CN108343456A - Blasting construction method in a kind of station of tunneling subway station - Google Patents
Blasting construction method in a kind of station of tunneling subway station Download PDFInfo
- Publication number
- CN108343456A CN108343456A CN201810075468.5A CN201810075468A CN108343456A CN 108343456 A CN108343456 A CN 108343456A CN 201810075468 A CN201810075468 A CN 201810075468A CN 108343456 A CN108343456 A CN 108343456A
- Authority
- CN
- China
- Prior art keywords
- earth
- cubic metre
- station
- explosion
- earthwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D13/00—Large underground chambers; Methods or apparatus for making them
Abstract
The present invention relates to blasting construction methods in a kind of station of tunneling subway station, including:The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;Each earthwork layer in top cubic metre of earth is excavated using vertical eye explosion successively;On top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis 1.5m ~ 2m;Uppermost earthwork layer in lower part cubic metre of earth is excavated using vertical eye explosion successively using horizontal eye explosion, other cubic metres of earth of layers, completes constructing operation in follow-up station after explosion according to a conventional method.The present invention combines bright, tunneling Technology of Blasting, the explosion of layer and section is carried out and for different location using adaptable blasting method to the earthwork in station, not only ensure that working security but it is time saving and energy saving, substantially increase construction efficiency, effectively control influence of the blast working to finished product structure.The present invention is suitable for rocky stratum, the excavation of the inverse work of station structure, construction period anxiety.
Description
Technical field
The present invention relates to blasting construction methods in underground engineering technical field more particularly to a kind of tunneling subway station station.
Background technology
After founding of New, with the recovery of economic construction of China, blasting technique is developed rapidly, especially
Since 1978, China's economy enters the rapid development stage, and the construction of various infrastructure has driven the fast development of blasting technique.
The Excavation Blasting of subway field rock stratum is generally used for open cut of subway station, running tunnel, tunneling subway
It stands due to by inner ring border is arrived at a station and space is restricted, not having to blast working substantially.And rock stratum is applied in traditional Station station
Work method has the defects of taking time and effort, waste of resource.Therefore, there is an urgent need in a kind of efficient and safe tunneling subway station station
Blasting construction method.
Invention content
Technical problem to be solved by the invention is to provide explosions in a kind of efficient and safe tunneling subway station station
Construction method.
To solve the above problems, blasting construction method in a kind of tunneling subway station station of the present invention, including:
The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;
Each earthwork layer in the top cubic metre of earth is excavated using vertical eye explosion successively;
On the top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis
1.5m~2m;
Vertical eye explosion is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in the lower part cubic metre of earth
It is excavated, completes constructing operation in follow-up station after explosion according to a conventional method.
Preferably, use the earthwork layer thickness of vertical eye explosion for 2 ~ 2.2m.
Preferably, the top cubic metre of earth is divided into three layers, the lower part cubic metre of earth is divided into two layers.
Preferably, after the completion of plate applies in the agent structure, when its concrete structural strength reaches design strength
Carry out the explosion of the lower part cubic metre of earth.
Compared with the prior art, the present invention has the following advantages:
The present invention combines the technology of bright tunneling blast working, is with vertical layered to earthwork progress in the station of tunneling subway station
Main, layer and section explosion and for different location using adaptable blasting method(I.e. vertical eye blasting method and horizontal eye
Blasting method), not only ensure that working security but it is time saving and energy saving, substantially increase construction efficiency, effectively control blast working
Influence to finished product structure.The present invention is suitable for the inverse work of rocky stratum, station structure, the excavation of foundation pit of construction period anxiety is applied
Work.
Description of the drawings
Specific embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is top provided in an embodiment of the present invention cubic metre of earth layering explosion situation schematic diagram.
Fig. 2 is lower part provided in an embodiment of the present invention cubic metre of earth layering explosion situation schematic diagram.
In figure:Plate in A-agent structure.
Specific implementation mode
With reference to figure 1 and Fig. 2, an embodiment of the present invention provides blasting construction method in a kind of station of tunneling subway station, tools
Body includes the following steps:
(1)The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively.
In specific implementation process, controlled in 2 ~ 2.2m, because drilling rod generally selects using the earthwork layer thickness of vertical eye explosion
It is conveniently operated the most with 2m, and a people facilitates hand steered, construction efficiency height.Also, it in top cubic metre of earth delaminating process, to protect
It demonstrate,proves its bottom one layer thickness and guarantees to reach 1.5 ~ 2m below its board bottom after the completion of middle plate A is applied, and its maximum is thick
Degree should not exceed 2.2m, if exceeding, need top cubic metre of earth being layered again.
