earth
cubic metre
station
explosion
earthwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810075468.5A
Other languages
Chinese (zh)
Inventor
朱凡
张国庆
潘普国
仝培培
张晋东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201810075468.5A priority Critical patent/CN108343456A/en
Publication of CN108343456A publication Critical patent/CN108343456A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D13/00Large underground chambers; Methods or apparatus for making them

Abstract

The present invention relates to blasting construction methods in a kind of station of tunneling subway station, including:The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;Each earthwork layer in top cubic metre of earth is excavated using vertical eye explosion successively;On top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis 1.5m ~ 2m;Uppermost earthwork layer in lower part cubic metre of earth is excavated using vertical eye explosion successively using horizontal eye explosion, other cubic metres of earth of layers, completes constructing operation in follow-up station after explosion according to a conventional method.The present invention combines bright, tunneling Technology of Blasting, the explosion of layer and section is carried out and for different location using adaptable blasting method to the earthwork in station, not only ensure that working security but it is time saving and energy saving, substantially increase construction efficiency, effectively control influence of the blast working to finished product structure.The present invention is suitable for rocky stratum, the excavation of the inverse work of station structure, construction period anxiety.

Description

Blasting construction method in a kind of station of tunneling subway station
Technical field
The present invention relates to blasting construction methods in underground engineering technical field more particularly to a kind of tunneling subway station station.
Background technology
After founding of New, with the recovery of economic construction of China, blasting technique is developed rapidly, especially Since 1978, China's economy enters the rapid development stage, and the construction of various infrastructure has driven the fast development of blasting technique.
The Excavation Blasting of subway field rock stratum is generally used for open cut of subway station, running tunnel, tunneling subway It stands due to by inner ring border is arrived at a station and space is restricted, not having to blast working substantially.And rock stratum is applied in traditional Station station Work method has the defects of taking time and effort, waste of resource.Therefore, there is an urgent need in a kind of efficient and safe tunneling subway station station Blasting construction method.
Invention content
Technical problem to be solved by the invention is to provide explosions in a kind of efficient and safe tunneling subway station station Construction method.
To solve the above problems, blasting construction method in a kind of tunneling subway station station of the present invention, including:
The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;
Each earthwork layer in the top cubic metre of earth is excavated using vertical eye explosion successively;
On the top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis 1.5m~2m;
Vertical eye explosion is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in the lower part cubic metre of earth It is excavated, completes constructing operation in follow-up station after explosion according to a conventional method.
Preferably, use the earthwork layer thickness of vertical eye explosion for 2 ~ 2.2m.
Preferably, the top cubic metre of earth is divided into three layers, the lower part cubic metre of earth is divided into two layers.
Preferably, after the completion of plate applies in the agent structure, when its concrete structural strength reaches design strength Carry out the explosion of the lower part cubic metre of earth.
Compared with the prior art, the present invention has the following advantages:
The present invention combines the technology of bright tunneling blast working, is with vertical layered to earthwork progress in the station of tunneling subway station Main, layer and section explosion and for different location using adaptable blasting method(I.e. vertical eye blasting method and horizontal eye Blasting method), not only ensure that working security but it is time saving and energy saving, substantially increase construction efficiency, effectively control blast working Influence to finished product structure.The present invention is suitable for the inverse work of rocky stratum, station structure, the excavation of foundation pit of construction period anxiety is applied Work.
Description of the drawings
Specific embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is top provided in an embodiment of the present invention cubic metre of earth layering explosion situation schematic diagram.
Fig. 2 is lower part provided in an embodiment of the present invention cubic metre of earth layering explosion situation schematic diagram.
In figure:Plate in A-agent structure.
Specific implementation mode
With reference to figure 1 and Fig. 2, an embodiment of the present invention provides blasting construction method in a kind of station of tunneling subway station, tools Body includes the following steps:
(1)The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively.
In specific implementation process, controlled in 2 ~ 2.2m, because drilling rod generally selects using the earthwork layer thickness of vertical eye explosion It is conveniently operated the most with 2m, and a people facilitates hand steered, construction efficiency height.Also, it in top cubic metre of earth delaminating process, to protect It demonstrate,proves its bottom one layer thickness and guarantees to reach 1.5 ~ 2m below its board bottom after the completion of middle plate A is applied, and its maximum is thick Degree should not exceed 2.2m, if exceeding, need top cubic metre of earth being layered again.
