6 according to car 4
It sets and changes.By making car 4 move, the intrinsic vibration velocity of the free part of above-mentioned displacement can be changed.Therefore, it is possible to anti-
The only shaking resonance of long strip article and building.
In the monitoring system of above structure, eleva-tor bank is selected according to the external information that external information reception unit 12 receives
Group.Also, from the lift appliance 2 that the elevator group selected includes, selection is detected the lift appliance 2 of action.Therefore,
It can prevent the operational efficiency of elevator from unnecessarily declining in multiple buildings.According to the monitoring system of above structure, in electricity
When ladder device 2 detects the swing of long strip article, it can make to be included in multiple in elevator group identical with the lift appliance 2
Lift appliance 2 carries out controlled operation.
Also, in the monitoring system of above structure, group selector 14 is received according to external information reception unit 12
External information selects elevator group.Therefore, it is possible to carry out the dynamic select of elevator group.It can be according to the hair of earthquake and high wind etc.
Life properly selects elevator group.
In the following, selecting the another method of elevator group to illustrate group selector 14.
When larger earthquake occurs, long period seismic shock can also occur for remote anaseismic region.Also, by soft
The Plain and basin of stack layer covering are easy to happen long period seismic shock.It, can if understanding the focus and size of earthquake
Determine the larger region of the possibility that long period seismic shock occurs.
For example, external information reception unit 12 receives the earthquake information of focus and size comprising earthquake.It is wrapped in earthquake information
The size of the earthquake contained can be measured value, can also be predicted value.Also, by the focus of earthquake and size in storage part 13
Larger regional interrelation gets up to be stored with the possibility of the generation long period seismic shock when the earthquake occurs.Group selects
Portion 14 is for example on the basis of external information reception unit 12 receives the size of earthquake when more than value earthquake information, according to storage part
The information stored in 13 determines the larger region of the possibility that long period seismic shock occurs.That is, group selector 14 determine with
The focus and size of the earthquake for including in earthquake information associate the region of storage.Then, group selector 14 selection include
Elevator group in the lift appliance 2 for determining region is set.
In addition, in the case where communication device 11 receives detection operation signal, it can also be according to before this just by outside
The earthquake information that information receiving part 12 receives and the detection operation signal received by communication device 11, update storage in portion 13
The information of storage.
Fig. 4 is the intensity for the long period seismic shock for showing to generate when specific earthquake has occurred and the figure of property.It can
To be composed according to speed responsive shown in Fig. 4 etc., eleva-tor bank is preset according to the natural period of the building equipped with lift appliance 2
Group.For example, preset the building equipped with lift appliance 2 natural period be 3 seconds less than 5 seconds elevator group, 5
Second less than 7 seconds elevator group, 7 seconds less than 10 seconds elevator groups and 10 seconds less than 13 seconds
Elevator group.Group selector 14 determines whether to have occurred specific according to the external information that external information reception unit 12 receives
Earthquake.In case of specific earthquake, then the elevator that the selection of group selector 14 is set according to the natural period of building
Group.
Alternatively, it is also possible to select elevator group according to the natural period of building simultaneously and selected according to other methods
Elevator group.For example, a lift appliance 2 can also be included in the elevator group of the natural period based on building and be based on it
In the elevator group both sides of its method.
In addition, building is made to shake such high wind due to typhoon etc..For example, external information reception unit 12 receives
Include the weather information of the measured value of wind speed.External information reception unit 12 can also receive the measured value comprising wind direction and wind speed
Weather information, the information such as issued by the meteorological Room.Fig. 5 is the figure of an example for the weather information for showing to be issued by the meteorological Room.
Weather information is regularly published by meteorological Room etc..Accordingly it is also possible to external information reception unit 12 is received
Weather information is stored in as past information in storage part 13 one by one.Also, receive detection operation signal in communication unit 18
In the case of, the information of the lift appliance 2 for the swing for being detected long strip article can also be connect with external information reception unit 12
The weather information received, which associates, to be stored in storage part 13.Such as time information, external information reception unit 12 are received
Weather information and be detected the information of lift appliance 2 of swing of long strip article and get up to deposit as past information association
Storage is in storage part 13.