In addition, making each layer in top cubic metre of earth as far as possible(The earthwork layer of vertical eye explosion is used in top cubic metre of earth)Thickness
It is equal or of substantially equal, in lower part cubic metre of earth in addition to the top each layer(The earthwork of vertical eye explosion is used in lower part cubic metre of earth
Layer)Thickness is equal or of substantially equal, in this case facilitates layering while construction efficiency is high and save working sources.
In addition, for quantities, the layer divided is more, and amount is bigger, so as possible in the feelings for meeting above-mentioned condition when layering
It is layered less under condition.
Based on above-mentioned layering principle, for example top cubic metre of earth can be divided into tri- layers of S1, S2, S3 from top to bottom, S1 ~ S3 is equal
For 2m;Lower part cubic metre of earth is divided into S4, S5 two layers from top to bottom(Structure in figure at S5 is built up after excavating), S4 4m,
S5 is 2m.
(2)Each earthwork layer in top cubic metre of earth is excavated using vertical eye explosion successively.
During vertical eye Blasting Excavation, blasting in once-through bout length in 15 ~ 20m, generally by detonator section how much
Control;The blast working of multiple paragraphs can be organized daily, and is not interfered between each other.As it can be seen that the more horizontal eye of vertical eye explosion is quick-fried
It is broken efficient, therefore vertical eye explosion is selected to the explosion on top cubic metre of earth.
(3)On top cubic metre of earth after the completion of explosion, applies plate A in agent structure and make its board bottom higher than on middle plate lower part cubic metre of earth
Surface layer 1.5m ~ 2m.
Middle harden structure construction before, for ensure the underground space stablize, foundation pit be not easy to excavate it is too deep, need to be by top earth excavation
To about 1.5 ~ 2m below middle plate A board bottoms, one can be that lower part full framing set up and remove that there are the properly amount of setting up and operations
Space, two can protect in plate A do not influenced by lower layer's explosion, play the role of vibration isolation.Wherein, plate A exists in agent structure
Support and balanced action are played in standing.
After the completion of plate applies in agent structure, when concrete structural strength reaches design strength, lower part can be carried out
The explosion of the earthwork, effectively to avoid middle plate A from being damaged in blasting process.
(4)Vertical eye is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in lower part cubic metre of earth
Explosion is excavated, and completes constructing operation in follow-up station after explosion according to a conventional method.
Specifically, the explosion of lower part cubic metre of earth is divided into two separate explosions, and first time S4 uses horizontal eye explosion, second of S5 to use
Vertical eye explosion.The reason is that:Middle plate A underlying spaces are smaller, do not have vertical eye operating space, and horizontal eye explosion coverage
Small, plate A is segmented and pours in can coordinating, and after reaching design strength paragraph by paragraph, carrying out lower part paragraph by paragraph expires the dismounting of hall frame and blast working, compared with
Conducive to the protection of centering plate;Second fast using vertical eye detonation velocity, efficient.
In addition, it is necessary to plate A Explosive Vibrating Velocity monitorings in strictly being carried out during blast working.
Technical solution provided by the present invention is described in detail above.Specific case used herein is to this hair
Bright principle and embodiment is expounded, the explanation of above example is only intended to help understand the present invention method and its
Core concept.It should be pointed out that for those skilled in the art, in the premise for not departing from the principle of the invention
Under, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection of the claims in the present invention
In range.
Claims (4)
1. blasting construction method in a kind of station of tunneling subway station, which is characterized in that including:
The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;
Each earthwork layer in the top cubic metre of earth is excavated using vertical eye explosion successively;
On the top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis
1.5m~2m;
Vertical eye explosion is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in the lower part cubic metre of earth
It is excavated, completes constructing operation in follow-up station after explosion according to a conventional method.
2. the method as described in claim 1, which is characterized in that use the earthwork layer thickness of vertical eye explosion for 2 ~ 2.2m.
3. the method as described in claim 1, which is characterized in that the top cubic metre of earth is divided into three layers, by the lower part cubic metre of earth
It is divided into two layers.