In addition, making each layer in top cubic metre of earth as far as possible(The earthwork layer of vertical eye explosion is used in top cubic metre of earth)Thickness It is equal or of substantially equal, in lower part cubic metre of earth in addition to the top each layer(The earthwork of vertical eye explosion is used in lower part cubic metre of earth Layer)Thickness is equal or of substantially equal, in this case facilitates layering while construction efficiency is high and save working sources.
In addition, for quantities, the layer divided is more, and amount is bigger, so as possible in the feelings for meeting above-mentioned condition when layering It is layered less under condition.
Based on above-mentioned layering principle, for example top cubic metre of earth can be divided into tri- layers of S1, S2, S3 from top to bottom, S1 ~ S3 is equal For 2m;Lower part cubic metre of earth is divided into S4, S5 two layers from top to bottom(Structure in figure at S5 is built up after excavating), S4 4m, S5 is 2m.
(2)Each earthwork layer in top cubic metre of earth is excavated using vertical eye explosion successively.
During vertical eye Blasting Excavation, blasting in once-through bout length in 15 ~ 20m, generally by detonator section how much Control;The blast working of multiple paragraphs can be organized daily, and is not interfered between each other.As it can be seen that the more horizontal eye of vertical eye explosion is quick-fried It is broken efficient, therefore vertical eye explosion is selected to the explosion on top cubic metre of earth.
(3)On top cubic metre of earth after the completion of explosion, applies plate A in agent structure and make its board bottom higher than on middle plate lower part cubic metre of earth Surface layer 1.5m ~ 2m.
Middle harden structure construction before, for ensure the underground space stablize, foundation pit be not easy to excavate it is too deep, need to be by top earth excavation To about 1.5 ~ 2m below middle plate A board bottoms, one can be that lower part full framing set up and remove that there are the properly amount of setting up and operations Space, two can protect in plate A do not influenced by lower layer's explosion, play the role of vibration isolation.Wherein, plate A exists in agent structure Support and balanced action are played in standing.
After the completion of plate applies in agent structure, when concrete structural strength reaches design strength, lower part can be carried out The explosion of the earthwork, effectively to avoid middle plate A from being damaged in blasting process.
(4)Vertical eye is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in lower part cubic metre of earth Explosion is excavated, and completes constructing operation in follow-up station after explosion according to a conventional method.
Specifically, the explosion of lower part cubic metre of earth is divided into two separate explosions, and first time S4 uses horizontal eye explosion, second of S5 to use Vertical eye explosion.The reason is that:Middle plate A underlying spaces are smaller, do not have vertical eye operating space, and horizontal eye explosion coverage Small, plate A is segmented and pours in can coordinating, and after reaching design strength paragraph by paragraph, carrying out lower part paragraph by paragraph expires the dismounting of hall frame and blast working, compared with Conducive to the protection of centering plate;Second fast using vertical eye detonation velocity, efficient.
In addition, it is necessary to plate A Explosive Vibrating Velocity monitorings in strictly being carried out during blast working.
Technical solution provided by the present invention is described in detail above.Specific case used herein is to this hair Bright principle and embodiment is expounded, the explanation of above example is only intended to help understand the present invention method and its Core concept.It should be pointed out that for those skilled in the art, in the premise for not departing from the principle of the invention Under, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection of the claims in the present invention In range.

Claims (4)

1. blasting construction method in a kind of station of tunneling subway station, which is characterized in that including:
The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;
Each earthwork layer in the top cubic metre of earth is excavated using vertical eye explosion successively;
On the top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis 1.5m~2m;
Vertical eye explosion is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in the lower part cubic metre of earth It is excavated, completes constructing operation in follow-up station after explosion according to a conventional method.
2. the method as described in claim 1, which is characterized in that use the earthwork layer thickness of vertical eye explosion for 2 ~ 2.2m.
3. the method as described in claim 1, which is characterized in that the top cubic metre of earth is divided into three layers, by the lower part cubic metre of earth It is divided into two layers.
4. the method as described in claim 1, which is characterized in that after the completion of plate applies in the agent structure, wait for its coagulation Soil structure intensity carries out the explosion of the lower part cubic metre of earth when reaching design strength.
CN201810075468.5A 2018-01-26 2018-01-26 Blasting construction method in a kind of station of tunneling subway station Pending CN108343456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810075468.5A CN108343456A (en) 2018-01-26 2018-01-26 Blasting construction method in a kind of station of tunneling subway station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810075468.5A CN108343456A (en) 2018-01-26 2018-01-26 Blasting construction method in a kind of station of tunneling subway station