It is deposited in weather information and storage part 13 that group selector 14 is for example newly received according to external information reception unit 12
The predicted value of the past information operation wind speed of storage.Group selector 14 can also carry out eleva-tor bank according to the predicted value calculated
The selection of group.For example, the selection of group selector 14 includes to be arranged in the region on the basis of predicted value calculated more than value
The elevator group of lift appliance.It, can be in the situation for actually occurring the swing for being easy to happen long strip article when typhoon is close etc.
Lift appliance 2 is set to be detected action before.
Embodiment 2
Fig. 6 is the figure of the configuration example for the monitoring system for showing embodiments of the present invention 2.The monitoring arrangement of present embodiment
1 for example with external information reception unit 12, storage part 13, group configuration part 19, device selector 15, detection operation instruction unit
16, controlled operation instruction unit 17 and communication unit 18.
Storage part 13 stores the information of lift appliance 2.The information of multiple lift appliances 2 is stored in storage part 13.Example
Such as, the information for all or part lift appliance 2 that communication unit 18 can be communicated is stored in storage part 13.It is depositing
It can also be stored in storage portion 13 in the lift appliance 2 that communication unit 18 can be communicated and be worth on the basis of the lifting travel of car 4
The information of above whole lift appliances 2.
The combination of group configuration part 19 is stored with multiple lift appliances of information to set one or more in storage part 13
Elevator group.Group configuration part 19 carries out the setting of elevator group according to the external information that external information reception unit 12 receives.
Device selector 15 selects in multiple lift appliances 2 from included in the elevator group that group configuration part 19 is set
One or more lift appliance 2.In the case where group configuration part 19 sets multiple elevator groups, device selector 15 is right
Each elevator group that group configuration part 19 is set, selects one or more lift appliance 2.
The part not being described in detail in the present embodiment in the structure and function of monitoring system, and in the embodiment 1
Disclosed arbitrary structures and function are identical.
In the following, illustrating the example for the action that this monitoring system carries out referring also to Fig. 7.Fig. 7 is the embodiment party for showing the present invention
The flow chart for the action example that the monitoring system of formula 2 carries out.
When usual, each lift appliance 2 being connect with monitoring arrangement 1 runs well.It runs well by control device 8
Control.
In monitoring arrangement 1, group configuration part 19 judges whether beginning condition is true (S201).Group configuration part 19 is for example
In the situation for the swing for detecting to be easy to happen long strip article, it is determined as that beginning condition is set up.For example, external information reception unit
12 receive the measured value of the earthquake degree comprising various regions or the earthquake information of predicted value.Measured value if there is earthquake degree or prediction
On the basis of value value more than region, then group configuration part 19 be determined as beginning condition set up.Also, external information reception unit 12 connects
The measured value of wind speed of the packet receiving containing various regions or the weather information of predicted value.Can also be that group configuration part 19 is there are wind speed
Measured value or predicted value on the basis of value more than region when, be determined as beginning condition set up.
The setting elevator group (S202) when being determined as that beginning condition is set up of group configuration part 19.It is set in group configuration part 19
Include multiple lift appliances 2 in fixed each elevator group.Combine the elevator that information is stored in storage part 13 in group configuration part 19
Device 2 sets one or more elevator group.Table 2 shows the example for being stored in the information of storage part 13.
[table 2]
Such as it will indicate that the device number of lift appliance 2 gets up to be stored in storage with the regional interrelation for being provided with lift appliance 2
In portion 13.Group configuration part 19 sets elevator group according to the measured value or predicted value of earthquake degree.For example, if the actual measurement of earthquake degree
It is adjacent to be worth above multiple regions on the basis of value or predicted value, then the elevator in these regions will be arranged in group configuration part 19
Device 2 is set as an elevator group.As an example, consider that external information reception unit 12 receives the shake in the cities A, the cities B and the cities C
Degree each predicted value on the basis of value more than earthquake information the case where.If the cities A are adjacent with the cities B, group configuration part 19 will be set
It sets the lift appliance 2 in the cities A and the cities B and is set as an elevator group.If the cities C and the cities A and the cities B are all non-conterminous, group is set
Determine portion 19 and the lift appliance 2 for being arranged in the cities C is set as an elevator group.