4. the method as described in claim 1, which is characterized in that after the completion of plate applies in the agent structure, wait for its coagulation
Soil structure intensity carries out the explosion of the lower part cubic metre of earth when reaching design strength.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810075468.5A CN108343456A (en) | 2018-01-26 | 2018-01-26 | Blasting construction method in a kind of station of tunneling subway station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810075468.5A CN108343456A (en) | 2018-01-26 | 2018-01-26 | Blasting construction method in a kind of station of tunneling subway station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108343456A true CN108343456A (en) | 2018-07-31 |
Family
ID=62961607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810075468.5A Pending CN108343456A (en) | 2018-01-26 | 2018-01-26 | Blasting construction method in a kind of station of tunneling subway station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108343456A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102562076A (en) * | 2011-12-23 | 2012-07-11 | 中铁十九局集团第五工程有限公司 | Underground excavation construction technology for large cross-section subway station under geological condition of soft upper layer and hard lower layer |
CN102758632A (en) * | 2012-07-19 | 2012-10-31 | 中铁隧道集团有限公司 | Rock stratum double initial support layering method for establishing large-scale underground structure |
CN202707075U (en) * | 2012-07-23 | 2013-01-30 | 中铁一局集团有限公司 | Long-span subway station main structure constructed based on column and arch method |
CN104180733A (en) * | 2014-08-22 | 2014-12-03 | 中铁四局集团有限公司 | Comprehensive damping method for mixed explosion of hard rock tunnel closely attaching to existing underground building |
-
2018
- 2018-01-26 CN CN201810075468.5A patent/CN108343456A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102562076A (en) * | 2011-12-23 | 2012-07-11 | 中铁十九局集团第五工程有限公司 | Underground excavation construction technology for large cross-section subway station under geological condition of soft upper layer and hard lower layer |
CN102758632A (en) * | 2012-07-19 | 2012-10-31 | 中铁隧道集团有限公司 | Rock stratum double initial support layering method for establishing large-scale underground structure |
CN202707075U (en) * | 2012-07-23 | 2013-01-30 | 中铁一局集团有限公司 | Long-span subway station main structure constructed based on column and arch method |
CN104180733A (en) * | 2014-08-22 | 2014-12-03 | 中铁四局集团有限公司 | Comprehensive damping method for mixed explosion of hard rock tunnel closely attaching to existing underground building |
Non-Patent Citations (2)
Title |
---|
洪开荣等: "大型地下水封洞库修建技术", <中国铁道出版社> * |
陈文尹: "分区组合爆破在硬岩暗挖地铁车站中的应用", 《工程爆破》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104314574B (en) | Hard rock tunnel non-blasting digging blocking method and construction method | |
CN100564802C (en) | The method of crushing rock formation in the colliery | |
CN104806251B (en) | Subsidiary inverted excavation construction method for urban subway station under complex environment | |
CN102306225B (en) | Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel | |
CN106381868A (en) | Water abrasive drilling construction method for manual hole digging pile | |
CN104564085B (en) | Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city | |
CN111322077A (en) | Super-underexcavation control energy-gathering water pressure smooth blasting construction method for slate tunnel | |
CN107024154A (en) | High slope deep hole blasting construction method under a kind of complex environment | |
CN102653945A (en) | Foundation reinforcing and replacing structure and construction method thereof | |
CN108301841A (en) | The construction of advanced reserved side soil is led in highway large cross-section tunnel | |
CN106225618A (en) | The method split is expanded in a kind of semo-infinite rock mass borehole blasting | |
CN207934087U (en) | A kind of water mill bores the constructing structure of cooperation manually digging hole | |
CN103967024A (en) | United construction method for forming holes and grooves in deep sandy gravel stratum | |
CN107327306B (en) | Construction method for excavating superposed tunnels under urban shallow-buried condition | |
CN103147778A (en) | Method for lane development and support in extremely crushed rock stratum | |
CN109139020A (en) | A kind of underground chamber quiet pop in rock burst area digs branch's unloading method | |
CN102155227B (en) | Vertical direction continuous mining method and application in whole ore body continuous mining | |
CN106869939A (en) | A kind of water under high pressure splitting shaping and the construction method of drilling and blasting method use in conjunction tunneling | |
CN202360116U (en) | U-shaped shed roadway junction support device | |
CN109458214A (en) | A kind of low air permeability coal seam static blasting permeability-increasing gas pumping method | |
CN107938652A (en) | A kind of embedding lithotype steel cement mixing wall and its construction method | |
CN108343456A (en) | Blasting construction method in a kind of station of tunneling subway station | |
CN110130321A (en) | The processing method of rock in a kind of manual digging pile construction | |
CN109723450A (en) | A kind of combined type TBM set of tunneling construction method | |
CN109469051A (en) | The construction of manual-excavation cast-in-place pile technique in weak-weathered rock or middle weathering formation area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180731 |
|
RJ01 | Rejection of invention patent application after publication |