Publications (1)

Publication Number Publication Date
CN108343456A true CN108343456A (en) 2018-07-31

Family

ID=62961607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810075468.5A Pending CN108343456A (en) 2018-01-26 2018-01-26 Blasting construction method in a kind of station of tunneling subway station

Country Status (1)

Country Link
CN (1) CN108343456A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562076A (en) * 2011-12-23 2012-07-11 中铁十九局集团第五工程有限公司 Underground excavation construction technology for large cross-section subway station under geological condition of soft upper layer and hard lower layer
CN102758632A (en) * 2012-07-19 2012-10-31 中铁隧道集团有限公司 Rock stratum double initial support layering method for establishing large-scale underground structure
CN202707075U (en) * 2012-07-23 2013-01-30 中铁一局集团有限公司 Long-span subway station main structure constructed based on column and arch method
CN104180733A (en) * 2014-08-22 2014-12-03 中铁四局集团有限公司 Comprehensive damping method for mixed explosion of hard rock tunnel closely attaching to existing underground building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562076A (en) * 2011-12-23 2012-07-11 中铁十九局集团第五工程有限公司 Underground excavation construction technology for large cross-section subway station under geological condition of soft upper layer and hard lower layer
CN102758632A (en) * 2012-07-19 2012-10-31 中铁隧道集团有限公司 Rock stratum double initial support layering method for establishing large-scale underground structure
CN202707075U (en) * 2012-07-23 2013-01-30 中铁一局集团有限公司 Long-span subway station main structure constructed based on column and arch method
CN104180733A (en) * 2014-08-22 2014-12-03 中铁四局集团有限公司 Comprehensive damping method for mixed explosion of hard rock tunnel closely attaching to existing underground building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
洪开荣等: "大型地下水封洞库修建技术", <中国铁道出版社> *
陈文尹: "分区组合爆破在硬岩暗挖地铁车站中的应用", 《工程爆破》 *

Similar Documents

Publication Publication Date Title
CN104314574B (en) Hard rock tunnel non-blasting digging blocking method and construction method
CN100564802C (en) The method of crushing rock formation in the colliery
CN104806251B (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN102306225B (en) Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel
CN106381868A (en) Water abrasive drilling construction method for manual hole digging pile
CN104564085B (en) Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city
CN111322077A (en) Super-underexcavation control energy-gathering water pressure smooth blasting construction method for slate tunnel
CN107024154A (en) High slope deep hole blasting construction method under a kind of complex environment
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN108301841A (en) The construction of advanced reserved side soil is led in highway large cross-section tunnel
CN106225618A (en) The method split is expanded in a kind of semo-infinite rock mass borehole blasting
CN207934087U (en) A kind of water mill bores the constructing structure of cooperation manually digging hole
CN103967024A (en) United construction method for forming holes and grooves in deep sandy gravel stratum
CN107327306B (en) Construction method for excavating superposed tunnels under urban shallow-buried condition
CN103147778A (en) Method for lane development and support in extremely crushed rock stratum
CN109139020A (en) A kind of underground chamber quiet pop in rock burst area digs branch&#39;s unloading method
CN102155227B (en) Vertical direction continuous mining method and application in whole ore body continuous mining
CN106869939A (en) A kind of water under high pressure splitting shaping and the construction method of drilling and blasting method use in conjunction tunneling
CN202360116U (en) U-shaped shed roadway junction support device
CN109458214A (en) A kind of low air permeability coal seam static blasting permeability-increasing gas pumping method
CN107938652A (en) A kind of embedding lithotype steel cement mixing wall and its construction method
CN108343456A (en) Blasting construction method in a kind of station of tunneling subway station
CN110130321A (en) The processing method of rock in a kind of manual digging pile construction
CN109723450A (en) A kind of combined type TBM set of tunneling construction method
CN109469051A (en) The construction of manual-excavation cast-in-place pile technique in weak-weathered rock or middle weathering formation area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180731