Group configuration part 19 can also set elevator group according to the measured value or predicted value of wind speed.For example, if wind
It is adjacent to be worth above multiple regions on the basis of the measured value or predicted value of speed, then group configuration part 19 will be arranged in these regions
In lift appliance 2 be set as an elevator group.
When group configuration part 19 sets elevator group, device selector 15 is from the electricity set included in group configuration part 19
One or more lift appliance 2 (S203) is selected in multiple lift appliances 2 in terraced group.That is, device selector 15 is to group
Each elevator group that group configuration part 19 is set, selection are detected the lift appliance 2 of action.
Action shown in S203~S207 of Fig. 7 is identical as action shown in S103~S107 of Fig. 3.Monitoring system is moved
The part not being described in detail in the present embodiment in work, in the embodiment 1 it is disclosed arbitrarily act it is identical.
Monitoring system with above structure, can also play has with disclosed monitoring system in the embodiment 1
The identical effect of effect.Monitoring system shown according to the present embodiment can be received according to external information reception unit 12
External information suitably sets elevator group.
Also, it can also be by the possibility of the focus of earthquake and size and the generation long period seismic shock when the earthquake occurs
The larger regional interrelation of property gets up to be stored in storage part 13.Group configuration part 19 is for example received in external information reception unit 12
On the basis of the size of earthquake when more than value earthquake information, is determined according to the information that is stored in storage part 13 and long period earthquake occurs
The larger region of the possibilities of vibrations.That is, group configuration part 19 determines the focus and size with the earthquake for including in earthquake information
Associate the region of storage.Then, the setting of group configuration part 19 includes the elevator for the lift appliance 2 being arranged in determining region
Group.
In addition, in the case where communication device 11 receives detection operation signal, it can also be according to before this just by outside
The earthquake information that information receiving part 12 receives and the detection operation signal received by communication device 11, update storage in portion 13
The information of storage.
It group configuration part 19 can also be according to the intrinsic of the focus and size of earthquake and the building equipped with lift appliance 2
Cycle set elevator group.Can also simultaneously according to the natural period of building come set elevator group and according to other methods come
Set elevator group.
The weather information that external information reception unit 12 receives can also be stored in storage one by one as past information
In portion 13.Also, in the case where communication unit 18 receives detection operation signal, it can also will be detected the pendulum of long strip article
The information of dynamic lift appliance 2 is associated with the weather information that external information reception unit 12 receives is stored in storage part 13
In.Such as by weather information that time information, external information reception unit 12 receive and the swing for being detected long strip article
The information of lift appliance 2 get up to be stored in storage part 13 as past information association.
It is deposited in weather information and storage part 13 that group configuration part 19 is for example newly received according to external information reception unit 12
The predicted value of the past information operation wind speed of storage.Group configuration part 19 can also carry out eleva-tor bank according to the predicted value calculated
The setting of group.For example, if be worth on the basis of the predicted value calculated, above multiple regions are adjacent, and group configuration part 19 will be set
It sets the lift appliance 2 in these regions and is set as an elevator group.
In various embodiments, there is the example of a car 4 to be illustrated lift appliance 2.Lift appliance 2 also may be used
With with more cars 4.In this case, lift appliance 2 can also have carries out pipe by more cars 4 as a group
The group management system of reason.When the lift appliance 2 with group management system receives detection operation signal, group management dress
It sets and is for example detected action using a car 4.Also, receive control in the lift appliance 2 with group management system
When CRANK PULSES, group management system for example makes some or all cars 4 be moved to off-resonance floor.
Each portion shown in label 12-19 shows the function that monitoring arrangement 1 has.Fig. 8 is the hardware knot for showing monitoring arrangement 1
The figure of structure.Monitoring arrangement 1 has as hardware resource such as processing circuit comprising processor 20 and memory 21.Monitoring arrangement
1 realizes each function by executing the program stored in memory 21 by processor 20.
Processor 20 is also referred to as CPU (Central Processing Unit:Central processing unit), central processing unit,
Processing unit, arithmetic unit, microprocessor, microcomputer or DSP.Memory 21 may be used semiconductor memory, disk,
Floppy disk, CD, compact disk, mini-disk or DVD.Semiconductor memory includes RAM, ROM, flash memory, EPROM and EEPROM
Deng.
The some or all of the various functions that hardware realization monitoring arrangement 1 has can also be utilized.It is supervised as realizing
The processing of single circuit, compound circuit, the processor of sequencing, concurrent program may be used in the hardware of the function of view apparatus 1
Device, ASIC, FPGA or combination thereof.
Industrial availability
The monitoring system of the present invention can be applied to the system that the transmitting and receiving of signal can be carried out with multiple lift appliances.
Label declaration
1 monitoring arrangement;2 lift appliances;3 networks;4 cars;5 counterweights;6 main ropes;7 traction machines;8 control devices;9 controls
Cable;10 detection devices;11 communication devices;12 external information reception units;13 storage parts;14 group selectors;15 devices select
Portion;16 detection operation instruction units;17 controlled operation instruction units;18 communication units;19 group configuration parts;20 processors;21 memories.
Claims (12)
1. a kind of monitoring system, which has:
External information receiving unit receives external information;
Storage unit, storage separately include the information of multiple elevator groups of multiple lift appliances;
Group selecting unit is deposited according to the external information that the external information receiving unit receives from the storage unit
It stores up in multiple elevator groups of information and selects at least one elevator group;
Device selecting unit, in multiple lift appliances from included in the elevator group that the group selecting unit is selected
Select at least one lift appliance;
Detection operation indicating unit makes the lift appliance that described device selecting unit is selected carry out for detecting long strip article
Swing detection operation;And
Controlled operation indicating unit detects the pendulum of long strip article in the lift appliance that described device selecting unit is selected
When dynamic, make the multiple lift appliances being included in elevator group identical with the lift appliance for the swing for being detected long strip article
Carry out controlled operation.
2. monitoring system according to claim 1, wherein
The external information that the external information receiving unit receives includes predicted value or the actual measurement for the earthquake degree for indicating multiple regions
The earthquake information of value,
The group selecting unit selection includes to be arranged in the region on the basis of predicted value of earthquake degree or measured value more than value
Lift appliance elevator group.
3. monitoring system according to claim 1, wherein
The external information that the external information receiving unit receives includes the earthquake information of the focus and size that indicate earthquake,
The focus of earthquake and size are got up to be stored in the storage unit with regional interrelation,
The group selecting unit determines the earthquake for including in the earthquake information received with the external information receiving unit
Focus and size associate the region of storage, and selection includes the eleva-tor bank for the lift appliance being arranged in identified region
Group.
4. monitoring system according to claim 1, wherein
The external information that the external information receiving unit receives includes predicted value or the actual measurement for the wind speed for indicating multiple regions
The weather information of value,
The group selecting unit selection includes to be arranged in the region on the basis of predicted value of wind speed or measured value more than value
Lift appliance elevator group.
5. monitoring system according to claim 1, wherein
The external information that the external information receiving unit receives includes the meteorological letter of the measured value for the wind speed for indicating multiple regions
Breath,
The storage unit will be detected the information of the lift appliance of the swing of long strip article and the external information receives list
The external information that member receives gets up to be stored as past information association,
The external information and the storage unit that the group selecting unit is received using the external information receiving unit are deposited
The predicted value of the past information operation wind speed of storage, selection include the region being arranged on the basis of the predicted value calculated more than value
In lift appliance elevator group.
6. monitoring system according to any one of claims 1 to 5, wherein
The monitoring system also has the communication unit communicated with multiple lift appliances,
It is worth above whole elevators in the lift appliance that the communication unit can be communicated on the basis of the lifting travel of car
Device is included at least any one elevator group of the elevator group of storage unit storage information.
7. a kind of monitoring system, which has:
External information receiving unit receives external information;
Storage unit stores the information of multiple lift appliances;
Group setup unit combines the storage unit according to the external information that the external information receiving unit receives
It stores multiple lift appliances of information and sets at least one elevator group;
Device selecting unit is selected in multiple lift appliances from included in the elevator group that the group setup unit is set
Select at least one lift appliance;
Detection operation indicating unit makes the lift appliance that described device selecting unit is selected carry out for detecting long strip article
Swing detection operation;And
Controlled operation indicating unit detects the pendulum of long strip article in the lift appliance that described device selecting unit is selected
When dynamic, make the multiple lift appliances being included in elevator group identical with the lift appliance for the swing for being detected long strip article
Carry out controlled operation.
8. monitoring system according to claim 7, wherein
The external information that the external information receiving unit receives includes predicted value or the actual measurement for the earthquake degree for indicating multiple regions
The earthquake information of value,
The group setup unit sets elevator group according to the predicted value or measured value of earthquake degree.
9. monitoring system according to claim 7, wherein
The external information that the external information receiving unit receives includes the earthquake information of the focus and size that indicate earthquake,
The focus of earthquake and size are got up to be stored in the storage unit with regional interrelation,
The group setup unit determines the earthquake for including in the earthquake information received with the external information receiving unit
Focus and size associate the region of storage, and setting includes the eleva-tor bank for the lift appliance being arranged in identified region
Group.
10. monitoring system according to claim 7, wherein
The external information that the external information receiving unit receives includes predicted value or the actual measurement for the wind speed for indicating multiple regions
The weather information of value,
The group setup unit sets elevator group according to the predicted value or measured value of wind speed.
11. monitoring system according to claim 7, wherein
The external information that the external information receiving unit receives includes the meteorological letter of the measured value for the wind speed for indicating multiple regions
Breath,
The storage unit will be detected the information of the lift appliance of the swing of long strip article and the external information receives list
The external information that member receives gets up to be stored as past information association,
The external information and the storage unit that the group setup unit is received using the external information receiving unit are deposited
The predicted value of the past information operation wind speed of storage sets elevator group according to the predicted value calculated.
12. according to the monitoring system described in any one in claim 7~11, wherein
The monitoring system also has the communication unit communicated with multiple lift appliances,
The storage unit stores in the lift appliance that the communication unit can be communicated on the basis of the lifting travel of car
The information of above whole lift appliances of value.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/082582 WO2017085839A1 (en) | 2015-11-19 | 2015-11-19 | Monitoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108349694A true CN108349694A (en) | 2018-07-31 |
CN108349694B CN108349694B (en) | 2020-07-31 |
Family
ID=58718517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580084519.5A Active CN108349694B (en) | 2015-11-19 | 2015-11-19 | Monitoring system |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP6436245B2 (en) |
CN (1) | CN108349694B (en) |
WO (1) | WO2017085839A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11370639B2 (en) * | 2017-09-20 | 2022-06-28 | Jessica Williams | Emergency elevator evacuation system |
US11649138B2 (en) * | 2020-05-01 | 2023-05-16 | Otis Elevator Company | Elevator system monitoring and control based on hoistway wind speed |
JP7226478B2 (en) * | 2021-06-30 | 2023-02-21 | フジテック株式会社 | DRIVING STATUS DISPLAY SYSTEM, CONTROL METHOD AND PROGRAM |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0986819A (en) * | 1995-09-27 | 1997-03-31 | Hitachi Building Syst Co Ltd | Earthquake control operation device for elevator |
CN1892254A (en) * | 2005-07-05 | 2007-01-10 | 株式会社日立制作所 | Earthquake information supply device |
CN101348205A (en) * | 2007-07-20 | 2009-01-21 | 三菱电机大楼技术服务株式会社 | Control apparatus and refit method of elevator |
JP4840187B2 (en) * | 2007-02-23 | 2011-12-21 | 株式会社日立製作所 | Elevator remote monitoring system |
CN103402900A (en) * | 2011-02-28 | 2013-11-20 | 三菱电机株式会社 | Device for detecting sway of elevator rope |
JP2014105068A (en) * | 2012-11-28 | 2014-06-09 | Mitsubishi Electric Corp | Elevator control system, and elevator control method |
CN104125922A (en) * | 2012-05-22 | 2014-10-29 | 三菱电机株式会社 | Elevator control device |
CN104803248A (en) * | 2014-01-23 | 2015-07-29 | 东芝电梯株式会社 | Elevator control device |
-
2015
- 2015-11-19 CN CN201580084519.5A patent/CN108349694B/en active Active
- 2015-11-19 WO PCT/JP2015/082582 patent/WO2017085839A1/en active Application Filing
- 2015-11-19 JP JP2017551469A patent/JP6436245B2/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0986819A (en) * | 1995-09-27 | 1997-03-31 | Hitachi Building Syst Co Ltd | Earthquake control operation device for elevator |
CN1892254A (en) * | 2005-07-05 | 2007-01-10 | 株式会社日立制作所 | Earthquake information supply device |
JP4840187B2 (en) * | 2007-02-23 | 2011-12-21 | 株式会社日立製作所 | Elevator remote monitoring system |
CN101348205A (en) * | 2007-07-20 | 2009-01-21 | 三菱电机大楼技术服务株式会社 | Control apparatus and refit method of elevator |
CN103402900A (en) * | 2011-02-28 | 2013-11-20 | 三菱电机株式会社 | Device for detecting sway of elevator rope |
CN104125922A (en) * | 2012-05-22 | 2014-10-29 | 三菱电机株式会社 | Elevator control device |
JP2014105068A (en) * | 2012-11-28 | 2014-06-09 | Mitsubishi Electric Corp | Elevator control system, and elevator control method |
CN104803248A (en) * | 2014-01-23 | 2015-07-29 | 东芝电梯株式会社 | Elevator control device |
Also Published As
Publication number | Publication date |
---|---|
JP6436245B2 (en) | 2018-12-12 |
CN108349694B (en) | 2020-07-31 |
JPWO2017085839A1 (en) | 2018-04-26 |
WO2017085839A1 (en) | 2017-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7926620B2 (en) | Elevator control apparatus and control method | |
JP5244965B2 (en) | Elevator operation control for vibration reduction | |
CN101537956B (en) | Earthquake recovery apparatus for elevator | |
CN108349694A (en) | Monitoring system | |
CN107406222B (en) | Elevator device | |
JP2008074536A (en) | Transverse vibration detection device for elevator rope, and control operation device for elevator | |
CN107614408A (en) | Elevator device | |
CN103359568A (en) | Control device for elevator | |
CN104169204B (en) | Elevator device | |
JP5743027B2 (en) | Elevator control device | |
CN103534191B (en) | Lift appliance | |
CN101428721A (en) | Management operation device for elevator | |
CN105073616B (en) | Elevator device | |
CN109863106A (en) | The automatic recovery system of elevator | |
CN108778973A (en) | Elevator device and its control method | |
CN103979378A (en) | Emergency operation device for elevator, and method thereof | |
JP5473375B2 (en) | Earthquake monitoring control system | |
JP5562196B2 (en) | Elevator control command device, elevator device, and elevator system | |
CN107848748B (en) | Elevator long distance monitoring arrangement and long-distance monitor system for elevator | |
JP6648864B1 (en) | Elevator equipment | |
JP2015042583A (en) | Emergency operation control device and emergency operation control method for elevator | |
JP5433748B2 (en) | Elevator operation control for vibration reduction | |
KR101243784B1 (en) | Apparatus and method for controlling elevator operation | |
JP2013103768A (en) | Elevator system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |